Loading...
HomeMy WebLinkAboutRES 1357 RESOLUTION NO. 1357 WHEREAS the City of Renton has heretofore adopted a Comprehensive Street Program for the then ensuing six years pursuant to Chapter 19544 the 1961 Session Laws which program has heretofore been amended from time to time and WHEREAS the aforesaid statute requires the City bi-annually thereafter to review the work accomplished under said six year program and to determine current City needs and adopt any revision or extension of such Comprehensive Street Program, and WHEREAS the City Engineer has heretofore prepared and submitted to the City Council for its due consideration such amendments, revisions and modifications and WHEREAS a public hearing having been held thereon on or about December 20, 1965, after due notice as required by law, and the Planning Commission having likewise approved such revisions and additions to said six year plan, and WHEREAS no written or oral objections to the amendments or modifications of said Comprehensive Plan having been made at said public hearing; NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON AS FOLLOWS: Section 1: The aforesaid recitals and facts are hereby found to be true and correct in all respects. The City's Comprehensive Street Program for the enusing six years is, as amended, including the City's arterial street program, as heretofore adopted, be and the same are hereby amended and modified as set forth in the attached Exhibit, labeled Exhibit "A" which is incorporated herein and made a part hereof as if fully set forth. All of said amendments, revisions and modifications on the attached Plan are properly marked by an asterisk to evidence such changes. Section 2: The City Clerk and the City Engineer are hereby authorized and directed to file said bi-annual amendment and revision with the Director of Highways for the State of Washington, together with a certified copy of this Resolution, including ExHbit "AY thereof. PASSED BY THE CITY COUNCIL this 24th day of January, 1966. Helmie Nelson, City Clerk APPROVED BY THE MAYOR this 24th day of January, 1966. �� --, < Donald W. Custer, Mayor Approved as to Form: Gerard M. Shellan, City Attorney SIX YEAR STREET PROGRAM RESOLUTION NO. 1120 CITY OF RENTON, WASHINGTON PASSED BY THE CITY COUNCIL Dec. 12,0 1961 RESOLUTION N0. 1120 Dec, 12, 1962 • EXHIBIT "A" AMENDED BY RESOLUTION a_Jan, 28, 1963 AMENDED BY RESOLUTION _l212 Nov. 14, 1963 AMENDED BY RESOLUTION 1357 Jan. 24, 1966 I. MAJOR ARTERIALS PROJECT LOCATION TYPE OF IMPROVEMENT ESTIMATED COST * Ci) lith Avenue North to Park Street Widening m Curbs and Gutters $503000 "M" Street to 132nd S.E. Paving, Right-of-Way 70,000 On Ramp from Sunset Blvd. East Storm Sewers, Traffic Control & Structure 200,000 :: (2) 3rd Avenue North Surfacing, Curbs & Gutters, Right-of-4.v 805000 Storm Sewers & Traffic Control * (3) Airport Way Rainier Avenue to Logan Street Curb & Gutter, Sidewalk and Paving 20,000 ,. (4) Grady Way Resurfacing, Curb & Gutters, Storm Sewers Main Street to Rainier Avenue and Traffic Control 80,000 • (5) 3rd Avenue Shattuck Street to Rainier Avenue Curb & Gutter, Sidewalks, Paving, Storm Sewers and Traffic Control 30,000 ,: (6) Park Street Bronson Way to 8th Avenue North Resurface, Storm Sewers, Curb & Gutter & Traffic Control 75,000 • (7) Main Street Grady Way to Bronson Way Resurface, Storm Sewers 42,000 :, (8) Main Street Widening-Curbs & Gutters, Paving, Right-of- Main Street to Mill Street Transition Way Storm Sewers & Traffic Control 150,000 :: Indicates Revision in Revised Program -I. MAJOR ARTERIALS (Continued) Exhibit "A" PROJECT LOCATION TYPE OF IMPROVEMENT ESTIMATED COST • * (9) Puget Drive Benson Highway to Pipe Line Right-of-Way Widening, Curbs & Gutters, Storm Sewers $ 150,000 and Traffic Control * (10) Renton Avenue Structure, Right-ofWay, Paving, Storm 350,000 Grade Separation at Rainier Drainage and Traffic Control * (11) Logan-Smithers Street Widening, Right-of-Way Grady Way to 6th Avenue North Structures, Curbs & Gutters, Paving 850,000 and Interchange at Grady Way Storm Sewers, & Traffic Control 545,000 • (12) 6th Avenue North Widening, Right-of-Way, Curbs and Gutters 50,000 Logan Street to Park Street Paving, Storm Sewers & Traffic Control • (13) 2nd Avenue Widening, Right-of Way, Curbs & Gutters 800,000 Main St. to Sunset Blvd. West Paving, Storm Sewers & Traffic Control (2 Way Operation) * (1 ) Bronson Way and Houser Way to Widening Right-of-Way, Widening Bronson Main Street Bronson Way North Way Bridge, Storm Sewers & Traffic 250,000 Control TOTAL COST ESTIMATE MAJOR ARTERIALS $3,792,000.00 • II. SECONDARY ARTERIALS S Exhibit "A PROJECT LOCATION TYPE OF IMPROVEMENT ESTIMATED COST (1) "M" Street- 4th Avenue North to 12th Aveune North Curb and Gutter, Sidewalks, Paving $126„500.00 and Storm Sewers (2) 12th Avenue North-112th S.E.• to "M" Street Curb.and Gutter, Sidewalks, Paving 95,500.00 Storm Sewers and Traffic Control (3) 116th Avenue S.E. -Sunset to S.E. 96th Street Curb and Gutter, Sidewalks, Paving 126,000.00 and.Storm Sewers (4) 112th Avenue S.E. -Sunset to S.E. 97th Street Curb and Gutter, Sidewalks, Paving, and Storm Sewers 145,000.00 (5) 7th Avenue-Grady Way to Rainier Avenue Sidewalks, Storm Sewers and Traffic 209000.00 Control (6) 90th Avenue South Renton Avenue to 88th Place South Curb and Gutter, Sidewalks, Paving, 31,500.00 and Storm Sewers (7) 88th Place South-90th Avenue South to South 122nd St. Curb and Gutter, Sidewalks, Paving, 32,000.00 and Storm Sewers TI, SECONDARY ARTERIALS o ( Continued-Page 2) Exhibit "A" PROJECT LOCATION TYPE OF IMPROVEMENT ESTIMATED COST (8) Garden Street nth Avenue North to 8th Avenue North Widening, Curb and Gutter, Sidewalks, $709000,00 Paving and Storm Sewers (9) 100th Avenue S.E.-Park Street to S.E. 94th Street Curb and Gutters, Sidewalks, Paving, 280500,00 and Storm Sewers (1.0) S.E. 94th Street-100th Avenue S.E. to City Limits Curb and Gutters, Sidewalks; Paving , 249000.00 and Storm Sewers (11) Langston Avenue-Sunset to City Limits Curb and Gutters, Sidewalks, Paving 47:500,00 and Storm Sewers it: (12) South 153rd East Valley to West Valley Highway Widening, Structure 480,000,00 Right-of-Way TOTAL COST ESTIMATE SECONDARY ARTERIALS $1,226,500.00 µii -