RESOLUTION N4. 619
VVIiEREAS application has besn made by Matt Malaspina,
contractor, on Unit �1, ':rrash. 45-175 N, for an egtension of tim�
same
and �has o�e±z �ubmitted to the Council and
V"�REAS, aPter carePul consideration it has been decided
by the Council that the extension of time requested should be
, granted.
NO�N 'Th'ER�'FORE BE IT R�SOLVED by the cz� courrczz o� �
CITY OF R�NTON, as follows:
\�:_.
�'hat the time of the completion of the contract for
�
, Unit �1� ��ash. 45-175 N, with Ntatt R�alaspina be egtended from
' , .
December 29, 1942 to February 4, 1943, an additional thirty-
seven (37� calendar da3rs and that the liquidated dam�ges for
that period of ti.me be waived.
B�' IT Ft7RTI�R RESOLVED That this granting of extension
of time was made after careful consideration of supporting
data presented by the contractor and the recommendation of the
consulting engineer oP the City.
BE IT �'tTRTFiER RES�LVED that the Citf Covncil of the
City of Renton ask the �ederal ¢�orks Agency to concur in the
grantin� of this extension of time.
Passed. and approved by the City Council of the City
of Renton this the 6th day of Jun.e 1944.
���
�4�ayor
Attest: -�
City Clerk