Loading...
HomeMy WebLinkAbout02849 - Technical Information Report i , ���� ,� • SDLiCND EN�INEERING, INC. - ci��il engineers•land planners STORM DRAINAGE AND EROSION CONTROL REPORT F � R THE BORGATA APARTMENT �. HOMES SEPTEMBER 1 ��9 REVISED FEBRUARY ZOOO , .., �A,�`��.__,��,ti I � PREPARED FOR: R�����'�� SEB, I1�C. FEB 2 1 2000 � 240 STADIUM WAY SOUTH g�J;�n�NG D11�i�lON ' T�coMl�, WA 98402 (253) 428-0800 ' � PREPARED BY: TIMOTHY D, HOLDERMAN, P.E., PRINCIPAL , SOUND ENGINEERING, INC. II'�, 1019 P�CIFIC AvENUE, SUITE 906 ��, T��co:��, WA 98402 ' (253) 573-0040 � T�n n�[,(-'r (1(1� �1 �(1 T� �rr��,� � � : 1111 t--'Z..d �� . STORM DRAINAGE AND EROSION CONTROL REPORT � FOR ' The Borgata Apartment Homes Renton, Washington September 1999 Revised February 2000 Prepared for: ;�.t D• NO�Q , �O�� oF W � F�` ;� e. ��, , ,:� �`,�?r ,� Steve Berg and Eric Blitz F�r1``•,� r'• z SEB, Inc. - / � 240 Stadium Way South A ��748 � Tacoma, WA 98402 � Rfrf���'� ���'� ��S�ONAL EN��, IXr"IRES 1�/23/Qr Prepared by: Timothy D. Holderman, P.E., Principal - REPORT #99121.10 This analysis is based on data and records either supplied to, or obtained by, Sound Engineering, I Inc. These documents are referenced within the text of the analysis. This analysis has been prepared utilizing procedures and practices within the standard accepted practices of the industry. SOUND ENGINEERING, Il�'C. '�1:;991211STORM REPORT.02.09.00.doc TABLE OF CONTENTS PAGE 1.0 PROJECT OVERVIEW.......................................................................................................................1 l.l PURPOSE AND SCOPE.....................................................................................................................1 II 1.2 PREDEVELOPEDCOND[TIONS........................................................................................................1 � 1.3 POST-DEVELOPMENT CONDITIONS...............................................................................................2 2.0 PRELIMINARY CONDITIONS............................................................................................................2 3.0 OFF-SITE ANALYSIS.........................................................................................................................3 4.0 FLOW CONTROL& WATER QUALITY FACILII'Y ANALYSIS AND DESIGN...................................3 ', 4.1 EXISTING SI"i'E HYDROLOGY.........................................................................................................3 I� 4.2 DEVELOPED SITE HYDROLOGY.........................................................••••........................................4 I 4.3 PERFOR;�tANCE STANDARDS..........................................................................................................4 ' 4.4 FLOW CONTROL SYSTEM ..............................................................................................................4 4.5 WATER QUAI.ITY SYSTE�t......................................................................................•••••..................5 �.0 CO�iVEYANCE SYSTE�i ANALYSIS AND DESIGN............................................................................5 6.0 SPECIAL REPORTS AND STUDIES....................................................................................................5 7.0 BASL�1 AND COhIMUNI'I'1'PLANNING AREAS..................................................................................� 8.0 OTFIER PER'�tITS..............................................................................................................................� 9.0 TESC ANALYSIS AND DESIG�1........................................................................................................6 9.1 UVTRODUCTION....................................................••••••••••................................................................6 9.2 DESIGN CONSIDERATIONS.....................................•••...•••...............................................................6 9.3 DES[GN..........................................................................................................................................7 ' 10.0 BOTiD QtiAtiTITIES,F:�CILITY SL�1'IMARIES AND DECLARr1TION OF COVENANT........................7 10.1 BOtVD QUANTITY SHEETS..............................................................................................................7 10.2 FLOW CONTROL r��ID WATER QUAL.ITY FACILITY SUMMARY SHEET AND SKETCH.....................7 103 DECLARAT[ON OF COVENANT.............................•••••...................................................................._8 i 11.0 1�I�►INTENANCE AND OPERATIONS MANUAL..................................................................................8 I AppendixA Vicinity Map A-1 USDA Soil Map A-2 USDA Soil Description A-3 USGS Topob aphic Map A-4 ' Appendix B Geotechnical Report B-1 I Appendix C Basin Summary G1 , CN Calculations C-3 !, Runoff Curve Numbers C-4 Basin Map GS M:1991211STORM REPORT.02.09.00.doc r�ppe�zdix C (Contint�ec�i Isopluvial Charts C-7 Correction Factor to Pond Volume C-]0 Detention Pond Sizing C-1 1 Bioswale Sizing G 1� Equivalent Area Calculations C-1�� Capacity Calculations C-1 l , Sediment Pond Sizing Calculations C-1�� Appendix D Maintenance and Operations Manual D-l Retention/Detention Summarv Sheet D-ll) I��cl�ir:i[i��n ;�f C�����n,int D-1� i f __� ,., . ,� .,. i� 1." ,=� , , M:199121\STORM REPORT.02.09.00.doc 1.O PROJECT OVERVIEW 1.1 Purpose and Scope This report accompanies the Preliminary Grading and Storm Drainage Plan for the proposed project as submitted to City of Renton. This document provides site information and the analysis used for the preliminary storm drainage design. The City of Renton Municipal Code, Section 4-6-030, the King County Surface Water Design Manual, January 1990 have partially established the methodology and design criteria used for this project. Because the project will require an HPA permit, the Department of Ecology Stormwater�'Llanagement ll�lanual for the Puget Sound Basin has been utilized for water quality treatment and stormwater detention sizing. 1.2 Predeveloped Conditions The existing site consists of a rectangular parcel totaling approximately 8.12± acres. The site is located east of Talbott Road South just north of S. SSth Street, within the City of Renton. (See Appendix `A' for Vicinity Map.). From the proposed developed eastern portion of the propeny, the site slopes to the west at approximately 15%. A single-family house currently located on the lower northwest portion of the site. Short grass, brush, scattered conifer trees, and a couple of small out buildings make up existing ground cover on the site. - The existing site consists of a rectangular parcel totaling approximately 8.12± acres. The ' site is located east of Talbott Road South just north of S. SSth Street, within the City of Renton (See Appendix `A' for Vicinity Map). From the proposed developed eastern �' � � " ' 1 portion of the property, the site slopes to the west at approximately 15°l0. A single-family house cunently located on the lower northwest portion of the site. Short grass, brush, scattered conifer trees, and a couple of small out buildings make up existing ground cover on the site. 1.3 Post-Development Conditions . ��`�% �I• The proposed project consists of the construction of 82 apartment units, parking, landscaping, recreational building and access roads. Approximately 5.16± acres of the overall site will be disturbed. Approximately 2.96± acres of the easterly portion will remain undisturbed due to steep slopes. An additional 0.75± acres will remain as buffers for a Type IV stream located within the undisturbed central portion of the site. There are two proposed paved accesses that will connect to Talbott Road South at the western edge of the site. Earthwork volumes are estimated in the 9,000 cubic yard range. The intent of the final grading plan will result in a balanced site. It is anticipated that unsuitable soils encountered durin� construction will be removed from the site. Site �rading will consist of cutting pads for the proposed buildings as well as parking and access road construction. Stormwater runoff from the buildings, traveled areas and landscaping will be routed through an underground detention vault and thru a 14' biofiltration swale located adjacent to Talbott Road South. 2.O PRE�IMiNARY CONDITIONS The conditions and requirements for the parcel have yet to be determined. This parcel falls within its intended zoning (R-14) and does not require any rezoning approval. � � 3.0 OFF-SITE ANALYSIS The project basin flows west to Talbott Road South where storm water from the site will be discharged via controlled release to the existing storm drainage system located within ', Talbott Road South. This storm system crosses under Talbott Road South and flows west to where it discharges to a Type N stream. Due to downstream drainage problems, the city has required that the proposed storm drainage detention system be designed to detain the 2, 10 and 100 post-developed storm events. The proposed detention system goes one step further by restrictin�the pre-developed runoff rates to 50% of the 2-year, 10-year and 100-year storm events. Consequently, post-developed runoffs will not exceed pre- developed flows up to the 100-year storm event. � This off-site basin delineation was based on a site visit and a field survey. In addition, the , USGS Map for this portion of King County was reviewed, and confirms the basin boundary. 4.O FLOW CONTROL 8c WATER QUALITY FACILITY ANALYSIS AND DESIGN 4.1 Existing Site Hydrology T'he 8.12-acre parcel is positioned along the easterly ridgeline. The soils consist of an I Alderwood soils according to the USDA Soil Conservation Service soils survey of King I �_ County. In addition, a geotechnical consultant also confirmed the soil type and ' characteristics. In May of 1999, twelve (12) test pits were excavated by Geotech i a � � i_ _"' 3 . � � 4 .,f.,,..,,.,r;.,., ,.1 \„ ,,1;•- �T2• .- th.� r.,,�r., l, A.�.-. proposed roof drains will be directed through a separate conveyance line that will flow to the 18" culvert within Talbott Road South, which then flows to the wetlands area to the west. The remaining 4.41 acres of developed site will be detained and released to a water quality treatment swale. A total of .44 acres of the site will be landscaped. The combined CN number for the developed 4.41 acres has been calculated to be 68. Please see Appendix `C' for additional area breakdown information. 4.3 Performance Standards Not applicable at this time. 4.4 Flow Control System The detention system was sized to detain the 2, 10, and 100 post-developed storm events and release at the pre-developed runoff rates equivalent to 50% of the 2 year, 10 year, and 100-year storm events with a correction factor of 1.37 has been utilized as required by the DOE design manual. Hydraulic calculations were performed utilizing the Santa Barbaza Unit Hydrograph Method per City of Renton guidelines. The computer program � 4 ��nenc�i�c `C' �f th� �1.� 1�ater lluality 5ystem Water quality will be addressed by providing a 12' wide biofiltration swale designed per a 1990 King County Surface Water Standards. �°� � 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN r�li lnc; >lUrItlW�llt;r iiOtIl tilc: �rU�JWc:IL Uulllllil�'� �lIl�l a��ti�til ar�u� '���lil Dc: �:iuliVC��c:ll U� .. tightlined conveyance system to the under� / .0 i7HJ1iV i-11VU liUlYl�rIUIVI! T i�L/�(VIVIIVIa HtiCHJ Not Applicable. 8.0 OTHER PERMITS HPA Permit and wetland approval. ! . 5 9.O TESC ANALYSIS AND DESIGN 9.1 Introduction The following discussion is provided to address general erosion control measures for site preparation. 9.2 Design Considerations The proposed �rading of the site, as well as the construction of the items listed below, will mitigate against any major diversion of storm water runoff by maintaining natural draina�e patterns. The structural components of the erosion control plan will work in combination with temporary and permanent soil stabilization effor[s to minimize the level of sediment-laden runoff from leaving the site and enterina the downstream environment. l�feasures taken to control sediment: ■ A planned construction sequence designed to provide for construction of erosion control features. ■ Quarry spall construction entrance to mitigate the introduction of sediment into any off-site storm facilities or adjacent public roadway facilities. ■ Timely stabilization of exposed soils to prevent erosion. ■ Temporary siltation fences as needed. � 6 9.3 Design A quarry spall construction entrance onto Talbott Road South will be provided. Silt fences will be utilized to control runoff velocities and sedimentation at appropriate locations. The creation of airborne dust during construction will also need to be controlled by the contractor. This can be accomplished through the use of watering trucks during construction. All of the features contained within the TESCP, if installed and periodically maintained, are expected to minimize the level of sediment-laden runoff entering any of the public road right-of-ways and adjacent properties. 1 O.O BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION OF COVENANT 10.1 Bond Quantity Sheets Not applicable at this time. 10.2 Flow Control and Water Quality Facility Summary Sheet and Sketch � A Retention/Detention Summary Sheet has been included in Appendix `D'. � � 7 10.3 Dectaration of Covenant Il Not applicable at this time. A completed Declaration of Covenant form has been included in Appendix `D' of this repoR for future use. 11.0 MAINTENANCE AND OPERATIONS MANUAL A Maintenance and Operations Manual is included in Appendix `D' of this report. i : :�� � � 8 APPENDIX A VicinityMap......................................................................................................A-1 USDASoil Map.................................................................................................A-2 USDASoil Description.....................................................................................A-3 USGSTopographic Map ...................................................................................A-4 � � 1019 Pacific Avenue.Suite 906 The BorQata Apartment Homes OIIND Tacoma.WA 98402 a Bus: (253) 573-0040 NGINEERING� Ir�C. Fax: f253) 573-0142 Vicinity Map cr:i�Er�cwEEas�vNo a�.aNNeas sound�soundenginc.com N hoc co sca►e � , .. ` , �'�`�... � ---_- - _ - -- _ - _ Slte ; ! i ' n:.t ,.: . � �: `z: I . . �� � cT�, : E:�182� 'i: ST. J �I i w g S <', �y ti- . w'� x � ��`� ` ^� W �i � �'t �' . � j�, N �vJ, �l� •» in :� .ix , :o t�`'L'--j m. . l ��y c i�;;tt _ ! • I �t � SE 18411���I f � .;i � �E ' � - - � ��; � JQ' � �-- SF....._ _ �TM-1-=T_. SE i8ti'H (L '— ��eery�'�'� 'e _ � --- - —}BCr�+-+' . } � Q S 9„^ �l � yV __ i t oe�� :� ��,illtr 'N SE�-- 188lH � � � 's -•r � ° . 4 NMII g�M�e �Q{ 2� Qr �". S `a,I.M i7 �'� � � ��� � ..: y(� � C a_. ��f ._ .. . � ' ,��� _. ` a y . .. x � � C_� _ .. J C . �t � .-�i ' _5�9�N'� 5'. -S— 55TH � 5T r :92t�; �� S? Sc -` ^I"� 192NL .-•ST cn >. . � ����. .. -�;� - ;�11iA0 (�/ ' > i" .. .�ila ��T �! �: .�- ; ': ` . �'C1� ._ J ; ....__ t � -�_$_�--- �___ � f t �� . . . ..�--- > Q �EYE(A� \ s� i Q � PARK `_ .<y i � a'i ��r=. sT ' 1_ sE i � s_ , _ :� � �5,�,. ,' , _ . ,. . ._4v�rH_ ; —='' i98'N ;T ���' � �...,� � '��4�C '� ~ � SE 197TM� fffH ST � " ' - F < �• �. � I.;� t� :� ='r�CK ; � � ,[I�IH S'. � . -.l fl'H i �t x .� . _ - QE IS 2COTI' _ � �E � Z�0'N 5T ,%� �� ��'�� ' . . _ �. 'gF.n . . ;l� `"4 SE`�,� i ' �'J �` . . . '. �i . . 'S.". _ . y, . _ . ... ., ' i � 5 � , - - :J. . ,-t . . �v .'�„ 'I . a'nk ��� r � i '�s .._.`�i �' ST � ._ $��� $T -_ � '� __._.�___ . _ .._ � . . _..�. . ; ' _._.'_ 3.y S �_-.-' ' f. , ! �x �Q� . 1C �, }� S'��x tr 2J3FD i ST x'�i �� $ i$j zt rR y'rr$E TG3RC . �� a: v�, ,Gt c, �� .,.+ p�� �i iAR'F � r*x y.ST �:. � � , � '� 7� i,.,'e' 'f. -1-•-'1-.� t_+-_. ^. . . ... .._._.�__ ` .•�'TTj+ . . � Q S 9114 ���! /� „+F �v n:.ti+�: 0 �, 5 205M�„� � 9 -� {"' �''�I! sTt<'� �`.��t .. .s� -r".. o w \ r `n��'., : . z� �= a ai i S(�h_ai ia � _ �6Tk -'< .i,`..� w'i �T.wtinif. � �F`�� �#�` . � m' `�-. � �� alFy' , . E ' , .. �, .csr � �. _� .. �: -.i .*;_, . . . � z�fSi'1 � 2�%`�4� . �: _1' . . . - �{: ' � . _ ;9n+ "__�s 2cy*H --.. :- ' S= -=.: ?�8'F �T �,-- �,< sT" 3 = - - �� t,. _ - - �ii;tH� ST � � � - ..trnr�� r a ,. x, _ .� __ �� � w ^ - - -. � ... ;..�--*_._.. . . _. ,,� . . ....._ L(M �� y�-. � ����� ot� �� ( 11JiN S1 ,'��H� ��ii--' �E �D'N'�� F:� � 212TH ST S 2��` � "'� sE1 ��'a'ztzTy;��ST � .� .;,. . ,• <_� `= N�� rf�5t17na sr: ���� "t`� ai �" , E a;T 212TN ST ' SE 2F2*N i�� :; �.4 , a � 1�� ,3" - --nt— ��.. : ;��. y-�r� �..� �� � : ,. �� � ��' .�I31N p� n l . �-� � ,............. y.' . � _� a s �$' :�i r�e�M, � . ���a < c. V.,ap. .,� _ n!. - . . ' . '- . . li,l - \4ap by Thomas Brothrn A4ap.��1997 1 1 ___ _ . __ __ _ ___ _ _ _ _ __ _ _ _ -- -_. ; 1019 Pacific Avenue,Suite 906 The Boraata Apartment Homes � OLIND Tacoma.WA 98402 � , Bus: (253) 573-0040 NGINEERING, Inc. Fax: (2531 s�s-o�a2 USDA Soil Conservation Service Soil Map CIVIL ENGINEERS'LAND PLANNERS soundCs'soundenginc.com N ' n�,t�„s�aie ��� ; ��*--:_,, -� ., : ` ,- , � �+: : w �,6 � 3 � � � � . :.� �� ' �� ': A �lli� i � �� � >,...� ..;•` ,�•s— .--'' �:�� �'�: ft� � R=�� � ,� � _ ra ��� . r - '. . ;�' � �� , ,�,` : ; `� -'z �" �; � ;Site ��C ::�' - ',� { '�.. ;:. c: � � ; ,,�;. �� � ' , � +:� - �' a�� i `" rt= ���_, f . . � I�I � '� � '� � �8�t� 1 � � � . r�.�. r - .i 3 ' _� , ,� � �c" + � ' . 1 . � ` VcF� � ;�i�r� •s� � : , r 3.Y� �.v,•• , � � . r_ �" ,.� + �Ya . i i `'`��-. +'••,y � "� ��; .. . r a�� �.,• r` I� "_'_ r__-�� � ,1 t�� - ���� � — a'�. ;.� • � i � ,.i f � i Usi � . } � , �- III '�� � `._ � �,• � SFc� �u'���. . ', � _i.� � ,I � � ____F.,. ' 1 �` . ! � - - �_ � —�:'ly� . :�a'�}s �..t r.'. .� � _�� ?.� � I �ly i =3N i �' I r.. � �..�.,__ _. ..._.. ___ I i � � -� � � � .� ` .��_.__.._ 4�� •�'f,� ��� '��� � ��� � '" '; J :�'.. '.�� i,��;: � � �� '�IA s�a� •����� ��r f�i� �y. �� ��� g � � � � � : � � ��i ; ks �i q �� . Y.. ��'�� r - .� x -.l�: �. � � �r QI� � i � I� ' � U _ '�C, � >� ' _ �± c t •__� < 'j• .`fi � •i'f .� � :''�"�'`.` p �'- .�s ti T• . . � _.1'_ ').` E �s'4 � `�'� � � � ? � � ,4` ' } y.�� I Pk. Lrr . '. i� �= - '� �,.+'��,`' � _ �* �� i � '!.. �i ¢ ��' r �' - l`.. �" tC� s� i �f. . — � i : 'L-• \ I. , Et . '�M ; T ;��.-�- �r� ' ^ • �` _ �----}-- - . � �' �--- � ; � _. . � - �� _� «` �� �� ' �4€� � � '' � � �J .. `'x� 1. :g, � �::�� ,. '� r •�, ;' +�t� ��t�''... � ` ` •,,tf .�_� - i:o � �e �r L � r� J ���. -�f ' :'� � RB - . � -�— , �t .•�*+'•[-'�� = ; t � ''_ � ^'ga �s F� r ' � �` .. s =. �n�r w = : � _ � � �\r �;�� `M'1P �� �� � ( ��-J% t"' +� p.' �'�r �� F� ��; ' r �■� I ��� � �! } ;� _ I - Ca:" s :� Ir,i ■.� � !t � � .�"� �' "y� i _ f-' ' t Y' . t " ��- ; � ;�� �',�� i�-�. i � � *�• � - u� � •�y ,�! A .,p �� � -,�i.f' � '� .. ,� > "s�. -��. . �' .. , � � s i �-�.'-__.... ..+� *' .t v� �,-' "'}'�!. �— ". " . • 0.:Y1C _� `I ��'r ��1 -�"' � '� � s' ^;�,^h � � � �y i �� I i�7 :.._ ,.� �Ur � r � - �"^:? I f � �� `'+„� j �j�pr . �5 � ` �; � 1 .:�s .l� . 1 a�.. �.. I . . V � i � - 4� _ � +4 � y --� .. `� �. Q�l. i-�. + � •(� �i � .•-i-- � i � �, Rh,C � . '�;- :�,� •! ,. ; � # �r'S£�= t� � ;,li�i '�se`'; G j�-' � ' .� 5��� � r� ��� � 1 � ` ,� �� ' - �;`�` - �� � . �i ��' � 3 �'�• 1 4 � 1 + ,.- � � � ., "_"' ' ' ' ' � _- - - , __-�_ ��lap h��CSU,a S��il C�msen��Uon Scn ire�91y?� - - Z 1019 Pacific Avenue,Suite 906 OIIND Tacoma.WA 98402 The Borgata Apartment Homes Bus: (253) 573-0040 NGINEERING, Inc. Fax: f2531 sr,�-o�as USDA Soil Conservation Services Soil Description CIVII ENGINEERS'LANO PUNNERS sound�soundenginc.com Alderwood gravelly sandy loam,6 to 15 percent slopes (AgC) This soil is rolling. Areas are irregular in shape and range from t0 to about 600 acres in size. The A horizon ranges from very dark brown to dark brown. The B horizon is dark brown, grayish brown, and dark yellowish brown. The consolidated C horizon, at a depth of 24 to 40 inches, is mostly grayish brown mottled with yellowish brown. Some layers in the C horizon slake in water. In a few areas, there is a thin, gray or grayish-brown A2 horizon. In most areas, this horizon has been destroyed through log�ing operations. Soils included with this soil in mapping make up no more than 30 percent of the total acreage. Some areas are up to 3 percent poorly drained Norma, Bellingham, Seattle, Tukwila, and Shalcar soils; some are up to 5 percent the very gravelly Everett and Neilton Soils; and some are up to 15 percent Alderwood soils that have slopes more gentle or steeper than 6 to 15 percent. Some areas in Newcastle Hills are 25 percent Beausite soils, some nonheast of Duvall are as much as 25 percent Ovall soils, and some in the vicinity of Dash Point are 10 percent Indianola and Kitsap soils. Also included are small areas of Alderwood soils that have a gravelly loam surface layer and subsoil. Permeability is moderately rapid in the surface layer and s�bsoil and very slow in the substratum. Roots penetrate easily to the consolidated substratum where they tend to mat on the surface. Some roots enter the substratum through cracks. Water moves on top of the substratum in winter. Available water capacity is low. Runoff is slow to medium, and the hazard of erosion is moderate. This soil is used for timber,pasture,berries,row crops, and urban development. Capability unit Ive-2; woodland group 3d1. Alderwood gravelly sandy loam, l�to 30 percent slopes(AgD) Depth to the substratum in this soil varies within shoR distances, but is commonly about 40 inches. Areas are elongated and range from 7 to 250 acres in size. Soils included with this soi�in mapping make up no more than 30 percent if the total acreage. Some areas are up to 25 percent Everett soils that have slopes of 15 to 30 percent, and some areas are up to 2 percent Bellingham,Norma, and Seattle soils, which are in depressions. Some areas, especially on Squak Mountain, in Newcastle Hills, and north if Tiger Mountain, are 25 percent Beausite and Ovall soils. Beausite soils are underlain by sandstone, and Ovall soils by andesite. Runoff is medium, and the erosion hazard is severe.The slippage potential is moderate. This Alderwood soil is used for timber. Some areas on the lower parts of slopes are used for pasture. Capability unit VIe-2; woodland group 3d1. USDA Soil Conservadon Service m1972 .3 tOt9 Pacific Avenue,Suite 906 �e Bor ata A artment Homes OIIND Tacoma.WA 98402 g P Bus: (253) 573-0040 NGINEERING, Inc. Faz: 12531 sr�-0�a2 USGS Topographic Map CIVIL ENGINEERS'UNO PUNNERS sound�soundenginc.com N Not to Scale ' � 2 � � �I�� ��,`f 1'� P � , � . : ,.- i o I n� �� � �� �"'"' , 25 r 30 �" �eM 2 _ : . �„ .` �1`� '� � as .�, '•. ; n � (1 � �. i �e ,:;,` ■; � �l ' � � 1 t� � � �� y�� ;; Q �ii .. � � J� � •. . I \ �' \ , , •(`f\.. � aM �� J) '\e i� :� _ : , _ — _ — — --�- � ... .., ------ — r�. — • , --, -- `: — ;a:} �'- — ; :.� � t� ` :!: ��'- , ... I �, •:a`"�, �„ ��' .� �:;�� � ; �'";. , .�� C ` �' ��• �•• .� '; ,s ; ; � �' � . ��/.��. �' '- -1:,�..::::::n'�'"�:....: ' : �, � :..,.......s,.. , - � ( �� -� �-���. : q ,�K, � t. � i , /-,..� ��i,Y� 9r+r '. , � ' �`:`��� �'�� --� i '� a3'.► , 36 \BM,27 � �� .� � ������ r'�'�: sMP�. 4. � .� � ,. � � � `,� ��:; ' � '� ,� 1�. �� :���;; � � ' /1 ;�: �:i ,�;, `� ^� •, w� �:,'� � � 2=-__ ._�.� _./_. _ � �IJlbl. �,�, �� '� �`�i������{��i �� � �w ���.�� �l� �.�� .� .i ,:.—�- � k .� '';� 1� � \;, \ :�� �� , ' ~�-1����.•l �, � ,� •I•� IE i�� /' •'` �'�? •�570�� a --- �i �' ' �`-� : �.\t I.�1' '� :�. �:... J j w ' �� � .\ � •1�'��. I�I ,t ' �v BH �I.�'� - .�r�wrrs — -------'�----- -�•� � � : . •«.`. ., _� � , u1. ; � � �' : !,`�,1�,�,�=t��� � '` �;�� . ' ', �� � j � � ;.i t ,;, •�� .��' .:c9:: � �; 1` , ��� _ 1 `\'~ - .. `� �� . . ; ` �:.�._: ':-_' :::s � , \� ; � '` � .`^•` -�.- ° � � �.� . .� .-�..�� �� r �- .-�� � , � . � 1 r;�. :�� � r � � \ .� �o �'; .� ��. � �'�.,.-.���� On.\ 1 /. �"t.�: i , •1 �-c1,:'�:.t:'i , � - �� •I+ '' `�._ -p�_ _ �Th ite';\ � �.. ,� �j s ,•• .� • �r. . T"� 1 v� 1�� . :J i :';`I�.:�r��l'11:1, t ti� (`� )� . :�• 'S `.�: .- \ Q,� �,` i , �i � � � � '� •�r� ° a� __ �' • � �\ �I. �� ' '� :_: ��-. � : ' r ��;�' � _ ,� . '�,� � °' ' /�. ��-- . I � I ' �:�; ... ' �,.;;.,:, ..•�' �\ �, � '; L ( r f�t 4 :f�• - � �' ��� �:� ` S�S �� \, ', , � � :.� �. � ' •a •I t�? � 1 i I •�'1� _ �11: r... � ��: �I � ' 'il'I�.:� � :�:..I � 'i . �!i .���.�C +.� i. ��. \ i-:` _ "��BNi. �1,�. 1 � ' ' • ' • . • . • : . 5 ---- ' —�J= '� ' ,� " " •;�� �� ` : ' _ :, ,�� � � __.._�� �� ; �' .j � I� � ..\. .� '�. ' . . , •::: � " o; , � :`�,.':-z � i � \ �•`-•��� •;,\ 1 o� :+::::;x::: � � s I • � (� .' 'Obrien � � � 1 '�'1'� 1 �---. �� '` , A ' , 'i i- � �J���T���.� T� Geotechnical IZeport..........................................................................................I3-1 �� ,� I� i �-, � I � -�� . � i • •� GEOTECHNICAL ENGINEERING STUDY Proposed Multi-Family Devetopment 186xx Talbot Road South King County� Washington This report p�esents the findings and recommendations of our geotechnical engineering study for the site of the proposed multi-family development in King County. The Vcinity Map, Plate 1, illustrates the general location of the site. We were provided with a faxed site plan showing lot lines and the location of the existing house in the northwest corne� of the site. We anticipate that the property will be developed with apartment buildings and that the existing house will be removed or demolished. Detailed plans showing the proposed building locations, existing topography, and final site grading were not available at the time of this report. SITE CONDITIONS Surface The nearly rectangular tract covers 8.3 acres on the east side of Talbot Road South in King County. It has approximately 375 feet of street frontage and an average depth of about 930 feet. The ground surface slopes gently upward to the east for most of the property length. The eastern 100 to 200 feet of the property slopes steeply upward to the east property line. In addition to the existing house located in the northwest corner of the property (18624 Talbot Road South), several concrete structures including a barn, a bathhouse, two pump houses, and possibly a filled-in swimming pool occupy the site. A concrete and rock basement foundation was faund near the middle of the site. Except for the area around the existing house, the property is wooded and overgrown. ' Nearby development consists of the Summit Park Condominiums immediately south of the site, and several houses located to the no�th and east. Subsurface The subsurface conditions were explored by excavating 12 test pits at the approximate locations shown on the Site Exploration Plan, Plate 2. The test pits were excavated on May 14, 1999 with a track-mounted excavator. A geotechnical engineer from our staff observed the excavation p�ocess, logged the test pits, and obtained representative samples of the soil encountered. "Grab" samples of selected subsurface soil were collected from the trackhoe bucket. The Test Pit Logs are attached to this report as Plates 3 through 8. In the southeastern portion of the site, Test Pit 4 encountered about 1 foot of topsoil, and 3.5 feet of gravelly, silty sand overlying stiff, fractured silt. The silt is underlain by dense, slightiy silty sand I extending to an explored depth of 10 feet. Elsewhere, beneath 1 to 1.5 feet of forest duff and topsoil, the native soils consist of inedium-dense, weathered, silty sand with gravel, which became gray and very dense with depth. The very dense silty sands have been glacially consolidated and I GEOTECH CONSULTANTS,INC. �—1 . .. ...., :>:c_.�.�;�:-.�:.,.. _._ . • � • sE6, rncorporared JN ss�as May 25, 1999 Page 2 are �efer�ed to in this report as glacial till. In our explorations, the dense to very dense glacial till was encounte�ed to a maximum explored depth of 12 feet below the existing surface grade. Based on our observations, the portions of the site have likely undergone grading associated with the existing and previous structures. Therefore, some fill and demolitions debris may be encountered. Fill will likely be found in the area of the old swimming pool. The final logs represent our interp�etations of the field logs and laboratory tests. The stratification lines on the logs represent the app�oximate boundaries between soil types at the explo�ation locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions indicated on the test pit logs are interpretive descriptions based on the conditions observed during excavation. The compaction of backfill was not in the scope of our services. Loose soil will therefore be found in the area of the test pits. If this presents a problern, the backfill will need to be removed and replaced with structu�al fill during construction. Groundwater Groundwater seepage was observed at a depth of about 6 feet in Test Pits 7 and 9. Surface water was observed flowing in several small ditches that traverse the site east to west. Water could be heard flowing into and out of a cistern located underneath one of the concrete pump houses. The test pits were left open for only a short time period. Therefore, the seepage levels on the logs represent the location of transient water seepage and may not indicate the static groundwater level. It should be noted that groundwater levels vary seasonally with rainfall and other factors. We anticipate that groundwater could be found near the contact between the weathered upper soils and the underlying glacial till. CONCLUSIONS AND RECOMMENDATIONS General Based on the results of the test pits and the observations made during our site visit, it is our opinion that the proposed multi-family development is feasible from a geotechnical engineering standpoint. The proposed buildings may be supported on conventional foundations bearing on the medium- dense to very dense, na�ive soils. A significant geotechnical consideration for development of this site is the overly moist to wet condition of some of the soils. Based on our observations, and the results of our laboratory tests, the moisture contents of the on-site soils varied from near optimum to as much as 5 to 10 percent above optimum. The fine-grained, soils are sensitive to moisture, which makes them impossible to adequately compact when they have moisture contents more than 2 to 3 percent above their optimum moisture content. The reuse of the overly-moist soils as structural fill to level the site will only be successful during hot, dry weather. Aeration or chemical treatment of each loose lift of soil will be required to dry it before the lift is compacted. This drying will slow the earthwork process. The earthwork contractor must be prepared to rework areas that do not achieve proper compaction due to high moisture content. Utility trench bacfcfill in structural areas, such as pavements, must GEOTECH CONSULTANTS,INC. ��� � , • SEB, Incorporated JN 99189 May 25, 1999 Page 3 also be dried before it can be adequately compacted. Imprope� compaction of backfili in utility - trenches and a�ound control structures is a common reason for pavement distress and failures. Imported granular fill will be needed wherever it is not possible to dry the on-site soils su�ciently befo�e compaction, o� if wet weather earthwork is attempted. Depending on the depth of cuts necessary fo� site g�ading, seepage may be encountered. This is most likely to occur following extended wet weathe�. Temporary dewatering can consist of installing sumps o� rock-lined ditches that are either pumped o� that outfall by gravity. Subsurface interceptor drains will be needed immediately upslope of permanent cuts that expose significant seepage. These drains would consist of gravel-filled trenches excavated at least 12 inches into dense glacial till. A non-woven filter fabric should be draped into the trench before backfilling with gravel. A 4-inch-diameter perforated PVC pipe should be placed approximately 6 inches above the bottom of the trench, with the pipe being sloped to a suitable discharge. Well-constructed footing drains, free-draining wall backfill, and waterproofing are needed to prevent seepage through below-grade walls. Underslab drains should be installed where building excavations encounter heavy seepage. Surface drainage features have been constructed on the site in the past. The grading and drainage plan will need to include provisions for surface runoff entering the site. The erosion control measures needed during the site development will depend heavily on the weather conditions that are encountered. The erosion potential on the site is relatively low due to , the gentle slope of the ground, however, site cfearing will expose a large area of bare soil. We anticipate that a silt fence will be needed around the downslope side of any cleared areas. Rocked construction access roads should be extended into the site to reduce the amount of mud carried off the property by trucfcs and equipment. Following rough grading, it may be necessary to mulch or hydroseed bare areas that will not be immediately covered with landscaping or an impervious surface. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may incfude revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. Conventional Foundatians The proposed structures can be supported on conventional continuous and spread footings bearing on undisturbed, medium-dense to dense, native soil, or on structural fill placed above this competent, soil. See the later sub-section entitled General Earthwork and Structural Fill for recommendations regarding the placement and compaction of structural fill beneath structures. Adequate compaction of structural fill should be verified with frequent density testing during fill placement. We recommend that continuous and individual spread footings have minimum widths of 12 and 16 inches, respectively. They should be bottomed at least 18 inches below the lowest adjacent finish ground surface. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Footing subgrades must be cleaned of GEOTEC}i CONSULTANTS,INC. I-��� � . _ _ _ _ • SEB, lncorporated JN 99189 May 25, 1999 Page 4 loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, this may require removing the disturbed soil by hand. Depending on the final site grades, some overexcavation may be required below the footings to expose competent, native soil. Unless lean concrete is used to fill an overexcavated hole, the overexcavation must be at least as wide at the bottom as the sum of the depth of the ove�excavation and the footing width. For example, an overexcavation extending 2 feet below the bottom of a 3-foot-wide footing must be at least 5 feet wide at the base of the excavation. If lean concrete is used, the overexcavation need only extend 6 inches beyond the edges of the footing. An allowable bearing pressu�e of 2,500 pounds per square foot (psfl is appropriate for footings supported on competent, native soil or properly-compacted structural fill. A one-third increase in this design bearing pressure may be used when considering sho�t-term wind or seismic loads. For the above design criteria, it is anticipated that the total post-construction settlement of footings founded on competent, native soil, or on structural fill up to 5 feet in thickness, will be less than one inch, with differential settlements on the order of one-haff inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latte� condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level structural fill. We recommend using the following design values fo� the foundation's resistance to lateral loading: Parameter Design Value _ Coefficient of Friction 0.40 Passive Earth Pressure 300 pcf Where:(i)pcf is pounds per cubic foot,and(ii)passive earth pressure is computed using the equivalent fluid density. If the ground in front of a foundation is loose or sloping, the passive earth pressure given above will not be appropriate. We recommend a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above design values. Seismic Considerations The site is located within Seismic Zone 3, as iflustrated on Figure No. 16-2 of the 1997 Uniform Building Code (UBC). In accordance with Table 16-J of the 1997 UBC, the soil profile within a depth of 100 feet is best represented by Soil Profile Type S� (very dense soil). The site soils are not susceptible to seismic liquefaction because of their dense nature. GEOTECH CONSULTANTS,INC. � � � � • SEB, Incorporated JN 99189 � May 25, 1999 . Page 5 Slabs-on-Grade The building floo�s may be constructed as slabs-on-g�ade atop firm, stable, native soil or an stcuctural fill. The subgrade soil must be in a firm, non-yielding condition at the time of slab constn.rction or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, impo�ted structural fill. All slabs-on-grade should be underlain by a capillary break or drainage layer consisting of a minimum 4-inch thickness of coarse, free-draining structural fill with a gradation similar to that discussed later in Permanent Foundation and Retaininq Walls. In areas where the passage of moisture through the slab is undesirable, a vapor barrier, such as a 6-mil plastic membrane, should be placed beneath the slab. Additionally, sand should be used in the fine-grading process to reduce damage to the vapor barrier, to provide uniform support under the slab, and to reduce shrinkage cracicing by improving the concrete curing process. Permanent Foundation and Retaining Wa_I_Is Retaining walls backfilled on only one side should be designed to resist the laterai earth pressures imposed by the soil they retain. The following recommended design parameters are for walls that restrain level backfill: Parameter Design Value Active Earth Pressure " 35 pcf ' Passive Earth Pressure 300 pcf Coe�cient of Friction 0.40 Soil Unit Weight 130 pcf Where:(i) pcf is pounds per cubic foot,and(ii)active and passive earth pressures are computed using the equivalent fluid pressures. ' For a restrained wall that cannot deflect at least 0.002 tlmes its height,a uniform lateral pressure equal to 10 pst times the height of the wall should be added to the above active equivalent fluid pressure. The values given above are to be used to design permanent foundation and retaining walls only. The passive pressure given is appropriate for the depth of level structural fill piaced in front of a retaining or foundation wall only. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners in the walls. The design values given above do not include the pffects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfifl in order to provide the appropriate GEOTECH CONSULTANTS,INC. �^� � •� SEB, lncorporated � May 25, 1999 Page 6 design earth pressu�es. The surcha�ge due to traffic loads behind a wali can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed fo� the additional lateral pressures resulting from the equipment. The wall design criteria assume that the backfill will be well-compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand-operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. Retaining Wall Backfill Backfill placed behind retaining or foundation walls should be coarse, free-draining, structural fill containing no o�ganics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. The onsite soils are not free-draining. If the excavated soils are reused as backfill, at least 12 inches of gravel should be placed against the walls. Gravel should be used for the entire width of backfill wh.ere seepage is encountered in the excavation. The purpose of these backfill requirements is to ensure that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relative': impermeable soil or topsoil, or the surface should be paved. The ground surface must alsc slope away from backfilled walls to reduce the potential for surface water to percolate into the backfill. The sub-section entitled General Earthwork and Structural Fill contains recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The performance of any subsurface drainage system will degrade over time. Therefore, moist conditions or some seepage through the walls are not acceptable, waterproofing should be provided. This typically includes limiting cold-joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. Applying a thin coat of asphalt emulsion is not considered waterproofing, but will only help to prevent moisture, generated from water vapor or capillary action, from seeping through the concrete. Rockeries We anticipate that rockeries may be used in the site development. A rockery is not intended to function as an engineered stn,icture to resist lateral earth pressures, as a retaining wall would do. The primary function of a rocfcery is to cover the exposed, excavated surface and thereby retard the erosion process. We recommend limiting rockeries to a height of 8 feet and placing them against only dense, competent, native soil. Loose�soils should be excavated and replaced with quarry spalls. The construction of rockeries is, to a large extent, an art not entirely controllable by engineering methods and standards. It is imperative that rockeries, if used, are constructed with care and in a GEOTECH CONSUITANTS,INC. � � , •\ SEB. Inco�porated JN 99189 May 25, 1999 Page 7 proper manner by an experienced contractor with proven ability in rockery construction. The rockeries should be constructed with hard, sound, durable rock in accordance with accepted local practice. Soft rock, or rock with a significant numbe� of fractures or inclusions, should not be used, in order to limit the amount of maintenance and repair needed over time. Provisions fo� maintenance, such as access to the rockery, should be considered in the design. In gene�al, we recommend that rockeries have a minimum dimension of one-third the height of the slope cut above them. Excavations and Slopes Excavation slopes should not exceed the limits specified in local, state, and nationaf government safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil away from property lines and existing structures, if there are no indications of slope instability. Based upon Washington Administrative Code (WAC) 296, Part N, the soil type at the subject site would be classified as Type B. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an inclination steeper than 1:1 (Horizontal:Vertical), extending continuously between the top and the bottom of a cut. Flatter cuts, excavation sharing, and/or dewatering will be necessary where excavations encounter heavy seepage or caving soils. The above-recommended temporary slope inclination is based on what has been successful at other sites with similar soil conditions. Temporary cuts are those that wifl remain unsupported for a relatively short duration to allow for the construction of foundations, retaining walls, or utilities. The cut slopes should be backfilled or retained as soon as possible to reduce the potential for instability. Please note that loose, wet soils can cave suddenly and without warning. Contractors should be made especially aware of this potential danger. All permanent cuts into native soil should be incfined no steeper than 2:1 (H:V). Fill slopes should not be constructed with an inclination greater than 2:1 (H:V). To reduce the potential for shallow sloughing, fi(I must be compact2d to the face of these slopes. This could be accomplished by overbuilding the compacted fill and then trimming it bacfc to its final incfination. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. Also, all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve the stability of the su�cial layer of soil. Drainaqe Considerations Foundation drains should be installed around the perimeters of the buildings, at the base of all earth-retaining walls, and behind stepped foundation walls. These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then wrapped in non-woven, geotextile fiiter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. Drainage should also_be provided inside the footprint of a structure, where a crawl space will sfope or be lower than the surrounding ground surface or an excavation encounters significant seepage. We can provide recommendations for inte�ior drains, should they become necessary, during excavation and foundation construction. . �1 GEOTECH CONSUITANTS,INC. ' �.} . . . . .. . . . ' SEB, lncorporated JN 99189 May 25, 1999 Page 8 All roof and surface water drains must be kept separate irom the foundation d�ain system. A typical drain detail is attached to this repo�t as Plate 97. For the best long-term performance, perforated PVC pipe is recommended for all subsurface drains. Groundwater and wet soils were observed during our field worlc. Surface water was also observed in shallow ditches across the site. If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, o� by pumping it from sumps interconnected by shallow connecto� trenches at the bottom of the excavation. Building excavations and the site in general should be graded so that surface water is directed off the site and away f�om the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to buildings should slope away at least 2 percent, except where the area is paved. Pavement Areas The pavement section may be supported on competent, nativ� soil or on structural fill compacted to a 95 percent density. Granular structural fill or geotextile fabric may be needed to stabilize soft, wet, or unstable areas. To evaluate pavement subgrade strength, we recommend that a proof roll be completed with a loaded dump truck immediately before paving. In most instances wher� unstable subgrade conditions are encountered, an additional 12 inches of granular structural fill wi; stabifize the subgrade, except for very soft areas where additional fill could be required. ThE subgrade should be evaluated by Geotech Consultants, Inc., after the site is stripped and cut to grade. Recommendations for the compaction of structural fill beneath pavements are given in a later sub-section entitled General Earthwork and Structural Fill. The performance of site pavements is directly related to the strergth and stability of the underlying subgrade. The pavement for lightly-loaded traffic and parking areas should consist of 2 inches of asphalt concrete (AC) over 4 inches of crushed rock base (CRB) or 3 inches of asphalt-treated base (ATB}. We recommend providing heavily-loaded areas with 3 inches of AC over 6 inches of CRB or 4 inches of ATB. Heavily loaded areas are typically main driveways, dumpster sites, or areas with truck traffic. The pavement section recommendations and guidelines presented in this repo�t are based on our experience in the area and on what has been successful in similar situations. As with any pavements, especially thrase underlain by silty soils, some maintenance and repair of limited areas can be expected as the pavement ages. To provide for a design without the need for any repair would be uneccnomical. Generai Earthwork and Structural Fill All building and pavement areas should be stripped of su�face vegetation, topsoil, organic soil, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but they could be used in non-structural areas, such as landscape beds. � 3-8 GEOTECH CONSULTANTS,INC. , . _ _ . ' SEB, Incorporated JN 99189 May 25, 1999 � Page 9 Structu�al fill is defined as any fill placed under a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very impo�tant and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the fift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not compacted to specifications, it can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: :Location af.�: �Minimum . -�_;'. � x::`..., ... �Fill Placement . _ ��rRelative�Compact�on ;�,�- Beneath footings, slabs 95% or walkways Behind retaining walls 90% j 95°/a for upper 12 inches of I Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction Is the ratio, expressed in percentages,of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D 1557-78(Modified Procto�j. Considerations for reuse of the on-site soils as structural fill are discussed in the General section. Structural fill that will be placed in wet weather should consist of an imported, coarse, granular soil j with a silt or clay content of no more than 5 percent. The percentage of particles passing the No. ' 200 sieve should be measured from that po�tion of soil passing the three-quarter-inch sieve. LIMITATIONS The conclusions and recommendations contained in this report are based on site conditions as I they existed at the time of our exploration and assume that the soil and groundwater conditions i� encountered in the tes� pits are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those ' observed in our explorations, we should be advised at once so that we can review these conditions i and reconsider our recommendations where necessary. Unanticipated soil conditions are � commonly encountered on construction sites and cannot be fully anticipated by merely taking soil ; samples in test pits. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making_additional expenditures to attain a properly ; constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. � a_� GEOTECN CONSULTANTS,INC. , � � SEB, Incorporated JN 99189 May 25, 1999 Page 10 This report has been prepared for the exclusive use of SEB, Incorporated, and its representatives, for specific application to this p�oject and site. Our recommendations and conclusions a�e based on observed site materials, and selective laboratory testing and engineering analyses. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our senrices and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the co�tracto�'s methods, techniques, sequences, or procedures, except as specifically desc�ibed in our report for consideration in design. We recommend including this report, in its entirety, in the project contract documents so the contractor may be aware of our findings. ADDITIONAL SERVICES ln addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confi�m that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the � recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or a5ents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. The following plates are attached to complete this report: Plate 1 Vicinity Map Plate 2 Site Exploration Plan Plates 3 - 8 Test Pit Logs Plate 9 Footing Drain Detail . �-/� GEOTECH CONSULTANTS,INC. . . ____ __ � SEB� I�corporated JN 99189 May 25, 1999 � Page 11 We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of fu�ther service, please do not hesitate to contact us. Respectfuily submitted. i GEOTECH CONSULTANTS, INC. G �t. McG ,4, aF wAs,,, lrt, �.,Q' '��' ' M�a�� 'ti �n` c.� 7 � �o fjt� 218a5 Q rv ,��,'`'CIST E�� ,�'�' s,sf�rvni.�•�'� S�zS;� FXP!FES � � Marc R. McGinnis, P.E. Associate DBG/MRM: alt I � ; � �-lj GEOTECH CONSULTANTS,INC. � . �f � ' ; i ►Nr � .. . g.�:.:L_ � � �- ,...,.y. .,.r� ; � ui ' � \ . E ' I .�.�• '�, [l�11 i►�.�. +�7 � RM ;�.�a• 1 T „ I �� � li .� .'�.. ��� ;� �` �, .�`•.� 'F f :� i ��t`"7.�:,,v. � ��� :. ` 1R`'" � r) i�'r� ,. '' '•:; ;� F � pAn ; . •� �•� r s .... ' 11��\: �r r � ���( .� Z.. .�� . • .`\ _. �I � �M��~ v � r �, n,ar. '•/� : t :� •W WY �Krt^YKLW�l 1 r s�nl" �� ` .i, R' �.a..' Y t` ;. �_^ � � � • .i ��w.,,�. l'^;'^ iR.9G• 1� s`�:•A•- •' • ^ � I Nnr.tir �' �. 9 �_ ` "�•�� ��n��� �'s�,.�w� .,a,. Z ,� .. s �,. �•� I ! \ o \ i_ ..� ,. z ' : '� • � O \ r.r7r � S9 � _�p.D`�� i ' f �"� _ I -r'� 2 C. �•r 2' . .:f� } l ��1'°�-�-?�:�- . - S �`�, '� �� ��r�l � \�- J�.--.-_�"?1�.r;'�' �� ��:: ..�.'�,'�.i ��. • ;'.: . . ,':� .•�,:: ti 2;, -. - - = . - s -_,�_`� _ .:�\ -``��e�-.' �P(, :' .. .. S . '�'i,.-�� ; : S - i . ?`" i $� y.. TMr _ . . . ' y � I' ' I . .�~.� r•-. ::��.:�•cr � -f.yrfq_�:_•.`:`;• (r� t�,;. :I..Lonyat'rts: , ; I i;''�"'� \ �� • tN IN� '� ~ � ��.'" �l. e� � �--� �:r �I, .� �, �- - -- .—�„r—t� � �SI • ... �M'�;. - .�� �_��' I� r�Rnrt� , ���.. F , 2 :� ,...., .;,., �,•„�: �, , ; � •, , . , ,: ; ' � s.+�.., :: .•i V Vw�vv "� il•�` i �� �i � aa _ STrnm �ti� •`'w� �.. ''''•'''•''��� 1j M ; �;;,!Trnrk i ' -=�� I:^�� .. :,.y a � ,y �-i- :::>(7o:.i.:r...;.;:/«. .�.°'.^� •1;' � • '-:i:��1 s.r �rx� sr _J."f• ' ',� -_ , . �� ~ 1{., . ,' < � � ' RENTON _ °3: . ::' ,., •'1' r I�j� 1 �•I'.!N'•/M'M' : .C'�f�ti��w .� c; , s�> �w _;� ti... f �. �:�:� �::�i: =��• : R' ivr_ar�------�� ` : � �'� ' ' +� � r �`��>I•,F,y. - :•:•� :.�.:.=. : �..� � � KCllQN_--- - -- - .- --�..- - — % . `'•'��"�:�; �;�_. � A��� .t�'�«� .���� '�� ` + �, � ' s.r.�. •:- ?�• i :_.;: � . ,. �; . � , :� s' � y1,, ...:.� �•_�r ,,,�; , yy ; .„+ r� y•. ��a-`-1�"•: � � �"��-yy n�e ^�, +� Y i f NR. 1' Ii�� �ut ` _� L SM i �LM 4 r '��. „:� -1��`j , "� 1 � �j i�' ,r M}��w t 1: �4 i ...._.�:N' •TI 1 = I ! .� � <: . � S .1:. `tit... �1.� � � / � � { �IYJ w'1 - •cf,� \ i 3 .�.::,.-:�__-'�a- _ 26 1 ;� �' 25 1: �,�, . \ :U, ,.. _ �;r, � s� �r�,: :, �. . n '<W I� A :;;, '� �,�,a: �::" i a $ - : ..,�; �' S♦ N . �� � � TU L -•�� =:, � i � �.� �- �� ; � '-�, -�, � i, �. . , E-A-T-AC� : ` : � , � „__ ._____. . \ _N�y � cw. ,I� ` �i � �� '� �� , :,1— ,� -t. •�:': •:�" .,µ„ - � �, .. �� ' .r' � . ... . "ry: . .o o.: � '• •(: - • = r : , L: . .. "� ..._�.� `� i,' i i7n•^ t. ,.. . � �a _.i;._••..., ' s� i .. � F' ,.q.\�= ( 4 i .�I . .tu _yl/�•N ., .1 u_ _ I „i'�� � iurt�c�u Y .r ''. �:� __ � � ---�--- � � r � � � ,..���„ ' �,. �?+. '���e� S� � �rr � i • ;� "e'�I�I L I ia � � srrA S , � t i� �t�, �,i�h 1 = .\� +�v...' �� I 1� ' S':� `! I � ST I •.i, i�� �. i �. S�li?fl.._I :� ;.. � � ��,:,� _ _ :JRO I ^ 5!�` .' , ''`� 'I I. � x..- _ _;; _ =•' �,• J.: 'F�r,..s� . S ,' :ttlUTti — ST ,,�I I +�'w. J' ,I ./ 1 'n�n \ ' s�l tivn.� � > � i d� -1' i �..I / a �s;o.0 .Y � — � c'' P (3.e�.. � i��;--�. . �! . :/ �: r . '• _. � �.t, , yl� . / r � __ . . ... _ . �3� . _ -rr;r / � j :'�,'r�a / - ::36:'� N , � j z 9 � v�uer' / ' . 1�s � ,Q '_ _,..�z, . ��:� < - _ . . . ; �---- �,� ��.: ._.- . .,� __ _ �� 1.T. _s, . . _ , , . , , ,.�. ::� , ' . _ -; � -- . � �. ' . _i .� -.■�_. .� �'. `7' - ; , :1._.r.:i� " 1 � S_ � ;�en„ r.��J. �`� = siwr.. .I , _ ____.'_ v . i � I �'�' .. ,y . J* ` �� .� -I--i, '� -- i /��� ��f I \\, . _��____� y' •. ��5� �I $tWlwS�l j I �� • sl�� =__:s i,.����s� , ��> �� -� ..;.�. ; �„ I . . .; � � :�. _ , ___ --t: /� - L. . - - - - ---=_°� s'-: ;�,.._� :�, -- - "'F�.., ,. �'. ' ., � r �� -�- W� - --..L_� _ �.:...�.�� - __ i. _a _ � _ :. , ,� ,i J� . , � ,�,, — :,�— I -o--�r_ P�� ;'�� _- �� ;.>_ I<ENT ,,`. ' ,�-,�,�„ , ;�;, � P � __'_ `I� ;2/� � � S. SI/�_ \�_I�^ V1 I •�_• •,tr_ '�� � ~ � it� _}!_�!1_ _'$�_""_ ,'� � 6`�3 ,�;: 2 f � � �I „ �- a.��,-,...��. I:-..,.1,� `� � . I' �� ;.,� : , - =� � r� . .., '��� .� 1,-LI � _ _t r�.r�� :f l hYw::�. �.��fi i'l��fa • �..• '� 7 i � $s IrTN . '{ ,;�' ""'_. _ I � 1' I . _ s w��?e"m �' . _ �l. : �5[. .�t�� _ ' ��+ � n li• 1:I'� Y ' .y' . � �1.. -� '�_ � . ] I� � "'_$ .�_�1^'� Sf 1 r�� .�.�... D .. ; 1 5 -��'4,•5�--C �..v'� . �.,� !, �.. � ViCINITY MAP GEOTECH s.E.B., iNc. ; CONSULTANTS � 186XX TALBOT RD. S. � - KING COUNTY, WA � dos No.r ao,.� Pro�.• � 99188 MAY 1999 1 �� c . _ OTP-6 , OTP-5 0 P-4 � � � ! � � i , OTP-7 0 P-3 � DTP-8 � � � Z 0 OT -2 � TP-10 �TP-9 ' OQ � Z � U � OTP-11 � a � a , F- i �- EXlSTING HOUSE � � OTP-� 2 pT -� � � � TALBOT RD. S. LEC3END: Q APPROXiMATE TEST PIT LOCATION � " S1TE EXPLORATION PLAN _ GEOTECH s.E.B., iNc. ; CONSULTANTS 186XX TALBOT RD.. S.. ' KING COUNTY, WA � �oe Ne.r po,e� P/o►.� � ''� ' 99188 MAY 1998 2 -�� � �� ��.� ��st���'`� TEST PIT 1 �� �'° �`��Q�`� �5 pQ' G° �°' J`' Description TOPSOIL Red-brown, silty SAND with some gravel, fine-grained, wet, medium-dense (Weafhered Glacial Till) �5'7% - becomes gray-b�own, dense to very dense (Glacial TiII) 5 13.9% ' SM : i I 10 ( i (` II * Test Pit was terminated at 12 feet on May 14, 1999. * No groundwater seepage was observed during excavation. 15 * No caving was observed during excavation. � t� o�� TEST PIT 2 `� �` �� �4�,`��o`�r�,���d'`��,e, G5 � G° �S°' J5 Description TOPSOIL ' '�� Red-brown, silty SAND with gravel, fine-grained, moist, medium-dense �I, � I� (Weathered Glacia/ Till) � �I - becomes gray-brown, dense to very dense (Glacial Till) I � f '�'��i ! SM " i .�. � '� ; � 'I - more gravelly and occasional cobbles within till � : ; ! ::i 10 � '� ' ( * Test Pit was terminated at 10 feet on May 14, 1999. " No groundwater seepage was observed during excavation. "` No caving was observed during excavation. 15 TEST PIT LOG � � GEOTECH 186xx Talbot Road South corrsuLz•a.rrrs,�rrc. King County, Washington � � � Job No: Date: Logged by: P/ate: `�`r�' 99189 May 1999 DBG 3 �'1 T �1 ' - - ��,�,�t��,�'`� TEST PIT 3 �Q�'� �'�o���`�o-o-'��� 5G5 � 9 G �S � Description TOPSOIL , , ,� � Red-gray, silty SAND with gravel and iron staining, fine-g�ained, very moist, i� medium-dense (Weathered Glacia! Till) 5 �, gM - becomes brown to gray, dense to very dense (Glacial Till) 10 '� * Test Pit was terminated at 10 feet on May 14, 1999. * No groundwater seepage was observed during excavation. * No caving was observed during excavation. 15 �� ��� �i�� TEST PIT 4 �4�,'���tio�o``'��`'�aa'°�.e ��5 Q G �S J Descrcption TOPSOIL ;l l l l'i'� ! Brown, gravelly, silty SAND with cobbles, fine-grained, moist, medium-dense ISM � Ii!!'I'I , 5 � ; ,� � �;', Bro�vn SILT, fractured, low plasticity, moist, stiff, iron stained � MLI i Ilili 10 j SP-SM I Brown, sli htl silt SAND, fine- to medium- rained, ve moist, dense � * Test Pit was terminated at 10 feet on May 14, 1999. * No groundwater seepage was observed during excavation. " No caving was observed during excavation. 15 TEST PIT LOG � � GEOTECH 186xx Talbot Road South � CONSULTANTS,�rrc. King County, Washington � � . � Job No: Dafe: Logged by: Plate: ��� 99189 May 1999 DBG 4 �j-�S 1 � �.� . L�����'�� TEST P IT 5 ��, o������a��`� G5 � p�Q �G° �C°' J`� Description TOPSOII. and Forest Duff ' �� Brown, gravelly, silty SAND, fine-grained, moist, medium-dense SM III 5 Brown, slightly silty SAND, medium-grained, moist, medium-dense - becomes finer grained SPSY � - becomes gravelly 10 SM Brown with iron staining, silty, gravelly SAND, medium- to coarse-g�ained, wet, '❑ dense ' Test Pit was terminated at 11 feet on May 14, 1999. * No groundwater seepage was observed during excavation. * No caving was observed during excavation. i- 15 � I r- � �� oi� TEST PIT 6 �,'r�� . �� ��� �� o�r�,�`�a�',��.z �5 pe4 Go ,�o- J5 Description � TOPSOIL and Forest Duff ,.. � � �: : Brown, silt SAND with some ravel, moist, medium- rained, medium-dense �,,�,� Y 9 9 ; SM 5 I ��I��� � ;; ��, I� Brown-gray, silty SAND with some gravel, fine-grained, moist, dense to very , I ; �!Ii: i dense (Glacia! TiII) SM _. ' .� :� � 10 ,�I'I I:) : - becomes very moist I * Test Pit was terminated at 10 feet on May 14, 1999. * No groundwater seepage was observed during excavation. '' No caving was observed during excavation. 1� TEST PIT LOG � � GEOTECH 186xx Talbot Road South CONSULTAN'I•s,INC. King County, Washington � �, � __ ___ _ .. Job No: Da1e: Logged by: Plate: 99189 May 1999• DBG 5 �—! !� .. . ._ ,:• .., _,r t � ��.��,���,ti�'�� TEST PIT 7 I Q�,�r �o rti��a��,� �5 � G° �o- J`' Description TOPSOIL and Forest Duff I SM I Red-brown, silty SAND with gravel, fine-grained, moist, medium-dense 18.2% Gray-brown, gravelly SAND, fine- to coarse-g�ained, wet, medium-dense � - becomes dense i SP 10 �"" Brown, silty, gravelly SAND, fine-grained, moist, very dense (Glacial Til!) * Test Pit was terminated at 10 feet on May 14, 1999. " Moderate groundwater seepage was observed at 6 feet during excavation. * No caving was observed during excavation. 15 I i � ��� `�� TEST PIT 8 2`��`r�`�o`��,~�ao-'°�2 5G� I 9 � � � Descnptton � TOPSOIL I ' ' � ' �' G�ay-brown with iron staining, silty SAND, fine-grained, wet, medium-dense � I I I I ' eathered Glacia/ Til! I (� ) 5 I � j I � - becomes slightly gravelly i SM �, - becomes dense (Glacial Ti!!) II � ' �I Ii 10 �I �! i * Test Pit was terminated at 10 feet on May 14, 1999. * No groundwater seepage was observed during excavation. " No caving was observed during excavation. 1� TEST PIT LOG � _�` GEOTECH 186xx Ta(bot Road South �r CONSULTANTS,�rrc. King County, Washington .� �, � ____ , Job No: Date: Logyed by: P/ate: 99189 May 1999 dBG 6 �-►1 ... . .. :�v . -- - ��,���,��'ti� TEST PIT 9 �,r' �,o �,tie�d,�� G5 ��Q G° �C°' J`' Description TOPSOIL ; , �,. � ! gM , Red-brown to gray with extensive iron staining, clayey SILT and fine-grained � � ML : SAND, wet, loose to medium-dense � ,; � � Gray, fine-grained SAND with some silt, very moist to wet, medium-dense to SPSY dense 10 � '' Test Pit was terminated at 10.5 feet on May 14, 1999. ; Light groundwater seepage was observed at 6.5 feet during excavation. '' No caving was observed during excavation. 15 �,�1 ���e�`i�� TEST PIT '10 �,r� ��o��,�ti���1a��`� �5 ��4 C,o ,�a �`' Description TOPSOIL ' j , ; Brown-gray with iron staining, silty SAND, fine-grained, wet, medium-dense ' (Weathered Glacia! TiIJ) . � � 'f , � SM ,' 12.3% 'I I`) - becomes dense to very dense (Glacial Til!) , , �.. I 'I'� * Test Pit was terminated at 8 feet on May 14, 1999. 10 * No groundwater seepage was observed during excavation. , * No caving was observed during excavation. , 15 � ' TEST PIT LOG j � � GEOTECH 186xx Talbot Road South I CONSULTANTS,li�c. King County, Washington � �, � _. ______ Job No: Date: Logged by: Plate: 99189 May 1999 DBG 7 . � ���U r ' � � y�� �'� TEST P1711 �� �,r��o��,ti���a����,� �9 � 9�� G° �S°' 0`' Description TOPSOIL Gray-brown with iron staining, silty SAND with trace gravel, fine-grained, wet, I �' loose to medium-dense (Weathered Glacial Till) � SM _ becomes very dense (Glacial TiJ!) 5 IIII � : ' Test Pit was terminated at 6 feet on May 14, 1999. * No groundwater seepage was observed during excavation. " No caving was observed during excavation. 10 � 15 � ��� �i� TEST PIT 12 �4�'���'0 0��,��'��o-a��,� ��5 � G � � Descnption TOPSOIL ' ; �( �'�� Brown-gray with iron staining, silty SAND with trace gravel, very moist, ; I ' I; I medium-dense (Weathered Glacial Till) I . :I. I: ` - becomes very dense (Glacia! Till) � �� S M ! �(. I , I �: I :` � : , I `: :I' I 10 * Test Pit was terminated at 9 feet on May 14, 1999. * No groundwater seepage was observed during excavation. * No caving was observed during excavation. 15 TEST PIT LOG � � GEOTECH 186xx Talbot Road South corrsuLTArrrs,irrc. King County, Washington � � Job No: Date: Logged by: Plate: ����— � - � 99189 May 1999 OBG 8 � ��� I S/ope bock/il/ owoy fiom /oundolion. � � � T/GNTL/NE ROOf ORA/N � Oo nol connecJ /o /oo/ing d�ain. BACXF/L L See Iex� lor ViIPOR BARR/ER �e�uiremenls. SLAB _� WASHED ROCX �'° .'o''• ��� � �� ��%��� `:�, 4��min. .e. � O.p: `� . ;� �r-"'-� o - J. , �`Y M / ' /^l � ♦� � 6 min. .•:�. : FREE-ORA/N/NG � NGNWOVEN GEOTEXT/LE SAND/GRAVEL � F/LTER F.4BR/C 4'�PERFORATED HARD PVC P/PE /nve�J aJ /easl os /ow os /ooling and/or c�awl spoce. Slope io d�ain. P/ace weepholes downwo�d. � FOOTING DRA1N DETAfL GEOTECH s.E.e., iNc. � CONSULTANTS 186XX TALBOT RD.. S. � KING COUNTY, WA � ..r.� doo No.+ Oah, Seoie+ i/oli+ r""-`"�� 99189 MAY 1999 N.T.S. 8 APPENDIX C BasinSummary..................................................................................................C-1 CNCalculations.................................................................................................C-3 RunoffCurve Numbers .....................................................................................C-4 BasinMap................................................�.........................................................C-6 IsopluvialCharts................................................................................................C-7 Correction Factor to Pond Volume ...................................................................C-10 DetentionPond Sizing.......................................................................................C-11 BioswaleSizin�.................................................................................................C-13 '� Equivalent Area Calculations............................................................................G16 , Capacity Calculations... ........................................................................C-17 II Sediment Pond Sizing Calculations ..................................................................C-19 I i �, i �� � �. �� , _ � .�.� 2/10/00 4 : 7 : 22 pm Sound Engineering Inc. page 1 Borgata Apartments Detention sizing calculations BASIN SUMMARY l BASIN ID: al • NAME: pre-developed 2 yr SBUH METHODOLOGY � TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS : 0 . 00 cfs RAINFALL TYPE. . . . : PElA PERV IMP PRECIPITATION. . . . : 2 . 00 inches AREA. . : 4 .41 Acres 0 . 00 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 85 . 00 0 . 00 TC. . . . . 34 . 96 min 0 . 00 min ABSTR.ACTION COEFF: 0 . 20 TcReach - Sheet L: 300 . 00 ns: 0 .4100 p2yr: 2 . 00 s : 0 . 1500 TcReach - Shallow L: 300 . 00 ks: 5 . 00 s : 0 . 1500 TcReach - Channel L: 300 . 00 kc: 5 . 00 s : 0 . 1500 PEAK R.ATE: 0 .44 cfs VOL: 0 . 29 Ac-ft TIME: 490 min BASIN ID: a2 NAME: pre-developed of 10 yr SBUH NlETHODOLOGY TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS : 0 . 00 cfs RAINFALL TYPE. . . . : TYPElA PERV IMP PRECIPITATION. . . . : 3 . 00 inches AREA. . : 4 .41 Acres 0 . 00 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 85 . 00 0 . 00 TC. . . . . 34 . 96 min 0 . 00 min ABSTRACTION COEFF: 0 .20 ' TcReach - Sheet L: 300 . 00 ns : 0 . 4100 p2yr: 2 . 00 s : 0 . 1500 TcReach - Shallow L: 300 . 00 ks : 5 . 00 s : 0 . 1500 TcReach - Channel L: 300 . 00 kc: 5 . 00 s : 0 . 1500 PEAK RATE: 1 . 03 cfs VOL: 0 . 58 Ac-ft TIME: 490 min BASIN ID: a3 NAME: pre-developed of 100 yr SBUH NIETHODOLOGY TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS: 0 . 00 cfs RAINFALL TYPE. . . . : TYPElA PERV IMP ' PRECIPITATION. . . . : 4 . 00 inches AREA. . : 4 .41 Acres 0 . 00 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 85. 00 0 . 00 TC. . . . . 34 . 96 min 0 . 00 min ABSTRACTION COEFF: 0 . 20 ', TcReach - Sheet L: 300 . 00 ns: 0 .4100 p2yr: 2 . 00 s : 0 . 1500 ' TcReach - Shallow L: 300 . 00 ks: 5 . 00 s : 0 . 1500 , TcReach - Channel L: 300 . 00 kc: 5 . 00 s : 0 . 1500 ' PEAK RATE: 1 . 69 cfs VOL: 0 . 90 Ac-ft TINIE: 490 min ', C' \ 2/10/00 4 : 7 :22 pm Sound Engineering Inc . page 2 Borgata Apartments Detention sizing calculations --------------------------------------------------------------------- --------------------------------------------------------------------- BAS IN SUNII�IARY BASIN ID: a4 NAME: post-developed 2 yr SBUH NIETHODOLOGY TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS: 0 . 00 cfs RAINFALL TYPE. . . . : ElA PERV IMP PRECIPITATION. . . . : 2 . 00 inches AREA. . : 4 .41 Acres 0 . 00 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 96 . 80 0 . 00 � TC. . . . . 1. 54 min 0 . 00 min ABSTRACTION COEFF: 0 . 20 TcReach - Sheet L: 100 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 1500 TcReach - Shallow L: 300 . 00 ks : 27 . 00 s : 0 . 1500 TcReach - Channel L: 300 . 00 kc :42 . 00 s : 0 . 1000 PEAK RATE: 1 . 75 cfs VOL: 0 . 61 Ac-ft TIME: 470 min BASIN ID: a5 NAME: post-developed 10 yr SBUH METHODOLOGY TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS : 0 . 00 cfs R.AINFALL TYPE. . . . : TYPElA PERV IMP PRECIPITATION. . . . : 3 . 00 inches AREA. . : 4 . 41 Acres 0 . 00 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 96 . 80 0 . 00 TC. . . . . 1. 54 min 0 . 00 min ABSTRACTION COEFF: 0 .20 TcReach - Sheet L: 100 . 00 ns: 0 . 0110 p2yr: 2 . 00 s : 0 . 1500 TcReach - Shallow L: 300 . 00 ks : 27 . 00 s : 0 . 1500 TcReach - Channel L: 300 . 00 kc : 42 . 00 s : 0 . 1000 PEAK R.ATE: 2 . 77 cfs VOL: 0 . 97 Ac-ft TIME: 470 min BASIN ID: a6 NAME: post-developed 100 yr SBUH METHODOLOGY TOTAL AREA. . . . . . . : 4 .41 Acres BASEFLOWS : 0 . 00 cfs RAINFALL TYPE. . . . : TYPElA PERV IMP PRECIPITATION. . . . : 4 . 00 inches AREA. . : 4 .41 Acres 0 . 00 Acres ' TIN� INTERVAL. . . . : 10 . 00 min CN. . . . : 96 . 80 0 . 00 TC. . . . . 1. 54 min 0 . 00 min ABSTRACTION COEFF: 0 .20 TcReach - Sheet L: 100 . 00 ns: 0 . 0110 p2yr: 2 . 00 s: 0 . 1500 TcReach - Shallow L: 300 . 00 ks : 27 . 00 s : 0 . 1500 TcReach - Channe� L: 300 . 00 kc : 42 . 00 s: 0 . 1000 PEAK RATE: 3 . 78 cfs VOL: 1 . 33 Ac-ft TIME: 470 min C'� • S O UND ENGINEERING, INC. - civil•structural engineers•land planners ' Project T�J c�,Sc�'�. With/To Page d Prqect No. G�q �a J . � f7 Address Fax# Subject �� (.�. �1,�,Y�''fl t 1�1� #Pages Faxed gy �f'1�� Copies to Date C7 �i J � o J i _ _ _ _ __ _ _ _ _ ,_ _ ._ _ _ _ , ', , _r li .��T� t3A5E�+ '��.Lafcao�J.1_ (=ur- "D.e,F�1�� 5� ����.g _ C,/� Ic,S � _ I r- '� ,7 D �AGrc� �5�- -����. ; 5��� ar�� :._ C.�S a���� re 1.�a$,e,.� r�c� F r���;-� v,tz.�.� '� Y«,,��^ N�a-r►�4�; R rt�o� D�' s ��-t� �� . r^,o .�-�►� �' e'E �s�'�� �c 1.7.J 5 �'" V J i e�r�—Q. -}�j Q�� t �,�.f�n 5 �� �,,,��a r� i � �L��o �e-s �' 04 ��. � ��a-n '�•+a� _ � (S 2-c. C�-�-ac,+•.z� c1•l c,s> : ' _ , � D r-' T�-f e 2 e�--a�,� ��.�� ,R 5 ���e.S � • 53 C1���s r5 �;- c,�n� �s�-c.�(':�ed- S�"c^c� ,� �n G� �t t'S �S � ��^t'F�,C.� • _..;......._ ;._ ;... ��'`QrC t'of'.t. � " ` ' ' _.._...,.. _ � - y � QG!`ts �u Cc � ��✓G�J�o� Gr'CG'— (i✓f'S G(�•J S�1 G{Gr'CU ►n �'� �GI G� l �J� � cc�s ,g.� °-_ __ (o mia f� El•� v� Y/ o�rcS Iro S W.t t� c•�r�� _� A r.G�S C��p.s.�_ _ �,�"� /'e,�-►•w_..� .�n� G�J S'i GLCr`t�,� _.. - -r �l >/ r'"1�Gr;�tv�....t' ' ._ _ _ _ _ _ __... _ _...; _ _ _ _ _ _ l4 �l ra�,..._ �� �v� {��.c- G�e��u�-c c� S t f't, e�e..� � Q'y`� � � � 1 . C 3.�7 G ','� �- �6 , C1 � . j G�,Ar/L c.l. d I ; If the above does nat meet with your understanding,please contact SE! in writirg within 7 days.Thank you. � 2 1019 PACIFIC AVE.,SUITE 906,TACOMP�WA 98402•(253)573-0040•FAX(253)573-0142 �J E-MAIL•SOUNDINC�AOL.COM KING COUNTY, WASHINGTON, SU,RFACE WATER DESIGN MANUAL �I�I TABLE 3.5?B SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS ' SCS WESTERN WASiiINGTON RUNOFF CUFiVE NUMBERS (Published by SCS in 1982) Runoff curve numbers fo�selected agricultural, suburban and urban land use for Type �A rainfall distribution, 24-hour storm duration. CURVE NUMBERS BY HYDROLOGIC SOIL GROUP LAND USE DESCRIPTION A B C D Cultivated land(t): winter condition � 86 91 94 95 Mountain open areas: low growing brush and grasslands i 74 82 89 92 I , Meadow or pasture: I 65 78 89 Wood or foresi Iand: undisturbed or older second growth 42 64 70 81 � Wood o�forest land: young second growth or brush I 55 72 8� 86 Orchard: with cover crop � 81 � 92 94 Open spaces, lawns, parks, goff courses. cemet2ries, � landscaping. good concfition: grass cover on 75% or more of the area 68 SO � c,p fair ccndition: gr2ss cover on 50°G to 754'0 of the area ; 77 85 90 g2 I Gravel raads and parking lots 76 85 d9 9t � Dirt Toads and parking lots I 72 82 E7 89 I Impervious surfaces, pavement, rcofs, etc. � 93 98 98 98 Open water bodies: lakes, wetlands, ponds, etc. I 100 t00 100 100 I � Single Family Residential (2) i � Dwe!{�rg Und/Gross Acre °b Impervious (3} � 1.0 DU/GA i5 Separate �ur�e number 1.5 DU/GA 20 shall be selected 2.0 DU/GA 25 for pervious and 2.5 DU/GA 30 impervious portion 3.0 DU/GA 34 of the site or basin 3.5 DU/GA 38 4.0 DU/GA 42 . 4.5 DU/GA �46 5.0 DU/GA 48 ', 5.5 DU/GA 50• 6.0 DU/GA 52 6.5 DU/GA 54 7.0 DU/GA 56 PI ned unit developments, % impervious cc�ominiums, apartments, must be computed cor��mercial business and indu�triat argas. , (t) For a more detailed description of agncultural land use curve numbers refer to Nationai Engineering I Handbook, Seciior.�, Hydrology, Chapter 9, Augusi 1972. (2) - Assumes roof and dr�reway runoff is directed into sireet/storm system. (3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers. I � 3.5.2-3 , 11/92 , e �� KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL (2) CN values can be area weighted when they apply to perviaus areas of similar CN's (within 20 :' -- -• CN points). However, high CN a�eas should not be combined with low CN areas (unless the low CN areas are less than 15°�6 of the subbasini. In this case, separate hydrographs should be generated and summed to form one hydrograph. FIGURE 3.SZA HYDROLOGIC SOIL GROUP OF THE SOILS IN tiINC COUNTY HYDROLOGIC HYDROLOGIC SOIL GROUP GROUP' SOIL GROUP GROUP• Alderwood Orcas Peat D Arents, Alderwood Material C Oridia D Arents. Everett Material 8 Ovall C Beausite C Pilchuck C Bellingham D Puget D Briscot D Puyallup 8 Buckley 0 Ragnar B Coastal Beaches Variable Renton D Eartmont Silt Loam D Riverwash Variable ( �dgewick C Salal C Everett A/B 'Samrr,amish D Indiancla � Seatile D Kitsap C I Shacar D Klaus C Si Si1t C Mixed Allwial Land Variable Snchomish D , Neilton A Sultan C Newberg B Tukwila D Nooksack C Urban Variable Normal Sandy Loam D Woodinville i D HYDROIGC�IC SOIL GRCU? C(.r�,.SSiF(Cn i(ONS 1 A. (Low r�noff potentiat). Soiis having high irfiltration ratas, evan when ,horoughly wett�, and consisting cniefly o�deep, weil-to-excessively drainec2 sancs or gravels. These scils have a hign rate cf water transmission. B. (Moderatety low runoff potentiaJ). Soils having moderate infiltration rates when ihoroughly wetted, and consisting chiefly of moderately fine to moderately caarse textures. These soils have a moderate rate of water transmission. C. (Moderately high runoff poterttiai). Soils having slow in�i tration rates when thoroughly wetted, and consisting chiefly of soils with a layer that impedes downward mavement of water, or soiis with moderately fine to fine textures. These soils have a slow rate of water transmission. D. (High nanoff poient�al). Soi(s having very slow infiltraiion rates when thoroughly wetted and c�nsisting chiefly of clay soils with a high sweiling potential, sols with a permanent hign�+rater table, soi(s with a hardpa� or cfay layer ai or near the surface, and shallow soits over neariy impervious materiai. These soils have a very slow rate of water transmission. • From SCS, TR-55, Second Edition, June 1986, Exhibit A-1. Revisions made frcm SCS, Sod Interpretation Record, Form �5. September t988. � 3.5.2-2 11/92� C�� �I � ^\�` v �I 1019 Pocific Avenue, Suite 906 DESIGNED: JOB N0. SHEEt N0. O UND Tacoma, WA 98�402 �.S/� 99�?_ 1. 10 p A c'A' ORAWN: OATE: L7fi J /tl NGINEERING, In c. KMB 2/�.5/0 0 °F !, Bus: (253) 573-0040 Fax: (253) 573-0142 CHECKED: SCALE: � CIVIL * STRUCTURAL ENGINEERS * LAND PLANN[RS � �u�-;' ",�-u��r� ���.,.�;r��rr� TDH � �=60� AutoCAD FILE: 99121C )M1 �- % I , _ � � J � I I , .� '� _ _.__.._._ ..— -- _-_ .' -' ' ' I � .. �.1 � I �_ , " �nn --- ,� I .,. . . . . _.._....� I � r' - �2� •1 , I � ��' 1 I , . . . , ( ''• '•' . . , . . � z2e . _.__ . • I -r`'—�-- �!'t . ■ • 216 I BZt I 1/ ALI � I ' �/lL . �-- ''� 222 t------- ,� .. •-.-_� ' . '' , • � I � LZt 120 � � � - xr �� I. IQ� s�e y ' . it " � � , � � � __,_ , nz � � ��� �'� }u ' ��, � . � I ' � . � o,t , — z�c � � ;�:, <:. ,I� � h�-- J I . Ioit t` , '�p _ 0_. ' � � fip : I ` � ` -- � . . . - snt � � � • _.� � I . . , . , . � .: I '•. .: � � �A —1 r: l�• . ' , , _ ror y • L � m I . . , ( � • . � . � ,�e • .--�— • _. uor � � �.. II • - - I . . . ` •-. ' �� -- ---- • ■ I . PoI . 19� \ . . . . f„ I �' �1 � f -_.'_ .._...._ ' � 191 I � �I MI �yb ,�� � I t61 1EE I I.-. , � 061 _,� 9i1 • I .. . � I �� -. � ' ` \� .. ---- I. � ,J ,�' I -- _- � '__�~ . II `\���,� I � WI 1A0 ' ' .. � . . . . . .. . � ' � ' . .. . - — . ., roi " • ___. �ie •. � , � � I � � • , S oYi� I � �76 .I . 1 . I • P[i �7� . �� . � �1 111 _ ' � I - -- 0 � 11 f� . I I � .. ` -,-� �ee ' .( � I — � ' � � ' � ' � ' �I �', �91 ._ . . , r � " � . . .. , . I � i . � • � „a� L91 ' .. - -. IE� �`_ . . � . � �� - _ . . ' . � � . .i,.' �. � ,. , I ;, / � � I 1 � . .. , . � \`.A r .. , _ . "_ ��lno� �pa .�oql�� . . , ; . . Y . o . . . . ,� . ,.. . � � � � `�. � � ---1 , / I � �,� � • _ . • �, � • , . � �. , � - - - •� . � L� � . . • • � y ' � i " - � �i;�;�t 'K��:t,�,-I ,� ` " -� -�'*��''-'�.�� .:,� �, , , _ �":�'�'ir � -� ; � t �1� �~. �, �,, � , - ���r� w ��r .`. � - ��_�"' � /.�� �� � 1i ., � ' � \` � �� �����, �� ��� ��� � -. 1►�i� � �� -- a 'i=�'�_ ��`�` P ��' ,1`���i �� __� /I • `y�� �i� ',•� .: �- �_ � � i�i � ���i�-�� �.��.�� � 1! ` _�L"s."� ._ �r- , _ /i.. � � t 1E/�!�- � fi,7 - � � ��: ����� rlplh��� �, �� - _ � , �;��,�-� �� _ '���� -� ,�, z�.z, . � . � �: � � � "�,�.��.� _ �-�� �j ��3 �� � �,�,��'r"�!�_�, � ��� � � - � , ��, . �► ����ww , l� � ,. ; - ; � � ���� sru � '�• ���i'��� � ���► �� ��`�'��� � w ���� , �, � , _ �.�.� � - ,�_�r . R�-- :._:,_ .�:' �� - �r��- �� ,� �i� _ ���. ���►-� ���''`; � - � . ������i. � = `':�/�t���l�l � . - � � ��/SF:� � � , . - . . ' ,�='�=��� �, • ~� • ` ��!� �� . , , - � ,�� � ��- ., � •�• - i • ' • . • � � - �� � i �� � • � . � ' �' - • � � � • � . . . L� , . . j �`�ii�'s���.�t t � �/ " -1 �: �-.--�-� �� ►.� ��:.�i�� �����, �� -+.�� � � � � � ��� ��R�, ��� =a _ ��� + � ��i�.�:'_'��� E�. e�����,. r, ; ���� � �!'�_ � e �������%�� �� � - ��1�19E�,��''� fP'we11t�,��� � "• `'����: ����� ,� i ��� :�.��1� , _���� ��,�,..� :�;. � ��� , �1�� ,� •�;.�LL q � � - - � ��� � �� �'"'-��'�' " �� � .► 'z� �,� �. � . 4�` ,� - _�.� �� �y� � , - �� � - �Q'�, � r� � -�,�� '. 1 !,� �i1- _ � �� .-.. ��► �� ; `�=.a �; �' `'�� �► � ,�--,�.���,�`�-� � , �� ti � �� ��� '. a� � , � e�� 1 ` �,i � '� � � ► _ �; ', �. �I�,�� ! � 1 . . • _ a � � ._ + �- � ��t �� 6., �i � ���i�� �" , -- ��..a�w.��s �,�,.w,�_ _� `., �y,U .��!���,�� _ � �II"�- � � ' � - ���w ��`��' � � � � � r� =� � r � � � . .�.�f►�� .��►. •'��'���.�������_ � . . �,/�/Ei'�ll�i1� ' wR'��►;�r �.• . , - . ��I�Y�rI/l� - - . - . « • p � , .�-.� _ � � ��_�� -- � .� . � • ' - ''• : • •. • / I .� - � ��.� . � . �- . �• • . 11 ' • I� � . . - . „ . . i � �'�1i�����''t �� E,�, � `1 � � � � „� �, � � � �� ` �a� �1��'-��w����+ �� �� �, �E�w�,N ` ��a ��•. t�� ,...��,w��r � � u�+�� .�� � , �,_ , e �� ���. _ ����� _ _ � � t����. �� -� ���: � � . w.�;��,�_ __.�,�, ��. -�= �:i-. �F, ��� .,�, � . ,�t�� -�`���► �► � ' _ �.,�� ��-- �� -�a�;�,�,.y "�•�ir.,P� � � ��'� ,�� j�C �� �r ' , . . I r,. � * =.�_..i.s� �-...��;,_ .� e,��� ��� � �►fi,_•,:•�`�,� ,` . ` `�� � � ��� `� �� �' - ,,�� ,� a _ �\'�\ � ���^ t�1�� c� � _ � �._ � �, �� a��.��,,� ,� �. .. � ���a. . � � .�� , . �,�� � � �: � ,... �► � t. �� ��.��;��� •�.�1►�. ,�. ,'�; ;�' ~�� ��� �► -����'~� ���:,. � - - , � _ � .:�-�,� � ,� � �� - .��, � - , , - - .��'i���� �� '��wi► _ y :,. ;�!�,�' ►`���► 'i�,��.� - ti� - �/��� - � ' 'i'��..�.: -- -`i�:�j� � � �r,;�r � ��! "i�_ �y, � � � !�� � L,� '��I� Y� _- ��' ���w � ����,/� �, I�.�e.�w.w��� �� _ ♦�---i - A���ry ,-�-..�'1►.`,� ' ,��'l�l r,�� - � �/��:. r��!` � -iJ'��►• '' / �i�• � � wri�- _1��t, C Fi � �•� � �r- �!� f _ -�� ' �.,���� �� � � � `�:�:������Mi�, . . . - - . �,��,�►�t��►��� - - . ��.�.: .. . . .. . .c►�s.a��� . ,- . , .. ��„�rw�,r ;�� ,.... ` ����_ � __ __- _' , `�' ���- .� I ORAFT TACOMA STORMWATER MANAGEMENT MANUAL - VOLUME I I 6.5.9 Correction Factor to Pond Volume When designing runoff quantity conirol facilities, the Engineer shall apply a co�rection factor to the design volume when using a unit hydrograph method to model 24-hour storm events. The coneciion factor is shown in Figure 6.1 and shall be used to increase the proposed pond volume by the applicable percentage, i.e. 10,000 c.f. + 30°� = 13,333 c.f. This factor is based on site impervious cover. If the facility is to serve for water quality also, the po�d depth cannot be increased beyond the criteria established in Chapter 7. NOTE: This factor does not apply to infiltration facilities or facilities sized with a continuous simulation mode! such as HSPF however, the design engineer is encouraged to incorporate an appropriate facior of safety based upon the level of detail inctuded in the model. FIGURE 6.1 VOLUIVIE CORRECTION FACTOR TO BE APPLIED TO RUNOFF QUANTiTY i CONTROL BMPS BASED ON S(TE IMPERVIOUS COVER � II 50 i � 45 � ^� � il � � - � ' � i � ! O 35 U � /� i v � ; 30 ; i o f � s � �" 25 = U ( � • w c Z� = u O 15 ( ' i ,o L � � � o zo � � � ,�o . srr� w+pF�v,ous c�v�x r,c� . Reference: Barker, et. af., 'Perfarmance of �eternion Ponds Designed According to Current Standards', 199Q. 6.6 DETENTION/RETENTION DESiGN CRITERIA 6.6.1 Discharge Criteria U�less exempted in Section 6.4, the fo(lowing runoff quantity control requirements shall apply: 1. . Discharge Point - The discharge point for the projeci shall occur at the natural location. �" C -�o s-s .�, 2/10/00 6 :43 :22 pm Sound Engineering Inc. page 1 Borgata Apartments Detention sizing calculations STAGE STORAGE TABLE RECTANGULAR VAULT ID No. 1 ', Descriptio • tention Vault � Length: 73 . ft. Width: 40 . 00 ft. voids : 1 . 000 '� /.�, , � VJ iT�-►v�.r G.Jr-R.e c,T �v,.r �o c,j J CZ- W`{l4.!. w�. . � I �����-. -�er�. ����,��3 (,� -��� = r�o �- ,,� �.e.�.�w w r c�.c.����.� �a -�:� STAGE c----STORAGE----� STAGE c----STt7RAGE----> STAGE <----STORAGE----> STAGE <----STORAGE--- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-: 151.70 0.0000 0.0000 153.80 6132 0.1408 155.90 12264 0.2815 158.00 18396 0.4�. 151.80 292.00 0.0067 153.90 6424 0.1475 156.00 12556 0.2882 158.10 18688 0.4� 151.90 584.00 0.0134 154.00 6716 0.1542 156.10 12848 0.2949 158.20 18980 0.4357 152.00 876.00 0.0201 154.10 7008 0.1609 156.20 13140 0.3017 158.30 19272 0.4424 152.10 1168 0.0268 154.20 7300 0.1676 156.30 13432 0.3084 158.40 19564 0.4491 152.20 1460 0.0335 154.30 7592 0.1743 156.40 13724 0.3151 158.50 19856 0.4558 152.30 1752 0.0402 154.40 7884 0_1810 156.50 14016 0.3218 158.60 20148 0.4625 152.40 2044 0.0469 154.50 8176 0.1877 i56.60 14308 0.3285 158.70 2C440 0.4692 152.50 2336 0.0536 154.60 8468 0.1944 156.70 14600 0.3352 158.80 20732 0.4759 152.60 2628 0.0603 154.70 8760 0.2011 156.60 14892 0.3419 158_90 21024 0.4826 152.70 2920 0.0670 154.80 9052 0.2078 156.90 15184 0.3486 159.00 21316 0.4893 152.80 3212 0.0737 154.90 9344 0.2145 157.00 15476 0.3553 159.10 21608 0.4961 152.90 3504 0.0804 155.00 9636 0_2212 157.10 15768 0.3620 159.20 21900 0.5028 153.00 3796 0.0871 155.10 9928 0.2279 �57.20 16060 0.3687 159.30 22192 0.5095 153.10 4088 0.0938 155.20 10220 0.2346 157.30 16352 0.3754 159.40 22464 0.5162 153.20 4380 0.1006 155.30 10512 0.2413 157.40 16644 0.3821 159.50 22776 0.5229 153.30 4672 0.1073 155.40 10804 0.2480 157.50 16936 0.3888 159.60 23068 0.5295 153.40 4964 0.1140 155.50 11096 0.2547 157.60 17228 0.3955 159.70 23360 0.53E3 153.50 5256 0.1207 155.60 11388 0_2614 157.70 17520 0.4022 159.80 23652 0.54_'�� 153.60 5548 0.1274 155.70 11680 0.2681 :57.80 17812 0.4089 159.90 23944 O.SS9% 153.70 5840 0.1"s4i 155.3C 11972 J.2748 :57.90 :B:JS 0.415e lEJ.�O 24235 0.5554 1 �11 v 2/10/00 6 :43 : 22 pm Sound Engineering Inc, page 2 Borgata Apartments Detention sizing calculations STAGE DISCHARGE TABLE MULTIPLE ORIFICE ID No. 1 Description: Outlet Control Structure Outlet Elev: 152 .20 Elev: 152 . 20 ft Orifice Diameter: 1. 9922 in. Elev: 156 . 50 ft Orifice 2 Diameter: 6 . 6563 in. STAGE <--DISCHARGE---� STAGE <--DISCHARGE---� STAGE <--DISCHARGE---> STAGE <--DISCHARGE---� (ft) ---cfs-- ------- (ft) ---cfs-- ------- (ft) ---cfs-- ------- (ft) ---cfs-- ------- 152.20 0.0000 154.00 0.1445 155.80 0.2043 157.60 1.5113 152.30 0.034: 154.10 0.1485 155.90 0.2072 157.70 1.5697 152.40 0.0482 154.20 0.'_523 156.00 0.2099 157.80 1.625? 152.50 0.0590 154.30 0.1561 156.10 0.2127 157.90 1.6797 152.60 0.0681 154.40 0.1597 156.20 0.2154 158.00 1.�319 152.70 0.0762 154.50 0.1633 156.30 0.2181 158.10 1.7824 152.80 0.0834 154.60 0.1669 156.40 0.2207 158.20 1.8315 152.90 0.0901 154.70 0.1703 156.50 0.2234 158.30 1.8791 153.00 0.0963 154.80 0.1737 156.60 0.6061 158.40 1.9255 153.10 0.1022 154.90 0.1770 156.70 0.7662 156.50 1.9707 153.20 0.1077 155.00 0.1802 156.8D 0.8895 158.60 2.0148 153.30 0.1134 155.10 0.1834 156.90 0.9939 158.70 2.0579 153.40 0.1180 155.20 0.1865 157.00 1.0861 158.80 2.1001 153.50 0.1228 155.30 0.1696 157.10 1.169� 158.90 2.1414 153.60 0.1274 155.40 0.1927 157.20 1.2468 159.00 2.1819 153.70 0.1319 155.50 0.1956 157.30 1.3186 153.80 0.1362 155.60 0.1986 157.40 1.3862 153.90 0.1404 155.70 0.2015 157.50 1.4503 C�(� 2/10/00 6 : 43 :24 pm Sound Engineering Inc. page 3 Borgata Apartments Detention sizing calculations --------------------------------------------------------------------- --------------------------------------------------------------------- LEVEL POOL TABLE SUNlMARY MATCH INFIAW -STO- -DIS- <-PEAK-> OUTFIAW STORAGE c--------DESCRIPTION---------� (cfs) fcfs) --id- --id- <-STAGE> id (cfs) VOL (cf) 2 YR 24 HOUR ................. 0.22 1.75 1 1 156.37 10 0.22 13641.66 cf 10 YR 24 HOUR ................ 1.03 2.77 1 1 156.85 11 0.94 15034.59 cf 100 YR 24 HOUR ............... 1.69 3.78 1 1 157.92 12 1.69 18154.87 cf C-f 3 Size Biofiltration Swale Flow 1.01 cfs slope (s) 1.00°/a (bottom slope for for biofiltration design) depth (y) 0.33 ft. Mannings n 0.07 Sides (z) 3 (3 to 1 side slope preferred) Actual Length 135 ft. (desired length is 200 ft.) Required bottom width (b) calculation Q = (1.49/ n) x A x R'f3x� (mannings equation) A = (b+ zY)Y R = A/(b+2y l+ z' ) "b" is solved for using a computer spreadsheet function to obtain a trail and error solution of b = 2.58 feet, for a desired length of 200 feet. check Q = 1.011 cfs, OK same as given Velocity = 0.857 fps <1.5 OK Residence Time = 3.9 mins. 1.178 Find bottom width required if actual length is 135 ft. (Minimum length is 50 feet.) For equal Surface Areas: Required water Surface area = (2zy+b) x 200 feet = 912 SF Actual bottom width required = (Des. Surf. Area)/(length (actual)) - 2zy b = 4.78 ft. Filename Biosx�ale.x/s Tab BIOSW.9LE 2i10%00 6:26 P,ti1 �_( l� l 1 2/10/00 4 : 7 : 37 pm Sound Engineering Inc. page 1 Borgata Apartments Detention sizing calculations --------------------------------------------------------------------- --------------------------------------------------------------------- BAS IN SLTNIl�ARY BASIN ID: WQ NAME: post-devel 64% of 2yr (6mo) SBUH NIETHODOLOGY TOTAL AREA. . . . . . . : 4 . 41 Acres BASEFLOWS: 0 . 00 cfs R.AINFALL TYPE. . . . : TYPElA PERV IMP PRECIPITATION. . . . : 1. 28 inches AREA. . : 4 . 41 Acres O . Oa Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 96 . 80 0 . 00 TC. . . . . 1. 54 min 0 . 00 min ABSTR.ACTION COEFF: 0 .20 TcReach - Sheet L: 100 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 1500 TcReach - Shallow L: 300 . 00 ks : 27 . 00 s: 0 . 1500 TcReach - Channel L: 300 . 00 kc : 42 . 00 s : 0 . 1000 PEAK R.ATE: 1 . 01 cfs VOL: 0 . 35 Ac-ft TIME: 470 min C-I5 �Q��� v���� �-�" �A-�C���Tta�1S Qtn 1 1/�ql.C-1 1 Ci 2�4 Q�' �'JO o S� �LJ�J Q� REC12 Event Summary:�lv,�.�,�� �-� W�z�t,-� ` t,,,�}.kn d �' BasinlD Peak G� Peak T Peak Vol Area �ethod Raintype Event ------- (cfs) (hrs) (ac-ft) ac /Loss REC12 0.13 7.83 0.0458 0.75 SBUH/SCS TYPEIA 6-MONTH Drainage Area: REC12 Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 0.20 Storm Dur 24.00 hrs Area CN TC Pervious 0.0000 ac 0.00 0.00 hrs Impervious 0.7500 ac 94.00 0.01 hrs Total 0.7500 ac Supporting Data: Impervious CN Data: REC BDLG AND BLDGS 1 2 AND LAWNS 94.00 0.7500 ac Impervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Sheet ROOF 25.00 ft 30.00% 0.0110 0.17 min Channel ROOF LEADER 600.00 ft 15.00% 42.0000 0.61 min TC of 0.79 min < 5 min, program will use a tc of 5 min in computations. EXISTING NORTH Event Summary: A��,� F�o,�v�,���o��,`'`�r W�Sj°� BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event ------- (cfs) (hrs) (ac-ft) ac /Loss EXISTING NORTH 0.05 8.67 0.0460 1.76 SBUHiSCS TYPEIA 6-MONTH Drainage Area: EXISTING NORTH Hyd Method: SBUH Hyd Loss Method: SCS CN Number ' Peak Factor: 484.00 SCS Abs: 020 Storm Dur 24.00 hrs ; Area CN TC I Pervious 1 J600 ac 85.00 0.42 hrs ; Impervious 0.0000 ac 0.00 0.00 hrs Total 1.7600 ac Supporting Data: Pervious CN Data: ! EXISTING NORTHERN BASIN 85.00 1.7600 ac I Pervious TC Data: Flow rype: Description: Length: Slope: Coeff: Travel Time �� Sheet SHEET FLOW 200.00 ft 15.00% 0.4000 21.12 min � Shallow SHALLOW CHANNEL FLOW 380.00 ft 15.00% 5.0000 3.27 min � Channel TALBOT RAOD DITCH 110.0o ft 2.00% 17.00Q0 0.76 min � i i � . �,�� I .:F . � Worksheet Worksheet for Circular Channel Project Description Project File m:199121\project2.fm2 Worksheet 6' ROOF DRAIN � 2.00% Flow Element Circular Channel Method Manning's Formula Solve For Discharge Input Data Mannings Coefficient 0.013 Channel Slope 0.020000 ft/ft Depth 0.50 ft Diameter 6.00 in Results Discharge 0.79 cfs 7 ���-�l� c�c,% : (�,��G-�^� ��;'��+►»�/S Flow Area 0.20 ftz ��a�, /� �,., � 3 Wetted Perimeter 1.57 ft Top Width 0.15e-7 ft Critical Depth 0.44 ft Percent Full 100.00 Critical Slope 0.017869 ft/ft Velocity 4.04 ft/s � Velocity Head 0.25 ft Specific Energy 0.75 ft Froude Number 0.2e-3 Maximum Discharge 0.85 cfs Full Flow Capacity 0.79 cfs Full Flow Slope 0.020000 ft/ft Flow is subcritical. G11 02/14/00 FlowMaster v5.13 02:07:24 PM Haestad Methods, Inc. 37 Brookside Road Waterbury,CT 06708 (203) 755-1666 Page 1 of 1 BLDGS 1 2 3 Event Summary: BasinlD Peak� Peak T Peak Vol Area Method Raintype Event ------- (cfs) (hrs) (ac-ft) ac /Loss BLDGS 1 2 3 0.44 7.83 0.1441 0.30 SBUH/SCS TYPEIA 100 yr Drainage Area: BLDGS 1 2 3 Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 020 Storm Dur 24.00 hrs Area CN TC Pervious 0.0000 ac 0.00 0.00 hrs Impervious 0.3000 ac 98.00 0.01 hrs Total 0.3000 ac Supporting Data: Impervious CN Data: BLDGS 1 2 3 ROOF DRAINS 98.00 0.3000 ac Impervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Sheet ROOF 25.00 ft 30.00% 0.0110 0.17 min Channel ROOF LEADER 600.00 ft 15.00% 42.0000 0.61 min TC of 0.79 min < 5 min, program will use a tc of 5 min in computations. i , __ ,� �tsa, C'IV Size Sediment ponds (�ng councy> Surface Area= FS(G12/V,�,) Q2= 1.75 cfs (Peak Flow , 2-yr 24hr Storm Event) V�= 0.00096 fUs (Particle Settling Velocity) FS= 2 (Factor of Safety) SA=2'G�2/VS�= 3645.83 sf, (Surface area at Top of Riser) (Per King County Stormwater Manual Pg. 5.4.5.2-2) Surface Area at Top of Riser Provided = 2800sf 2' Settling Zone 1.5' Sediment storage Principal Spilway(Riser) Diameter Q,o =2.77cfs (Peak Flow, 10yr Pre-developed ) H = 1 ft. (Head measured from Top of Riser to Top of Spillway) Diameter= 12" (From Table, Appendix "B") Dewatering Orifice Ao=(AS(2'h)"'')/(10.6'3600"T'g"�') i Ao= 0.001856 (Orifice Area , Square Feet) ' A5= 3645.83 (Pond surface Area, Square Feet) h = 3.5 (Height of Riser in Feet) T= 24 (Dewatering Time, HRs g = 32.2 (Acceleration of gravity ftlsec2) Dewatering Orifice Diameter D- 24*(Ao/3.14)^.5 = - 0.58 in Filenume SEDI.ME.VT PO,VDS.xls Tub K/.b'G-POND 02/I1/L000 Z:58 PM C�I� ; ��` - ��. i 4 ;;�i _ � APPENDIX D Maintenance and Operations Manua1................................................................D-1 Retention/Detention Summary Sheet................................................................D-10 Declaration of Covenant....................................................................................D-12 `,: , I t � , KINCi COUNTY, WA38INC3TON, SURFACE WATER DESI (� N MANUAL MAINTENANCE REQUIREMENTS FOR �- PRIVATELY MAINTAINED DRAINAGE FACiL1TIES N0. 1 - PONDS MaYM�n�� Candfdam Wlw�Mainbiw�cy Rwutb E�ct�d NRwn Cowipaw�t D�f�at b NNd�d Maint�n�na M Pwform�d Gawr�l TrMh�D� Any vesh snd debri�which excsed 1 cubio 7rash and debris deared from . foot per 1,000 square fs�t (thi�is about squal site. • ' to the amount of us�h it would taks to fill up one�tandard aizs offic� parbeps canl. In penerd, tMr�shouid b�no viwal evidenc�of dumpinp. Pawnous Any paso�ous vsqsution wtich may No danper of pasonous VeQetetion constituts a hu�rd to County penonnel or the veqetaoon where County public. Exart�ples of pawnou�vepetadon peroonnel or the public miqht include: tstay rspwort,poison oak, stinpinq normaily bs. (Coordinatian with nettle�,devils club. Seetde/Kinp County Hedth Deperanent} ' Pollution Oil, �dir», o►othe�contaminanb of one No contaminann present other pailon or mors or any emount found tfi�t than a surfacs film, (Coordinacen could: 1) caus�damaas to plent, ertimai,o� with Ssettle/fGnp County Heeicn merins life;2) conatitute a fire hazerd;or Depertmertt) 3) bs flushed downatrsam durinQ rain stormt. Urrrwwed Grs�s/ If facility is Ixatsd in privets residerrod area, When mowinp is nseded, Ground Cover mowinp is needed when prass exceed� 18 yrau/pround cover ahould bs inchs�in heiQht. In other sreas,the penerd mowsd to 2 inches in heipht. policy is to maks the pond aits match edjacent . ' pround covsr and tertain as IonQ a�thers i�no interferencs with the functio� of ths facility. Rods�t Holes Any evidence of rode�t hole�if fecility is Rodents destroyed end dam or sctnp u a dam or berm, or any evidencs of bertn repaired. (Caordinetion with water pipirp throuph dem o�bertn via rodent Seattfe/Kiny County Heelth holes. Deparcnentl trnects When insects auch as wasps and homsu I�sects desvoyed o� removsd interfe�s with msintenance activitiss. from eite. Trs�Growth Trse prowth dos�not dlow maintensnc� T�ees do not hinder maintenance accsas or irrterferos with msintenenc��cvvity sctivitiss. Sslectively cultivats (i.s., slope mowinp, siit removd,vactorinq, or trees wch as eldero for flrewood. squipmern movemsMsl. If trses sro not irrts�ferinq with sccess,Iseve trse�sioM. Sid�Slop�s of Eroaon Eroded damps owr 2 inche�deep wF�n Slopes ahould bs stebilized by Pond caus�of drnep�ia so!present or whero usinq appropriats erosion co�ud - thsro is potential fo�eorttinued erosion, mea�ure(sl;e.p., rock rsinforcement.plantinQ of yrass. compaction. Storp�An� S�dim�M Accumul+tsd ssdirtN�+t that excsed� 109f.of Sed+ment cleaned out to desipned tl+�desipned po�d d�pth. pond shapa and depth;pond ross�ded if nscessary to contrd eroaon. Pond DikN S�ttfern�nts Any pert of dik� wHeh has�atded 4 inches Dike should be built back to the low�r than ths desipn elev�tion. desipn sisvaoon. Em�rq�noy Rodc Ibissinq Or�iy one layer of rodc s�dsts abow n�tivs sal Replace rocks w de�ipn OwrAowJSpiNwq in sro fiw*qusro teet or larps�, or eny standerd�. �xpowro of netive soii. b-I . � A-1 11/94 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 3 - CLOSED DETENTION SYSTEMS (PIPES/TANKS) �__ Mainbnane� Cordttlona VYh�n Matnt�ane� Raults Exp�ct�d Canpon�nt DN�et b NNd�d Mlh�e Mal�ana li PKtontMd StoraQe Ana Plufly�d Air Verns On�-half of the cross s�tjon of a wnt is Wnts fre�of debris and ssdlmenL bbcked at any poiM wifh debris and a�diment. Dsbris and Accumulated sedim�M depth excesds Ail sediment and debris removed from S�dim�nt 1096 of th�diamet�r ot tM storag�arsa atorape aroa. for 1/2 I�npth of atorap�vauft or any point depth exceeds 15%of diamster. Example: 72�nch storags tank would nquirs deaninfl when ssdiment reaches depth of 7 inches for mon than 1/2 length of tank. Joints Bstween Any aack allowi�g materia!to be A!I joims between tank/pips sections ara Tank/Pipe Section Vansported into facility. sealed. Tank/Pips Be�t My part of tank/pips is bent out of shape Tank/pipe repaired or replaced to design. Out of Shaps more than 10%of its design shape. Manhale Cover not in Place Cover is missing or only partially in place. Manhole is ciosed. Any open manhole requires maintenanoe. Locking Mechanism cannot be opened by one Mechanism opens with proper toals. Mechanism Not maintenance parson with proper tools. Working Bolts into frame have less than 1/2 inch of thread (may not apply to self-locking lids). Cover Difficult to One maintenancs person cannot remova Cover can be removed and reinstalled by Rsmove lid after applying 80 pounds of lift. Intent one maintenance person. is to keap cover from sealing off accass to maintenance. Ladder Rungs IGng County Safety Office and/ar Ladder meets design standards and Unsafe maintenance person judges that ladder is allows maintenance persons safe access. unsafe due to missing rungs, ' misalignment, rust,or cracks. Catcfi Basins Ses'Catch Basins' Standard No. 5 See'Catch Basins'Standard No.5 _ . V/� A-3 1/90 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 4 - CONTROL STRUCTURE/FLOW RESTRICTOR Mai�nano� CondMlons Wlwn M�Man��w R�wlb Ezp�e�d Compon«K D�f�e:t 1�NNd�d Wh�n Malnt�nana Is PKform�d GM�aI Trash and D�bris dstano�b�lwwn d�is butld�p and All trash and debris removsd. (hdudq bottom of ariffc�plat�is I�ss than 1-1/2 S�dim�rtt) fMt. , SWctural Damay� Struatun b not s�curoly attach�d to Struetun aecuroly attached to wall and manhoN wall and outbt plp�structuro aritet pipe. ahould wpport at I�ut 1�000 pounds of up ot down proswn. Structun is not in upriqht position {allow Structurs I�oorrsct positio�. up to 10X irom plumb�. Connections to outlet pip�ars not Co�nections to outlet pipe ars watertight; watsrtight and show sqns of rust. structurs repaired or replaced and worlcs as designed. My holes-other than designed holes- Structuro has no holas other than in the structure. designed holes. Cleanout Gate Damaged or Cleanout gate is not watertight or is Gate is watertight and works as designed. Missinp missing. Gate cannot be mowd up and dawn by Gats movea up and down easily and is one maintenance psrson. watertight. Chain Isadin�to gate is missing or Chain is in place and works as dasigned. damaped. Gats is rusted owr 50%of its surfacs Gete is ropaired or roplaced to meet usa. design standards. Ori�cs Plate Dama�ed or Convol device is nat worlcing propsriy Plate is in plaos and works as designed. ' Missinfl due to missing,out of place,or bent oritice plats. Obsuuctions Any trash,debria, sediment,or vepetation Plate is free of all obstructions and works blocking the plats. as designed. Overflow Pip� Obstructio�s Any Vaah or debris bbcking (or heving Pipe is frea of all obstructions and works the potential of blocking)ths overflow as designed. P�Pe• Manhols SN'pos�d Dstention Systems'Standard See'Gossd O�tsntion Systams'Standard No.3. No.3. Catch Basin SN'Catch Basins'Standard No.5. Ss�'Catch Basi�s'Standard No.5. b-3 A-4 1/� � KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 5 - CATCH BASINS Matnt�nana Condltlona Wh�n MaleO�nana R�w1ts Exp�ct�d compoe.nt aa�t b N..a.a wr,.n MaMt�nano.i. w.+�orm.d General Tash 3 Osbris Tnah or d�btis ot moro than 1/2 cubio No trash or deb�is locatsd immediately in (Indudq foot which is locat�d immediately in fro�t froM of catch basin openinfl. S�dirtHnty of th�catch basin op�nin�or is blockinp capactty of basin by mon than t096. Trash or debris(in tM basin)that No Vash or debris in ths catch basin. exceeds 1/3 ths depth from ths bottom of basin to irnert of tha iowest pips i�to w out of the basin. Trash or debris in any inlet or outlet pipe Inlet and outlet pipas frae of trash or bbcking more than t/3 of its height. debris. Dead animals or vegetation that could No dead animals or vegatation present genarats odors that would cause within the catch basin. complaints or dangerous gases (s.g., msthana). Deposits of garbage exceeding 1 cubic No condition present which would attract foot in voVume. o�support the breeding of insects or rodents. Structurat Damage Comer of frame extends mors than 3/4 Frama is aven with curb. to Frame and/or inch past curb face into the strest (f Top Slab applicable). Top slab has holes larger than 2 square Top stab is free of holes and aacks. inches or cracks wider than 1/4 inch [mtent is to maks sure all material is running into the basin). Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab. . separadon of more than 3/4 inch of the frame from ths top slab. Ctacks in Basin Gacks wider than 1/2 inch and longer Bnain replaced or repaired to dasign Walls/Bottom than 3 feet,any evidence of soil particles standards. entering catch basin through cracks,or maintenancs penon judges that mucture is unsound. Gacka wider than 1/2 inch and Ionger No cracks more then 1/4 inch wide at the than 1 foot at the joint of any inlet/ouUet joint of inlet/ouUet pips. pipe or any evidence of soil partiGes enterinfl catch basin through cradcs. SsttlemeM/ Basin has settled more than 1 inch or has Basin replaced or repaired to design Misalignment rotated rtwre than 2 inches out of standards. _ alignment. Fro Hazard Pressnce of chemicats such as natural No flammable chemicals present. ges,oil,and gasoline. Vegetation Vsgetatio�growing across and bbcking No vegetation blocking opening to basin. rtwre than 1096 of the basin op�ninq. Vsgetation growing in inlet/outlet pipe No vegetation or root growth present. joinq that is more than six inchsa tall and less than six inches apart. Pollution Nonflammabb chemicals of mors than No pollution present other than surface t/2 cubic foot per thrse fest of basin film. length. �J l p_5 1/90 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 5 - CATCH BASINS (Continued) �- Mal�nano� CondHlon�NRNn M�M�Nn�r�w R�sults Fxp�o�d Cwnpoe�K D�f�ot Is NNd�d Wh�n Malnbnana Is PKfomNd Catch Baain Cowr C,owr Not in Plaw Cowr is rMairp or ony p�Nalty in plac�. Gtch basin oowr is cloasd. My op�n c�ch basin rpuires ma1�LKw�a. Locking M�chaniam cannot b�opM�d by on� M�chanism op�ns with proper tools. �aniun Not mai�ano�p�aon with propK tools. Worlclnfl Bolb irtEo 1nm�haw las than 1/2 inch of thnad. Cov�r pifhcuR to O��maiM�nana pKson cannot romow Co�sr can bs romoved by ons Rsmow lid aftK applying 80 Ibs.of lift; intsnt is maintenance p�rson. kNp cowr from s�alinp oit axass to maintMana. Ladde� Ladd�r Rungs Ladd�r is unsafs due to missing runqs, Ladder maets dasign standards and Unsaf� misaliqnment,rust,cracks, or sharp allows maintenance person sate axess. ed�es. Metal Grates Grate with opsning wid�r than 7/8 inch. Grate opaninps maet design standards. (f applicable) Trash and Debris Trash and debris that is blocking rtwre Grats free of trash and debris. than 2096 of flrate surtacs. Damaged or Grate missing or broken member(s)of Grate is in place and meets design Missing the grate. standards. — 1 l� a-� i/90 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 6 - DEBRIS BARRIERS (e.g. Trash RaCks) MalnO�nanw CondMbn�Wh�n WlnMmnw R�sults Esp�cMd CompoMnt ON�et Is NMd�d YMh�n �Aal�nar�b PKfonn�d General Trash and D�bris Tnsh or d�bris that is Mu�pfnp mon BartIM dwr to roceiw capac�ty flow. than 2076 of tM op�►irps in tM barriK. nnew �.d/�wa�ny �e.M an of shap.m«.n,an 3 3ears�ptac.wkl,no b.nas mon than � 8ara an mfssiny or�rMin barti�r b Bars in plac�accordinp to d�sign. missinp. Bars an loos�and rust is caudnp 50% Fi�pair or nplacs bartiK M design det�rbratlon to arry part of barriK. sundards. . . .� , D�� A-7 1/9U KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 7 - ENERGY DISSIPATORS Maln��nana CondNlon�1Mh�n Malnt�nano� R�sufts Exp�cad CompoMnt D�Net b li��d�d 1Alh�n �Aaint��►ana ia PKtorm�d mal: Rodc Pad t�Usslnp or hAcv+d Only on�IayK ot rock�xists at�ow natiw Rsplaa rocks to d�si�n standard. Rodc soil in ana fiw sqwn fNt or larfler,or arry ezpown of natM soil. Disp�rsion Tnnch Plps Pluyped with AccumulaUd s�dlm�M that ucaeds 20% Pip�deaned/flushed so that it matches Ssdiment af th�desiQn depeh. desipn. Not IXscharqinfl Viwal evid�w of watsr diacharpl�at Trench must b�rsdesiflned or rebuik to Water Propery conwmrated poi�s along trMch (normal standud. condition is a'shset flow'of watsr along trench). Int�nt is to prevent�rosion damaps. Perforations Over 1/2 of perforaUons in pipe are qean or raplace pertorated pipe. Pluppsd plugpsd with debris and sadiment. Watar Flows Out MaiMenancs person observes water Facility must be rebuiR or redesigned to Top af'Distributor' flowin9 out during any storm Isss than standards. Catch 8asin ths dssign storm or it is causing or appears liksly to cause damags. Receiving Area Water in rsceiving area is causing or has No danger of landslides. Over-Saturated potantial of causing landslide problema. Intemal: Manhole/Chamber Wom or Damaged Structurs dissipating flow deterioratsa to Replace structure to design standards. Posts, Battlas, 1/2 or original sizs or any concentrated Sides ot Chamber wom spot excseding one square foot which would maks sttucture unsound. Othar Defects See'Catch Basins' Standard No. 5 See'Catch 8asins' Standard No. 5 � �� _� — '✓�� A-8 1/rI0 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL NO. 10 - CONVEYANCE SYSTEMS (Pipes & Ditches) Nlalnbeanc� CondHlons NRNn Malnbnano� R�wlb Exp�et�d Cwnpo�t D�bct Is NNd�d VYh�n Mak�t�nana b PKform�d Pip�s S�dlm�nt�D�bris Accumulated s�dimKrt that exos�da 2096 Pips d�an�d of all s�diment and debris. of the diam�tK of the pip�. V�pstatbn Vp�tttlon that reduas fn�mov�ems�t of All vprtitlon romowd so watet flows wat�t�rouph pipes. itssly throuflh pipes. pamaped Proosctiw coatiny is damaged;rust is P9ps ropaired or replacsd. causing moro than 5096 deterioration to �Y P��P�P�• My derh that dscreasss the cross ssction Pip�repaind or roplaced. ana of pips by more than ZO%. Open Ditches Tnsh �Debris Trash and debris exceeds 1 cubic toot Trash and debris dsarsd from ditches. per 1,000 squu�test of ditch and slopes. SedimeM Axumulated sedimeM that excseds 2096 Ditcfi dsaned/flushed of all ssdYmsnt and ot ths design depth. debris so that it matches desiyn. Vegetation Vegetation that reduces free movement oi Water flows hesly through ditches. water through ditches. Eroalon Damaqs to Sss'Ponds'Standud No. 1 Ses'Ponds' Standard No. 1 Slopes Rock Lining Out of Maintenance person can see native soil Replacs rxks to design standard. Placs or Missing (M beneath the rxk Iining. Applicable) Catch Basina Sss'Gtch Basins" Standard No.5 See'Catch Basins'Standard No. 5 Debria Barriers Sse'Debris Barriers" Standard No. 6 Ses'Debris Barriers'Standard No.6 (e.p.,Trash Rack) i �_, �'V A-11 � '� KING COUNTY, WASHINGTON� SURFACE WATER DESIGN MANUAL NO. 11 - GROUNDS (Landscaping) Malrtanano� Condltlons VNwn M�M�Mnr�a R�auRs Exp�e�d Compornnt D�Not Is NNd�d Wh�n Mairr�anw la PKMrm�d G�nKal IAN�ds VYNds�rowinp in ma�than 2096 of th� VW�ds pnssrtit in I�ss than 5%ot th� M�P��s1 lar►dscaP�d ana�tn�s and�hrubs only). iandscap�d ana. S+htY�� MY P�^a a P�+�NY or othK No poitonous ve��tation prossnt in a poiwnous v�p�Uor�. landsCapsd aroa. ' Tra�h or Litt�r Pap�r,an,bottla.�obilin�mors than t Ma dear of Iftter. cubic foot within a landscaped area(vses and shrubs ottlyj of 1,000 aquan feet Trses and Shrubs Damaqs Um�s or parts of Ve�s or shrubs that an Tnes and shrubs wkh Isss than 5%of the split ot brok�n which afMci mors than total foliage with split or broken limbs. 259�of the toL!foliaq�of th�Vee ot shrub. Trses or ehrubs that havs been blown Trss or shrub in placs fres of injury. down or knodced owr. Trs�s or shrubs which ars not adaquatsly Trse or shrub in placs and adequataly supported a ars leaning over,causing supportsd; romove any dead or diseased expowrs of ths roots. Vees. V� 1 A-12 1/90 KING COUNTY, WASHINGTON, SURFACE WA'TER DESIGN MANUAL RETENTtON%DETENTION SUMMARY SHEET � DevelopmeM oate Location ENGINEER DEVELOPER Name Name Firtn Frtn Address Add�ess Phone Phone • Developed Site acres Number of Lots • Number of Dete�tion Facilities On Site • Detention provided in regional facility ❑ � Regional Facility bcation • No detention required � Acceptable receiving wate�s • Downstream Drainage Basins Immediate Major Basin Basin A Basin B Basin C Basin D TOTAL INDIVIDUAL BAS1N A B C D Drainage Basin(s) Onsite Area Offsite Area Type of Storage Facitity Live Storage Volume Predeveloped Runoff Rate 2 year 10 year Postdeveloped Runoff Rate 100 year 2 year 10 year Developed Q 100 year Type of Restriction Size of Or'rf'�ce/Restriction Or'rficeJRestriction No.1 Noz No.3 n�o.a �..�,D No.5 �� . 1/'90 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL RETENTIOWDETENTION SUMMARY SHEET SKETCH All retentioNdete�ion summary sheets must include a sketch prepared to the tolbwing criteria: 1. Heading for the drawings should be located at the bop of the sk�etch. Pre- ferably at the top right t�ac�d corner. Zhe heading sl�ould oontain: - North arrow point up or to the left — D9� - Plat name or Short Plat n�nber - Date drawn or updated - Address (nearest the site) - Thomas Brothers page and grid number - Maintenance Division n�nber 2. Label CB's and I�i's with the plan and profile designation. Label the oontrol structrue in writing or abbreviate with C.S. or O.W.S. 3. Pipes - indicate: - Pipe size - Pipe lenghth - Flow direction - Use a single, heavyw�ight line Example: ��o-��' _r-Ua,.� 4. Tanks - use a double, heavyweight li`e�and indicate the size Example: �Z„ 5. Access Roads - Outl ine the 1 imi ts of the road - Fill the outline with dots if the road is grav�el. Label in writing if it is another surface 6. Other Standard Symt�ols: - Bollarc3s ��•_ a�i� - FencesP -�f��-�Y�— - Di tches �c^--�o-�-�o 7. Label trash racks in writing. �,_�2, E)cc�tilple: }ros}� raeic ,,/•-'—i 8. Label all streets with the actual street sign desigaation. Zf you don't kncxa the actual street name, consult the plat map. 9. Znclude easen�ents and lot lines or tract limits when possible. 10. Arrange all the labeling or writing to read frnm left ta right or fran bottaa to tAp with reference t�o a p�ronerly oriented heading. 11. Indicate driveways or features that may impact our acoess, maintenance or replacement. . �-u RD-2 1/9U ,- �-�, After recording return to: ; DECLARATION OF COYENANT IN CONSIDERATION OF the approved King County , permit for application No. relating to real property legally described as follows: The undersigned as Grantor(s) , declares that the above described property is hereby subject an easement for a natural or constructed conveyance system and hereby dedicates, covenants and agrees as follows: 1 . King County shall have the right to ingress and egress over those portions not contained in Exhibit "A" to access such easement area for inspec- tion of and to reasonably monitor the system for performance, operational flows, or defects in accordance with and [as presented in King County Code Section 9.04. 120] . 2. If King County determines that maintenance or repair work is r?quired to be done to the system, the Manager of the Surface Water Management Division of the Department of Public Works shall give notice of the specific maintenance and/or repair required pursuant to K.C.C. 9.04.030. The Manager shall also set a reasonable time in which such work is to be completed by the ,` Grantor(s) , its heirs, successors or assigns. If the above required 08:M[16 - 1 - ��r,� / !/� maintenance and/or repair is not completed within the time set by the Manager, . � the County may perform the required maintenance and/or repair. Written notice will be sent to the Grantor(s) stating the County's intention to perform such maintenance. Maintenance work will not commence until at least seven (7) days � after such notice is mailed. If, within the sole discretion of the Surface Water Management Division Manager, there exists an imminent or present danger, said seven (7) day notice period will be waived and maintenance and/or repair ' work will begin immediately. 3. If at any time King County reasonably determines that any existing retention/detention system creates any of the conditions listed in K.C.C. 9.04.030 and herein incorporated by reference, the Surface '�1a� - � Management Division Manager may take measures specified therein. 4. The Grantor(s) shall assume all responsibility for the cost of any maintenance and for repairs to the system. Such responsibility shall include reimbursement to the County within thirty (30) days of the receipt of the invoice for any such work performed. Overdue payments will require payment of interest at the current legal rate as liquidated damages. If legal action ensues, the prevailing party is entitled to costs or fees. 5. The Grantor(s) is (are) hereby required to obtain written approval from the Surface Water Management Division Manager of the King County Department of Public Works prior to filling, piping, cutting, or removing veg- etation (except in routine landscape maintenance) in open vegetated drainage facilities (such as swales, channels, ditches, ponds, pond, etc. ), or perform- ing any alterations- or modifications to the drainage facilities contained within said drainage easement. Any notice or consent required to be given or D8:lII16 - 2 - ��LJ otherwise provided for by the provisions of this Agreement shall be effective �, � � i upon personal delivery, or three (3) days after mailing by Certified Mail , ' return receipt requested. 6. This Agreement constitutes the entire agreement between the parties, and supersedes all prior discussions, negotiations, and all agreements whatso- ever whether oral or written. I' ' This covenant is intended to protect the value of desirability of the ! real property described above, and shall insure to the benefit all the citi- I, zens of King County, and shall be binding on all heirs, successors and I assigns. I, OWNER OWNER STATE OF WASHINGTON ) COUNTY OF KING ) ss. On this date personally appeared before me: , to me known to be the individual (s) described in and who executed the within and fqregoing instru- ment and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes .therein stated. Given under my hand and official seal this day of , 199 NOTARY PUBLIC in and for the State of Washington, residing at � My Commission Expires: :. ...�- os:�t�6 - 3 - D-�� I ! APPENDIX E City of Renton Mitigated Deternunation of Non-Significance ........................E-1 � �,�: I �; �� ( , 4 , � _ �� � �� �l �. '�._'' 1 � �� � � _ r ' � � r � .. ' ;� ,.� CITY OF RENTON ' .�l Planning/Building/Public Works Department 3eabe T�er.Mr:os G�7immermaa P��.dminisbratoc January 06, 2000 Mr. Paul Casey,A.1.A. The Casey Group Architects 10116—36'�Avenue Court SW, Suite�109 Lakewood,WA 98499 SUBJECT: Normandy Ridge Project No. LUA-99-136,SA-A,V-B,ECF Dear Mr. Casey: This letter is written on behalf of the Environmentai Review Committee (ERC) and is to advise you that they have completed their review of the subject project. The ERC, on January 04, 2000, issued a ;hreshold Determination of Non-Significance-Mitigated with Mitigation Measures. See the enclosed ti1itigation Measures document. Appeals of either the environmental determination [RCW 43.21.0075(3), WAC 197-11-680] and/or the land use decision must be filed in writing on or before 5:00 PM January 24, 2000. If no appeals are filed by this date, both actions will become final. Appeals must be filed in writing together with the required �75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obt2ined from ;he Renton City C1erk's Office, (425)-430-6510. �he preceding info�mation wiil assist you in planning for implementation of your projec; and enable you to exercise yo�r appeal rights more fuliy, if you choose to do so. if you have any questions or desire I clarification of the above, please cail me at (425)430-7219. For the Environmental Review Committee, I ����� I Peter Rosen I Project Manager cc: Mr. & Mrs. Ervm Yoder/O wners II Mr. & Mrs. G. Warren Diamond/Owners Mr. Stephen Berg/SEB, Inc. Mr. Jack Martz � Enclosure dnsmletter G�� 1055 South Grady Way- Renton,Washington 98055 �This papor concams 50:recyc�otl matonal,209.posl consurt�er CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) ', MITIGATION MEASURES AND CONDITIONS APPLICATION NO(S): LUA-99-136,SA-A,V-B,ECF 4 APPLICANT: SEB, Inc PROJECT NAME: Normandy Ridge DESCRIPTION OF PROPOSAL: Proposal to construct 83 multi-family residentiai units, consisting of 42 ground-related townhouses and 41 muiti-family stacked flats.Access is proposed via a driveway off Talbot Road S. A secondary, emergency access also connects to Talbot Road S. A total of 190 parking spaces are proposed; with 64 garage spaces and 64 driveway parking spaces for the townhouses, and 62 parking stalls in carports for the multi-family flats. 27 guest parking stalfs are also provided, with 24 stalis as parallel parking along the internal streets and 3 stalis of head-in parking associated with the recreation building. There are five Category 3 wetlands identified on the site, ranging in size from 475 sq. ft. to 2,048 sq. ft. The City does not regulate Category 3 wetlands that are less than 5,000 sq. ft. and hydrologically isolated. The proposal would fill the wetlands and compensatory mitigation is not required. A drainage channel/creek bisects the site and the proposal includes a 25-foot stream buffer. The proposed internal street crosses the stream in 2 locations. A variance from the Land Clearing and Tree Cutting Ordinance was approved by the Renton Board of Adjustments to allow the two street crossings to intrude into the 25-foot required buffer. LOCATION OF PROPOSAL: 4914 Talbot Road South MITIGATION MEASURES: 1. The applicant shall install a silt fence along the downslope perimeter of the area that is to be dist�rbed. The silt fence shall be in place before clearing and grading is initiated, and shall be construc;ed in conformance with the specifications presented in Section D.4.3.; of the King County SurFace Water Design Manual, Appendix D. This will be required during the construction of both off-site and on-site improvements as well as building construction. 2. Shallow drainage swafes shall be constructed to intercept surface water flow and route the flow away from the construction area to a stabilized discharge point. Vegetation growth shall be established in the ditch by seeding or placing sod. Depending on site grades, it may be necessary to line the ditch with rock to protect the ditch from erosion and to reduce flow rates. The design and construction or drainage s�riales shall conform to the specifications presented in Section 4.4.1 of the SW DM. Temporary pipe systems can also be used to convey stormwater across the site. This will be required during the construction of both off-site and on-site improvements as well as building construction. 3. The project contractor shall perform daily review ard maintenance of all erosion and sedimentation control measures at the site during the construction of both off-site and on-site improvements as well as building construction. 4. Weekly reports on the status and condi6on of the erosion control plan with any recommendations of change or revision to maintenancE schedules or installation shall be submitted by the Project Engineer of record to the public works inspector. Certification of the installation, maintenance and proper removal of the erosion control facilities shall be required prior to final approval of construction permits. . � �-Z ' Nortnandy Ridge � LUA-99-136,SA-A,V-B,ECF Mitigation Measures 8 Conditions(continued) Page 2 of 2 � 5. The applicant shall provide extra stormwater detention on-site with a 30% safety factor beyond the normal requirements for the 2, 10 and 100-year storm events to minimize additional downstream flooding problems. Plans for this facility shall be submitted to the satisfaction of the Development Services Division prior to the issuance of consUuction permits. 6. The applicant shall pay the appropriate Fire Mitigation Fee equal to $388 per multi-family unit and $0.52 per square foot for the recreation building. The Fire Mitigation Fee is payable prior to the issuance of building permits. 7. The applicant shall be required to pay a Traffic Mitigation Fee of $75 for each average daily trip associated with the project. The traffic mitigation fee is estimated to be $35,762.25. This fee is payable prior to the issuance of building permits. 8. The applicant shall pay a Park's Department mitigation fee of �354.51 per multi-family dwelling unit. The value of the proposed recreation building may be credited for up to one-third of the total parks mitigation fee. The required mitigation fee shall be subject to the approval of the Parks Department and the Development Services Division, and the fee shall be paid prior to the issuance of building permits. The Site Plan for Normandy Ridge, File No. LUA-99-136, SA-A, ECF, is approved subject to the following conditions. 1) The applicant shall submit details of the street lighting, mailboxes, and signage in order to qualify for the R-14 bonus provision. The details shall be subject to the approval of the Development Services Division, prior to issuance of building permits. 2) The applicant shall revise the site plan to eliminate the carport to the east of Building 9 because the carport does not meet the front setback requirement for detached accessory struc;ures. The revised site plan shall be subjec; to :he Gpproval of the Cevelopment Services Civisicn, prior to issuance ci building permits. 3) The applicant shall record a restrictive covenant or other device acceptable to the City that assigns tandem parking spaces to the exclusive use of specific dwelling units. The applicant shall also install signs at the garages indicating that the driveway apron is reserved for use by the unit occupant. The restrictive covenant shall be approved by the Development Services Division prior to recording. Recording of the covenart shall occur prior to final occupancy permits. ��� CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) ADVISORY NOTES APPLICATION NO(S): LUA-99-136,SA-A,V-B,ECF APPLICANT: SEB, Inc PROJECT NAAAE: Normandy Ridge DESCRIPTION OF PROPOSAL: Proposaf to construct 83 muiti-famly residentiat units. consisting of 42 ground-related townhouses and 41 muiti-family stacked flats. Access is proposed via a d�iveway off Talbot Road S. A secondary, emergency access also connects to Talbot Road S. A total of 190 parking spaces are proposed; with 64 garage spaces and 64 driveway parking spaces for the townhouses, and 62 parking stalls in carports for the multi-family flats. 27 guest parking stalls are also provided, with 24 stalls as parallel parking along the internal streets and 3 stalls of head-in parking associated with the recreation building. There are five Category 3 wetlands identified on the site, ranging in size from 475 sq. ft. to 2,048 sq. ft. The City does not regulate Category 3 wetlands that are less than S,OQO sq. ft. and hydrologically isolated. The proposal would fill the wetlands and � compensatory mitigation is not required. A drainage channel/creek bisects the site and the proposal inclu�es a 25-foot stream buffer. The proposed internal street crosses the stream in 2 locations. A variance from the Land Clearing and Tree Cutting Ordinance was approved by the Renton Board of Adjustments to allow the two street crossings to intrude into the 25-foot required buffer. LOCATION OF PROPOSAL: 4914 Talbot Road South . Advisory Notes fo Applicant: The following notes are supplemental information provided in conjunciion with the environmental defermination. Because these notes are provided as information only, they are not subject to the appea!process for envrronmental determinafions. � BUILDING Follow geotechnical recommendations. F1RE 1. The preliminary fire flow required is 3,000 GPM which requires one fire hydrant within 150 feet of the building and two additional hydrants within 300 feet of the building. 2. Secondary access roadway is required. Bollards cannot be used to control traffic. An approved gate or chain and padlock are allowed ta restrict traffic on the emergency access. All roadways 20- feet in width are required to be marked as"Fire Lane, No Parking." 3. All buildings two stoaes and five or more units are required to be sprinklered. Central station monitored fire alarm systems are required in all buildings by City Ordinance. Separate plans and permits are required for the sprinkler and fire alarm systems. PLAN REVIEW SEW ER • There is an existing 8" sewer main in Talbot Road available for this site. Most of the internal sewer system will be private, but constructed to City main line standards. A portion of the main may be required to be public to provide future service east of the site. This would required a minimum 15 foot easement, which would extend to the easterly property line. The main will not be required beyond the developed portion of the site. • System Development Charges (to be paid to the City, for Soos Creek Sewer District) will be required for this project(approximately$1835 per unit). (i � �� ' NoRnandy Ridge LUA-99-136,SA-A,V-B,ECF , Advisory Notes (continued) � Page 2 of 3 , WATER • A water main loop extension will be required for this project. To meet the fire flow requirement of 3000 gpm set by the Fire Department, a minimum 10"main must be provided through the site. Easements will be required for all on-site water mains and hydrants (minimum of 15 feet in width). • Backflow prevention devices will be required for irrigation and fire protection systems. • Depending on fire flow requirements, additional hydrants will be required. • System Development Charges will be required for this project (�510 per unit). There are SAD ($0.048 per sq. ft.) and Latecomers Fees (�0.0262 per sq. ft..) also due upon development of this site. DRAINAGE • A conceptual drainage plan and drainage repo�t has been submitted with the site plan application for this project. The conceptual drainage plan includes provisions for detention and water quality treatment in compliance with the requirements of the KCSWM. • Due to downstream flooding problems in this drainage basin, staff recommends a SEPA condition for extra detention for the on-site drainage system. The recommendation will for detention through the 100 year storm event with a 30% safety fac;or. It appears that an HPA permit is also required for this project, which will incfude this additional detention standard as a permit condition. The conceptual ��iN�ce P[.��submitted with this application complies with this additional detention requirement. • System Development Charges will be required for this project (�0.129 per sq. ft.. of new impervious surface) STREETIMPROVEMENTS • Talbot Road South adjacent to the site must be improved with curb, gutters, sidewalks, street lighting, new paving from the edge of existing pavement to the new gutter, and drainage improvements for the new street improvements. • This zone allows for condominium style development (i.e. no separate platted lots), but must meet the development standards of a shadow plat. The shadow plat provided demonstrates the equivalent of standard right-of-way widths throu5h the project, with a interccnnected vehicular and pedestrian system. The praject provides equivalent street improvements internal to the site, including adequate pavement width, curos, drainage, sidewalks and tumarounds for dead-end street sections. The standard street design requirements for this type of project has been modified to allow for sidewalks along one side of the street only, pavement widths of 20 feet where parking is precluded by driveways , on both sides of the street, and 28 feet of pavement with parking limited to one side of the street where parallel parking is feasible. • Street lighting must be provided on the private street sections, meeting or exceeding the lighting levels established in City Code. This systern will be privately owned and maintained. GENERAL _ • All required utility, drainage and street improvements will require separate plan submittals prepared according to City of Renton drafting standards by a registered Civil Engineer. The construction perrtiit application must include a itemized cost estimate for these improvements. The fee for review and inspection of these improvements is 5% of the first $100,000 of the estimated construction costs; 4% of anything over $100,00 but less than $200,000, and 3% of anything over $200,000. Half of this fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. There may be additional fees for water service related expenses. PARKS Recommend 5-foot bike lanes striped and signed on Talbot Road S. Ensure that new street trees are not planted under existing electric/telephone lines. ��� � . � . Nortnandy Ridge • LUA-99-136,SA-A,V-B,EC F Advisory Notes (continued) Page 3 of 3 POLICE Estimate 76.36 police calls for service annually, based on the number and type of residential dwelling units. Many of these estimated calls will occur during the construction phase, and will be incidents such I as Trespass, Commercial Burglary and Theft of building materials and tools. To help prevent these crimes, the site will need to have temporary, security fencing in place and security lighting. Post the correct No Trespass signs along the fencing (�efer to the attached flier with the correct wording). Other properties along Talbot Road experienced crime problems such as burglary, theft, trespass and even a drive-by shooting at one of the construction traile�s. Other sites felt the need to use the services of off-duty police and private security companies for on-site patrols of the area while it was being built. All building materials and tools will need to be kept locked up when not in use, and any construction site office trailer will need to have metal doors with dead-bolt locks, metal bars over the windows, and all office machinery will need to have the serial numbers recorded to aid in recovery in the event of theft. On some of the proposed units, there are windows adjacent to the entry doors. These windows will either need to have reinforced glass in place, or an application of security film. Otherwise, it would be too easy `or a burglar to break the glass, put his hand through the window, unfock the front door and gain entry to individual units. Each door to each unit will need to be solid core wood or metal, with dead-bolt locks and peepholes for security of the residents. Each unit will need to have the address clearly posted, of a color that contrasts strongly with the color of the unit, and at least 6" in height, to aid ' responding emergency personnel. Since this development has one entry/exit, recommend the installation of a security gate to limit access only to residents and guests. PLANNING Only rockeries or retaining walls that are less than 4-feet in height may extend into required yard setbacks. The applicant shall require variance approval if the rockery walls shown on the site plan that extend into the required yard setbacks exceed 4-feet in height. I V��