GEOTECHNICAL ENGINEERING STUDY
PROPOSED ELM HURST
RESIDENTIAL SUBDIVISION
201 BREMERTON AVENUE
RENTON, WASHINGTON
E-11251
August 30, 2004
Revised December 2,2004
PREPARED FOR
LIBERTY RIDGE, LLC
~,r Scott S. Riegel
Sta fist
Kristina M. Weller, P.E.
Project Manager
Earth Consultants, Inc.
1805 -136th Place Northeast, Suite 201
Bellevue, Washington 98005
(425) 643-3780
Toll Free 1-888-739-6670
DEVELOPMENT P
CITY OF AENT~~NING
DEC 2 8 2aO~
RECEIVED
IMPORTANT INFORMATION
ABOUT YOUR
GEOTECHNICAL ENGINEERING REPORT
More construction problems are caused by site subsur-
face conditions than any other factor As troublesome as
subsurface problems can be. their frequency and extent
have been lessened considerably in recent years. due in
large measure to programs and publications of ASFE/
The Association of Engineering Firms Practicing in
the Geosciences.
The following suggestions and observations are otfered
to help you reduce the geotechnical-related delays.
cost-overruns and other costly headaches that can
occur during a construction project.
A GEOTECHNICAL ENGINEERING
REPORT IS BASED ON A UNIQUE SET
OF PROJECT-SPECIFIC FACTORS
A geotechnical engineering report is based on a subsur-
face exploration plan designed to incorporate a unique
set of project-specific factors. These typically include:
the general nature of the structure involved. its size and
configuration; the location of the structure on the site
and its orientation; physical concomitants such as
access roads. parking lots. and underground utilities.
and the level of additional risk which the client assumed
by virtue of limitations imposed upon the exploratory
program. To help avoid costly problems. consult the
geotechnical engineer to determine how any factors
which change subsequent to the date of the report may
affect its recommendations.
Unless your consulting geotechnical engineer indicates
otherwise. your geotechnical engineering report should not
be used:
• When the nature of the proposed structure is
changed. for example. if an office building will be
erected instead of a parking garage. or if a refriger-
ated warehouse will be built instead of an unre-
frigerated one;
• when the size or configuration of the proposed
structure is altered;
• when the location or orientation of the proposed
structure is modified;
• when there is a change of ownership. or
• for application to an adjacent site.
Geotechnical engineers cannot accept responsibility for problems
which may develop if they are not consulted after factors consid-
ered in their report's development have changed.
MOST GEOTECHNICAL "FINDINGS"
ARE PROFESSIONAL ESTIMATES
Site exploration identifies actual subsurface conditions
only at those points where samples are taken. when
they are taken. Data derived through sampling and sub-
sequent laboratory testing are extrapolated by geo-
technical engineers who then render an opinion about
overall subsurface conditions;their likely reaction to
proposed construction activity. and appropriate founda-
tion design. Even under optimal circumstances actual
conditions may differ from those inferred to exist.
because no geotechnical engineer. no matter how
qualified. and no subsurface exploration program. no
matter how comprehensive. can reveal what is hidden by
earth. rock and time. The actual interface between mate-
rials may be far more gradual or abrupt than a report
indicates. Actual conditions in areas not sampled may
differ from predictions. Nothing can be done to prevent the
unanticipated. but steps can be taken to help minimize their
impact. For this reason. most experienced owners retain their
geotechnical consultants through the construction stage. to iden-
tify variances. conduct additional tests which may be
needed. and to recommend solutions to problems
encountered on site.
SUBSURFACE CONDITIONS
CAN CHANGE
Subsurface conditions may be modified by constantly-
changing natural forces. Because a geotechnical engi-
neering report is based on conditions which existed at
the time of subsurface exploration. construction decisions
should not be based on a geotechnical engineering report whose
adequacy may have been affected by time. Speak with the geo-
technical consultant to learn if additional tests are
advisable before construction starts.
Construction operations at or adjacent to the site and
natural events such as floods. earthquakes or ground-
water fluctuations may also affect subsurface conditions
and. thus. the continuing adequacy of a geotechnical
report. The geotechnical engineer should be kept
apprised of any such events. and should be consulted to
determine if additional tests are necessary.
GEOTECHNICAL SERVICES ARE
PERFORMED FOR SPECIFIC PURPOSES
AND PERSONS
Geotechnical engineers' reports are prepared to meet
the specific needs of specific individuals. A report pre-
pared for a consulting civil engineer may not be ade-
quate for a construction contractor. or even some other
consulting civil engineer Unless indicated otherwise.
this report was prepared expressly for the client involved
and expressly for purposes indicated by the client. Use
by any other persons for any purpose. or by the client
for a different purpose. may result in problems. No indi-
vidual other than the client should apply this report for its
intended purpose without first conferring with the geotechnical
engineer. No person should apply this report for any purpose
other than that originally contemplated without first conferring
with the geotechnical engineer
A GEOTECHNICAL ENGINEERING
REPORT IS SUBJECT TO
MISINTERPRETATION
Costly problems can occur when other design profes-
sionals develop their plans based on misinterpretations
of a geotechnical engineering report. 1b help avoid
these problems. the geotechnical engineer should be
retained to work with other appropriate design profes-
sionals to explain relevant geotechnical findings and to
review the adequacy of their plans and specifications
relative to geotechnical issues.
BORING LOGS SHOULD NOT BE
SEPARATED FROM THE
ENGINEERING REPORT
Final boring logs are developed by geotechnical engi-
neers based upon their interpretation of field logs
(assembled by site personnel) and laboratory evaluation
of field samples. Only final boring logs customarily are
induded in geotechnical engineering reports. These logs
should 'lOt under an!! circumstances be redrawn for indusion in
architectural or other design drawings. because drafters
may commit errors or omissions in the transfer process.
Although photographic reproduction eliminates this
problem. it does nothing to minimize the possibility of
contractors misinterpreting the logs during bid prepara-
tion. When this occurs. delays. disputes and unantici-
pated costs are the all-too-frequent result.
To minimize the likelihood of boring log misinterpreta-
tion. give contractors read!! access to the complete geotechnical
engineering report prepared or authorized for their use.
Those who do not provide such access may proceed un-
der the mistaken impression that simply disdaiming re-
sponsibility for the accuracy of subsurface information
always insulates them from attendant liability. Providing
the best available information to contractors helps pre-
vent costly construction problems and the adversarial
attitudes which aggravate them to disproportionate
scale.
READ RESPONSIBILITY
CLAUSES CLOSELY
Because geotechnical engineering is based extenSively
on judgment and opinion. it is far less exact than other
design diSCiplines. This situation has resulted in wholly
unwarranted daims being lodged against geotechnical
consultants. 1b help prevent this problem. geotechnical
engineers have developed model dauses for use in writ-
ten transmittals. These are not exculpatory dauses
designed to foist geotechnical engineers' liabilities onto
someone else. Rather. they are definitive dauses which
identify where geotechnical engineers' responsibilities
begin and end. Their use helps all parties involved rec-
ognize their individual responsibilities and take appro-
priate action. Some of these definitive dauses are likely
to appear in your geotechnical engineering report. and
you are encouraged to read them dosely. Your geo-
technical engineer will be pleased to give full and frank
answers to your questions.
OTHER STEPS YOU CAN TAKE TO
REDUCE RISK
Your consulting geotechnical engineer will be pleased to
discuss other techniques which can be employed to mit-
igate risk. In addition. ASFE has developed a variety of
materials which may be beneficial. Contact AS FE for a
complimentary copy of its publications directory.
Published bI,J
A5F 'THE ASSOCIATION
OF ENGINEERING FIRMS
PRACTICING IN THE GEOSCIENCES
8811 Cole5Ville Road/Suite G 106/Silver Spring. Maryland 20910/(301) 565-2733
0788/3M
August 30, 2004
Revised December 2, 2004
Liberty Ridge, LLC
9125 Tenth Avenue South
Seattle, Washington 98108
Attention: Mr. Gary Merlino
Dear Mr. Merlino:
Established 1975
E-11251
Earth Consultants, Inc. (ECI) is pleased to submit our report titled "Geotechnical
Engineering Study, Elm Hurst Residential Development, 1 36th Avenue Southeast, Renton,
Washington". This report presents the results of ECI's field exploration and engineering
analyses.
Based on the results of this study, it is ECI's opinion the construction of single-family
residences and associated infrastructure elements, at this site, is feasible from a
geotechnical standpoint. Support for the residences should be provided using
conventional spread and continuous foundation systems bearing on competent site soils
or on granular structural fill used to modify site grades. Slab-on-grade floors should be
similarly supported.
Due to the variability and extent of fill encountered at our test pit locations, the suitability
of site soils for use as structural fill should be further assessed at the time of
construction. Portions of the existing site soils may be deemed unsuitable, and would
require replacement with a granular structural fill. In addition, the soils in the vicinity of
the proposed detention tract are generally unsuitable; therefore we recommend the pond
be lined.
Specific recommendations regarding structural fill placement, detention pond
construction, and the suitability of the existing site soils, as well as pertinent, project-
related geotechnical recommendations are discussed further in this report.
1805136th Place N.E., Suite 201, Bellevue, WA 98005
Bellevue (425) 643-3780 FAX (425) 746-0860 Toll Free (888) 739-6670
Other Locations
Fife
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
E-11251
Page 2
ECI appreciates this opportunity to be of service to you. If you have any questions or if
we can be of further assistance, please call.
Respectfully submitted,
EARTH CONSULTANTS, INC.
Kristina M. Weller, P.E.
Project Manager
SSR/KMW Iddw
Earth Consultants, Inc.
TABLE OF CONTENTS
E-11251
PAGE
INTRODUCTION..................................................................................................... 1
General ............................................................................................................ .
P · D .. rOJect escrlptlon ....................... " ............. , ............... , ....... , ............................. .
Scope of Services ............................................................................................. .
1
1
2
SITE CONDITIONS.................................................................................................. 3
Surface ............................................................................................................. 3
Subsurface ................................................. , . . . .. . . .. . . . . . . . . . . . . . . .. . . . .. . . . . .. . .. . . .. . . . . . . . . .. . 3
Groundwater. ... . . ... . ... . . ... .. . . . .. . .. . . . . . . .. . .. . . . . . . . . . . ... . . . .. . .. . . . . . . . . . . . . . . . . . . . . . .. . .. . . .. . . . . . . . . . . . 4
DISCUSSION AND RECOMMENDATIONS ................................................................. 4
General ............................................................................................................. 4
Site Preparation and General Earthwork ............................................................... 5
Stripping ...................................................................................................... 5
Structural Fill ................................................................................................ 6
Compacted Berms and Till Liners.................................................................... 6
Rockeries and Modular Block Walls ................................................................. 7
Foundations ...................................................................................................... 7
Retaining and Foundation Walls........................................................................... 9
Slab-on-Grade Floors.......................................................................................... 9
Seismic Design Considerations.......................................................................... 1 0
Ground Rupture ........................................................................................... 1 0
Liquefaction .......... , ................................ , .................. " ......... " . . . . . . .. .. .. . . . . . . .. . . 1 0
Ground Motion............................................................................................. 11
Excavations and Slopes..................................................................................... 11
Site Drainage.................................................................................................... 11
Utility Support and Backfill................................................................................. 1 2
Pavement Areas ............................................................................................... 1 3
LIMITATIONS........................................................................................................ 14
Additional Services ........................................................................................... 1 4
Earth Consultants, Inc.
ILLUSTRATIONS
Plate 1
Plate 2
Plate 3
Plate 4
APPENDICES
Appendix A
Plate A1
Plates A2 through A 11
Appendix B
Plates B 1 and B2
TABLE OF CONTENTS, Continued
E-11251
Vicinity Map
T est Pit Location Plan
Retaining Wall Drainage and Backfill
Typical Footing Subdrain Detail
Field Exploration
Legend
T est Pit Logs
Laboratory Test Results
Particle Size Distribution Reports
Earth Consultants, Inc.
General
REVISED
GEOTECHNICAL ENGINEERING STUDY
PROPOSED ELM HURST
RESIDENTIAL SUBDIVISION
201 BREMERTON AVENUE
RENTON, WASHINGTON
E-11251
INTRODUCTION
This report presents the results of the geotechnical engineering study completed by Earth
Consultants, Inc. (ECI) for the proposed Elmhurst residential subdivision in Renton,
Washington. The general location of the site is shown on the Vicinity Map, Plate 1. The
purpose of this study was to explore the subsurface conditions at the site and, based on
the conditions encountered, develop geotechnical recommendations for the proposed site
development.
Project Description
Based on review of the preliminary site plan, the site development will include up to sixty-
four (64) residential lots, associated access streets, and drainage facilities. At the time
this study was performed, the site, roadway locations, and exploratory locations were
approximately as shown on the Test Pit Location Plan, Plate 2.
The currently proposed development plan includes construction of up to sixty-four (64)
single-family residences with an asphalt paved access roadway system. In order to
provide roadway and adjacent building lot grades, grading of the existing site contours
will be necessary. Based on the existing site topography, we anticipate site grading will
be minimal, with cuts and fills of less than approximately four feet generally required,
except in relation to the detention pond, where fills may be as deep as seven feet in some
places.
We anticipate the proposed residences will be of relatively lightly loaded, wood-frame
construction, with a combination of slab on grade and wood joist floors.
A stormwater detention pond/facility will be constructed in the southwest potion of this
site within proposed Tract A. A combination of cuts and fills will be used in the
construction of that pond/facility.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
E-11251
Page 2
If the above design criteria are incorrect or change, ECI should be consulted to review
the recommendations contained in this report. In any case, ECI should be retained to
perform a general review of the final design.
Scope of Services
Our scope of services for this project included excavating a series of test pits with client-
provided track-hoe and operator, and the preparation of this report, which specifically
addresses:
• Surface and subsurface soil and water conditions;
• Site preparation, grading and earthwork procedures, including stripping depth
recommendations, details of structural fill placement and compaction;
• Suitability of existing on-site materials for use as structural fill, or
recommendations for imported fill materials;
• Pavement subgrade preparation recommendations;
• Utility trench excavation and backfill recommendations;
• Seismic design criteria;
• Short-term and long-term groundwater management and erosion control
measures;
• Foundation design recommendations, including bearing capacity and lateral
pressures for walls and structures;
• Estimates of potential total and differential settlement magnitudes; and
• Temporary and permanent slope recommendations.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
SITE CONDITIONS
Surface
E-11251
Page 3
The subject site is located on the southwestern terminus of Bremerton Avenue Northeast
(formerly 136th Avenue Southeast under the King County addressing system), in Renton
(see Plate 1, Vicinity Map). The site is roughly rectangular in shape with an area of
approximately ten acres. The site is bordered on the north and south by residential
development, to the east by Bremerton Avenue Northeast (the southerly portion of which
is currently being improved in conjunction with the Laurelhurst residential subdivision),
and to the west by a stream/drainage channel, which was dry during our July 2004 field
investigation.
The site topography gently descends to the southwest with approximately 20 feet of
elevation change across the site. The existing topography is largely the result of past
filling and grading activities.
The surrounding topography to the south and west is lower in elevation than the
existing site. There are a few large stockpiles of soil located in the northwest corner of
the site.
There are three residential buildings and other buildings located in the northeast
portions of the site.
The site contains little existing vegetation. Some trees and brush lie along portions of the
site perimeter.
Subsurface
Subsurface conditions were explored by excavating ten test pits to depths of up to
seventeen (17) feet below existing grades. The approximate locations of the test pits are
shown on Plate 2. Please refer to the Test Pit Logs, Plates A2 through A 11, and
Appendix B for a more detailed description of the conditions encountered at each location
explored. A description of the field exploration methods is included in Appendix A. The
following is a generalized description of the subsurface conditions encountered.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30,2004
Revised December 2, 2004
E-11251
Page 4
The test pits indicate that the majority of the site is immediately underlain by fill with
depths varied up to fifteen (15) feet and generally increasing in depth towards the south
and west site boundaries. The fill consisted of medium dense silty sand with gravel
(Unified Soil Classification SM) and contained variable amounts of construction debris and
organic matter such as tree limbs and trunk pieces.
The native soils underlying the fill in the majority of the exploration sites consist primarily
of medium dense to dense poorly graded sand with gravel (SP), silty sand (SM), silty sand
with gravel (SM) and well graded gravel with sand (GW).
Review of the King County Soil Survey indicates the site is immediately underlain by
Alderwood series glacial till soils. However, we encountered native soils in several of the
exploration sites that are consistent with outwash sand and gravel soils. The Soil Survey
map for the subject area indicates isolated areas of Everett series soils to the northeast of
the subject site. The native soil encountered in the majority of the site is interpreted to
be Alderwood series glacial till soils while the native soil encountered in isolated areas of
the explorations sites is interpreted as Everett series outwash soil.
Groundwater
Groundwater seepage was not encountered at our test pit locations at the time of our
fieldwork in July 2004. However, the contractor should be made aware that
groundwater is not static. There can be fluctuations in the level depending on the
season, amount of rainfall, surface water runoff, and other factors. Generally, the water
level is higher and the seepage rate is greater during the wetter months of the year
(typically October through May).
DISCUSSION AND RECOMMENDATIONS
General
Based on the results of this study, it is ECl's opinion that the construction of single-family
residences with associated infrastructure is feasible from a geotechnical engineering
standpoint. Support for the residences should be provided using conventional spread and
continuous foundation systems bearing on competent site soils or on granular structural
fill used to modify site grades. Slab-on-grade floors should be similarly supported.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
E-11251
Page 5
Medium dense to dense fill was encountered at the majority of the exploration sites
varying in depths up to over fifteen (15) feet. Portions of the fill also contained varying
amounts of organic and construction debris. Those portions of the fill may be unsuitable
for use as structural fill and will require replacement with a granular structural fill.
This report has been prepared for specific application to this project only and in a manner
consistent with that level of care and skill ordinarily exercised by other members of the
profession currently practicing under similar conditions in this area for the exclusive use
of Liberty Ridge, LLC and its representatives. No warranty, expressed or implied, is
made. This report, in its entirety, should be included in the project contract documents
for the information of the contractor.
Site Preparation and General Earthwork
Based on the preliminary plat site drawing, it appears that site earthwork will consist of
installing erosion control measures, stripping the site, cutting and filling the site to provide
street and building pad grades, installing underground utilities, constructing the storm
water detention pond, and preparing curb, gutter, sidewalk and roadway subgrades.
Stripping
Silt fencing should be installed on the downslope portions of the property and
construction fence should be installed in other areas. We recommend ECI be contacted
once the site clearing limits are flagged to walk the site with the contractor to provide
additional geotechnical and erosion control recommendations, as necessary.
The proposed grading areas of the site should be stripped and cleared of surface
vegetation, organic matter, and other deleterious material. Existing concrete structures
can be considered for use as an additive to structural fill provided it is reduced to a
maximum aggregate grain size of four inches. Existing utility pipes to be abandoned
should be plugged or removed so that they do not provide a conduit for water and cause
soil saturation and stability problems.
Stripped materials should not be mixed with materials to be used as structural fill. A
representative of ECI should be on site periodically during stripping to observe the
stripping operation and provide additional recommendations for stripping depths, if
needed. Stripped materials may be considered for use in non-structural fill areas.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
Structural Fill
E-11251
Page 6
Structural fill is defined as compacted fill placed under buildings, roadways, slabs,
pavements, slope areas, or other load-bearing areas. Structural fill should be placed in
horizontal lifts not exceeding twelve (12) inches in loose thickness. Fill materials should
be placed at or near their optimum moisture content. Structural fill should be compacted
to a minimum of 95 percent of its laboratory maximum dry density determined in
accordance with ASTM Test Designation 0-1557-00 (Modified Proctor).
The suitability of the existing fill soils for use as structural fill should be further evaluated
at the time of construction. Some of the existing fill soils may not be suitable for use due
to the presence of organic debris. Based on the conditions observed in the test pits, we
anticipate the fill soils that are suitable for structured fill will be near the optimum
moisture content provided the grading operations are conducted during dry weather.
Moisture conditioning of the soils may be necessary depending on the conditions
observed during construction.
Compacted Berm and Till Liners
In our opinion, the existing site soils observed at the test pit locations should generally
be suitable for the detention pond berms. However, due to the amount and extent of
debris and organic matter encountered in our test pits in the vicinity of the proposed
detention pond, the suitability of using the existing soils for use in pond berms should
be further assessed at the time of construction. Portions of the soil may be deemed
unsuitable, in which case the soils would require removal and replacement with an
approved fill material.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2,2004
E-11251
Page 7
In addition, we recommend that the pond be lined. At the time the soils are placed,
the moisture content of the soils should be at or slightly above the optimum moisture
content. Moisture conditioning of the soil may be necessary prior to placement. The
soil used for the compacted till liner should meet the following gradation:
Till Liner Gradation
Sieve Size Percent Passing
6-inch 100
4-inch 90
No.4 70 -100
No. 200 20 -100
The thickness of the compacted till liner should be at least eighteen (18) inches, the
soil should be placed in six inch lifts, and compacted to a relative compaction at least
95 percent (ASTM D-1557-00). Eel should observe the placement of the till liner and
provide testing of the compacted soil.
Rockeries and Modular Block Walls
In our opinion, the use of _ rockeries or modular block walls at the site is feasible from a
geotechnical standpoint. If walls or rockeries that exceed four feet in exposed height
are utilized, an engineered design will need to be completed. ECI can provide an
engineered design for site rockeries or modular block walls, if requested. At a
minimum, due to the variability of the site soils, ECI should review the layout of the
proposed walls and the proximity of foundations to the walls. Supplement
geotechnical recommendations can then be prepared, if necessary, to address wall
design and surcharge loading.
Foundations
If the site is prepared in accordance with the recommendations provided above, it is ECI's
opinion the proposed residences can be supported on a conventional spread and
continuous footing foundations bearing on competent site soil or on granular structural
fill. Large debris or excessive organic debris should be removed and replaced with
granular structural fill if encountered in structural area excavations.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2,2004
E-11251
Page 8
With foundation support obtained as described, for design, an allowable soil bearing
capacity of two thousand (2,000) pounds per square foot (psf) for structural fill or
competent site soil, should be used. Continuous and individual spread footings should
have minimum widths in accordance with local building codes. Loading of this magnitude
would be provided with a theoretical factor-of-safety in excess of 3.0 against shear
failure. For short-term dynamic loading conditions, a one-third increase in the above
allowable bearing capacity can be used.
For frost protection considerations, exterior foundation elements should be placed at a
minimum depth of eighteen (18) inches below final exterior grade. Interior spread
foundations can be placed at a minimum depth of twelve (12) inches below the top of
slab or on competent soils exposed in the crawl space surface, except in unheated areas,
where interior foundation elements should be founded at a minimum depth of eighteen
(18) inches.
With structural loading as expected, total settlement in the range of one inch is
anticipated with differential movement of about one-half inch. Most of the anticipated
settlements should occur during construction as dead loads are applied.
Horizontal loads can be resisted by friction between the base of the foundation and the
supporting soil and by passive soil pressure acting on the face of the buried portion of the
foundation. For the latter, the foundation must be poured "neat" against the competent
native soils or backfilled with structural fill. For frictional capacity, a coefficient of 0.35
should be used. For passive earth pressure, the available resistance should be computed
using an equivalent fluid pressure of three hundred fifty (350) pounds per cubic foot (pet).
These lateral resistance values are allowable values, a factor-of-safety of 1.5 has been
included. As movement of the foundation element is required to mobilize full passive
resistance, the passive resistance should be neglected if such movement is not
acceptable or if the ground surface around the residence slopes away the foundation at a
gradient steeper than 5H: 1 V (Horizontal:Vertical).
Footing excavations should be observed by a representative of ECI, prior to placing forms
or rebar, to verify that conditions are as anticipated in this report.
Earth Consultants. Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
Retaining and Foundation Walls
E-11251
Page 9
Retaining walls, and foundation walls that act as retaining walls, should be designed to
resist lateral earth pressures imposed by the retained soils. Walls that are designed to
yield should be designed to resist the lateral earth pressures imposed by an equivalent
fluid with a unit weight of thirty-five (35) pet. If walls are to be restrained at the top
from free movement, the equivalent fluid weight should be increased to fifty (50) pcf.
These values are based on horizontal backfill an~ assume that surcharges due to backfill
slopes, hydrostatic pressures, traffic, structural loads or other surcharge loads will not act
on the wall. If such surcharges are to apply, they should be added to the above design
lateral pressure. The foundation bearing, passive pressure, and friction coefficient
previously provided in the Foundations section are applicable to retaining walls.
In order to reduce the potential for hydrostatic forces building up behind the walls,
retaining walls should be backfilled with a suitable free-draining material extending at
least eighteen (18) inches behind the wall. The free-draining material should consist of
washed drain rock or pea gravel. The remainder of the backfill should consist of
structural fill. A perforated drainpipe should be placed at the base of the wall and should
be surrounded by a minimum of one cubic foot per lineal foot of pea gravel. A typical
detail is attached as Plate 3.
Slab-an-Grade Floors
Slab-on-grade floors should be supported on competent existing site soil or on granular
structural fill. Disturbed or unstable subgrade soil must either be recompacted or replaced
with structural fill.
Slab-on-grade floors should be provided with a minimum of four inches of free-draining
sand or gravel. In areas where slab moisture is undesirable, a vapor barrier such as a 6-
mil plastic membrane should be placed beneath the slab. Two inches of damp sand may
be placed over the membrane for protection during construction and to aid in curing of
the concrete or the concrete may be poured directly on the vapor barrier.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
Seismic Design Considerations
E-11251
Page 10
The Puget Lowland is classified as a Seismic Zone 3 in the 1997 Uniform Building Code
(UBC). Earthquakes occur in the Puget Lowland with regularity. However, the majority
of these events are of such low magnitude they are not detected without instruments.
Large earthquakes do occur, as indicated by the 1 949, 7.1 magnitude earthquake in the
Olympia area, the 1965, 6.5 magnitude earthquake in the Midway area, and the 6.8
magnitude earthquake of February 28, 2001, in the Nisqually area.
There are three potential geologic hazards associated with a strong motion seismic event
at this site: ground rupture, liquefaction, and ground motion response.
Ground Rupture
The strongest earthquakes in the Puget Lowland are widespread, subcrustal events,
ranging in depth from thirty (30) to fifty-five (55) miles. Surface faulting from these deep
events has not been documented to date. Therefore, it is ECI's opinion, that the risk of
ground rupture during a strong motion seismic event is negligible.
Liquefaction
Liquefaction is a phenomenon in which soils lose all shear strength for short periods of
time during an earthquake. Groundshaking of sufficient duration results in the loss of
grain-to-grain contact and rapid increase in pore water pressure, causing the soil to
behave as a fluid. To have a potential for liquefaction, a soil must be cohesionless with a
grain size distribution of a specified range (generally sands and silt); it must be loose to
medium dense; it must be below the groundwater table; and it must be subject to
sufficient magnitude and duration of groundshaking. The effects of liquefaction may be
large total and/or differential settlement for structures founded in the liquefying soils.
Based on the density and gradation of the site soils and the absence of a shallow
groundwater table, it is ECI's opinion the potential for liquefaction at the site during a
seismic event is negligible.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2,2004
Ground Motion Response
E-11251
Page 11
In accordance with Table 16-J of the 1997 UBC, soil type Sc, or Site Class C from the
International Building Code (lBC) Table 1615.1.1, should be used in design, as
appropriate.
Excavations and Slopes
The following information is provided solely as a service to our client. Under no
circumstances should this information be interpreted to mean that ECI is assuming
responsibility for construction site safety or the contractor's activities; such responsibility
is not being implied and should not be inferred.
In no case should excavation slopes be greater than the limits specified in local, state
(WISHA) and Federal (OSHA) safety regulations. Based on the information obtained from
the field exploration, the existing site soils would be classified as Type C WISHA/OSHA.
Temporary cuts greater than four feet in height in Type C soils should be sloped at an
inclination of 1.5H:1V. If slopes of this inclination, or flatter, cannot be constructed,
temporary shoring may be necessary.
Permanent cut and fill slopes should be inclined no steeper than 2H: 1 V. Cut slopes
should be observed by ECI during excavation to verify that conditions are as anticipated.
Supplementary recommendations can then be developed, if needed, to improve stability,
including flattening of slopes or installation of surface or subsurface drains. In any case,
water should not be allowed to flow uncontrolled over the top of slopes.
Permanent slopes should be hydroseeded with a fiber matrix and native seed species to
reduce erosion and improve stability of the surficial layer of soil.
Site Drainage
During site construction, storm water must not be allowed to stand in areas where
structural fill wi" be placed or in building or pavement areas. Loose surfaces should be
sealed by compacting the surface to reduce the potential for moisture infiltration into the
soils. Graded areas should be sloped towards interceptor swales to prevent ponding of
water.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2, 2004
E-11251
Page 12
The appropriate locations of subsurface drains, if needed, should be established during
grading operations by ECI' s representative at which time the seepage areas may be more
clearly defined.
Groundwater seepage was not encountered in our test pits at the time of our fieldwork in
July 2004. However, if seepage is encountered in foundation excavations during
construction, the bottom of the excavation should be sloped to one or more shallow
sump pits. The collected water can then be pumped from these pits to a positive and
permanent discharge, such as a nearby storm drain. If significant seepage is
encountered, ECI should be contacted to provide additional drainage recommendations.
Footing drains should be installed around the residence perimeters, at or just below the
invert of the footing, with a gradient sufficient to initiate flow. A typical detail is provided
on Plate 4. Under no circumstances should roof downspout drain lines be connected to
the footing drain system. Roof downspouts must be separately tightlined to discharge.
Cleanouts should be installed at strategic locations to allow for periodic maintenance of
the footing drain and downspout tightline systems.
Final site grades must allow for drainage away from the residence foundations. The
ground should be sloped at a gradient of 3 percent for a distance of at least ten feet
away from the buildings.
Utility Support and Backfill
We anticipate that storm drains, sewer, water, and franchise utilities will be installed on-
site and within the proposed roadway rights-of-way. The site soils exposed by utility
excavations should generally provide adequate support for utilities. Caving in the native
poorly graded sand and gravel soils should be expected if utility trenches encroach into
this soil layer. ECI should be on site full-time during utility excavation and backfill to
obtain representative tests on the backfill soils.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2,2004
E-11251
Page 13
Utility trench backfill is a primary concern in reducing the potential for settlement along
utility alignments, particularly in pavement areas. It is important that each section of
utility line be adequately supported in the bedding material. The material should be hand
tamped to provide support around the pipe haunches. Fill should be carefully placed and
hand tamped to about 12 inches above the crown of the pipe before heavy compaction
equipment is brought into use. The remainder of the trench backfill should be placed in
lifts having a loose thickness of less than twelve (12) inches. Trench backfill within
roadways should be compacted in accordance with the City of Renton standards.
Pavement Areas
To provide a properly prepared subgrade for pavements, the subgrade should be treated
and prepared as described in the Site Preparation and General Earthwork section of this
report. This means the subgrade should be compacted to 95 percent of the maximum
dry density (per ASTM 0-1557-00).
The subgrade should be proof-rolled with a loaded dump truck under the observation of
an ECI representative prior to the placement of the crushed rock base. Soft, wet or
unstable sub grade should be removed and replaced with granular structural fill or crushed
rock.
The following minimum pavement section is suggested for the site roadways:
• Two inches of asphalt concrete (AC) over four inches of crushed rock base (CBR),
or
• Two inches of AC over three inches of asphalt treated base (ATB) material.
Pavement materials should conform to WSDOT specifications. The use of ATB is
recommended for residential developments and should be installed prior to the end of
October. If ATB is used, the final lift of asphalt concrete pavement should be installed
following building construction on-site.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Liberty Ridge, LLC
August 30, 2004
Revised December 2,2004
LIMITATIONS
E-11251
Page 14
ECl's recommendations and conclusions are bas~d on the site materials observed, our
engineering analyses, and the design information provided us, and our experience and
engineering judgment. The conclusions and recommendations are professional opinions
derived in a manner consistent with that level of care and skill ordinarily exercised by
other members of the profession currently practicing under similar conditions in this area.
No warranty is expressed or implied.
The recommendations submitted in this report are based upon the data obtained from the
test pits. Soil and groundwater conditions between test pits may vary from those
encountered. The nature and extent of variations between exploratory locations may not
become evident until construction. If variations do appear, ECI should be requested to
reevaluate the recommendations of this report and to modify or verify them in writing
prior to proceeding with the construction.
Additional Services
As the geotechnical engineer of record, ECI should be retained to perform a general
review of the design and specifications to verify that the earthwork and foundation
recommendations have been properly interpreted and implemented in the design and in
the construction specifications.
ECI should also be retained to provide geotechnical services during construction. This is
to observe compliance with the design concepts, specifications or recommendations and
to allow design changes in the event subsurface conditions differ from those anticipated
prior to the start of construction.
Earth Consultants, Inc.
KJIJ(T"
OLIVET
CfHfTERY
q.PL
I LEISIJRE
I ESTATES
ImP
-----------~ -
ImP I
5l \I
Reference:
King County
Map 656
By Thomas Brothers Maps
Dated 2005
NOTE: This plate may contain areas of color.
ECI cannot be responsible for any subsequent
misinterpretation of the information resulting
from black & white reproductions of this plate.
s
('1
• ~,~,~,~~~,,,,.~.~!}~~J:~~!~;,,,!2E~,,
Construction Tt>sting & leBO I WABO Inspection s..,,'ices
Vicinity Map
Elm Hurst Residential Development
Renton, Washington
Drwn. GLS Date July 2004 Proj. No. 11251
Checked SSR Date 7/26/04 Plate 1
-------------- - - - - - -,.--, ---, --i-- - --, --...,
I·) 13 12 17 10 9 8 ;)
--~ ~I-~·~
~IIP-a -.-I TP-11 -.-I 15
:..17 .12 I
16 56' 57 58 59 , I
17'
~ Tfp~7
18 -.-.. _ J.
20
21
I TP-6 -.-;:2 I
TP-91 i
! -.--<-__ J L
55
54
53
S2
57
50
"
TP-5i -.-I
Trdct
1 -.-TP-41 23
"1 I),
62
63
" -.-I TP-3
25 26
----
";0
39
36
35
3,~ 32
1
27
~ 1 W
<-+3 I :::::> I
---I Z -14 W I
I ~ I
IZ ---1 0
47 II-
-~----~1 a:
W
ITP-2---: ~
-.-W
48
I 30 a: 1m
31 /1
28 I I -.-TP-11 I
29 I . ',~ _________________________ : ___ ' _____ .J
LEGEND
TP-1-r-Approximate Location of
Eel Test Pit, Proj. No.
E-11251, July 2004
---1 I I Subject Site l __ _
Existing Building
22 Proposed Lot Number
NOTE: This plate may contain areas of color.
ECI cannot be responsible for any subsequent
misinterpretation of the information resulting
from black & white reproductions of this plate.
Not -To -Scale
• GN~~,~!r.::""~ff?'~;;;~lt:.!~!~:,,,!~~,;e,
Construction Tt'sung & leBO I \VABO Inspt"ction Se-r\'in"'s
Test Pit Location Plan
Elm Hurst Residential Development
Renton, Washington
Drwn. GAP Date Dec. 2004 Proj. No. 11251
Checked SSR Date 12/2/04 Plate 2
1" Drain
Rock
WEEP HOLE DETAIL
111=111=111
1foot min.
1-4 18 inches min .• 1
Excavated Slope
Perforated Pipe
Wrapped with
Filter Fabric
1 foot min. Compacted Subgrade
STANDARD NOTES
1) Free Draining backfill should consist of
granular soil having no more than 5
percent passing the #200 sieve and
no particles greater than 4 inches in
diameter. The percentage of particles
passing the #4 sieve should be between
25 and 75 percent.
2) Structural backfill should be free of
organics, clayey soils, debris and other
deleterious materials. It should be
placed at or near the optimum moisture
content.
3) Where weep holes are utilized, surround
each weep hole with 3 cubic feet of 1 inch
drain rock. Maximum horizontal spacing
of weep holes should be 6 feet.
4) Drain pipe; perforated or slotted rigid
PVC pipe laid with perforations or slots
facing down; tight jOinted; with a positive
gradient. Do not use flexible corrugated
plastic pipe. Drain line should be bedded
on and surround with free draining 1 inch
drain rock. The drain rock may be
encapsulated with a geotechnical drainage
fabric at the engineers discretion.
~ •. ~: •. o.:.: .•... : -.0.
'0 -.! 0· •• -. .. ..
LEGEND
Surface Seal; Native Soil or other Low
Permeability Material
Free Draining Backfill-Washed Drain
Rock or Pea Gravel
Structural Fill compacted to 90 percent
relative compaction
1 inch Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
.~,~j.Q,,£~!l~,!;!I.t~~!~~, ~Q,S;
Constnlction Testing & leBO I \,\·ABO Insp<:>ction Services
RETAINING WALL DRAINAGE AND BACKFILL
Elm Hurst Residential Development
Renton, Washington
Drwn. GLS Date Aug. 2004 Proj. No. 11251
Checked SSR Date 8/27/04 Plate 3
o
4 inch min.
Diameter
Perforated Pipe
Wrapped in Drainage
Fabric
f
2 inch min. / 4 inch max.
LEGEND
I~
Surface seal; native soil or other
low penneability material.
1" Drain Rock
Drain pipe; perforated or slotted rigid
PVC pipe laid with perforations or
slots facing down; tight jOinted; with a
positive gradient. Do not use flexible
corrugated plastic pipe. Do not tie
building downspout drains into footing
lines. Wrap with Mirafi 140 Filter Fabric
or equivalent.
12 inch
min.
18 inch
min.
~I t
2 inch min.
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
• !.2,~!.!.Q.£-?~,!;!I.t~!:!,!~,:. ~~,S;
Construction Testing & leBO / \". ABO Inspection services
TYPICAL FOOTING SUBDRAIN DETAIL
Elm Hurst Residential Development
Renton, Washington
Drwn. GAP Date Aug. 2004 ProJ. No. 11251
Checked SSR Date 8/27/04 Plate 4
A
P
P
E
N
o
x
A
APPENDIX A
FIELD EXPLORATION
E-11251
Field exploration was performed by Earth Consultants, Inc. (ECI) on July 16, 2004.
Subsurface conditions at the site were explored by excavating ten test pits to a maximum
depth of seventeen (17) feet below the existing grade using a client-provided track hoe
and operator.
Approximate test pit locations and relative elevations were determined by interpolation
from site features. The locations and elevations of the test pits should be considered
accurate only to the degree implied by the method used. These approximate locations
are shown on the Test Pit Location Plan, Plate 2.
The field exploration was continuously monitored by a geologist from our firm who
classified the soils encountered, maintained a log of each test pit, obtained representative
samples, measured groundwater levels, and observed pertinent site features. Samples
were visually classified in accordance with the Unified Soil Classification System, which
is presented on Plate A 1, Legend. Representative soil samples were placed in closed
containers and returned to our laboratory for further examination.
Test Pit Logs are presented on Plates A2 through A 11. The final logs represent our
interpretations of the field logs and the results of the laboratory tests of field samples.
The stratification lines on the logs represent the approximate boundaries between soil
types. In actuality, the transitions may be more gradual. The consistency of the soil
shown on the logs was estimated based on the effort required to excavate the soil, the
stability of the trench walls, and other factors.
Earth Consultants, Inc.
MAJOR DIVISIONS GRAPH
\SYMBOL
LETTER
SYMBOL TYPICAL DESCRIPTION
Coarse
Grained
Soils
More Than'
50% Material
Larger Than
No. 200 Sieve
'Size
Fine
Grained
Soils
More Than
50% Material
Smaller Tt'an
No. 200 Sieve
Size
C
qu
W
P
*
pet
LL
PI
Gravel
And
Gravelly
Soils
More Than
)50% Coarse
rraction
Retained On
No.4 Sieve
Sand
And
Sandy
Soils
More Than
50% Coarse
Fraction
Passing No.4
Sieve
Silts Arid
Clays
Silts
And
Clays
Clean Gravels
(tittle or no fines)
Gravels With
Fines ( appreciable
amount of fines l
Clean Sand (little or no fines)
Sands With
Fines (appreciable
amount of fines)
Liquid Limit
Less Than 50
Liquid Limit 1111 Greater Than 50 U
Highly Organic Soil&
Topsoil , '" '" '" '" -I
Fill I~ IX
Well-Graded Gravels, Gravel-Sand
Mixtures, Little Or No Fines
Poorly -Graded G(avels, Gravel-
Sand Mixtures, Little Or No Fines
Silty Gravels, Gravel-Sand-
Silt Mixtures
Clayey Gravels, Gravel-Sand-
Clay Mixtures
Well-Graded Sands, Gravelly
Sands, Little Or No Fines
Poorly-Graded Sands, Gravelly
Sands, Little Or No Fines
Silty Sands, Sand -Silt Mixtures
Clayey Sands, Sand -Clay Mixtures
Inorganic Silts & Very Fine Sands, Rock Flot.r,Silty-
Clayey Fine Sands; Clayey Silts wI Slight Plasticity
Inorganic Clays Of Low To Medium Plasticity,
Gr,avelly Clays, Sandy Clays, Siliy 'Clays, Lean
Organic Silts And Organic
Silty Clays Of Low Plasticity
Inorganic Sitts, Micaceous Or Diatomaceous Fif'i
Sand' Or Silty Soils
Inorganic Clays Of High
Plasticity, Fat CI ays.
Organic Clays Of Medium To High
Plasticity, Organic Silts
Peat, Humus, Swamp Soils
With High Organic Contents
Humus And Duff Layer
Hfl"hly Variable Constituents
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
DUAL SYMBOLS are used to indicate borderline soil classification.
TORVANE READING, tsf I 2" 0,0. SPLIT SPOON SAMPLER
PENETROMETER READING, tsf
MOISTURE, % dry weight n 24" 1.0. RING OR SHELBY TUBE SAMPLER
SAMPLER PUSHED
• SAMPLE NOT RECOVERED WATER OBSERVATION WELL
DRY DENSITY, Ibs. per cubic ft.
UQUID UMIT. % SZ DEPTH OF ENCOUNTERED GROUNDWATER
PLASTIC INDEX DURING EXCAVATION
Y SUBSEQUENT GROUNDWATER LEVEL WI DATE
Earth consultants Inc. LEGEND
(Oc..:OI(~iUliCilll~lSlI\ecrs. (;cc.>log:ISIS &. Envirof\ll\ctuul SCicn1lsts
Proj. No. 11251 Date July 2004 Plate Al
Test Pit Log
Project Name:
Elm Hurst Residential
Job No. Logged by:
11251 SSR
Excavation Contactor:
Client Provided
Notes:
General
Notes
W
(%)
26.4
2
3
4
Date:
7/16/04
Test Pit No.:
Sheet
1
Ground Surface Elevation:
100'
of
1
Surface Conditions: Sparse Grass and Gravel
, medium dense to dense, damp (Fill)
-brick
-increase silt content
-increase organics
-loose
5~~~--+--=----------~~--~--~--~--~----~~----------~ SM Gray brown silty SAND gravel, medium dense,
15.3 6
7~~----+-~~~~~--~~~~~~--~~--~~~----~~----~ Test pit terminated at 7.0 feet below existing grade. No groundwater
Proj. No. 11251 DINn. GLS
encountered during e><eavation.
NOTE:
Test pit elevations relative to each other.
2004
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
conditions depided represent our observations at the time and location of this
ludgment. They are not necessarily representative of other times and locations. We cannot accept responsibility for
uWI\..".,Mi"," nrcwtAntAl"f """ thio 1t'V't
of
Test Pit Log
Project Name:
Elm Hurst Residential o. "'<:>I1l
Job No. I Logged by: 11251 SSR
Excavation Contactor:
Client Provided
Notes:
u-(/)~ General W :c.8 ~~I D.E o E Notes (%) I'!! >-~LL (/) >-
(!)(/) :::>(/)
x< SM X< -X< 1-X< x< -X< X< 2 -
><
>< -
Xx >< 3 !---Xx Xx
15.2 1 4 f--SM
r----
5 !---
!---
6 !---
7 r----GM
3.9 !---
8
i
I oa;;~6/04
Surface Conditions: Gravel
Test Pit No.:
TP-2
Ground Surface Elevation:
100'
Brown silty SAND with gravel, medium dense, moist (Fill)
-gray mottling
-asphalt pieces
"".v. ~~ v. HCI. ii\..., and silt
Brown silty SAND with gravel, medium dense, moist
Brown well graded GRAVEL with sand, dense, moist
-1.8% fines
of
1
Test pit terminated at 8.0 feet below existing grade. No ground water
encountered during e>«:avation.
~r-------~--~~--~~~----~-----------r--------------------------------------~ ~ '" Test Pit Log -Earth Consultants Inc. Elm Hurst Residential Development
§ Gootectmlcdl Fllg1net:rs. GcoIog1sIs& FllvlronmefltdlSckmIlsts Renton, Washington i Proj. No. 11251 J Own. GLS I Date July 2004 Checked SSR Date 7126/04 I Plate A3
Subsurface _"'" ,,, .. ,," ,.; ~~~ ~'X' --,/ our. ~' ,,: .. '~ ~"-at the tim~. and .Iocation of this exploratory ~~~~ ~~if!ed.~ .. '~~" '~' '! ~~. tests, analysis and ~udgme~t. They are not ".....,.... ... "1 ' ..... .,...,. """YO or omer times and~ !ocations. We cannot accept responsibility for the use or interpretation by others of
.nfl"trn'laf."n rv"AC!:AntClt"l 1\" thict I"""
Test Pit Log
project Name:
Elm Hurst Residential ~
Job No. I Logged by:
11251 SSR
Excavation Contactor:
Client Provided
Notes:
General
Noles
... IIC11l
I--
1 t--
-
2-
t--
3 I--
41--
51--
I--
SM
SM
1 ~~~6/04
Surface Conditions: Gravel
Test Pit No.:
R~
Ground Surface Elevation:
100'
Brown silty SAND with gravel, medium dense, moist (Fill)
-bark I wood layer at 1.5'
-asphalt pieces and brick
-21.4% fines
Brown silty SAND with gravel, medium dense, moist (Fill)
-dense
-gray
61--
I--
71--
t--
8 t---large concrete piece
t---brick fragment, increase organics, asphalt pieces
of
1
9~~~--+-~----~~~~~----~--~~------~----~--------~ SM Brown silty SAND with gravel, medium dense to dense, moist I--
10~~~--+-~------~--~~~~~----~~----~------------~ SP Brown poorly graded SAND with gravel, dense, moist I--
11~~----+-~~~--~~~~~~~~--~~----~~----~~--~ Test pit terminated at 11.0 feet below existing grade. No groundwater
encountered during elCCavation.
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
Test Pit Log
project Name:
Elm Hurst Residential n,
Jd> No. I Logged by:
11251 SSR
Excavation Contactor:
Client Provided
Notes:
General
Notes
W
(%)
22.8
12.4
><
>< >< ><
>< >< >< ><
>< >< >< >< I
IIClll
r-
1~
~
2~
I---
31---
I---
41---
r--
51---
r--
6r--
-
7-
-
8-
-
9-
-
10 I---
-
11 I---
SM
I o;~6/04
Surface Conditions: Gravel and Brush
Test Pit No.:
TP-4
Ground Surface Elevation:
100'
Brown silty SAND with gravel. medium dense. moist (Fill>
-asphalt. concrete and brick
-mottled texture
-increase silt content
-increase organic zone
-iron pipes
-large concrete slabs
-construction debris
of
1
-
12~~~--+-~----~~~~------------------------------------~ SM Brown silty SAND. dense. moist I---
13~;-----+-~~--~--~--~~~~~----~------~----------~ Test pit terminated at 13.0 feet below e><isting grade. No groundwater
encountered during excavation.
Test Pit Log
Elm Hurst Residential Development
Renton. Washington
m Proj. No. 11251 I Own. GlS I Date July 2004 Checked SSR Date 7126/04 I Plate A5
~u~urface_ conditions depicted represent our observations at the time and .Iocati~ of this exploratory hole.ITlC>dW:1ed .~ ':'~~,,!,'."'''''! 'Y t~ts!,.!I.!l~~~L and l~. They are not ~rily representatille of other times and locations. We cannot accept responsibility for the use or ............. ,a ... '" by others of
,"'nrrnm.n" nroGantArf nn .h~ .,..,..
Test Pit Log
Job No.
11251
~ Contactor:
Client Provided
Notes:
General
Noles
W
(%)
11.6
14.1
1
2
3
4
5
6
7
8
9
10
11
Date:
7/16/04
Surface Conditions: Grass 1 Brush
Sheet of
Test Pit No.:
Ground Surface Elevation:
100'
1 1
SM Brown silty SAND with grawl, medium dense, moist
-concrete slabs with rebar
-19.7% fines
-'NOOd debris
-concrete slabs
-tire and plastic
12~~~~+-~----~~~~~----~~--~----------------------1 SM Brown silty SAND, dense, moist to wet
13~~----+-~~~~~~~~~~~~--~~----~~----~~----1 Test pit terminated at 13. feet below existing grade. No groundwater
encountered during excavation.
Test Pit Log
Elm Hurst Residential Dewlopment
Renton, Washington
Test Pit Log
project Name:
Elm Hurst Residential Dc ........ t" ••• ...,it
of
1
Job No. I Logged by:
11251 SSR
Excavation Contactor:
Client Provided
Notes:
General
Notes
W
(%)
13.9
14.1
t--
1 t--
t--
2-
-
3-
-
4-
-
5--
6,..--
r-
7 'r--
r----
8 'r--
r----
9 t--
10 t--
-
11-
-
12 -
-
13 ----
14-
-
15 r----
SM
I ~~~6/04
Surface Conditions: Gravel
Test Pit No.:
TP-S
Ground Surface Elevation:
100'
Brown silty SAND with gravel, medium dense, moist (Fill)
-trace organics and construction debris
-increase organics
-6" thick layer of concrete wash
-concrete slabs and chunks
-wood debris
-dense
,.-
16~~~~1-~----~~~~~----~~----~----------------------~ SM Brown silty SAND with gravel, dense, moist r----
17~~----1-~~~----~~~~~~~~--~~----~~----~------~ Test pit terminated at 17.0 feet below e>dsting grade. No groundwater
encountered during e>eeavation.
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
m Proj. No. 11251 I Own. GLS I Date July 2004 Checked SSR Date 7126/04 I Plate A7
~upsurface _\NIIU'LlUI';:t depicted represent our oI?Servations at the time and .Iocation of this exploratory hole, .~o,dif!ed by enginElE!ring tests,. analysis and
~udgment. They are not necessanly representatIVe of other times and locatlOl1s. We cannot accept responSibility for the use or InterpretatlOl1 by others of .nf"'....,,'!Ifi,," ~Gi"+AI"f t'\n fhie I""",
Test Pit Log
Project Name:
Elm Hurst Residential
Job No. Logged by.
11251 SSR
Excavation Contactor:
Client Provided
Noles:
w ~:8 ~ GeneraJ
Notes
Cl. 15. .... I!! S. CD u.. (%) C!) (I) 0
2
3
11.7 4
5
6
7
8
9
10
11
12
13
14
15
5.5 16
(1):8 o E (1)>-=>(1)
Date:
7116/04
Surface Conditions: Gravel
Test Pit No.:
Sheet
1
Ground Surface Elevation:
100'
of
1
SM Brown silty SAND with gravel, medium dense, moist (Fill)
SM
-gray mottling
-gray
-20.0% fines
-brick pieces
Brown silty SAND with gravel, dense, moist
Test pit terminated at 16.0 feet below e)(jsting grade. No groundwater
encountered during e>eeavation.
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
T~tPitLog
Job No.
11251
Excavation Contactor:
Client Provided
Notes:
General W
Notes (%)
7.6
9.7
8.7
.Q B a E e ?i C)
~ ..!!! OOB 15...0.
GI u: E o E
o ~ 00;>-
=>00
SM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15 SM
Date:
7116/04
Surface Conditions: Graded Fill
Sheet of
Test Pit No.:
Ground Surface Elevation:
100'
1 1
Brown silty SAND with gravel, medium dense, moist (Fill)
-mottled texture
-construction debris
-barbed wire
Red brown silty SAND, dense, moist
Test pit terminated at 15.5 feet below existing grade. No groundwater
encountered during e>a::avation.
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
Test Pit Log
Project Name:
Elm Hurst Residential Development
Job No. I Logged by:
11251 SSR
Excavation Contactor:
Client Provided
Notes:
u-GI (/):8 General W :c.8 i .a. Q.E GI u: E o E Notes (%) 5ct o ~ (/)>-::l(/)
)< )< I--SM
>< >< )< )< 11-->< >< )< I--
>< 2 r--)<
>< I--
9.3 )< 3r--
)< I--)<
)< 41--
~ I--
>< 51-->< >< I--)<
>< 61--
>< )< ;--
>< 71--
>< ><
>< >< i--
I>~ 81--~~ I>~ r--)<~ 91--I>~ )<~ I--I> )< I>~ 10 I--
>< I--)<~ )c~ 11 I--
><} I--~y 12 r--~y ~>< I--
>< 13 i--
>< I--
>< 14 I--><
>< I--5.6 >< 15
I
b (!)
~
Surface Conditions: Graded Fill
Test Pit No.:
TP-9
Ground Surface Elevation:
100'
Brown silty SAND with gravel, dense, moist (Fill)
-gray
-pieces of brick
-16.3% fines
-slight organic and construction debris throughout fill zone
of
1
Test pit terminated at 15.0 feet below existing grade. No groundwater encountered during e><eavation.
~r---------~--~--~~--~----~----------~----------------------------------------; ~ : _~~U}~~,~.
I-
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
~~------------~------------~------------~------------~---------------r----------; ~ Proj. No. 11251 I DINn. GLS I Date July2004 Checked SSR Date 7126/04 I Plate A10
Subsurface conditions depicted represent our observationS at the time and location of thiS e>cpIoratory hole, modified by engineering tests, analysIS and ludgment. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of .mnrn"lotinn nrACtAntAl"l nn .hi~ Inn:
Test Pit Log
Job No.
11251
El«:avaI:ion Contactor:
Client Provided
Notes:
General W
Notes (%)
8.3
7.3
Proj. No. 11251
t :8 E ?i (!)
.c J! (1):8 a·a. o E II u: E o ~ (I)>> ::>(1)
SM
1
2
3
4
5
6
7
Date:
7/16/04
Surface Conditions: Graded Fill
Sheet fA
Test Pit No.:
Ground Surface Elevation:
100'
1 1
Brown silty SAND with gravel, medium dense, moist (Fill)
~bleat3.5'
8~~----+-~~~--~~~~--~--~~----~------------------~ SM Red brown silty SAND with gravel, dense, moist
9~~----+-~--~--~--~~~~~~--~~--~~~----~~----~ Test pit terminated at 9.0 feet below existing grade. No groundwater encountered during e><eavation.
Test Pit Log
Elm Hurst Residential Development
Renton, Washington
Subsurface conditions our
ludgment. They are not n..r..:!!lll""ilv representative of other times and locations. We cannot accept rMrllOl1Albilitv 1"fIVM~i"'''' nrAeAnfAl"t 1'\"
A
p
P
E
N
o
x
B
APPENDIX B
LABORATORY TESTRESUL TS
E-11251
Earth Consultants, Inc.
Particle Size Distribution Report
o it
100 \11\f'i
~~--+H~~~~~-r~~~~r-+---~~~~~+-~*+~~~r-+---+rH1~~r-+---1 ~~-Hft+~:fl~~:~i\~:~~~'~L~-+ __ ~: K+~~~~H+~-+--~H+~-+~
\! " ro~--tHtt~~~b-~~ji~~--~~tffiii~~~t-~tMiii-~--t---tMiii-~--t---i "" .. ~~ ,
W ~~--~+r~r+~~~~: ~~'r~-r~~~-+~:~~~-+~~~~H-~-r-+---+H+++~+-~--~ ~ I': ~ '\ ffi ~r+-+~H-~~i~~+r~n~~~---w.:H~n~~:~~~~~~1-~~~~~-+-+~
~ i' \ N~~ ~ ~~~H:~~~~~B+~~~~-+--~~++,~l~N~~~-Ti~+.H~~-+--~~++~~~
~~~,~~~~~~~~!:~~~~
~~--+H++~~~~~+H++~~--r---+N~~~~r-r-~~~~--r---+H++~~--r---1
~~ ,
: ... ~""'" ' 10~--+H*+~~~~-r~++~~--r---+ffl++~~rl-r-r-~*+~~--~--+H++~~--r---1 ~~~, ..ow.rJ o ~~~~1~00~~~~~---1~O~~~~~---+1~~~~~--~O~.1~~~~~--~O~.01~~~~~~O.~OO~1
GRAIN SIZE -mm
% COBBLES % GRAVEL % SAND % SILT % CLAY USCS AASHTO PL LL
o 50.1 48.1 1.8 GW
o 35.1 43.5 21.4
18.6 61.7 19.7
SIEVE PERCENT FINER SIEVE PERCENT FINER
inches
size
1.5
3/4
3/8
o
100.0
92.7
64.2
o
100.0
69.1
69.1
100.0
100.0
91.9
>< GRAIN SIZE
060 8.26 2.20 0.649
DJo 1.79 0.183 0.169
o Source:
o Source:
;:, Source:
0.335
1.16
24.67
COEFFICIENTS
number
size
#4
#8
#16
#30
#50
#100
#200
o
49.9
34.5
24.7
15.6
9.0
3.0
1.8
Sample No.: TP-2
Sample No.: TP-3
Sample No.: TP-5
Client:
Project: Elm Hurst
o
64.9
60.4
56.4
49.8
38.4
27.3
21.4
EARTH
CONSULTANTS, INC. Proiect No.: E-11251
81.4
72.4
66.9
58.7
43.4
27.8
19.7
SM
SM
SOIL DESCRIPTION
o TP-2: 7.5' -GW
Brown well graded Gravel wi1h sand; 3.9%
moisture o TP-3: 4' -SM
Dark brown silty Sand wi1h gravel; 18.9"10
moisture
;:, TP-5: 4.5' -SM
Brown silty Sand wi1h gravel; 1l.6% moisture
\
REMARKS:
o Tech: JNC
o Tech: JNC
;:, Tech: JNC
Elev.lDepth: 7.5'
Elev.lDepth: 4'
Elev.lDepth: 4.5'
Plate Bl
~ = = ~ ~ :s; .. (l Ii .. .. ~ .., .... ~
100 ~' ,
, , , 90
~~i ,
80 :\' I~r ' , ~ , ,
~ 70 ....... ~ 0::: 1IIoo~ ~ W 80 ~
Z ~ ,~ u::: , ~ N I--Z 50 ~~ " w r\ 0 S~ 0::: 40 w il~ ~ ~: a. ' , , , , ,
, ,
30 , ~ , , ~ , , I':'
20 ' ,
""! : ,
, ,
10
0
200 100 10 1 0.1 0.01 0.001
GRAIN SIZE -mm
% COBBLES % GRAVEL % SAND % SILT % CLAY USCS AASHTO PL LL
0 35.8 44.2 20.0 8M
0 22.9 60.8 16.3 8M
b, 20.2 53.9 25.9 8M
SIEVE PERCENT FINER SIEVE PERCENT FINER SOIL DESCRIPTION
inches 0 0 b, number 0 0 b, o TP-7: 4' -SM
size size Dark gray silty Sand wi1h gravel; 11.7"10 1.5 100.0 100.0 100.0 #4 64.2 77.1 79.8 moisture 3/4 100.0 100.0 100.0 #8 57.7 70.2 7l.2 o TP-9: 3' -SM 3/8 72.1 88.5 91.5 #16 52.8 65.3 65.8 Gray silty Sand wi1h gravel; 9.3% moisture #30 46.5 56.7 58.8 #50 36.0 38.0 46.4 b, OS-I': 0' -SM #100 25.5 22.5 33.6
#200 20.0 16.3 25.9 Gray silty Sand wi1h gravel; .9% moisture
>< GRAIN SIZE REMARKS:
D60 3.00 0.721 0.656 o Tech: JNC
D3Q 0.208 0.220 0.113
D10 o Tech:JNC
>< COEFFICIENTS
Cc b, Tech: JNC
Cu
o Source: Sample No.: TP-7 Elev.lDepth: 4'
o Source: Sample No.: TP-9 Elev.lDepth: 3'
b, Source: Sample No.: GS-l Elev.lDepth: 0'
EARTH Client:
Project: ElmHurst
CONSULTANTS, INC. Proiect No.: E-11251 Plate B2
~Copies
~Copies
DISTRIBUTION
E-11251
Liberty Ridge, LLC
9125 Tenth Avenue South
Seattle, Washington 98108
Attention: Mr. Michael Merlino
Pacific Engineering Design, LLC
4180 Lind Avenue Southwest
Renton, Washington 98055
Earth Consultants, Inc.
• Geotechnical
Engineering
• Earthwork
Observation
& Testing
Services
• Geological
Services
• Laboratory
Testing:
Construction
Materials
Engineering
& Inspection
• Environmental
Services
Earth Consultants, Inc., a subsidiary
of U.S. Laboratories, Inc., is a consulting geotechnical,
environmental, and materials engineering firm
specializing in providing high quality services, which
are economical and responsive. Our multidisciplined
approach includes a broad base of services which include:
December 22, 2004
Liberty Ridge LLC
9125 10th Avenue South
Seattle, WA 98108
Attn: Mr. Michael Merlino
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 282004
RECEIVED
RE: WETLAND AND STREAM RECONNAISSANCE FOR THE PROPOSED
"ELMHURST" RESIDENTIAL SUBDIVISION, RENTON, WASHINGTON
At your request, Shannon & Wilson visited the Elmhurst site on June 8, 2004, and
December 20, 2004, to conduct a wetland and stream reconnaissance in anticipation of your
planned application to the City of Renton for an approximately 64-10t single-family residential
subdivision of the site. The property (referred to herein as the "site" or "Elmhurst") consists of
three parcels of land (Assessor's Parcel Numbers 5182100049, 5182100050, and 5182100051)
that are located at 201 Bremerton Avenue NE in Renton, Washington.
Our scope of work consisted of (a) delineation of on-site wetlands; (b) a wetland assessment,
including an assessment of an off-site wetland to the north of the site's northeast comer (a
wetland referred to herein as "Wetland B" because we referred to it as such in a wetlands
delineation report we prepared in 1998 dealing with an abutting property); and
(c) categorization of an ephemeral stream, part of the upper reach of Maplewood Creek, which
coincides, in part, with the subject property's west boundary and which, near the site's
southwest comer, turns east on the site then heads to the southeast off of the site. At your
request, we subsequently flagged the eastern edge of Maplewood Creek as it crosses the subject
property. Our scope of work also included preparation of this letter report, describing our
findings and categorizing an on-site wetland, the off-site wetland and the stream based on the
City of Renton's Development Regulations to determine the width(s) of required buffers (if
any) associated with both the wetlands and the stream.
400 NORTH 34TH STREET· SUITE 100
P.O. BOX 300303
SEATTLE, WASHINGTON 98103
206·632·8020 FAX 206·695·6777
TOO: 1·800·833·6388
21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
December 22, 2004
Page 2
SHANNON &WILSON.ING.
BACKGROUND
The Soil Survey of King County Area, Washington (U.S. Soil Conservation Service, 1973)1
maps the site's soils as Alderwood gravelly sandy loam. That soils series, which is considered
moderately well-drained, is not listed on the Washington State hydric soils list.
The 1991 City of Renton Wetland Inventory and the 1988 National Wetland Inventory (NWI)
map do not show any wetlands on or adjacent to the site; however, Maplewood Creek is
mapped and is shown crossing a portion of the site. The creek is classified in the NWI as a
riverine, intermittent, seasonally flooded streambed.
METHODS
We walked the Elmhurst site to identify plant community types and wetland and stream
classification types present. We determined wetland presence using methods described in the
1987 Army Corps of Engineers Wetland Delineation Manual and supplemented by the
Washington State Department of Ecology (Ecology) 1997 Wetland Identification and
Delineation Manual. The triple-parameter approach, which considers the presence of
vegetation, soil conditions, and hydrologic conditions, was used to determine wetland areas.
Sample points were selected within identified plant community types to help describe general
conditions at the Elmhurst site. Information concerning vegetation, soils, and hydrology was
collected at each sample point. We flagged the wetland area associated with the existing
stormwater detention area. We also flagged the eastern edge of Maplewood Creek with blue
and white striped flagging, tying flags along the approximate edge of the ordinary high water
mark. (Centre Pointe Surveying, the land surveyor for the Elmhurst project, subsequently field-
located those flags and plotted them out on a survey drawing of the site. Based upon that field
survey work, the locations of those flags have now been depicted on the preliminary plat
drawings prepared by Pacific Engineering Design, LLC, the civil engineering firm designing
the Elmhurst subdivision.)
I Soil Conservation Service, United States Department of Agriculture, November 1973.
21-1-12146-001-L3/wpllkd 21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
December 22, 2004
Page 3
SHANNON ~WILSON.INC.
According to City of Renton Municipal Code Section 4-4-130DA.b, a 25-foot wide buffer from
the ordinary high water mark of creeks or streams is ordinarily required. That buffer, along the
east side of Maplewood Creek, has also been depicted upon the preliminary plat drawings.
EXISTING SITE CONDITIONS
Ephemeral Stream
As noted above, during our June site visit we flagged the east edge of Maplewood Creek's
channel as the channel generally runs along the Elmhurst site's west boundary. This south-
flowing stream, which is a tributary to the Cedar River, is ephemeral. It was dr:y at the time of
our June site visit. During our December site visit, it had ponded water in places but was not
flowing. The channel bottom is generally unvegetated and lined with gravel, mud and cobbles.
The channel is entrenched with steep sideslopes along the northern two-thirds of the site. That
stretch of the stream channel was straight and channelized along the property edge. In the
southern portion of the site, the creek is not as channelized as further upstream but it is about 6
to 8 feet lower than the remainder of the site.
Riparian vegetation along the creek is dominated by Himalayan blackberry except near the
southern end of the property, where there is an overstory of black cottonwood and some
Douglas fir, with an understory of Douglas spirea and clustered rose. The creek is reported to
have fish migration barriers downstream of the project area.
Onsite Wetland
Stormwater runoff from most of the Elmhurst site is currently directed to a relatively flat,
roughly bowl-shaped low-lying area near the site's southwest corner (an area generally lying
within a portion of proposed Tract A, the tract for the proposed stormwater detention pond).
Since at least the 1950s, most of the site has been at least partially developed, with filling and
grading having been involved. Stormwater runoff from some of the developed portion of the
site has been directed to the site's southwest corner through a combination of (a) overland flow
and (b) collection and discharge of runoff through a 12-inch-diameter storm drain pipe in the
south-central portion of the site that drains the most intensively developed portion of the site
21-1-12146-00I-L3/wpfJkd 21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
December 22, 2004
Page 4
SHANNON &WILSON, INC.
(roughly the south half of the northeast quarter of the site). The low area provides stormwater
detention for stormwater runoff from the portions of the site that have been developed since as
far back as at least the 1950s. The bulk of the site's stormwater runoff that passes through that
low area appears to both infiltrate and drain via overland flow to Maple Creek. Portions of that
low area were dominated by reed canary grass, birdsfoot trefoil, rough stem bluegrass, soft
rush, and sedges. During our June site visit, soils in that low area were saturated and
dominated by a lOYR3/2 gravely loam with oxidized rhizospheres, over a 2.5Y3/2 gravely
sandy loam with lOYR % mottles. Based on the local vegetation, soils and hydrology, a
portion of the low area that receives the stormwater currently meets the three parameters for a
wetland. In December 2004, we delineated a 3,130-square-foot wetland area in this location
(Wetland A). Data sheets completed during the delineation are included in the attached
appendix. This palustrine, emergent wetland area is highly disturbed, formed on top of fill and
is dominated by reed canary grass, an invasive plant species. Under Section 4-3-050B.7.b.iii of
the Renton Municipal Code, this area would be considered a Category 3 (lower quality)
wetland because it (a) is severely disturbed and newly emerging on fill material, (b) is
characterized by emergent vegetation, (c) has low plant species richness, and (d) is minimally
used by wildlife.
There are two reasons why this Category 3 wetland would not be regulated under the Renton
Municipal Code. The first reason is that it is less than 5,000 square feet in size. Renton
Municipal Code Section 4-3-050B.7.a states:
a. Applicability: The wetland regulations apply to sites containing or abutting
wetlands as described below. Category 2 wetlands, less than two thousand two
hundred (2,200) square feet in area, and Category 3 wetlands, less than five
thousand (5,000) square feet in area, are exempt from these regulations.
(Emphasis added.)
The second reason why this Category 3 wetland would not be regulated under the Renton
Municipal Code is that it is an artificial wetland intentionally created from a nonwetland area
21·1·12146-001.L3/wp/lkd 21-1-12146-001
Liberty Ridge LLC SHANNON &WILSON.INC.
Attn: Mr. Michael Merlino
December 22, 2004
Page 5
for purposes other than wetland mitigation. Renton Municipal Code Section 4-3-050M.l.a
states in relevant part:
"Regulated wetlands do not include those artificial wetlands intentionally
created from non wetland sites for purposes other than wetland mitigation,
including, but not limited to, irrigation and drainage ditches, grass-lined swales,
canals, detention facilities, wastewater treatment facilities, farm pond and
landscape amenities .... The Department Administrator shall determine that a
wetland is not regulated on the basis of photographs, statements, and other
evidence."
(Emphasis added.) Prior to the past development of the site, that area was not a wetland. This
is evident from the 1968 Walker and Associates aerial photo of the site and a 1978 City of
Renton aerial photo ofthe site (copies attached). It appears from those photos that the creek
was already in its present day location when those photos were taken. The 1964 photo depicts
the northern half of the site as developed with several buildings on it and depicts the southern
half of the site as having been cleared of trees, with grass and brush evident upon it scattered
throughout the area. In the 1978 photo, the site's northern half appears similar to what was
evident from the 1968 photo while most of the eastern two-thirds of the site's southern half
appears to have been recently filled and graded and the remaining (westerly) third of the south
half appears to be brushy with some open grassy areas. In both the 1968 and 1978 aerial
photos, that westerly third of the south half shows neither evidence of vegetation typical of
wetland areas nor evidence that the creek influences the area. Based upon our aerial photo
interpretation the low flat area that currently receives stormwater does not appear to historically
have been a wetland. Based upon current site conditions the soils associated with the portion of
that area which now detains stormwater consist of over 12 feet of fill material. The filling and
grading of the site that occurred subsequent to 1978 left the bowl-shaped detention area near the
site's southwest comer. Because the low area, a previously non-wetland area, has been
established as a stormwater detention area for the site, in view of Renton Municipal Code
Section 4-3-050M.l.a it should not be considered a regulated wetland.
21-1-12146-00I-L3/wp/lkd 21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
December 22, 2004
Page 6
OtT-site Wetland
SHANNON &WILSON,INC.
An off-site wetland exists north of the northwest comer of the site. During our site visit, we
observed some of the remaining flags that our firm set along the edges of this wetland
(Wetland B) during our 1998 delineation of wetlands on the property to the north. That
wetland continues to be vegetated with slough sedge, ninebark, willow, and aspen. Based on
the presence of the old flags and our observations of wetland characteristics (similar to what we
saw in 1998), it is our opinion that this wetland has not changed in size or location. The
wetland is only 2,140 square feet in size. Most of the wetland is relatively undisturbed;
however, its south and west boundaries appear to have been bermed long before our 1998
delineation, hydrologically isolating the wetland from the nearby creek.
Because Wetland B is less than 5,000 square feet in size, is isolated from Maplewood Creek,
and has historically been disturbed, it does not meet the definition of a City of Renton
Category 1 or 2 wetland. While (aside from size) it may otherwise fit the definition of a City of
Renton Category 3 wetland, because it is less than 5,000 square feet in size, it is not regulated
under the City's development regulations. (See Renton Municipal Code Section 4-3-050B.7.a
and the first paragraph of Section 4-3-050B.7.b.iii.) Thus, no buffer is required around it.
CONCLUSIONS
An upper reach of Maplewood Creek, an ephemeral stream, generally borders the west side of
the site. A 25-foot-wide buffer is required from the edge of stream's ordinary high water line
under the City of Renton's development regulations.
A small portion of the area that receives stormwater near the site's southwest comer meets the
three-parameter wetland criteria but, because it results from an intentionally made stormwater
discharge and detention area, under the City's wetland regulations it should not be considered a
regulated wetland. It should also not be considered a regulated wetland under the City's
wetland regulations because it would be considered a Category 3 wetland under those
regulations and, at a size of only 3,130 square feet, is less than the City's 5,000 square feet
threshold size for purposes of wetland regulation.
21-1-12146-00I-L3/wpllkd 21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
December 22, 2004
Page 7
SHANNON &WILSON,INC.
The off-site wetland to the north of the site's northwest comer (Wetland B) appears to be
similar to what we observed during our 1998 delineation of it. It is considered a Category 3
wetland. However, it is also less than 5,000 square feet in size and, therefore, not regulated by
the City.
CLOSURE
The findings and conclusions documented in this report have been prepared for specific
application to this project and have been developed in a manner consistent with that level of
care and skill normally exercised by members of the environmental science profession
currently practicing under similar conditions in the area, and in accordance with the terms and
conditions set forth in our proposal. The conclusions presented in this report are made within
the operational scope, budget, and schedule constraints of this project. No warranty, express or
implied, is made. This report is for the exclusive use of Liberty Ridge LLC and its
representati ves.
If you have any questions or comments, or require additional information, please contact me at
(206) 695-6738.
Sincerely,
SHANNON & WILSON, INC.
Katie L. Walter, P.W.S.
Associate
Natural Resources Manager
KL W :DNC/klw
Enclosures: 1978 City of Renton Aerial Photo
1968 Walker and Associates Aerial Photo
Shannon & Wilson Wetland Data Sheets for Wetland A (9)
c: Lou Larsen, Pacific Engineering Design, LLC
21-1-12146-001-L3/wpllkd 21-1-12146-001
Data Point: .J-of .:L
DATA FORM
ROUI'INE WETLAND DETERMINATION
Project/Site: £t~L. ~~ " \AHJ1tt..-J flo Date: /2-ZO-Ot.(
Applicant/Owner: L JC,t;.:wz:= City: ~
II-~In::'!{=es~ti~ga:::to::.r.:...:: =K=LW======J=ob::::#~;=2==1-==1 Z.=I=Y~Io;;-;;:6J,=,()=' =--.;"......_~ County: J<G M
cfff) State: W If·~
Have vegetation, soils, or hydrology been disturbed: es No
Is the area a potential Problem Area: Yes No
(If needed, explain on reverse.)
VEGETATION
'1J.0llantfj.ant S~ies Stratum 2!! Cover· Indicator Dominant Plant Sl!ecies Stratum 2!! Cover Indicator h JOD £e.q.J 1. 1. C.
2. 2.
3. 3.
4. 4.
S. 5.
6. 6.
7. 7.
8. 8.
Percent of Dominant Species that are OBL, 100>, FACW or FAC (except FAC-). .-Dominant species.
Cowardin Classification: ~()"(v5 m'N. ~ .rJ-
Remarks:
HYDROLOGY
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream, Lake, or Tide Gage
_ Aerial Photograph Inundated
_Other K Saturated in Upper 12 Inches
-No Recorded Data Available _ Water Marks
_ Water Lines
Field Observations: -Sediment Deposits
_ Drainage Patterns in Wetlands
Depth of Surface Water: (in.)
_ Oxidized Root Channels in Upper
~~J 12 Inches
Depth to Free Water in Pit: (in.) Water-Stained Leaves
Depth to Saturated Soil: (in.) -:!l(Q.~· _ Local Soil Survey Data.,
_ Other (Explain in Remarks)
Remarks: ,"" .::~:,,~.
'.~ '-11 .. \ .'~
Data Point: of
sons
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth Matrix Color Mottle Colors Mottle Texture, Concretions,
(jncl!sl§) (Munsell Moist} (Munsell Moist) Abundance/~ntrast BhizoSDhem.§. etc.
0-13 lOJ~?/~ :;L -C['fl
(3-r If) '1f;..'1/z, [0 i~'/& ~Jrl iP1l'tl,J' ~5L-
Hydric Soil Indicators:
_ Histosol
_ Histic Epipedon
-Sulfidic Odor
_ Probable Aquic Moisture Regime ,x.. Reducing Conditions
_ Gleyed or Low-chroma Colors
Remarks:
WETLAND DETERMINATION
Hydropbytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
S-2-93IDATA.FRMfI1UI-lkdIdgwc<!I!
.... '
•
' ..
-Concretions
_ High Organic Content in Surface Layer
_'_ Organic Streaking
_ Usted on Local Hydric Soils Ust
_ Listed on National Hydric Soils List
_ Other (Explain in Remarks)
,4~-
No
No "
No
..
Is ~s, Data Point Within a Wetland? @ No
. . ""
".~
Data Point: 2-of ~
DATA FORM
ROUTINE WETLAND DETERMINATION
Project/Site: fd hl (~+-w(..,tt~ A D~te: lj;); };$;lJ.
Applicant/Owner: L, i::y ~;;; L" l..-c., City: y
Investigator: K. v9" .... <\,f-c .. .c Job #: Z I -/-I ZI 4 to County: jinf
Have vegetation, soils, or hydrology been disturbed: CbP No State: W.
Is the area a potential Problem Area: Yes No
(If needed, explain on reverse.)
VEGETATION
D2m~ Plant S~ies Stratum ~ Cover Indicator Dominant Plant S~ies Stratum ~ Cover Indicator
1. (s-h lQO -fi..-c..w 1.
2. 2.
3. 3.
4. 4. s. s.
6. 6.
7. 7.
8. 8.
Percent of Dominant Species that are OBL, 100Y FACW or FAC (except FAC-). "'-Dominant species.
Cowardin Classification: P eLL u 51-riY\t..
Remarks:
.'
HYDROLOGY
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream, Lake. or Tide Gage
_ Aerial Photograph -Inundated
-Other _ Saturated in Upper 12 Inches
_ No Recorded Data Available -WaterMarks
Water Lines -
Field Observations:
_ Sediment Deposits
_ DrainagePattems in Wetlands
Depth of Surface Water: -_ Oxidized Root Channels in Upper
(in.) 12 Inches
Depth to Free Water in Pit: ~~ (in.) Water-Stained Leaves
Depth to Saturated Soil: 11.\ (in.) -• _ Local Soil Survey Data
Other (Explain in Remarks)
Remarks:
sons
Map Unit Name:
Taxonomy (Subgroup):
Profile Description:
Depth Matrix Color Mottle Colors
(inches) (Munsell MQist) (Munsell Moist)
O-{S ;-lo it lIz..
,
Hydric Soil Indicators:
Histosol -_ Histic Epipedon
-Sulfidic Odor
_ Probable Aquic Moisture Regime
_._ Reducing Conditions
-Gleyed or Low-Chroma Colors
Remarks:
WETLAND DE'i'ERMINATION
Hydrophytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
1-2-93IDATA.FRMII'RH-lIcdIdp
~ No 'Ye:' 0
Yes
Data Point: Z of
Drainage Class:
Field Observations
Confirm Mapped Type? Yes No
Mottle Texture, Concretions,
Abundance/Contrast Rhizospheres. etc.
SL ~ll
Concretions -_ High Organic Content in Surface Layer
_ Organic Streaking
_ Listed on Local Hydric Soils List
_ Listed on National Hydric Soils List
_ Other (Explain in Remarks)
Is this Data Point Within a Wetlanc\? Yes ®
Data Point: 1-of '1
" DATA FORM
ROurINE WETLAND DETERMINATION
Project/Site: UvY\h~ r--o+ W~ ~ Date: 12.. -J"I·O'1
Applicant/Owner: l.c;~ t::.J$ City: ~ I~In~v~es::ti~g=ato~r~: ="==W=A/=l=:k-r====J~ob::=#~;=2=1-=I=-=1 =Z-={y=(.o== ___ ~ County: )6=
@ .1, State: ~ -Have vegetation, soils, or hydrology been disturbed: Yes No
Is the area a potential Problem Area: es No
(If needed, explain on reverse.) ;~:
VEGEtATION
D~ant Plant S~ies Stratum ~ Cover Indicator Dominant Plant S~ies Stratum ~ Cover l!!dicato[
1. '==: G---' ~ ~O tz: 1.
2. ~ ~ ~5 ,!1'A1!i4 b ':1.0 2.
3. 3.
4. 4.
S. S. ..
6. 6.
7. 7.
8. S.
Percent of Dominant Species that are OBL, l (b./, FACW or FAC (except FAC-). *-Dominant species.
Cowardin Classification:
Remarks:
HYDROLOGY
,
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream, Lake, or Tide Gage
_ Aerial Photograph -Inundated
-Other ~ Saturated in Upper 12 Inches
-No Recorded Data Available -Water Marks
-Water Lines
Field ObselVations:
_ Sediment Deposits
. _ Drainage ,Patterns in Wetlands
Depth of Surface Water: -(in.)
_ Oxidized Root Channels in Upper
'11" 12 Inches "
, Depth to Free Water in Pit: (in.) Water-Stairied Leaves
Depth to Saturated Soil: I Q" (in.) -" _ Local Soil SUlVey Data , ,
Other (Explain in Remarks)
ReJDlUb: .
I
'"
Data Point: 3 of
SOILS
Map Unit Name: Drainage Class:
Field ObselVations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches) (Munsell Moist) (Munsell Moist) Abundance/Contrast Rhizomheres, etc.
f2.-I~-t to~ ~ "'It. ~~t .. .....ff4;s 6--SL.
. ~
-' I::
Hydric Soil Indicators:
-Histosol -Concretions
_ Histic Epipedon _ High Organic Content in Surface Layer
-Sulfidic Odor _ Organic Streaking
_ Probable Aquic Moisture Regime _ Listed on Local Hydric Soils List
_ Reducing Conditions _ Listed on National Hydric Soils List I
_ Gleyed or Low-Chroma Colors _ Other (Explain in Remarks)
Remarks:
WETLAND DEI'ERMlNATION
Hydrophytic Vegetation Present? I No
Is this Data Point Wi'b.in a Wetland? ® No Hydric Soils Present? No
Wetland Hydrology Present? No
Remarks' ~ ~
• ~'. II U;I ~!:,
f'\Uvr. J.. ' \-zl-. \ lW-
1I-2-93IDATA.FRMITRH-lkdIdgw
,,,,<. ~:;
Data Point: !l.-of cr
DATA FORM
ROUTINE WETLAND DETERMINATION
Project/Site: CI ~h ~ c.::.~ l..}~~.Jt·/!l J)ate: ~ Applicant/Owner: ~ e.~LL't . . City:
Investigator: ~ w-== == t; l-l-U:: l:l. Ie County:
Have vegetation, soils, or hydrology been disturbed: @ No State: .
Is the area a potential Problem Area: No
(If needed, explain on reverse.)
VEGETATION
l2om~ant Plant S;ies Stmtum ~ Cover Indicator Dominant Plant S~ies Stratum 22 Cove[ Indicator
;..0 EEMJ 1. 1.1' L4r= h 2.lf..~<fL..Jd. II zo -2.
2 vel 3. 3.\P~ ,S 4.~~~~ .~ 5 ;ec~u 4. 2D s. 5."-4" 10
6. 6.
7. 7.
8. 8.
Percent of Dominant Species that are OBL, 33 >, FACW or FAC (except FAC-). lie-Dominant species.
Cowardin Classification:
Remadcs:
HYDROLOGY
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream, Lake, or Tide Gage
_ Aerial Photograph -Inundated
-Other _ Saturated in Upper 12 Inches
_ No Recorded Data Available -Water Marks.
Water Lines -
Field Observations:
_ Sediment Deposits
_ Drainage Patterns in Wetlands
Depth of Surface Water: -_ Oxidized Root Channels in Upper
(in.) 12 Inches
Depth to Free Water in Pit: -(in.) Water-Stained Leaves
Depth to Saturated Soil: -(in.) -_ Local Soil Survey Data
Other (Explain in Remarks)
Remarlcs: v~
Data Point: 4 of
SOILS
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches} (Munsell Moi!lt} (Munsell Moist) Abundance/Contmt Bbizo§pheG§. etc:
f2-l~ lOy l.3/z-. &-SL-
SL lb-lo~ to '1g 'l.-/l.
Hydric Soil Indicators:
-Histosol -Concretions
-'
_ Histic Epipedon _ High Organic Content in Surface Layer
-Sulfidic Odor _ Organic Streaking
_ Probable Aquic Moisture Regime _ Listed on Local Hydric Soils List
_ Reducing Conditions _ Listed on National Hydric Soils List
_ Gleyed or Low-Chroma Colors _ Other (Explain in Remarks)
Remarks: H--z..O J-LO II
WETLAND DETERMINATION
Hydrophytic Vegetation Present? y~ j>
YeseJ Hydric Soils Present? Yes 0 Is this Data Point Within a Wetland?
Wetland Hydrology Present'? Yes 0
Remarlcs: ~W*'r i.\\\ l..D I,
8-2-93IDATA.FRMfrRH-lIcdIdp
Data Point: :s of ~
DATA FORM
ROUTINE WETLAND DETERMINATION
Proj':""Site: ~ Et" t.J~ l:I: Date: ) Z -/'1 ~otf
City: ~ ApphcantlOwner: L \ ~
Z I -1-i 2/~ to County: Investigator: t Vi---_I/..:
Have veg~on, soils, or hydrology been disturbed: @ No State:
Is the area a potential Problem Area: Y No
(If needed, explain on reverse.)
VEGETATION
Dominant flant S~ies Stratum ~ Cover Indicator Dominant Plant S~ies Stratum ~ Cove[ Indicator ~: Dt~![~~J"5 S(!t ~ zo -1.
lfl fg"w 2.
3. ~~sl-c..~ ~ ru!tIp... h ,~ -t=Q'==Y-3.
h 20 -4. 4.0'" SOp 5. _.
5. '
6. 6. --7. 7.
B. 8.
Percent of Dominant Species that are OBL, 50/. FACW or FAC (except FAC-). lie-Dominant species.
Cowardin Classification:
Remarks:
HYDROLOGY
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream, Lake, or Tide Gage
_ Aerial Photograph -Inundated
-Other _ Saturated in Upper 12 Inches
_ No Recorded Data Available -Water Marks
-Water Lines
Field Observations:
_ Sediment Deposits
_ Drainage .Patterns in Wetlands
Depth of Surface Water: -_ Oxidized Root Channels in Upper -(in.) 12 Inches
Depth to Free Water in Pit: (in.) Water-Stained Leaves
Depth to Saturated Soil: -(in.) -_ Local Soil Survey Data
Other (Explain in Remarks)
Remadcs: hA-.Mi5r-
Data Point: of
sons
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches) (Munsell Moist) (Munsell Moist} Abundance/Cont!!§t Rbizospheres. etc.
t; '11 LD~r( z,!..z, tiL
lI-l]t lOJ~'1I, lfC{"c.t. ~4R~ 7 .5;>~
-I ,
Hydric Soil Indicators:
-IDstosol -Concretions
_ IDstic Epipedon _. _ High Organic Content in Surface Layer
-Sulfidic Odor _ Organic Streaking
_ Probable Aquic Moisture Regime _ Listed on Local Hydric Soils List
_ Reducing Conditions _ Listed on National Hydric Soils List
_ Gleyed or Low-Cbroma Colors _ Other (Explain in Remarks)
Remarks: ~C> ~
WETLAND DEI'ERMINATION
Hydrophytic Vegetation Present? ~~. yes(§) Hydric Soils Present? Is this Data Point Within a Wetland?
Wetland Hydrology Present? Yes fRO)
Remarks:
8-2-93IDATA.FRMfI1UI-lkdldgw
Data Point: to of J.-
DATA FORM
ROurINE WETLAND DETERMINATION
Project/Site: Z-11"Yl h lJ,S + WtAi~/~ Date: ~( •
Applicant/Owner: ~flj e~ City: I~In~v:.:es::ti:!g:::ato~r~: =K.~IA==)=(;...;=~====:==i~0bii!Z-~'==I-=I=-=2::::;I '-I~(.p==-----t County:
\ ~ State: Have vegetation, soils, or hydrology been disturbed: yes No
Is the area a potential Problem Area: No
(If needed, explain on reverse.)
VEGETATION
nominant Plant Soecies Stratum Si Cover Indicator DQminant Plant S~ies Stratum ~ Cover Indicator l.r-Po 6.. ~ ,QIOG h 30 -. 1.
2.~f)1'.t1~L.'1 tJL ~/Au...~ -J..., h 2-Q +'.:..-c.-u 2.
3.1.11 Co-H.I-«-!-k OS ~-" b ~() ( -3.
4.V~ • ±= t;; -4.
S. &-<.rS.~'\ l'Vvv, '5 -S.
6. 6.
7. 7.
8. 8.
Percent of Dominant Species that are OBL, ()~ FACW or FAC (except FAC-). *-Dominant species.
Cowardin Oassification:
Remarks:
HYDROWGY
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream. Lake, or Tide Gage
_ Aerial Photograph -Inundated
-Other _ Saturated in Upper 12 Inches
_ No Recorded Data Available -Water Marks
_" Water Lines
Field Observations:
_ Sediment Deposits
_ Drainage Patterns in Wetlands
Depth of Surface Water: (in.)
_ Oxidized Root Channels in Upper ....... 12 Inches
Depth to Free Water in Pit: -(in.) Water-Stained Leaves
Depth to Saturated Soil: (in.) -----_ Local Soil S-urvey Data
Other (Explain in Remarks)
Remarks: ~
Data Point: (P of
sons
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type?, , Yes No
Profile Description: ~ ""
\
Depth Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches) (Munsell Moi~) (Munsell Moist) Abundance/Contmn Bhizoamem§. eIQ.
tJY~ IO'1.t 2/Z ,"SL
&1Br Z#5~ '3_/& 5 ~d I
~ , ,
Hydric Soil Indicators:
-Histosol -Concretions
_ Histic Epipedon _ High Organic Content in Surface Layer
-Sulfidic Odor _ Organic Streaking
_ Probable Aquic Moisture Regime _ Listed on Local Hydric Soils List
_ Reducing Conditions _ Listed on National Hydric Soils List
_ Gleyed or Low-Cbroma Colors _ Other (Explain in Remarks)
Remarks:
".
WETLAND DETERMINATION
Hydrophytic Vegetation Present? Yes ~ 0 Yes~ Hydric Soils Present? Yes Is this Data Point Within a Wetland?
Wetland Hydrology Present? Yes ~ 0
Remarks:
1I-2-93IDATA.FRMITRH-lkdIdgw
-Data POInt: .3.. of !l
DATA FORM
ROUTINE WETLAND DETERMINATION
Project/Site: ~~ w~ A Date: 1l.!!:£", 'I
City: Applicant/Owner: ~ = :Ll ~(~
;2...1 -\-\ z., I !.f h county:~ Investigator: /(A b #:
Have vegetation, soils, or hydrology been disturbed: G;J No State:
Is the area a potential Problem Area: Y No
(If needed, explain on reverse.)
VEGETATION
DOmin~t Plant SQecies Stratum % Cover Indicator Dominant Plant SQecies Stratum ~ Cover Indicator
h lOb ±;a;;) 1. 1. L(j..
2. 2.
3. 3.
4. 4.
5. 5.
6. 6.
7. 7.
8. 8.
Percent of Dominant Species that are OBL,
FACW or FAC (except FAC-). *-Dominant species.
Cowardin Classification:
Remarks:
HYDROLOGY --
_ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators
_ Stream., Lake, or Tide Gage
_ Aerial Photograph -Inundated
-Other _ Saturated in Upper 12 Inches
-No Recorded Data Available -Water Marks
-Water Lines
Field Observations: _ Sediment Deposits
_ Drainage Patterns in Wetlands
Depth of Surface Water: ---.. (in.)
_ Oxidized R~t Channels in Upper
12 Inches Depth t9 Free Water in Pit: -(in.) Water-Stained Leaves Depth to Saturated Soil: (in.) --_ Local Soil Survey Data
·'-other (Explain in Remarks)
Remarks:-:~ ...
• __ 1.-_ ... -,. .. .-~-;;-i··-·-
~}:---',-.~
:'-;~ .
. Data Point: 1-' of
SOlIS
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth . Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches} CMunsellMoist) (Munsell Moist) Abundance/Contrast Rhizospheres. etc.
6-'1' 10 '1K7L~ (,-~'-
l·l~+ I~ if 1Lz.. 5t... -Dr~
Hydric Soil Indicators:
-Histosol -Concretions
-Histic Epipedon _ . High Organic Content in Surface Layer
-Sulfidic Odor -Organic Streaking
-Probable Aquic Moisture Regime -Listed on Local Hydric Soils List
-Reducing Conditions -Listed on National Hydric Soils List
-Gleyed or Low-Chroma Colors -Other (Explain in Remarks)
Remarks:
wETLAND DETERMINATION
Hydrophytic Vegetation Present? <8tl yes® Hydric Soils Present? Yes Is this Data Point Within a Wetland?
Wetland Hydrology Present? Yes 0 -h-tj~\t\.l UA~~/ Remarks: 5~~.lt~l~ ~~11 1~·
Pn -fl...t-Iv...--"t l "J<-r
8-2-93IDATA.FRMII'RH-llcdldp
· Data POInt: 8 of l'
DATA FORM
ROUTINE WEILAND DETERMINATION
Project/Site: ~;~ ~f.,tl~ A: Date: /2.:J4=D'f ApplicantlOwner~ ~g . City: -----"R....::;;~":_'T~""--I~In~v~es~ti~g~at~or~: ..::=:=:::::~========J=b=#=:==Z=-='-=/~2~/~Y=LR=:...--__ ~ County: §
:@State:_...JhZif1=-..t.L.....; __ Have vegetation, soils, or hydrology been disturbed: es No
Is the area a potential Problem Area: Yes No
(If needed, explain on reverse.)
VEGETATION
D0f{jant Plant Species Stratum % Cover Indicator
h IQD kW 1. C,&
2.
3.
4.
5.
6.
7.
8.
Percent of Dominant Species that are OBL,
FACW or FAC (except FAC-). *-Dominant species.
Cowardin Classification:
Remarks:
HYDROLOGY
_ Recorded Data (Describe in Remarks):
__ _ Stream, Lake, or Tide Gage
_ Aerial Photograph
_Other
No Recorded Data Available
Field Observations: -Depth of Surface Water:
Depth to Free Water in Pit: -0 __ -"--
Depth to Saturated Soil:
(in.)
(in.)
(in.)
Dominant Plant Species Stratum ~ Cover
1.
2.
3.
4.
s.
6.
7.
8.
{ 00)..,
Wetland Hydrology Indicators
_ Inundated
~ Saturated in Upper 12 Inches
_ Water Marks
_ Water Lines
_ Sediment Deposits
_ Drainage Patterns in Wetlands
_ Oxidized R~t Channels in Upper
12 Inches
_ Water-Stained Leaves
_ Local Soil Survey Data
Other (Explain in Remarks)
Indicator
. Data Point: r;; of 3..-
SOILS
Map Unit Name; Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth . Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches) (Munsell Moist) (Munsell Moist) Abundance/Contrast Rhizo§pheres, etc.
rJ-{j lot;t1i G-~Sk
t3-¥r [0 't£ 1./ /I 1,5~~ "Ii 6-S,-
Hydric Soil Indicators:
IDstosol Concretions --
-Histic Epipedon -. High Organic Content in Surface Layer
-Sulfidic Odor -Organic Streaking
-Probable Aquic Moisture Regime -Listed on Local Hydric Soils List
-Reducing Conditions -Listed on National Hydric Soils List
-Gleyed or Low-Chroma Colors -Other (Explain in Remarks)
Remarks:
WETLAND DETERMINATION
Hydrophytic Vegetation Present? @ No
Is this Data Point Within a Wet1and?~O Hydric Soils Present? A!? No Wetland Hydrology Present? Yes No
Remarks: ~T~ ~ -~/dl7r 'SOIl
~t~
1I-2-93IDATA.FRMtrRH-lkdldgw
· Data POInt: cr of 1
DATA FORM
ROUI1NE WETLAND DETERMINATION
Project/Site: . [\1'\1\ hu,. ~ ~ (.,~~ ~ D~te: II :!:/i:;Y;":J
Applicant/Owner: L-.:;. q ~ t-LC-CIty: £ ,
County: 3Bj Investigator: t I:> ~ \ ~ J #: ;;'1 -l-rt.1 '-i {,p
Have vegetation, soils, or hydrology been disturbed:
Is the area a potential Problem Area:
(If needed, explain on reverse.)
VEGETATION
Dominant Plant Sgecies Stratum % Cover Indicator
1. IZ(,~ I 00' ~ !~
2. ~Q~~ ~ Y 20 -+-
3.
4. s.
6.
7.
8.
Percent of Dominant Species that are OBL,
FACW or FAC (except FAC-). *-Dominant species.
Cowardin Classification:
Remarks:
HYDROLOGY
_ Recorded Data (Describe in Remarks):
_ Stream, Lake, or Tide Gage
_ Aerial Photograph
_Other
_ No Recorded Data Available
Field Observations:
Depth of Surface Water: (in.)
Depth to Free Water in Pit: __ -=-__ (in.)
Depth to Saturated Soil: --(in.)
Remarks:
(j No State:
No
Dominant Plant Sgecies Stratum % Cover
1.
2.
3.
4.
5.
6.
7.
8.
lOO'/,
Wetland Hydrology Indicators
_ Inundated
_ Saturated in Upper 12 Inches
_ Water Marks
_ Water Lines
_ Sediment Deposits
_ Drainage Patterns in Wetlands
_ Oxidized RC!Ot Channels in Upper
12 Inches
_ Water-Stained Leaves
_ Local Soil Survey Data
Other (Explain in Remarks)
Indicator
. Data Point: '1 of_
sons
Map Unit Name: Drainage Class:
Field Observations
Taxonomy (Subgroup): Confirm Mapped Type? Yes No
Profile Description:
Depth . Matrix Color Mottle Colors Mottle Texture, Concretions,
(inches) (Munsell Moist} (Munsell Moist) Abundance/Contrast Rhizomheres, etc.
()-~ IO'1t\3/z €()..{-.y'*~ &SL-
I ~Jt+ ~ I01k J'L ~
Hydric Soil Indicators:
-Histosol -Concretions
-Histic Epipedon -. High Organic Content in Surface Layer
Sulfidic Odor --Organic Streaking
-Probable Aquic Moisture Regime -Listed on Local Hydric Soils List
-Reducing Conditions -Listed on National Hydric Soils List
-Gleyed or Low-Chroma Colors -Other (Explain in Remarks)
Remarks:
wETLAND DETERMINATION
Hydrophytic Vegetation Present? ~i Yes@) Hydric Soils Present? Is this Data Point Within a Wetland?
Wetland Hydrology Present? Yes
Remarks:
1I-2-93IDATA.FRMITRH-llcdldP.
<!lJ ~
a-
r
t:,""""~' 1
(
•
1 , .~
l. :11 "' •
~ I ~ ~
w ~
~.!! ~~ !j ~!Z Ii
Oil! i~ "n u
La II'W"
j I ~:I -~!i
s Will i
~
> m
!
~
REVISIONS
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
1 'J"+ I (
-sO' (UNRCGUtATfD CAm;afY J -Z.UI SF)
I,
I; ~'l~'~~."
!!~ 1,' -\1;,~:";t~';%;;;;'~;~f~S~~:~:f~;"f:!;;i':~:t!";;=.-:~~-~--~~~f~b", <r~
\
Ao" " :?
'" ,'" -,,--'-\ '" "
---~ ~
10
II !I--';
r-
I
I
11
I I ~"f-i
/ ... , \ ,
/ \ ~"~ / \ \ '" / ,,1 / IlL ,--v_ " I':
"
"-4n . i\'
I!:
\ ,
\
~-oL:W 'j .M
GIW'HC""""-,,
SCALE I r -50'
\Si'1JCAL. DA T1.II
..... r vr N:I'I,ON, HAW ae CONJQJR JH1E7tVAL -Z'
E3ENCHIAIf(
"'''' KING COUNTY POINT I RENnB52: FaJNO PUNat IN J. KING COUNTY SURFACC BRASS DISC AT 1HE S1RE'ET /H7£RS£CTlCIH OF HE 4TH STREET AND H8TH A\oE SE MARKING THE NORTHIIICST CORNER OF S£CTJOH '<f, TOMHSHP 23N., RANGE 5£, W.M. nEVA1lON-45+.11 FrET.
srm scr COTTON GIN SPfK£ JU' SOUTHIIEST OF 7H[' !lEST COLUMN OF GA 1E. fLEVAlJCIH-407." FFET.
BASIS OF BEARIi/Q
JRU£ NORTH. BASfD UPC»I Q.OSAL POSlnONING Sl'S1ElI (CPS) LWSfRT GRID WASHHG1tW STAlE NORTH ZOI£ CXXIRDWAlES. A CON\£RG£HC£ NHl.E OF OOVJO.zr COUN1Dla.OQIC1WSC WAS APPUED AT A PUNCH MARK IN r ICJHG COUNTY SU'lf"ACE" BRASS DISC, AT THE S7R£[1' IN1£RS£C7JOH OF HE 47H ST. AND , ... TH A\oE SE. It4RKJHO 7HE NORTHEAST CORNER OF SECTION r~ TO'fWSHIP 23 NORTH,
IW#iIE " CAST OF JHE" MI..LWfTI'£ IIERfDIAH. THE NORTH tWERlCAH
DA1UV OF r88J'/ln, (HAD eJ/l1') caD CClClRf)fNA.TES II£R£ FOUND 10
E I~m I r:JlfSfJ22.J21 AT THAT POINT. JH£ IN'I£RSE OF 80TH rHE SEA Ln£L CORR£C7IOH FACTOR OF dnfi81&2. AND THE GRID
SCALf" F"AC7tlR OF U)000Q2187 WAS APPlIED TO TH£ GRIO ~Jl:S FOR SHOWH (;RO(JNQ OISTAIoIC£S.
aiECKED FOR COMPUANCE TO OTY STANDARDS
RlCOIllONDID FOB .APPROVAL
oote----1 BY: _______ 0010 ____ BY: ____ _
Oote ___ _
D
~~ ~~ il t~ 2i"~ ~~~ J C"'4 "1(1)
iii ~"""m ~ ~~~~~~
,g~ ji
,~u d! ·u ~a:: ]1 u
~
~llli 00 ~
t 0 m :)
00 ~ ~~ ~
:)~ ~ d J:~ ~.i~ ::!-.JOO ~ml wW • a:
PROJECT NO.: 02054
DRA'MoI BY: .JQC
ISSU£ DA 1£: 't2-OI-o.
SHEET REV.: \ I
LJ , -02054ECOl-P08 poa
8tEI!T • CP •
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 2 8 2CJ4
RECEIVED
Attn: Mike Merlino
Liberty Ridge LLC
9125 10th Avenue S
Seattle, WA 98108
tel: 425-226-1000
(owner / applicant)
Fernwood North H .A.
PO Box 2364
Renton, WA 98056
(party of record)
Katie Walter
Shannon and Wilson
400 N 34th St., Ste 100
Seattle, W A 98103
Michael Yantis
Yantis Acoustical Design
720 Olive Way, Ste. 1400
Seattle, W A 98101
Updated: 02/03/05
PARTIES OF RECORD
ELMHURST PRELIMINARY PLAT
LUA04-162, PP, ECF
David Halinen
Halinen Law Offices, PS
10500 NE 8th Street ste: #1900
Bellevue, WA 98004
tel: 206-443-4684
eml:
davidhalinen@halinenlaw.com
(contact)
Terrance Flaig
PO Box 3106
Renton, WA 98056
tel: 425-277-3551
(party of record)
Lou Larsen
Pacific Engineering & Design LLC
4118 Lind Avenue
Renton, W A 98055
Cliff Williams
5326 SW Manning
Seattle, W A 98116
Rose Woodall
248 Union Avenue NE
Renton, WA 98059
tel: 425-255-9584
(party of record)
Sara & David Scott
179 Whitman CT NE
Renton, WA 98059
(party of record)
C. Thomas Foster
Langley Fourth Ave Assoc., LLC
5460 Southcenter Blvd., Ste. 106
Seattle, W A 98188
(Page 1 of 1)
(d)JCj
N ~
~ , ~ • ~ ~ • N • E-t
• !!l ~
• • • t
• • • • • • • • • • 8-Cj • ,
IyJJ • 01-Cj • • t
i~l~ ! i
~ ~
::l ~ ~ I
~~ ~~ !) ~ffi i~
Oa:: t::' 06 ~~ ~ ~E 4r.I~ U
P@~ I ~ q 0
j I J::I -~!i
s Will t
~
~
i
g
REVISIONS
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
DENSITY CALCUU 1IONS :
R/W AREA -1.72 oc. OR 74,i2,3 IItJ. ft. S'TJf(.Uf ACREAGE' -10' IiWO£ AREA SOUTH OF' HE 2ND PL, AND I' !WOE AREA NORTH OF' HE 2ND PL -dOi ex: OR J,aoe aq. It. TOTAL AREA _ !UO ae. OR 41~I7e ~ It. PRQPOS£l) ACC£SS £ASOI£NT AREA _
o.ClJae. f.2el~ ft.
PROPOSED I OF' LOTS -e4 ZOHING RIO. SU8.ECT 10 A O£'r£1..ClPAlDtT AGR££W£NT (KING COUNTY RECOROIHG ->
············--;·~JI
II! ~
I
.-------1-,
\,< r·."
1 (~
/
/
DENSITY -54 LOTS
1OTAL. AR£A (oe) -R/W (ae) -STR£..W (oe) -ACCESS (ae)
DENSITY -e4 _LOTS
llI.OU OC -'.12ee -0.01 ee -O.OJ ex:
DENSITY -,. LOTS
7.18 oc
OEHSITY -4M du/oc
SIre /NFORA/A 1ION :
I. EX SITE: AREA -i.if.9 ae
Z. EX R/W 10 BE VA~1lD (8R£IIERTON A~) .. A." ae
J.O~SlTE:AREA (INa.. VACATED AREA) -UO ex:
.. R/W TO Be 0£DICAttD-1.72 ae
OWHER/Al'f'UCANT : UBERTY RIDG£ L.L.e. "M 10TH AK" S. S£Arn..r, irA "'08
c/IiL ENGINEER :
~~~.J;rk:!!;Jr'"
PACfF'IC CNGINEERING DESIGN, LLC 41SO UNO AYE s.w. RENTON. It'A~ ~.lt!S;s1;~I
PAVEJmoIT AND SIDEWALK NORTH OF £J.JIHURST 10 BE INSTALi£D IN CON.iJHCTIOH IIITH RlDGE'\'fEW COURT
GC07rCHNlCAL £ARTH CCWStJl TANTS, !He.
ENGINEER: ~~1H PLACE N.E.
~4~1~780
SUR\£l'tIR : CENTRE POINTE: SURV£Y1HG J3701 iTH A\o£. S =t:L(1'~ ::,_~
stfET f'C)E)(
t't1I I'/ftUUINARY PlA T P02 COIrIPOSIlI" unuTY PLAN
POl 1R£E aJT1lNG,.1.ANO a.£ARtHG PLAN PCH HSGHBORHOOO OCTAIL MAP POS BREWERTON AYE. N.E. AND ROAD 8
PREI.JItIINARY PROFILE POd ROAD CROSS SECTIONS AND
VlCHTYMAP
~'S.S'EX.R-o-W ROAD A PREUMIHARY PROfU P07 GRADING AND DRAINAGE' PLAN "" 10 8£ VACATED \ POtJ DtlS1JNG CONDITIONS .... ..,..,.,..Y
DJS1ING BOOHDARY
FUi: Vl~1""
~IO' PRIIARY Smuc7URf \ S£'1BACK (TYP.)
20' ATTACH£D GARAOC
SE1B.4Q( (TYP.)
1f'··UWTY ~ L, £ASEJlrNT (TYP.)
II \, ..
I " I)
I --------I ~22'1
.-, I '''s' EX. R-o-W . TO BE VACA lED
.3
"
ClRA/'ItC 8CAI..E
SCALE. l' -50'
NOTE·
FUR L0CA1IOH OF SElI£R. WAn:R AND STORW ORAJHAGE' SEE 5H£CT P02
"
VER11CAL. DATIM
arT OF RU4TON, NAW 88 CONTOUR INn:RVAL .. 2'
BENCH.WJ(
BASE: KING COUNTY POINT I RENT7M2: FOUND PUHQI IN Ja KING COUNTY SURFAC£ BRASS DISC AT 1H£ S1R[£T /HT[R5ECT1ON OF NE 4TH S1R£ET AND I4aTH AI£ SE ",ARKING THE NORTH'II£ST CORHm OF SECTION 14, 10WNSHIP 2JN" RN«J£ Mo, .. ",. nEVATK»I_ of54.7a FrET.
Slm SET COnDN CIH SP/KF 'P.I· SOUTHMEST OF 1H£ MEST OOI..UIIH OF QA1£. nEVA 1IOH-.fD7.PfS F£ET.
BAs/sOF~
rHUt. N<R1H. BASED IJPOH Gt.C&AL POSITIONING SYS1DI (CPS) LAMB£RT GRID WASHINGTON STAlE NORTH ZONE COOROINAT£S. A COH\IERtitHCE AHGU OF 00'58'.lO.28-COUNn:RC1.OOOIISE WAS
APPI..JED AT A PUNOf ",ARK IN ,3-KING COUNTY SURFACE BRASS DIsc.
AT THC S1RfU INTmSEC1JON OF HE 4TH ST. AND 1.f11TH A\£ sc. MARKING THE NORTH£AST CORNER OF SEC1ICW 15. TOtIHSHF 2J NORTH. RANGE S EAST OF THE IllU..4MITTE" MERIOIAN. THC NORTH AIrlfRfCAH DATIJIII OF 198J/lnl (NAD al/91) GRJO COOROINATES M:Rf" FOUND 1"0
B£ 1809o.lm / "'5822.J2I AT THAT POIKT. TH£ INVERS£ OF 80TH 'THE SEA LE\£L CORReCTION FACTOR OF o.!i9998l424 AND THE GRID SCItL£ FACTOR OF 1.000002187 WAS APPUED TO THC GRtD
COOROfNA 7ES FOR SHO'IfN GROUND DISTANCES.
L.EQAL DE9CFFT1ON
~
THE SOUTH flO FEET OF 1H£ EAST 21S FFET OF THE rou.OIllNG OESCRIB£D PROPERTY: THE NORTH HALF OF 7H£ SOUTHEAST QUAR7IR OF 1H£ NORJHlEST QUARTE:R OF THE: NOR1Hr£ST QUART£R OF SECTION 1.5. TOIIHSHIP 2J NORTH. RANGE' 5 EAST, "M.;
EXC£PT THE EAST J7.S F£CT 1HERCOF FOR ROAD;
(ALSO KNOWN AS 1H£ SOUTH 110 FEET OF 1Ht EAST 21S FrET OF THE NORTH HALF OF TRACT S. IlARnN ACRe" TRACTS, ACCORDING ro THE IJNR£CORDED PLAT THER£OF.
srnJATE: !H THE COUNTY OF KING. STAlE OF WASHINGTON.
PARCEl 8:
THE SOUTH HAiF OF THC SOUTHCAST OOARTER OF 1H£ NORTHIIEST QUARTER OF 1HE NORTHMEST OUAR7IR OF SECTION '5. TOMNSHfP 2J NORTH. RANGE. 5 EAST, lit",.:
EXCEPT THE E"ASTER/.Y 7.S FrET 1H£R£CIF FOR ROAD;
(ALSO KNOWN AS 1H£ s001HERl.Y HALF OF TRACTS 5 AND B. MAR1IN ACRE 1RAC~ ACCORDING TO 7HE" IJNRCCOROED PUt T THER£OF.
SIn/ATE: IN THE COUNTY OF ICWG. STATE: OF It'ASHJNGTON
PAACEl C:
THE NORTH HAlF OF THE" SOUTHEAST OUARn:R OF THE NORTHlEST QUARTER OF THE NORTHWEST OOAR1[R OF SECTION 1S. 10WNSHIP 2J NORTH, RANGE'S EAST, IItAl.;
£XC(PT THE EAST J7.!S F£CT THER£OF FOR ROAD:
AND £XC£PT THE SOOTH 110 F'EET OF 7HE £AST 215 FF£.T OF TH£ REJ.WNO£R.
(ALSO 1OIO'/tN AS THE NORTH HALF OF TRACTS 5 AND 4, MARTIN ACRE tRAC~ ACCORDING 10 THE UNRa:CWOED PUtT TH£REOF; EXC£PT"THE SOUTH flO F[ET OF THE £AST 21S FEU OF SoU) mACT S);
SIn/ATE: IN THC COUNTY OF KING, STAlI" OF WASHINGTON
~~ ~S g::; <~ ~ is ~5w~ ~~~ E;~iOiOm~ ill "'~'" < ~a: StLS~ ..
O/}U :::~ u·t::~ tP ~ ~ .... al :::
U ::: 0/} (';j ........ ~ 0/) rIl r= al ~ ~OJ!
0/
~
~lIIi ~ ~ ::> en .J ~~ i~
.g5 ~~ "'~ • is .§'u ... 1!? ·U ~a: ~'" Oii
i
~
~ .
~d ~c~~ ::E-~t .Jff} ~ ii~~ ~a:
PROJECT NO.: 02054
OR"~ BY: .JQC
ISSUE DATE: ~
SHEEr Rev.:
LJ , .... 02054HCOl ~P03
P01
SHEET 1 OP a
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 282004
RECEIVED
®
.. ,
:j'!:4a I '!"':'I'kI !!I!-.. ~-
1.5411'10. @I
®
2.~Ac @ -N-_ .', _____ _
\ --------OIW'IIC 8CW.E
SCAlE' r • 2DO'
~D47UW
QTY OF IIOfltW. 1M'" tIS ~.MEItVAL -2'
f:i/EIlICH<IAFI .....,
/(WQ COCJNTY PfJNT , R£Jrm4U' FOt.WO PUNQf ~ r KJIIG COUNTY stlfFM.:t MASS DISC AT 1')£ S1Rf£T IfmfSIfC1JCW OF He 41H SlREET AND 1481H AI,£ S£ iMItKJNG THE'
HOtlMIEST ctIIJIER OF !!'ClJCW ' ... ~ 2.W., RANQ£ .£. .. oW. fJ.EVAlJON-$..11 FttT.
,n" SET Q)T"J'tW GIN SPfI(£ ffl." SOU1HIIEST OF 7H£ 1IDT CtX.UItIH OF GAlE.
ll.£VAJJCW-407.11 FEET.
SASS OF EARINQ
'nIUt NDImt &4SED IJIIIOH Q.QW. ~ S\"SJDI (lPS) LAMlIOfT GIRl) ~ STAlE' NORm ZONE COOffOiHAlES. A
CXW\EIIIGfNI% MIQE " OO'N'~ COUHJEJfQ.OQCIIISE' IMS N'PID AT A NNCH IIWfK 14 r KM COUNTY SUllF'ACE auss DGC:. AT lH[' S1JItf£T lNlERS£CnGW OF H£ .1H st NID r«nH A\o£. 5E, AfMIICN) lHE HCIfJH[A!T ~ OF !tClJOH f5, 7OIHSHP.2J HanH, FtANQC ~ CAST OF lHE ~ AefJQIAH. THE NORtH AJI£JtJC;NI fM1LII OF 1MJ/I'''' (NNJ 1J/tI) QIfIID cc::x:JI:WM1ES IISI£ FrxHJ 10 lit" 1301Ol._1 ,.11I1422..m AT »fAT POIH1. 1HE' jN~ (I" sam
JH[' srA r..nn oatREt:Tk'II FACmR OF a.HH8f424 AND THE QIffO ~ FACTCJI' OF 1.000002'I81 WAS AJIPUED 10 THE '*' COORDINATES mt SffOWN GRQJND 0ISTANCfS.
~I ~~ II I ~ g~ ~ u~ nhnmf
bOU ().~ ~ ~ Q ~ .... Q s::: () s::: bO ~ tIS ........ Ij~ bO fIl s::: Q! ~OJi
~
1111
i
~I
.If Ii It
"'lu . .il'
. ~ .lis:
!1 u
~
I
~
3m lUa::
~ II ~·~I ~I;il
PRO.ECT NO.1 oac:.4
ORA .. ft .JQC
ISSUE DAlE: -..ot-CM
9iEET IW:V.:
~ U
r ..... a2OS4CllOl-POl
P04 ...,. ... ",. .
03AI303l:1
I;ODl 8 l :J3G
N01N3!::J ::10 AlIO
DNINNlfld lN3VVd013A30
III
~ ~ ~ ~ ~ !II~~I ~ m ;:. ~ ~ ! ~ I
;R CfTYOF
" RENTON
~
"ELMHURST"
RESIDENTIAL SUBDMSION
ELMHURST
BRB.ERTON AVE. NE. AND
ROAD B PRELIMINARY PAOFILE
4180 UNO AVE. S.W.
RENTON. WA 98055
RENTON,WA
FOI>
UiERTY NXE LLC. .... """. BEATTLE. WA 88108 f"HOtrE< (42:5) 22&-1000 FAX· (~ 228-42A Civil Engioeering, Surveying
and Planning Consulllmts
m 0
.01
~
I\)
(,J
~;z,
~ ~
0'1
In
~ ~
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 282004
RECeIVED
~ i I--..~~-'-'-'-'---'-+-~~~+-+---I
).
"ELMHURST"
RESIDENTlAL SUBDMSION
1m CfTYOF ~ RENTON ELMHURST
ROAD CA06S SECTlONS AM)
ROAD A PFEUMINAAY PROFILE
Pacific 4180 LIND AVE. s.w. Engineering ~. WA 98055
RENTON,WA Design, LLC ~";i? 251-aan
FOf> L.JBERTY FIDClE LLC. 01251D"TH e
BEATT1..J:,WA.1iI8108 f'HClPE> (.0&26) 22&-1000 FAX. (o42Q 22&-<4824
(425) 251-8880
WEB SITE'
Civil Engineering, Surveying PACENG.COM
and Planning Consultants
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 282004
RECEIVED
~~ :ij
§!Z if w ~..j It (~ !D
\1 U
Rf'II",",'
____ ~L); , ", __ ~J
'{\ '.' '., ~; T7{'Aer B "-
; '. '-'\ .. _' .. " . <;.'>' ~-~"'. , i ~C;" ~
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
'"
~
~
_I -----~c-,-H
! I
; I "'1
II
8 ~!I : , ,
, -r
I .......... --.;.-1
4,~
" I
\
k-...u-: T
<lIW'HC 8CJ\I.C
SCALE' r -50'
~DAT1JU
QTT UF IfD#TCJH, HAW 1!18 CONJaJR IHTDfVAL -2'
BENCH.fAFI(
"''''' KING COUNTY POINT I RENnl!52:
FOUND PUN04 IN J-K1HG OOUNTY SURFACC MASS DISC AT 7H£ S7REET 1HTtRS£C11ON « HE 4TH STREET AND 148TH A\IE SE w.RJOHG 7H£ HCW1HII£ST CORNER OF S£CDOH ,... TDIINSHfP ZJH., RANG£ tf£., IU".
Q.£VATlOH-.f5.f.7tl F'f:£T.
",., seT COm:w QN SPfK£ flU' SOU1H1tEST OF THE MEST CCl.UMN OF GA1E'.
a£VA11CW-407.111 FUT.
SASlSOF~
7RUf NORTH. BASfD UPON a.OSAL POSTJOMHG Sl'S1DI (CPS) UJrIBERT GRID WASHWGTCW STAlE NORTH ZONe COClROfHA1ES. It
CON\£RCI£NC£ ANGtL OF OOVJO.28· COVN1ERQ.OQOWSE' WAS APPUED AT A PUNCH IIARK IN J-KING C(J(JNTY SURFACE: BRASS DISC. AT TH£ STRaT INT£RSCCTION OF N£ 4TH Sf. AND 148TH A\€'. S£. UARKJHG 7HC HOR~T CORNER OF SCCJlOH 1.5. TOtWSHIP 23 NORTH. RANGe 5 CAST OF JHE MU..AWCTJl" II£RIOMH. THE NORTH NtIERICAH DATUoV OF fNJl"eef (HAD aJ;91) GRID COOROWAJES IIERf" FOUHO 10
SIE" 14OQOJ.JN /IJ18822.J21 AT THAT POINT. 7H£ INVERSE OF 801H 1HE SCA l£\o£l. CORRf'CTlCW FACTOR OF o.IHM1SZ4 AND JHC GRID
SCALE FACTOR OF 1.000002181 WAS APf'I.IED 10 ȣ fRIO COORQItU,JES FOR SHOWH GRCXJND OtSTANCt:S.
I..EOENJ
SMfTNtY SDER a.EANQJT
• SAMTMY ..,.. MAIHU ..... ,. HrDIWIT AS:SD&.Y
~ CAP. IMlER lINN W/lDFOIWfY 2" aoIKIfF ASSEIa.Y .. ""..,.,.
If, ..-
• C8 """,
C8 nfIE' , JrftCU) L.OCJCIr«I LID
til C8 ""'"
<el 121 J"IR' , Ir/5CU) LDCJalIIIG LG
-.........,. -L AIICNISID .. DtJfIIIISI'WT MANftlD ---1 PIIfCPOSED .. DM£1M Y DRAIN CItNIEClJCW
DIS'JM I'AWMNT
c:::=J -,..-c:::=J _ .........
~~ ~S i il «~ , I"~ ~5'~ ~~~ !ziG"GmB h~$~$~::
OilU ~....:l ()'\:: ....:l t;:i a) ~ .... a) ~ () ~ Oil (\I ........
~ Oil rIJ ~ a) ~ CL
~
~llli
I1I1
be '~:l ~~ ",1
bIl O f;' " ,e 'U ~a:: 'n u
I
I .J ~~ ~ d f ~ ~.~I ~~ ~ml
PRO..ECT NO.: 02054
DRAWN 8'1': .JQC
ISSUE DATE: 1I-0I-04
SHEET REV.:
LJ ,. .... 02054CU01-P02
P02
....-raOP.
DEVELOPMENT PLANNING CITY OF RENTON
DEC 282004
RECEIVED
REVISIONS
10
4"
/
_ ... /J_. _~,/
\ \ -----~\
UNRECORDED . ./
"-.~
sec. 15, TWP. 23 N., RNG. 5 E., W.M.
\
"-..'-....., ...... "-.
I
I
\ )---
H.i::: VUf·
.. ~ .
;J}--'-, -----~oH-
. LAV-<Cl : I
II "-:1
I
3
" 8 ill ! ; --~----.-.-;
, 7 \
J, ___ ...... _\
Ie: I
".1. .. 11
5
; ~ 1 ....
\
t..J W Ii
OIW'HC 8CAI.E
SCALE' r -50'
~DAT1AI
..... ..... ~,CH. HAW 118 CONTOUR WlERVAL -Z'
BENCHIAIf(
BAse KING COUHTY POINT I RENTla52:
FWND PUHC>I IN r /OHG COUNTY SlIIfF"ACE MASS DISC AT 1HE S1REET INT£RS£CTJOH OF HE .TH SJRfET AND '48TH A\E SE IMRK1NG JH£ NORTHIfEST CORNER OF S£CnoH '.f, roMHSHIP 2.lN., fWIG£ 5£, WM. £LEVA T/OH_ ..,.., 78 FEr.
Sl£: SET COT1CH GIN SPIKE UU' SOUlHlfST OF 1HE JEST caJJIrIH OF Go4.1E.
£LEVATJOH-.07." nET.
SASIS OF BEARING
7RtJE" NORTH. BASfD UPON Gl.08AL. POSl'noHlHG Sl'S1DI (CPS) I.ANSERT GRfO WASHNG1tW STAlE NmTH ZONE CCICIRI:XNA1ES. A CCW\t£RGfHCf" ANGL£ OF ooV.30.28-COUNlERQ.OCKMfSE WAS
APPU£D AT A PUNCH MARK IN r KING COUNTY SURf"AG'E BRASS £¥SC. AT JH£ S1RaT INlERSEC7KW OF IE 4TH ST. AND ,46TH AI£ SE WARKIHG JH£ NORTHCAST CORNER OF SEC7KW '5. 10MNStfP 2J NORTH. IWlGE 5 EAST OF 1HE M.L.AIJ£TlE" U£1ffOIAH, THE NORTH MI£RfCAH
DAMI OF U'8J/lH' (HAD 8l/i1) GRID COOflOjNATES II€R£ FOLHJ 10 BE 180e03.H8/IJUSd22.J2! AT THAT POINT. THe IMERSC OF BOTH THE $£A Ln£L CORR£CTJOH FACTOR OF Q,iH88faz4 AND 7HC GRfO SCJ.LE FACTOR OF J.OOOOQ2f87 WAS APPUf.D TO THE GRIO
COQ1iOIHA 1ES FOR SHOMN QIfCX.WO OISTANC£S.
~I ~« i i ~ o~ , 'jlits Z~~1ii 1iim~ ~!Z ~~~m~ I;~ $IL$~::
OJ)U ~...:l '~:l C)'I::...:l ~~ t;:: ~ ~ 3] ..... ~ ~ "' . C)~OJ) .. ell.......... .~ .. Il. OJ) rIJ 3·S ~ ~ ~ .~ ~ ~Oll .:10:: ]1 u
~
~llli I I
~ ~ ~~ ~~ ~-ulffl
~ d ~.i~ ~ i;i~ • a:
PRO.ECT NO.: 020IS4
ORA" BY: ..xac:::
ISSUE OAl[: 1I-Ofoo04
SHEET REV.:
LAIC) a.&AFINQ
"-AN ~CUTTI<IQ
02054TRo\-P03
P03
aEET :I OF •
a3AI3~3~
frOOl g l J30
N01N3H ,:jO A.LIO 8NINNVld IN3Wd013A30
~I: r,li'
~ i ~ I
~~ 11 ~!Z Ii
oil! t~
RE\1S1ONS
I~
"n ;1 UI
a.rn,
II'W'
--,--
j I J;:I -~!l
g
W!ll t
!
!1
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
~i" '''4~?'1:::'~~ ---f'=.!;::a; tt4!',' iii , - ---- ---- ---
",
FUr::
-~c-, H-
~ I i I
9 "" _mn
I I
"""""'-; ---~-!i\'
7 \,
I' -
I r: I!
....••.•••••••• _. ,", ......•..••• -. __ : ... J ~
II I
~ ~
ic~-LW 1~ -~ ~8CALE
SCALE: r -50'
w:mJCAL. DATUW
OTT'" RENtoH. NA~ 88 CONTOUR INTERVAl -2'
BENCI-IIAFf( .....,
KINO OCXIHTY POINT I R£NT7Bl52:
FOUND Pf.JNQ4 IN J-KfHG CQJNTY SURFAce BRASS DISC A T THE: STREET IHTERS£CJK)N OF ~ 4TH STRaT AND 148TH A~ SE MARKlHG THE HCWTHM£ST CORNER OF S£C7lOH 14, TOWNSHP 2JH., RANGe Mo. w..w. £L.fVAJKJN-0f.78 f[ET.
S'll": SET com:w QN SPIKE 1111' SOUTHIIEST OF THE IlEST OOI..UIMI OF GAT£.
fl£VA17OH-407.H FEeT.
8AS/S OF 8EAIIH)
1JftJf" NCJfUH. BASED UPON GlO8AL POSI1JONING SlSTDI (GPS) L.oWSDtT GRID WASHNGTCW STAll" NORTH ZON£ c:c:::ICROIN,UES. A COH\f:RG£NC£ AHQ.£ OF ooV.3O.28· COUN1ERQ.OQOWS[" WAS NIPUCD AT A PUNCH .wNfl( IN J" KING COUNTY SlJRFAC£ BRASS r:¥SC; AT THE: smaT WTERSECTIOH OF He 4TH ST. AND ,..aTH A~ SE. .wARKlNO THE NORTHEAST CORNER OF SECTJOH IS. TCWtHSHIP 2J NORTH. RAHGC , CAST OF 1H£ IIIl..L.AA£Tll" IIERlOINt. 1HC NORTH AJJ£RfCAN OAruv OF INJ/'7iI'" (HAD SJ/8l) GRD COORDINATES IER£" FOf.N) TO
B£ 180"o.",,88 / IJleaZ2..l21 AT THAT POINT. 1H£ ~ OF 80TH THE S£A I..E\fl. CORR£C1ION '-"C7Oft OF Q.8HG8I424 I.HD THE QW) SCALE F"C7Oft OF I.ODOOD2167 WAS APPU£D TO "D£ GRfO
COOROiHATES FOR SIKJ'MII GROUND DISTANCES.
/..EGEID
SMfTMY SEIEt aLAIIQJT
• SNnMY SEEt MNttfCU ..... lIE HYDIWIT ASSEIB.r
~ CAP, IMmt MAlI .. ~ ,. ROIO'l'" ASmaY .. ,....,.,.
;r. ..-
• CO""'"
C8nR"'''~I.OCJCJ«JW
Ii) co 1lI'E'
iil C8 nPE" , w~ I.OQOHQ W
........., ......,."r
--L. MCIPOSEJ) ~ DOtWSPOUT MANRl.Q
---I PRCf'OSEP 8" IlAM'lMY DRAIN CQtMC1I(W
DISlM PA\IWEHT
c::::J .........,,,. .......
c:::::J .........,-
~I ~~ J !~8 :J5~" .,co g
i~ ~~~m~ ..,~ ~IL~~"
eo U ~...l (')'1:: ...l t;:: Q) ~
.... Q) ~
(,) ~ bJ)
'fl1 ~~ ~~ '5 bD ~ ........ Il. eo 00 ~ Q) " ,9 'U ~O ~ ...
'$!"" iJ ~
~
~llli (/) ~ ~ 0 m => (/) ~ ~~ ~
a:~ ~d =>w l:O ~.~~ ::E-...I(/) ~Im Ww • a:
PRO..ECT NO.: 02014
DRAWN BY; oJQC
ISSUE DATE: -....ot-Oot
SHEET R[V.: , I
LJ , -02054GR01-P07
P07
....,. 7 C. •
1 I \
AFFIDAVIT OF INSTALLATION OF
PUBLIC INFORMATION SIGN
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231
STATE OF WASHINGTON )
)
COUNTY OF KING )
__ ---.&.H-L...::e~i -=-....;.cl_l ---.:-K;-=-.l-=......:::ua-=-t-______ , being first
duly sworn on oath, deposes and says:
1. On the ;;;..tf/zaay of December, 2004, I installed ~ public information sign
and plastic flyer box on the property located at 201 Bremerton Avenue NE, Renton, WA
98059 for the following project:
"Elmhurst" Preliminary Plat
Project name
Liberty Ridge L.L.C.
Owner Name
2. I have attached a copy of the neighborhood detail map marked with an "X" to
indicate the location of the installed sign.
3. This/these public information sign(s) was/were constructed and installed in
locations in conformance with the requirem ts -ef Chapter 7 Titl 4 of Renton Municipal
Code. '
f December, 2004.
N Y PU in and for the State of Washington,
ing at Des Mol Jes, lJA... .
My commission expires on 1#/19/01
C:\WJNN1\Profiles\heidik\Local Settings\Temporary Internet Files\OLK33\Public Info Sign Installation.doc
12/27/04
#152305-9192
Cortess D. Pippin
310 Bremerton Ave NE
Renton W A 98059
#518210-0020
I/d-.
Langley 4th Avenue Assocs LLC
4225 4th Ave Northeast
Renton W A 98055
#518210-0081
Rose Woodall
248 Union Ave NE
Renton W A 98059
#518210-0031
U S Postal Service
17200 116th Ave SE
Renton WA 98058
#252550-0290
Jon Morgan Hendrickson
150 Bremerton PI NE
Renton W A 98059
#252550-0530
Clifford D. Griffin
154 Vashon PI NE
Renton W A 98059
#252550-0440
Edward N. James
156 Whitman Ct NE
Renton W A 98059
#252550-0540
Joseph M. Cunanan
5019 NE 18th Ct
Renton W A 98059
#252550-0450
Andrew Rosko
1900 NE 48th St Apt BIOI
Renton W A 98056
#252550-0500
WArren J. Madaj
167 Whitman Ct NE
Renton W A 98059
#252550-0720
Fernwood North Homeowners Assoc.
Po Box 2364
Renton W A 98056
#252550-0400
Edward D. & Sandra L. Gullekson
PO Box 3104
Renton W A 98056
#252550-0390
Gerald C. & Susan R. Dorer
151 Bremerton PI NE
Renton W A 98059
#252550-0520
John A. Lambert
15 S Grady Way
Renton W A 98055
#252550-0380
Henry L. Royce
157 Bremerton PI NE
Renton W A 98059
#252550-0370
Dauna M. Koval
161 Bremerton PI NE
Renton W A 98059
#252550-0360
Terrance L. Flaig
PO Box 3106
Renton W A 98056
#252550-0350
Scott A. & Julie M. Rutledge
169 Bremerton PI NE
Renton W A 98059
#152305-9014
#152305-9213
Conner Homes Co
846 108th Ave NE Ste 202
Bellevue W A 98004
#518210-0085
Salvador C. Patrianca
27 59th PI SW
Everett W A 98203
#252550-0280
Chuong M. & Tien G. Tran
116 Bremerton PI
Renton W A 98059
#252550-0430
Timothy J. & Andrea M. Braun
152 Whitman Ct NE
Renton W A 98059
#252550-0300
Steven A. & Deena M. Stricker
156 Bremerton PI NE
Renton W A 98059
#252550-0620
Kelly Salvatori
159 Vashon PI NE
Renton W A 98059
#252550-0510
James D. & Gail Cunningham
161 Whitman Ct NE
Renton W A 98059
#252550-0550
Joanne C. Marcellis
166 Vashon PI NE
Renton W A 98059
#252550-0310
Kamilla Teletnik
170 Bremerton PI NE
Renton W A 98059
#252550-0460
Renee Sajous
170 Whitman Ct NE
Renton W A 98059
#252550-0490
Nigel S. C. & Linda E. Lo
173 Whitman Ct NE
Renton W A 98059
#252550-0330
Gildardo Lazcano
179 Bremerton PI NE
Renton W A 98059
#252550-0320
Glen W. K. & Tessie Wong
185 Bremerton PI NE
Renton W A 98059
#518210-0042
Ridgeview Court LLC
PO Box 2401
Kirkland W A 98083
#518210-0082
Jodi J. Delmar
4207 NE 2nd PI
Renton W A 98059
#252550-0410
Michelle M. Mckay
4314 NE 1st PI
Renton W A 98059
#252550-0560
Thanh Huynh
172 Vashon PI NE
Renton W A 98059
#252550-0470
Todd A. & Tracie C. Fredericksen
176 Whitman Ct NE
Renton W A 98059
#252550-0480
Peter M. Jamero
179 Whitman Ct NE
Renton W A 98059
#152305-9035
Violet F. Bliss
330 Bremerton Ave NE
Renton W A 98059
#518210-0083
John H. & Margaretta J. Losch
4213 NE 2nd PI
Renton W A 98059
#152305-9030
Fue Vue
13004 136th Ave SE
Renton W A 98059
#252550-0340
Kathleen S. Schrader-nada
173 Bremerton PI NE
Renton W A 98059
#252550-0570
Geoff A. Erbeck
178 Vashon PI NE
Renton W A 98059
#252550-0580
Gordon & Marsha Schroeder
183 Vashon PI NE
Renton W A 98059
#518210-0071
Teresa A. Cronin
4115 NE 2nd PI
Renton W A 98059
#252550-0420
C. E. Stone
PO Box 2401
Renton W A 98056
#518210-0050
Liberty Ridge L.L.c.
9125 10th Ave S
Seattle W A 98108
March 29, 2005
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
Minutes
APPLICANT:
CONTACT:
LOCATION:
SUMMARY OF REQUEST:
SUMMARY OF ACTION:
DEVELOPMENT SERVICES REPORT:
PUBLIC HEARING:
Liberty Ridge LLC
Attn: Mike Merlino
9125 10th Ave S
Seattle, W A 98108
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th Street, Ste. 1900
Bellevue, W A 98004
Elmhurst Preliminary Plat
File No.: LUA 04-162, PP, ECF
DEVELOPMENTSER~CES
CITY OF RENTON
MAR 29 2005
RECEIVED
201, 251, & 257 Bremerton Avenue NE
Approval for a 64-lot subdivision of a multiple parcel, 9.6-acre,
site intended for detached units.
Development Services Recommendation: Approve subject to
conditions
The Development Services Report was received by the
Examiner on March 8,2005.
After reviewing the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding area; the Examiner
conducted a public hearing on the subject as follows:
MINUTES
Thefollowing minutes are a summary of the March 15, 2005 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, March 15, 2005, at 9:31 a.m. in the Council Chambers on the seventh floor of
the Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No.1: Yellow file containing the original Exhibit No.2: Neighborhood Detail Map
application, proof of posting, proof of publication and
other documentation pertinent to this request. -.
Exhibit No.3: Preliminary Plat Plan Exhibit No.4: Tree Cutting and Land Clearing Plan
Elmhurst Preliminary Plat
File No.: LUA-04-1 62, PP, ECF
March 29, 2005
Page 2
Exhibit No.5: Grading and Drainage Plan
Exhibit No.7: Zoning Map
Exhibit No.9: Katie Walter, Professional Resume
Exhibit No. 11: Vacation Petition to City dated
12/27/2004
Exhibit No. 13: Renton City Council minutes dated
2/28/2005
Exhibit No. 15: Deed to the Foster property
Exhibit No. 17: Access Easement Agreement dated
March 9, 2004
Exhibit No. 19: Lawsuit, Snohomish Case Law
Exhibit No.6: Existing Conditions
Exhibit No.8: ERC Mitigation Measures
Exhibit No. 10: Sheet I of Preliminary Plat drawing
set showing vacation of 15.5 foot right-of-way along
Bremerton A venue
Exhibit No. 12: Letter from Bonnie Walton dated
311/2005
Exhibit No. 14: Noise Report by Mr. Jerry Lilly
Exhibit No. 16: Lot Line Adjustment
Exhibit No. 18: Lawsuit, Kitsap Case Law
-.
Exhibit No. 20: Second Grading Sheet
The hearing opened with a presentation of the staff report by Susan Fiala, Senior Planner, Development
Services, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The site is located in the east portion
of the City of Renton just south of the NE 4th corridor and to the west of Bremerton A venue NE. The site is
zoned Residential-I o.
On the site there is a Category 3 unregulated wetland located in the southwest portion of the site, which is
proposed to be filled. There are two tracts proposed, Tract A in the southwest corner of the site for the storm
drainage facility and Tract B which continues along the entire southwest and western edge of the property which
would be a Native Growth Protection area. Maplewood Creek runs along this area and continues northward.
There would be a 25-foot enhanced buffer on each side ofthe creek. Due to any wetland that would be
potentially located within 100 feet of the site, the applicant did an assessment of this wetland in the northwest
corner of the site and that is unregulated Category 3 therefore, this proposal would not be affected with that
wetland.
A Development Agreement was made on this site, it was approved in August of 2004 with several stipUlations.
One, this site would be zoned R-I 0 as well as the Comprehensive Plan Use designation of Residential-Options
(RO). There are also some site-specific restrictions that state that all residential buildings must be single-family,
all lots abutting the south boundary line must be 50 feet in width (Lots 23 through 29), and lastly the net density
cannot exceed 10 dulac. The proposed density for this plat is 8.3 dulac.
The Environmental Review Committee issued a Determination of Non-Significance -Mitigated for the project,
which included fourteen mitigation measures. No appeals of the determination were filed.
The purpose of the Residential Options designation is to create new, lower-density neighborhoods in a
traditional development style while at the same time support infill development. This proposal is consistent with
the Residential Options land use development and the environmental element.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 3
A net density of the development would be 8.3 dwelling units per acre, which is within the allowed range. This
proposal is all detached single-family units and complies with the density and unit mix requirements for R-l 0
zoning.
All lots comply with the lot dimension requirements as well as meeting the required setbacks. The proposal's
compliance with these building standards would be verified prior to the issuance of individual building permits.
Several buildings and outbuildings currently exist on the site, the applicant must obtain a demolition permit and
complete all inspections and approvals for all buildings prior to the recording of the final plat.
The R-IO zone requires setback areas to be landscaped including the addition of trees and shrubs to be planted
within the front yard area of all lots within the plat. The satisfaction of this condition is subject to the review
and approval of the Development Services Division Project Manager.
The side lot line of the proposed lots are at right angles to the street line. All lots would gain acce~s to public
roadways either directly, or via private driveway access easements. As proposed, lots comply with arrangement
and access requirements of the Subdivision Regulations.
Each of the lots satisfies the minimum lot area and dimension requirements ofthe R-I 0 zone. All lots located at
the intersection of public rights-of-way would meet code, all would have a radius equal to or greater than 15
feet.
Access is proposed via the Bremerton A venue NE coming from the south through the Laurelhurst Plat. This
proposed plat required two means of access, depending on the outcome ofthe Ridgeview Plat, north of the site
along Bremerton A venue NE, it is a requirement by code that a minimum of 20 feet width of pavement and a
pedestrian walkway be required along Bremerton Avenue NE from the northern property line up to NE 4th
Street. If the right-of-way required to be dedicated by the Ridgeview Court Plat is not in place prior to the
recording of the Elmhurst Plat, the applicant ofthis plat would be required to dedicate the public right-of-way
along that parcel. There also is a requirement for a dedication of a minimum of 25 feet from the centerline of
Bremerton Avenue NE for this subject plat.
A homeowner's association or maintenance agreement is suggested for the development, which would be
responsible for any common improvements and/or tracts within the plat.
Traffic, Park and Fire Mitigations fees were imposed by the ERe.
The subject site is located within the Renton School District boundaries and they have indicated that they can
accommodate the approximately 28 new students.
The storm drainage/surface water would be located in Tract A in the southwest corner of the property between
Lots 22 and 23. In order to enhance the storm drainage tract it is to be fenced, landscaped and irrigated unless
drought tolerant plants are used. The property lines of Tract A fronting Road A, Lot 22 and 23 should include a
landscape visual barrier and fencing. The property lines along Lot 22 and 23 should include a six foot high solid
wood fence or other approved material (no chain link), the portion to the southwest of Tract A required only the
split rail fence.
Staff recommends approval of the Elmhurst Preliminary Plat subject to five conditions.
David Halinen, 10500 NE 8th Street, Suite 1900, Bellevue, WA 98004 stated that he represents the
owner/applicant Liberty Ridge LLe. There were a couple of questions that arose during Ms. Fiala's testimony,
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 4
in terms of the question of shared driveways, the applicant is planning to have individual driveways, the
purchaser of the project has requested that and that is the applicant's intention to provide those driveways.
Secondly, regarding the small segment of Tract A that abuts the south line of the property, they are willing to
fence that in any way that the City staff would like to have it done.
The applicant has reviewed the proposed conditions for approval and finds them acceptable.
There was a question regarding the unregulated wetland in Tract A, Katie Walter, a wetland scientist, biologist
and botanist is present today and can address that question.
Katie Walter, Shannon and Wilson, 400 N 341h Street, Suite 100, Seattle, WA 98103 stated that she performed
the wetland del ineation both on this site and the site to the north back in 1998. The wetland to the north is just
offsite north along the west property boundary. It is a small wetland, just over 2,000 square feet in size. It was
designated a Category 3 wetland under the City's regulations and the question was with respect to its closeness
to Maplewood Creek. That creek has been channelized in the past, the area was developed early in the 1950's,
and at different periods oftime the creek has been channelized and moved and it appears that long before now
that wetland has become isolated from the creek. There is a dirt berm that exists between the creek and that
wetland.
The isolated wetland on site is slightly different in that it appears to have formed on fill as a result of a
stormwater pipe that outlets near the east side of the wetland and it appears that that wetland is isolated, most of
the water that gets to that wetland either infiltrates or evaporates and probably during very large storm events it
may have some overland flow. The creek on site, which runs along the western property boundary has been
heavily channelized, it's about four feet lower on the northern side than the site boundary depending on the
amount offill in different places on that site. On the southern portion it is six to eight feet lower than the actual
site. On the northern two-thirds of that site it's been channelized along the property boundary, it's an ephemeral
stream, it wasn't flowing, in fact it was completely dry in June of 2004, and in December of2004 it wasn't
flowing, but there were some puddles of water. It was flowing in 1998 when she was at the site. II does flow
occasionally, but mostly during storm events in the area. The buffer along the creek is heavily vegetated with
blackberries with almost no native vegetation. On the southern end there are a few more trees and some native
vegetation.
Mr. Halinen stated that for the record, the Bremerton Avenue right-of-way abutting the site, there were three
small strips of land along the west edge of Bremerton Avenue designated as a 15.5 foot ROW to be vacated that
is within proposed Lot I. The second strip has a note that also shows 15.5 foot ROW to be vacated from Lot 46
north to Lot 42 up to proposed Road A, and finally the very south end of the site there is a note that says 7.5 foot
existing ROW to be vacated, along the east edge of Lot 29. The applicant filed a petition with the City on
December 27,2004. This is a contiguous strip that Road A will cross and does not need to be vacated.
This matter went before the City Council on February 28 and the Council voted to approve the requested street
vacation with two conditions; area of vacation for the two northerly portions of the original request be set to a
maximum vacation width of 12.5 feet and secondly, the petitioner shall provide satisfactory proof that outside
utilities have received and are satisfied with any easements which are necessary to protect their facilities in the
requested vacation area. Going forward with construction plans, the three-foot adjustment will be made within
the lots and make everything fit.
The reason that a Noise Analysis was done was in view of the Ridgeview Court project to the north, there was
testimony by the manager of the abutting postal facility concerning truck and delivery noises that he wanted to
make the City aware of. In that particular case, the Examiner indicated a recommendation for denial of that
project, or in the alternative some special conditions of approval were suggested. That matter is now on appeal
to the City Council by the applicant. While the Elmhurst site is further from the postal site than the Ridgeview
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 5
Court, it seemed prudent to have some field noise measurements taken over an extended period of time, 64
hours, so that some hard data would be available. That work was done by Jerry Lilly, who could not be here
today, one of his colleagues, Michael Yantis is here today to provide an overview of the testing.
Michael Yantis, Yantis Acoustical Design, 720 Olive Way, Suite 1400, Seattle, WA 9810] stated that he was
here today on behalf of Jerry Lilly. He visited the project site on Sunday, March 6 with Mr. Lilly. The noise
monitoring stations were set and they were able to review both the location of the stations and the equipment
that was used.
Two noise-monitoring locations were set up on site, one on the north boundary of Elmhurst property and a
second approximately mid point on that north boundary line. Mr. Lilly took data for approximately 64 hours
between March 6 and March 9 at these two locations. Position two took hourly data and position one was
continuous recording of data every 2 seconds. Primary noise sources were traffic on NE 4th Street, aircraft
flyovers, and although the Post Office has been indicated as a noise source in the vicinity, the study indicated
that it was not a primary noise source in the area.
Mr. Yantis continued with an overview of the report. Noise codes do not specifically apply to public roadways
and aircraft because these noises are exempt from the noise codes, developmental regulations help provide
guidelines for jurisdictions and developers and how they might build their developments to make sure that the
residents don't have noise levels that are excessive. Both Bellevue and Snohomish guidelines are based on the
HUD guidelines that provide noise guidelines that are suitable for residential developments. Noise levels above
65 LDN are in the less acceptable category, noise levels under 65 are generally acceptable. The C:ty of Renton
also has a noise ordinance that regulates noise levels between adjacent properties. The results of the
measurements that Mr. Lilly recorded show that the Ldn (day-night average) varied from 56.3 at position 2 to a
high of 57.8 at position 1. They are all very close in noise level. In addition to the long-term noise levels that
were measured, Mr. Lilly paid particular attention to noise levels that might be occurring from the Post Office.
While he was on site, there were two events that happened, that were truck events. One event happened at 4:45
pm when a truck left the facility and beeped its horn and the other event was the arrival of a semi-truck trailer
rig that traveled onto the property, dropped its tailgate and unloaded material. Both of these events, although the
noise levels are identifiable, they are a little bit higher than the typical activity happening on the site during that
time. Using Figures from the report, he showed how Mr. Lilly was able to assess what might be an aircraft
event versus some unknown event.
In summary the noise levels that Mr. Lilly measured and reported in his report are suitable for residential use.
There are within the HUD guidelines, maximum noise levels are primarily due to aircraft flyovers and they are
consistent with other residential areas in the vicinity.
Rose Woodall, 248 Union Ave NE, Renton, WA 98059 stated that her property abuts this proposed plat at the
northwest comer out to Union Avenue. She has lived there 33 years and lots of changes have taken place. Her
concern is that her back lot is like a park, if there is a split rail fence, it seems that children could just climb over.
The City of Renton is going to build a park on the west side of Union Avenue directly across from her property,
it seems that the children could cut across from this development, through her property and to the park. She
would like to have a fence that kids are not going to be able to crawl over. She is concerned about her liability if
the children jumped in the creek and wade across.
The Examiner explained that the City does not usually require fencing between similar types of uses, in other
words single family and single family. Perhaps you and the applicant can work something ont, although a fence
of some type is required to protect the stream buffer.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 6
Cliff Williams, 5326 SW Manning, Seattle, W A 98116 stated he was here representing the property owner of
the development bordering to the northeast, known as Ridgeview Court. They are in support of this
development. It represents a well planned and logical development and transition from the R-8 developments to
the R-l 0 and then up into Ridgeview Court which has been zoned R-20. They have worked together in
coordinating the site developments, the key things addressed are the road profile for Bremerton Avenue, the
sewer service for Ridgeview Court, and also the grading between the property lines on the north side. They
would like to complement the developer on the initiative to undertake this noise study. They find the study
results very encouraging for all parties concerned.
Thomas Foster, Langley Fourth Avenue Associates LLC, 5460 South center Bou levard, Suite 106, Seattle, W A
98188 stated that they own the property to the northwest and adjacent to the Post Office. He submitted a letter
to the City staff yesterday only to encourage the staff to look at the overall development of the area when you
have Ridgeview Court to the east and Elmhurst to the south. They have a small piece of property to the south of
the Post Office that potentially could be landlocked based on the new zoning ofCA that happened in November.
The southwest corner of the property is the end ofthe wetlands on the property and also the site of their storm
detention pond. Some of the area has been cleared and they are currently under construction development
permit with the City of Renton to complete the requirements for a Short Plat. He was encouraging the staff to
look at the overall development potential of the site and area for pedestrian friendly access and also to provide
for secondary fire access to not only their property but to the other properties as well. If Bremerton was ever to
become blocked a secondary access from their property onto either one of these sites could add additional fire
control possibilities and also would enhance pedestrian access to NE 4th and would help the development of
their property as well.
Terrance Flaig, President of Fernwood North Homeowner's Association, PO Box 3106, Renton, W A 98056
stated that he had a question regarding the grading of the site. Specifically the homeowners that abut the
southern end of Elmhurst are concerned about grading that has been done to this site prior to the beginning of
Elmhurst. When he and his wife moved here, this was zoned residential but there was a business operated here,
McCann Trucking owned this land they were a trucking and excavating business. When the property was sold
to Tydico and as soon as that happened they began to bring in large truckloads of earth and fill without applying
for or receiving any permits. They raised the level of this land considerably, particularly in the area that abuts
Fernwood North to the south of their land. Since this was not done with permits from the City of Renton, they
wonder if this is going to be allowed to exist the way it is or if some effort is going to be made to return this
level of the land to what it was before the illegal grading was done. They are concerned because it is quite a bit
higher now than the lots in Fernwood North. The homes that will be built will be towering above them and
provide an unsightly view to the north.
The Examiner stated that they were talking about Lots 32, 33, 34, and 35 in Fernwood North and suggested that
perhaps staff may have some comments about this issue.
Kayren Kittrick, Development Services stated that Elmhurst can be held to dedicate the rights-of-way off
Bremerton when they don't own the property. A secondary access is required by Fire for this site. The
preference is to the north, the owners of the property to the north have been in serious talks and trying to make
sure that their designs met code. It has always been the intent that Ridgeview would go first, or a little ahead, or
at the same time as Elmhurst. When Ridgeview was denied, it was necessary to make sure that that was
secured, that is the secondary access, it is the way that they designed for their secondary access. Whether an
easement would be sufficient if the timing did not work out, the answer is no, the dedication must be for sure, it
is necessary to know that it is going to go through.
Split rail fences are basically to allow for the movement of small animals that would go through that area.
Planning would most likely have some concerns about blocking off that location entirely, but there could be
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 7
some discussions on something that might have small openings. Not quite sure how to solve that particular
problem.
Regarding Mr. Foster and his wish to have secondary access to the north is an issue that they agree on, but there
is nothing that is in the code that would allow for this. The Transportation Division would be very interested in
something through the Ridgeview Court, some type of connection through there. However, in that instance, the
Post Office decl ined to participate. Ultimately this comes down to some type of agreement between private
property owners in this case. Mr. Foster does have access up to NE 4th, primary access, but he doe:~ need a
secondary access, just not sure what is going to be developed on his property.
The site has been used out of standards both under King County and City of Renton when they took it over.
There is no plan to do any grading or changing of the site height. All grading will be \vithin the site, cut and fill,
nothing new being brought in and nothing being taken out.
Mr. Halinen stated that regarding Mr. Foster's comments and concerns about wanting a secondary access, Mr.
Foster pointed out that the company he represents is a recent purchaser of the property that wraps behind the
Post Office. The property was purchased September 2004. In 1999 a Lot Line Adjustment was done and
included the Post Office property and the Langley Property (Mr. Foster). Regarding the secondary access, this
is a problem of self-creation. An Access Easement Agreement was recorded March 9, 2004 proving that the
Post Office did get title. The Lot Line Adjustment was set up to dead end at the back end ofthe property, they
didn't need to do that, they could have had a loop easement along the east side ofthe postal property to provide
for secondary access for emergency vehicles. It was set up deliberately, sold the property in its current
condition to someone who would like to have one of the abutters bear the burden ofa secondary access. This
should have been considered and dealt with prior to selling off the properties. Elmhurst should not have to bear
the burden of these issues, they should not have to give access through Elmhurst.
Lou Larsen, Pacific Engineering and Design LLC, 4118 Lind Avenue, Renton, WA 98055 stated that there are
four existing lots in Fernwood North, Lots 32, 33, 34 and 35 that abut against the area in question. The pad
elevations are set such that they can get access from Bremerton Avenue, they are set to provide se\\:er
connections to these lots, and to provide access for lot drainage into the detention pond. All this grading occurs
on-site, within the Elmhurst property lines, they do not even come close to the south property line. If the lots
were lowered, they would not drain into the detention pond. Lot 27 will be a little bit higher than what it is
today, Lots 26, 25, 24, and 23 are being raised anywhere from three to five feet, depending on where you
measure it. Those elevations are 25 feet into the property where this will occur. Some of that could be buffered
out a little, but not very much.
The Examiner stated that it doesn't sound like the City will address what may have happened prior to
annexation.
Ms. Kittrick stated the City will not explore the site levels, it was like that when it came in for site approvals.
They will not require the owner to return to what the property was like years ago.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 11 :24 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 8
FINDINGS:
1. The applicant, Liberty Ridge, LLC, represented by David L. Halinen, filed a request for a 64-lot
Preliminary Plat.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit # 1.
3. The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non Significance -Mitigated (DNS-M).
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 20 1,251 and 257 Bremerton Avenue NE. The subject site is located on the
west side of Bremerton approximately 600 feet south ofNE 4th Street.
6. The map element of the Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of single-family homes, but does not mandate such development without
consideration of other policies of the Plan.
7. The subject site is currently zoned R-l 0 (Residential Options including detached Single Family uses).
s. The subject site was annexed to the City with the adoption of Ordinance 5092 enacted in S'eptember
2004.
9. The subject site is approximately 9.6 acres or 418,176 square feet. The parcel is rectangular and is
approximately 650 feet long along Bremerton (north to south) by approximately 640 feet deep.
10. The site has been used for construction offices and staging and older homes and outbuildings generally
served office purposes.
II. The subject site slopes generally downward 3 to 5 percent from the north-northwest to the south-
southwest where Maplewood Creek crosses the subject site. The site also has bands of steeper terrain
that vary between 20 to 40 percent. Fill was placed on the subject site in the past and this material
appears to have been placed without benefit of a permit. Neighbors report that it raised the elevation of
the property adjacent to the creek 8 to 10 feet.
12. A Category 3 wetland is located in the northwest corner of the subject site and it is unregulated.
Another wetland located offsite is also unregulated. As noted, Maplewood Creek crosses the southwest
portion of the site.
13. The subject site is mainly cleared of vegetation but small stands or rows of trees are located near the
south and west property lines, near the existing older structures in the northeast corner of the site and
near the creek. Most of the trees with the exception of those in the protected creek corridor would be
removed to allow development at the R-I 0 density permitted by the zoning.
14. The subject site is governed by a separate development agreement. There are site-specific restrictions
that include that all residential buildings be single family, lots abutting the south boundary ofthe site
(abutting R-S homes) be not less than 50 feet wide and that the density not exceed 10 units per acre.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 9
15. The applicant proposes dividing the subject site into 64 lots. The lots would be arranged around the
perimeter ofthe site and in two interior blocks. Lot sizes wiIl vary from 3,801 square feet to 5,979
square feet. The R-l 0 zone requires lots to be not less than 3,000 square feet, lot width to be 30 feet for
interior lots and 40 feet for corner lots and lot depth to be 55 feet. Staff reported that lots would vary
between 40 feet to 54 feet wide and from 95 feet to 112 feet deep. The lots along the south property
line will comply with the 50-foot width required by the Development Agreement.
] 6. Two east to west roads will provide access to the interior of the subject site from Bremerton. These two
roads wi II be connected to each other in a loop by a north to south road running through the western
third of the site. A second north to south road will run between the east to west roads in the middle of
the site creating the blockwise lot arrangement. Bremerton has an inconsistent alignment and width
along the frontage of the subject site. The applicant is seeking a vacation and \vill rededicate property to
create a more consistent alignment.
17. Bremerton does narrow north of the site adjacent to where the Ridgeview Plat was proposed. The City
Council will be determining the status of that plat during an appeal procedure. Staff has nuted that
Bremerton does need to serve this proposed plat.
18. The density for the plat would be 8.25 dwelling units per acre after subtracting sensitive areas (creek
corridor) and roadways.
]9. The subject site is located within the Renton School District. The project is expected to generate
approximately 28 school age children. These students would be spread across the grades and would be
assigned on a space available basis.
20. The development will increase traffic approximately 10 trips per unit or approximately 640 trips for the
64 single-family homes. Approximately ten percent ofthe trips, or approximately 64 additional peak
hour trips, will be generated in the morning and evening.
21. The applicant has submitted a Noise Analysis Report for the project to determine if noise from the
nearby but non-adjacent Post Office would be a factor for residential development of the subject site.
The report was done since the Hearing Examiner recommended that the proposed Ridgeview Plat
immediately north of the subject site but also directly abutting the Post Office be rejected due to
incompatible noise generated. by the adjacent Post Office.
22. The summary of the report contains the following language:
"The ambient noise measurements conducted at the Elmhurst site's north edge
demonstrate that the site is suitable for residential development ...
While there are routine loading and unloading activities and other activities at
the post office that generate occasional environmental noise, this study has
clearly shown that the intensity and duration of the noise generated by the post
office is insufficient to significantly impact residential use of the Elmhurst site.
(Footnote 2) ...
Footnote 2: Anticipated future development ofthe Ridgeview Court site and the
vacant parcel immediately to the north of the west half of the Elmhurst site will
significantly screen the Elmhurst site from post office-generated noise, further
reducing its intensity on the Elmhurst site."
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 10
23. Stormwater will be collected in a pond in Tract, A which will serve as both a detention and water
quality facility. The pond, which is located in the southwest corner of the site, will be adjacent to
Maplewood Creek. Energy would be dissipated using a "bubble-up" system with the overflow running
to the creek. It would meet the 1998 King County standards, Level 2 flow control.
24. Staff has recommended that the pond be screened and landscaped. The screen is to form a visual barrier
but one that does not interfere with traffic. Staff recommended the materials to use and to avoid chain
link fencing.
25. The subject site will be served by City water and sewer services. Utility line extensions to serve the site
will be required and governed by code.
26. Staff has approved a street modification allowing narrower roadways. Since this narrows what would
be parking strips or landscape areas, staff has recommended the addition oftrees
27. The owner of the adjacent property north of the subject site was concerned about access to a portion of
his property behind the post office. That property fronts along NE 4th Street and access is possible from
there. It was noted that the current owner's predecessor in interest created the odd-shaped parcel by
segregating off the post office site leaving the remainder.
CONCLUSIONS:
1. The proposed plat appears to serve the public use and interest. Due to a recommendation by this office
that another residential development (Ridgeview Court) adjacent to the post office was inappropriate,
the applicant was concerned that post office noise might create issues for developing the subject site.
Those noises might be an issue but it appears that the distance between the subject site and the post
office site should help attenuate the noise. The subject site can be distinguished from the Ridgeview
court parcel by a number of factors. The subject site is zoned for residential purposes and is shielded by
the adjacent Ridgeview Court property, which as a transitional property can be used for commercial
purposes. In addition, open space that now lies between the subject site and post office could be
developed with uses that further attenuate the noise. That is new structures could occupy the
intervening open space and block post office noises. The greater distance and the potential for
intervening buildings were not factors that could help the other property. The noise studies that were
conducted were specifically conducted for the subject site and cannot be relied on for determining
impacts on other properties and other properties cannot count on the development of intervening
buildings that could eventually buffer this site from the post office.
2. The proposed plat appears to create reasonably rectangular lots. A fairly regular grid roadway and
block system rather than a deadend cul-de-sac will also serve the 64-lot plat. The smaller lots of the R-
10 zone will still provide detached single-family housing choices to those who want less yard
maintenance and smaller homes.
3. The plat will offset its impacts on fire, parks and transportation services by paying mitigation fees. It
will also contribute to the tax base of the City when developed with homes. The additional population
and traffic will be felt in this currently sparsely developed area but those impacts were anticipated when
the Zoning was adopted for the area.
4. The applicant will be planting trees on the lots while also preserving the stream course and the current
vegetation in buffers surrounding the creek. It appears that filling that occurred on the subject site can
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 11
remain and might have be permitted to allow appropriate sewer service. The applicant wili have to
demonstrate that the materials are suitable for foundation support.
5. The applicant will have to satisfy the City's needs for access to and along Bremerton to NE 4th Street.
6. In conclusion, the proposed plat should be approved by the City Council.
RECOMMENDATION:
The City Council should approve the 64-lot Preliminary Plat subject to the following conditions:
1. The applicant shall comply with the conditions imposed by the ERe.
2. The applicant shall have to demonstrate that the on-site fill materials are suitable for foundation support.
3. The applicant shall obtain a demolition permit and complete all inspections and approvals for all
buildings located on the property prior to the recording of the final plat. The satisfaction of this
requirement is subject to the review and approval of the Development Services Project Manager.
4. All lots within the plat shall be required to have a minimum of one new approved tree, with a minimum
cal iper of 1-1/2 inches (deciduous) or 6-8 feet in height (conifer), and shrubs (or equivalent) planted
within the front yard. The applicant shall be required to set forth a restriction on the final plat stating
this requirement. Each application for a single family building permit shall include a plan noting the
location and type of plant materials within the front yard. All front yard landscaping shall be planted
prior to final building permit inspection. The satisfaction of this condition is subject to the review and
approval of the Development Services Division Project Manager.
5. The right-of-way for Bremerton Ave. NE along Parcel #518210-0042 (327 Bremerton Ave. NE) shall be
dedicated prior to the recording of the Elmhurst Final Plat. The satisfaction of this requirement is
subject to the review and approval of the Development Services Project Manager prior to recording of
the final plat.
i 6. A homeowner's association or maintenance agreement shall be created concurrently with the recording
of the final plat in order to establish maintenance responsibilities for all shared improvements. A draft
of the documents(s), if necessary, shall be submitted to the City of Renton Development Services
Division for review and approval by the City Attorney and Property Services section prior to recording
of the final plat.
7. Tract A shall be fenced, landscaped, and irrigated (unless drought tolerant plants are used). The
property lines of Tract A fronting Road A, Lot 22 and 23 shall include a landscaped visual barrier so as
to not interfere with sight distance triangles including plant materials which would provide a year-round
dense screen within three (3) years from the time of planting. Also, the property lines along J. ots 22 and
23 shall be fenced with a six-foot high solid wood fence, or other approved material (no chain link).
Tract A fronting Road A shall be fenced with either a wrought iron, or chain link with vinyl covering, or
other decorative wood fence. The applicant shall submit a landscape plan and fence design identifying
construction and plant materials for the review and approval of the Development Services Pro$ct
Manager prior to IIlstallation. Fences and landscaping shall be installed prior to recording of the final
plat. -
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 12
ORDERED THIS 29th day of March 2005.
HEARING EXAMINER
TRAN SM lTTED THIS 29th day of March 2005 to the parties of record:
Susan Fiala
1055 S Grady Way
Renton, WA 98055
Liberty Ridge LLC
Attn: Mike Merlino
9125 lOt" Ave S
Seattle, W A 98108
Lou Larsen
Pacific Engineering and Design LLC
4118 Lind Avenue
Renton, W A 98055
Terrance Flaig
President of Fernwood North HOA
PO Box 3106
Renton, W A 98056
Kayren Kittrick
1055 S Grady Way
Renton, W A 98055
Katie Walter
Shannon and Wilson
400 N 34th Street, Suite 100
Seattle, WA 98103
C. Thomas Foster
Langley Fourth Ave Associates LLC
5460 Southcenter Blvd, Suite 106
Seattle, W A 98188
Cliff Williams
5326 SW Manning
Seattle, W A 98116
TRANSMITTED THIS 29th day of March 2005 to the following:
Mayor Kathy Keolker-Wheeler Stan Engler, Fire
Rose Woodall
248 Union Ave NE
Renton, W A 98059
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th St., Ste. 1900
Bellevue, W A 98004
Michael Yantis
Yantis Acoustical Design
720 Olive Way, Suite 1400
Seattle, W A 9810 I
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Larry Warren, City Attorney
Larry Meckling, Building Official
Planning Commission
Transportation Division
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
King County Journal
Pursuant to Title IV, Chapter 8, Section 100Gofthe City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., April 12, 2005. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in jUdgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date ofthe Examiner's decision. This
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 13
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of$75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m., April 12, 2005.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Councilor final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This means that parties to a land use decision may not communicate in
private with any decision-maker concerning the proposal. Decision-makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation ofthe request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
0 ~~---------------------R 117c1.tI
19-81'
® C ® (!
0 4: 0
" ..,
N
01'
4:
0 ttl r-i.
~
§ Il ~ ,I ~
.. ,
!
\." _ _ .'L ..... ,/ / ... , .......
I
.-.~
SEC. 15, TWP. 23 N., RNa 5. E., WM.
\
\ \
Fl:RNWOOO\~~~ ~ -...... ~
vur::
----r----rr-lA~RElHURit. T PH Ah~, : I (;J~o~!:..~c:.~~T~~NJ ill I
2 :,1 9 : I I
, 'I -.... --... ·l:·~· ~'''---'-'+1 3 , a I II I ___ .. _.' __ L ____ --: ,
1"1'1
~ It'd" 1011 bJ---~_ I
CIIW'HO .......
IICALJI ' r • 6()'
~~TUI
_ .. _ ~ •. QJI4NA\O" CQIiinUC.Mt'~ ... r
BEHC:HJAIlf( ...... ~ CCIC.trI'" ~r I ~"aaa I'OIJNO ~ '" rWlO CCIJHT'f',.." ... CE'1i'fJ.SS OI.SC "T JWC J'n.ar IHlOtSI'Cncw ~ N¥ .»1 .mcrr .wo , .. »4 A\oI: It ~G' lkC HQlfYHIIOT txJIItI.IDt " .cf'OH 'of. ,.,...... z..w.. fWIQC.sr:.. Wow. ~mw-..... 1f lIlT.
ftr COnaJri ON ... ' .. ,' ax/lHIKJT " rNC IO'f QQ.I.JU~ fY ~ rr.. f1I\4,IJI(:N..fQ7MI1rt
..... ~ IJ/VrIfHO
~'T:" ~ M1t~T::==I.~) A
CCW\DCDlQf MM.S .. OO'V'J4.I'. CCIUN~ .., ~.:r:=r~~:~~~7K AAW ... wr.'IJC~~ J)C'NOIf7H.4iIlJIICM
1Mft.W" '.Ir&VJ.., (NN)~)" ~1'D ..,.. fQI.M) "' :-t'~ ~'#&1'~~-:::X",,::;'~CI"~1H ~~,: ~w.u,.~~""
~I ~~ ~ !~~ iU~~~;~
OJ)U Q.§:J .~ j ~ 0 ' f~ ..... 0 .:: U d OJ) cd._ .""", :il ~ OJ) Vl Q ,~ r: 0 n ,9 ~ U..lOIi 1 ...
~
~IIII
r~
~ ~ ~ II ~ d ~.~~ ~Ui~
~Jlo...t:CT WO.I 0'1lOI4
~.4'IIN ,." .JQO
IlSUt()~Tt: ~
lMaT .. tv.!
CJ""""" u.ND c::uIAAHO ~
020'4","O'''~~
P03 _'01"'
CA R-IO
r--r---';;:~I---_-1
R-8
~ ~. ~ .' ~ .~
~ e ~ z
G foe
'0 ~ .-4 , .t;t ~ ~
RMH
SE 142nd St.
RCCP)
CP)
G6 -22 T23N R5E W V2 F6 ZONING
15 T23N R5E W 1/2 . 5315
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201, 251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.S-acre site. Two tracts for open space and
stonn drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestem portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES;
The City of Renton
Department of Planning/Building/PubliC Works
Development Planning Section
1. A Geotechnical Engineer shall detennine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building permits, additional geotechnical studies addreSSing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
~. ' .• the applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc., \,,;V dated August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
".. . Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume II of the 2001 Stonnwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
profeSSional and properly documented and reporled to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the eXisting three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (i.e.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
CITY )F RENTON
Wheeler, Mayor
April 26,2005
Liberty Ridge LLC
Attn: Mike Merlino
9125 10th Ave. S.
Seattle, W A 98108
Re: Elmhurst Preliminary Plat; LUA-04-162, PP
Dear Mr. Merlino:
City Clerk
Bonnie I. Walton
At the regular Council meeting of April 25, 2005, the Renton City Council adopted the
recommendation of the hearing examiner to approve the referenced preliminary plat,
subject to conditions to be met at later stages of the platting process.
Pursuant to RCW, a final plat meeting all requirements of State law and Renton
Municipal Code shall be submitted to the City for approval within five years of the date
of preliminary plat approval.
If! can provide additional information or assistance, please feel free to call.
Sincerely,
Bonnie 1. Walton
City Clerk
cc: Mayor Kathy Keolker-Wheeler
Council President Terri Briere
Susan Fiala, Senior Planner
David Halinen, Halinen Law Offices, 10500 NE gth St., Ste. 1900, Bellevue, W A 9g004
-1 0-5"""C"5-'-S-ou-t-h -O-ra-:-dy-W'--ay---:-R-e-nt-o-n,-W-a-sh:-"C"i-ng-to-n-9-:-g-:-0-'-55---(-'-42-5-:-) 4-3-0--6:-:"5-:10-:/-FAX-::-:--:-(4:-:"2-5)-4-30--6-5:-1-::-6 -~ * This paper contains 50% recycled material, 30% post consumer AHEAD OF THE CURVE
April 25, 2005
Boa!;ct/Commission:
Organization & Process
Modifications
Latecomer Agreement:
Wharton, Sewer Extension (SE
122nd St), LA-04-OO1
EDNSP: Multi-Family
Housing Property Tax
Exemption, Merrill Gardens
and Parks ide
Finance: Bad Debt Write Off
Plat: Elmhurst, Bremerton Ave
NE, PP-04-162
CORRESPONDENCE
Citizen Comment:
Knickerbocker et al -Garden
Ave N Street Name Change
UNFINISHED BUSINESS
Utilities Committee
Utility: Clean Sweep Renton
Program
Renton City Council Minutes Page 148
Administrative, Judicial and Legal Services Department recommended approval
of modifications to the organization and process of City boards, commissions,
and committees. Refer to Committee of the Whole.
Development Services Division reported completion of construction and
submission of final costs for the Glenn Wharton latecomer agreement for sewer
extension to serve property at 14035 SE 122nd St., and requested final approval
of the agreement and authorization for the City Clerk to notify affected property
owners and commence 20-day appeal period. Refer to Utilities Committee.
Economic Development, Neighborhoods and Strategic Planning Department
recommended approval of the multi-family housing property tax exemption
agreements with Merrill Gardens at Renton Centre, 104 Burnett Ave. S., and
with Parks ide at 95 Burnett, 77 and 95 Burnett Ave. S. Refer to Planning and
Development Committee.
Finance and Information Services Department requested approval to write off
bad debt in the total amount of $52,524.22. Refer to Finance Committee.
Hearing Examiner recommended approval, with conditions, of the Elmhurst
Preliminary Plat; 64 lots on 9.6 acres located at 201,251, and 257 Bremerton
Ave. NE (PP-04-162). Council concur.
MOVED BY CORMAN, SECONDED BY NELSON, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
Letter and informal petition signed by 27 residents received from Jennifer
Knickerbocker, 318 Garden Ave. N., Renton, 98055, requesting that the street
name of Garden Ave. N. be changed on the north side ofN. 8th St. The letter
stated that the name change will alleviate traffic problems and confusion as the
area is further developed.
MOVED BY CLAWSON, SECONDED BY PERSSON, COUNCIL REFER
THIS CORRESPONDENCE TO THE TRANSPORT A TION (A VIA TION)
COMMITTEE. *
Pointing out that the street runs through an area that is the subject of a potential
development, Councilman Corman requested that the Administration ask for the
developer's opinion on the requested street name change.
*MOTION CARRIED.
Utilities Committee Chair Corman presented a report recommending
concurrence in the staff recommendation to approve the implementation of a
portion of the Clean Sweep Renton program. The Committee recommended
appropriating funds from the Solid Waste Utility fund balance in 2005, for the
implementation of the Reuse It! Renton event, projected to cost $6,325, and for
the Neighborhood Association Cleanup event, projected to cost $39,450. The
Committee further recommended that the one-time Neighbor-to-Neighbor
Curbside Cleanup event, projected to cost $299,225, and the associated public
education and outreach campaign, projected to cost $55,000, be referred to the
Committee of the Whole. *
Councilman Corman indicated that the Committee desires to have further
discussion regarding the curbside cleanup event costs with the Committee of
the Whole, but does not want to stop the other Clean Sweep Renton events
from moving forward.
c OF RENTON COUNCIL AGEND [LL
I AI#:
Submitting Data: For Agenda of: 412512005
Dept/Div /Board .. Hearing Examiner
Staff Contact ...... Fred J. Kaufman, ext. 6515 Agenda Status
Consent. .............
Subject: Public Hearing ..
Correspondence ..
Elmhurst Preliminary Plat Ordinance .............
File No. LUA-04-162, PP, ECF Resolution ............
Old Business ........
Exhibits: New Business .......
Hearing Examiner's Report and Recommendation Study Sessions ......
Legal Description and Vicinity Map Information .........
Recommended Action: Approvals:
Legal Dept.. ...... .
Council Concur Finance Dept. .... .
Other .............. .
Fiscal Impact:
Expenditure Required... N / A Transfer/ Amendment. ..... .
Amount Budgeted ...... . Revenue Generated ........ .
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
The Hearing Examiner's Report and Recommendation on the Elmhurst Preliminary Plat was
published on March 29,2005. The appeal period ended on April 12,2005. The Examiner
recommends approval of the proposed preliminary plat subject to the conditions outlined on
page 11 of the Examiner's Report and Recommendation. Conditions placed on this project are
to be met at later stages of the platting process.
STAFF RECOMMENDATION:
Recommends approval of the Elmhurst Preliminary Plat with conditions as outlined in the
Examiner's Report and Recommendation.
Rentonnet/agnbilll bh
X
March 29, 2005
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
Minutes
APPLICANT:
CONTACT:
LOCATION:
SUMMARY OF REQUEST:
SUMMARY OF ACTION:
DEVELOPMENT SERVICES REPORT:
PUBLIC HEARING:
Liberty Ridge LLC
Attn: Mike Merlino
9125 loth Ave S
Seattle, W A 98108
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th Street, Ste. 1900
Bellevue, W A 98004
Elmhurst Preliminary Plat
File No.: LUA 04-162, PP, ECF
201, 251, & 257 Bremerton Avenue NE
Approval for a 64-lot subdivision of a multiple parcel, 9.6-acre,
site intended for detached units.
Development Services Recommendation: Approve subject to
conditions
The Development Services Report was received by the
Examiner on March 8, 2005.
After reviewing the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding area; the Examiner
conducted a public hearing on the subject as follows:
MINUTES
Thefollowing minutes are a summary of the March 15, 2005 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, March 15, 2005, at 9:31 a.m. in the Council Chambers on the seventh floor of
the Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No.1: Yellow file containing the original Exhibit No.2: Neighborhood Detail Map
appl ication, proof of posting, proof of publication and
other documentation pertinent to this request. -
Exhibit No.3: Preliminary Plat Plan Exhibit No.4: Tree Cutting and Land Clearing Plan
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 2
Exhibit No.5: Grading and Drainage Plan
Exhibit No.7: Zoning Map
Exhibit No.9: Katie Walter, Professional Resume
Exhibit No. 11: Vacation Petition to City dated
12/27/2004
Exhibit No. 13: Renton City Council minutes dated
2/28/2005
Exhibit No. 15: Deed to the Foster property
Exhibit No. 17: Access Easement Agreement dated
March 9, 2004
Exhibit No. 19: Lawsuit, Snohomish Case Law
Exhibit No.6: ExistinA Conditions
Exhibit No.8: ERC Mitigation Measures
Exhibit No. 10: Sheet 1 of Preliminary Plat drawing
set showing vacation of 15.5 foot right-of-way along
Bremerton A venue
Exhibit No. 12: Letter from Bonnie Walton dated
3/1/2005
Exhibit No. 14: Noise Report by Mr. Jerry Lilly
Exhibit No. 16: Lot Line Adjustment
Exhibit No. 18: Lawsuit, Kitsap Case Law
Exhibit No. 20: Second Grading Sheet
The hearing opened with a presentation of the staff report by Susan Fiala, Senior Planner, Development
Services, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The site is located in the east portion
of the City of Renton just south ofthe NE 4th corridor and to the west of Bremerton Avenue NE. The site is
zoned Residential-l O.
On the site there is a Category 3 unregulated wetland located in the southwest portion of the site, which is
proposed to be filled. There are two tracts proposed, Tract A in the southwest corner of the site for the storm
drainage facility and Tract B which continues along the entire southwest and western edge of the property which
would be a Native Growth Protection area. Maplewood Creek runs along this area and continues northward.
There would be a 25-foot enhanced buffer on each side of the creek. Due to any wetland that would be
potentially located within 100 feet of the site, the applicant did an assessment of this wetland in the northwest
corner of the site and that is unregulated Category 3 therefore, this proposal would not be affected with that
wetland.
A Development Agreement was made on this site, it was approved in August of2004 with several stipulations.
One, this site would be zoned R-IO as well as the Comprehensive Plan Use designation of Residential-Options
(RO). There are also some site-specific restrictions that state that all residential buildings must be single-family,
all lots abutting the south boundary line must be 50 feet in width (Lots 23 through 29), and lastly the net density
cannot exceed 10 dulac. The proposed density for this plat is 8.3 dulac.
The Environmental Review Committee issued a Determination of Non-Significance -Mitigated for the project,
which included fourteen mitigation measures. No appeals of the determination were filed.
The purpose of the Residential Options designation is to create new, lower-density neighborhoods in a
traditional development style while at the same time support infill development. This proposal is consistent with
the Residential Options land use development and the environmental element.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 3
A net density of the development would be 8.3 dwelling units per acre, which is within the allowed range. This
proposal is all detached single-family units and complies with the density and unit mix requirements for R-I 0
zonmg.
All lots comply with the lot dimension requirements as well as meeting the required setbacks. The proposal's
compliance with these building standards would be verified prior to the issuance of individual building permits.
Several buildings and outbuildings currently exist on the site, the applicant must obtain a demolition permit and
complete all inspections and approvals for all buildings prior to the recording of the final plat.
The R-I 0 zone requires setback areas to be landscaped including the addition oftrees and shrubs to be planted
within the front yard area of all lots within the plat. The satisfaction of this condition is subject to the review
and approval of the Development Services Division Project Manager.
The side lot line ofthe proposed lots are at right angles to the street line. All lots would gain acce5.S to public
roadways either directly, or via private driveway access easements. As proposed, lots comply with arrangement
and access requirements of the Subdivision Regulations.
Each of the lots satisfies the minimum lot area and dimension requirements ofthe R-IO zone. All lots located at
the intersection of public rights-of-way would meet code, all would have a radius equal to or greater than IS
feet.
Access is proposed via the Bremerton Avenue NE coming from the south through the Laurelhurst Plat. This
proposed plat required two means of access, depending on the outcome of the Ridgeview Plat, north of the site
along Bremerton Avenue NE, it is a requirement by code that a minimum of20 feet width of pavement and a
pedestrian walkway be required along Bremerton Avenue NE from the northern property line up to NE 4th
Street. lfthe right-of-way required to be dedicated by the Ridgeview Court Plat is not in place prior to the
recording of the Elmhurst Plat, the applicant of this plat would be required to dedicate the public right-of-way
along that parcel. There also is a requirement for a dedication of a minimum of 25 feet from the centerline of
Bremerton Avenue NE for this subject plat.
A homeowner's association or maintenance agreement is suggested for the development, which would be
responsible for any common improvements and/or tracts within the plat.
Traffic, Park and Fire Mitigations fees were imposed by the ERC.
The subject site is located within the Renton School District boundaries and they have indicated that they can
accommodate the approximately 28 new students.
The storm drainage/surface water would be located in Tract A in the southwest corner of the property between
Lots 22 and 23. In order to enhance the storm drainage tract it is to be fenced, landscaped and irrigated unless
drought tolerant plants are used. The property lines of Tract A fronting Road A, Lot 22 and 23 should include a
landscape visual barrier and fencing. The property lines along Lot 22 and 23 should include a six foot high solid
wood fence or other approved material (no chain link), the portion to the southwest of Tract A required only the
split rail fence.
Staff recommends approval of the Elmhurst Preliminary Plat subject to five conditions.
David Halinen, 10500 NE 8th Street, Suite 1900, Bellevue, W A 98004 stated that he represents the
owner/applicant Liberty Ridge LLC. There were a couple of questions that arose during Ms. Fiala's testimony,
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 4
in terms of the question of shared driveways, the applicant is planning to have individual driveways, the
purchaser of the project has requested that and that is the applicant's intention to provide those driveways.
Secondly, regarding the small segment of Tract A that abuts the south line of the property, they are willing to
fence that in any way that the City staff would like to have it done.
The applicant has reviewed the proposed conditions for approval and finds them acceptable.
There was a question regarding the unregulated wetland in Tract A, Katie Walter, a wetland scientist, biologist
and botanist is present today and can address that question.
Katie Walter, Shannon and Wilson, 400 N 34th Street, Suite 100, Seattle, WA 98103 stated that she performed
the wetland del ineation both on this site and the site to the north back in 1998. The wetland to the north is just
offsite north along the west propelty boundary. It is a small wetland, just over 2,000 square feet in size. It was
designated a Category 3 wetland under the City's regulations and the question was with respect to its closeness
to Maplewood Creek. That creek has been channelized in the past, the area was developed early in the 1950's,
and at different periods of time the creek has been channelized and moved and it appears that long before now
that wetland has become isolated from the creek. There is a dirt berm that exists between the creek and that
wetland.
The isolated wetland on site is slightly different in that it appears to have formed on fill as a result of a
stormwater pipe that outlets near the east side of the wetland and it appears that that wetland is isolated, most of
the water that gets to that wetland either infiltrates or evaporates and probably during very large storm events it
may have some overland flow. The creek on site, which runs along the western property boundary has been
heavily channelized, it's about four feet lower on the northern side than the site boundary depending on the
amount offill in different places on that site. On the southern portion it is six to eight feet lower than the actual
site. On the nOIthern two-thirds of that site it's been channelized along the property boundary, it's an ephemeral
stream, it wasn't flowing, in fact it was completely dry in June of 2004, and in December of2004 it wasn't
flowing, but there were some puddles of water. It was flowing in 1998 when she was at the site. II does flow
occasionally, but mostly during storm events in the area. The buffer along the creek is heavily vegetated with
blackberries with almost no native vegetation. On the southern end there are a few more trees and some native
vegetation.
Mr. Halinen stated that for the record, the Bremerton Avenue right-of-way abutting the site, there were three
small strips of land along the west edge of Bremerton Avenue designated as a 15.5 foot ROW to be vacated that
is within proposed Lot 1. The second strip has a note that also shows 15.5 foot ROW to be vacated from Lot 46
north to Lot 42 up to proposed Road A, and finally the very south end of the site there is a note that says 7.5 foot
existing ROW to be vacated, along the east edge of Lot 29. The applicant filed a petition with the City on
December 27,2004. This is a contiguous strip that Road A will cross and does not need to be vacated.
This matter went before the City Council on February 28 and the Council voted to approve the requested street
vacation with two conditions; area of vacation for the two northerly portions of the original request be set to a
maximum vacation width of 12.5 feet and secondly, the petitioner shall provide satisfactory proof that outside
utilities have received and are satisfied with any easements which are necessary to protect their facilities in the
requested vacation area. Going forward with construction plans, the three-foot adjustment will be made within
the lots and make everything fit.
The reason that a Noise Analysis was done was in view of the Ridgeview Court project to the north, there was
testimony by the manager of the abutting postal facility concerning truck and delivery noises that he wanted to
make the City aware of. In that particular case, the Examiner indicated a recommendation for denial of that
project, or in the alternative some special conditions of approval were suggested. That matter is now on appeal
to the City Council by the applicant. While the Elmhurst site is further from the postal site than the Ridgeview
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
Marth 29, 2005
Page 5
Court, it seemed prudent to have some field noise measurements taken over an extended period of time, 64
hours, so that some hard data would be available. That work was done by Jerry Lilly, who could not be here
today, one of his colleagues, Michael Yantis is here today to provide an overview of the testing.
Michael Yantis, Yantis Acoustical Design, 720 Olive Way, Suite 1400, Seattle, WA 98101 stated that he was
here today on behalf of Jerry Lilly. He visited the project site on Sunday, March 6 with Mr. Lilly. The noise
monitoring stations were set and they were able to review both the location of the stations and the equipment
that was used.
Two noise-monitoring locations were set up on site, one on the north boundary of Elmhurst property and a
second approximately mid point on that north boundary line. Mr. Lilly took data for approximately 64 hours
between March 6 and March 9 at these two locations. Position two took hourly data and position one was
continuous recording of data every 2 seconds. Primary noise sources were traffic on NE 4th Street, aircraft
flyovers, and although the Post Office has been indicated as a noise source in the vicinity, the study indicated
that it was not a primary noise source in the area.
Mr. Yantis continued with an overview of the report. Noise codes do not specifically apply to public roadways
and aircraft because these noises are exempt from the noise codes, developmental regulations help provide
guidelines for jurisdictions and developers and how they might build their developments to make sure that the
residents don't have noise levels that are excessive. Both Bellevue and Snohomish guidelines are based on the
HUD guidelines that provide noise guidelines that are suitable for residential developments. Noise levels above
65 LDN are in the less acceptable category, noise levels under 65 are generally acceptable. The C:ty of Renton
also has a noise ordinance that regulates noise levels between adjacent properties. The results of the
measurements that Mr. Lilly recorded show that the Ldn (day-night average) varied from 56.3 at position 2 to a
high of 57.8 at position I. They are all very close in noise level. In addition to the long-term noise levels that
were measured, Mr. Lilly paid particular attention to noise levels that might be occurring from the Post Office.
While he was on site, there were two events that happened, that were truck events. One event happened at 4:45
pm when a truck left the facility and beeped its horn and the other event was the arrival of a semi-truck trailer
rig that traveled onto the property, dropped its tailgate and unloaded material. Both of these events, although the
noise levels are identifiable, they are a little bit higher than the typical activity happening on the site during that
time. Using Figures from the report, he showed how Mr. Lilly was able to assess what might be an aircraft
event versus some unknown event.
In summary the noise levels that Mr. Lilly measured and reported in his report are suitable for residential use.
There are within the HUD guidelines, maximum noise levels are primarily due to aircraft flyovers and they are
consistent with other residential areas in the vicinity.
Rose Woodall, 248 Union Ave NE, Renton, W A 98059 stated that her property abuts this proposed plat at the
northwest corner out to Union Avenue. She has lived there 33 years and lots of changes have taken place. Her
concern is that her back lot is like a park, ifthere is a split rail fence, it seems that children could just climb over.
The City of Renton is going to build a park on the west side of Union Avenue directly across from her property,
it seems that the children could cut across from this development, through her property and to the rark. She
would like to have a fence that kids are not going to be able to crawl over. She is concerned about her liability if
the children jumped in the creek and wade across.
The Examiner explained that the City does not usually require fencing between similar types of uses, in other
words single family and single family. Perhaps you and the applicant can work something out, although a fence
of some type is required to protect the stream buffer.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 6
Cliff Williams, 5326 SW Manning, Seattle, WA 98116 stated he was here representing the property owner of
the development bordering to the northeast, known as Ridgeview Court. They are in support of this
development. It represents a well planned and logical development and transition from the R-8 developments to
the R-J 0 and then up into Ridgeview Court which has been zoned R-20. They have worked together in
coordinating the site developments, the key things addressed are the road profile for Bremerton Avenue, the
sewer service for Ridgeview Court, and also the grading between the property lines on the north side. They
would like to complement the developer on the initiative to undertake this noise study. They find the study
results very encouraging for all parties concerned.
Thomas Foster, Langley Fourth Avenue Associates LLC, 5460 Southcenter Boulevard, Suite 106, Seattle, WA
98188 stated that they own the property to the northwest and adjacent to the Post Office. He submitted a letter
to the City staff yesterday only to encourage the staff to look at the overall development of the area when you
have Ridgeview Court to the east and Elmhurst to the south. They have a small piece of property to the south of
the Post Office that potentially could be landlocked based on the new zoning ofCA that happened in November.
The southwest corner of the property is the end of the wetlands on the property and also the site of their storm
detention pond. Some ofthe area has been cleared and they are currently under construction development
permit with the City of Renton to complete the requirements for a Short Plat. He was encouraging the staffto
look at the overall development potential of the site and area for pedestrian friendly access and also to provide
for secondary fire access to not only their property but to the other properties as well. If Bremerton was ever to
become blocked a secondary access from their property onto either one of these sites could add additional fire
control possibilities and also would enhance pedestrian access to NE 4th and would help the development of
their property as well.
Terrance Flaig, President of Fernwood North Homeowner's Association, PO Box 3106, Renton, W A 98056
stated that he had a question regarding the grading of the site. Specifically the homeowners that abut the
southern end of Elmhurst are concerned about grading that has been done to this site prior to the beginning of
Elmhurst. When he and his wife moved here, this was zoned residential but there was a business operated here,
McCann Trucking owned this land they were a trucking and excavating business. When the property was sold
to Tydico and as soon as that happened they began to bring in large truckloads of earth and fill without applying
for or receiving any permits. They raised the level of this land considerably, particularly in the area that abuts
Fernwood North to the south of their land. Since this was not done with permits from the City of Renton, they
wonder if this is going to be allowed to exist the way it is or ifsome effort is going to be made to return this
level of the land to what it was before the illegal grading was done. They are concerned because it is quite a bit
higher now than the lots in Fernwood North. The homes that will be built will be towering above them and
provide an unsightly view to the north.
The Examiner stated that they were talking about Lots 32, 33, 34, and 35 in Fernwood North and suggested that
perhaps staff may have some comments about this issue.
Kayren Kittrick, Development Services stated that Elmhurst can be held to dedicate the rights-of-way off
Bremerton when they don't own the property. A secondary access is required by Fire for this site. The
preference is to the north, the owners of the property to the north have been in serious talks and trying to make
sure that their designs met code. It has always been the intent that Ridgeview would go first, or a little ahead, or
at the same time as Elmhurst. When Ridgeview was denied, it was necessary to make sure that that was
secured, that is the secondary access, it is the way that they designed for their secondary access. Whether an
easement would be sufficient if the timing did not work out, the answer is no, the dedication must be for sure, it
is necessary to know that it is going to go through.
Split rai I fences are basically to allow for the movement of small animals that would go through that area.
Planning would most likely have some concerns about blocking off that location entirely, but there could be
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 7
some discussions on something that might have small openings. Not quite sure how to solve that particular
problem.
Regarding Mr. Foster and his wish to have secondary access to the north is an issue that they agree on, but there
is nothing that is in the code that would allow for this. The Transportation Division would be very interested in
something through the Ridgeview Court, some type of connection through there. However, in that instance, the
Post Office decl ined to participate. Ultimately this comes down to some type of agreement between private
property owners in this case. Mr. Foster does have access up to NE 4th, primary access, but he doe~.; need a
secondary access, just not sure what is going to be developed on his property.
The site has been used out of standards both under King County and City of Renton when they took it over.
There is no plan to do any grading or changing ofthe site height. All grading will be within the site, cut and fill,
nothing new being brought in and nothing being taken out.
Mr. Halinen stated that regarding Mr. Foster's comments and concerns about wanting a secondary access, Mr.
Foster pointed out that the company he represents is a recent purchaser of the property that wraps behind the
Post Office. The property was purchased September 2004. In 1999 a Lot Line Adjustment was done and
included the Post Office property and the Langley Property (Mr. Foster). Regarding the secondary access, this
is a problem of self-creation. An Access Easement Agreement was recorded March 9, 2004 proving that the
Post Office did get title. The Lot Line Adjustment was set up to dead end at the back end ofthe property, they
didn't need to do that, they could have had a loop easement along the east side of the postal property to provide
for secondary access for emergency vehicles. It was set up deliberately, sold the property in its current
condition to someone who would like to have one of the abutters bear the burden of a secondary access. This
should have been considered and dealt with prior to selling off the properties. Elmhurst should not have to bear
the burden ofthese issues, they should not have to give access through Elmhurst.
Lou Larsen, Pacific Engineering and Design LLC, 4118 Lind Avenue, Renton, WA 98055 stated that there are
four existing lots in Fernwood North, Lots 32, 33, 34 and 35 that abut against the area in question. The pad
elevations are set such that they can get access from Bremerton Avenue, they are set to provide sewer
connections to these lots, and to provide access for lot drainage into the detention pond. All this grading occurs
on-site, within the Elmhurst property lines, they do not even come close to the south property line. If the lots
were lowered, they would not drain into the detention pond. Lot 27 will be a little bit higher than what it is
today, Lots 26, 25, 24, and 23 are being raised anywhere from three to five feet, depending on where you
measure it. Those elevations are 25 feet into the property where this will occur. Some of that could be buffered
out a little, but not very much.
The Examiner stated that it doesn't sound like the City will address what may have happened prior to
annexation.
Ms. Kittrick stated the City will not explore the site levels, it was like that when it came in for site approvals.
They will not require the owner to return to what the property was like years ago.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 11 :24 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 8
FINDINGS:
1. The applicant, Liberty Ridge, LLC, represented by David L. Halinen, filed a request for a 64-lot
Preliminary Plat.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit # 1.
3. The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non Significance -Mitigated (DNS-M).
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 201,251 and 257 Bremerton Avenue NE. The subject site is located on the
west side of Bremerton approximately 600 feet south ofNE 4th Street.
6. The map element of the Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of single-family homes, but does not mandate such development without
consideration of other policies of the Plan.
7. The subject site is currently zoned R-I 0 (Residential Options including detached Single Family uses).
8. The subject site was annexed to the City with the adoption of Ordinance 5092 enacted in ~eptember
2004.
9. The subject site is approximately 9.6 acres or 418,176 square feet. The parcel is rectangular and is
approximately 650 feet long along Bremerton (north to south) by approximately 640 feet deep.
10. The site has been used for construction offices and staging and older homes and outbuildings generally
served office purposes.
11. The subject site slopes generally downward 3 to 5 percent from the north-northwest to the south-
southwest where Maplewood Creek crosses the subject site. The site also has bands of steeper terrain
that vary between 20 to 40 percent. Fill was placed on the subject site in the past and this material
appears to have been placed without benefit of a permit. Neighbors report that it raised the elevation of
the property adjacent to the creek 8 to 10 feet.
12. A Category 3 wetland is located in the northwest corner of the subject site and it is unregulated.
Another wetland located offsite is also unregulated. As noted, Maplewood Creek crosses the southwest
portion of the site.
13. The subject site is mainly cleared of vegetation but small stands or rows of trees are located near the
south and west property lines, near the existing older structures in the northeast corner of the site and
near the creek. Most of the trees with the exception of those in the protected creek corridor would be
removed to allow development at the R-l 0 density permitted by the zoning.
14. The subject site is governed by a separate development agreement. There are site-specific restrictions
that include that all residential buildings be single family, lots abutting the south boundary of the site
(abutting R-8 homes) be not less than 50 feet wide and that the density not exceed 10 units per acre.
Elmhurst Prel illl inary Plat
File No.: LUA-04-162, PP, ECF
Mar'ch 29, 2005
Page 9
15. The applicant proposes dividing the subject site into 64 lots. The lots would be arranged around the
perimeter of the site and in two interior blocks. Lot sizes will vary from 3,801 square feet to 5,979
square feet. The R-I 0 zone requires lots to be not less than 3,000 square feet, lot width to be 30 feet for
interior lots and 40 feet for corner lots and lot depth to be 55 feet. Staff reported that lots would vary
between 40 feet to 54 feet wide and from 95 feet to 112 feet deep. The lots along the south property
line will comply with the 50-foot width required by the Development Agreement.
16. Two east to west roads will provide access to the interior of the subject site from Bremerton. These two
roads will be connected to each other in a loop by a north to south road running through the western
third of the site. A second north to south road will run between the east to west roads in the middle of
the site creating the blockwise lot arrangement. Bremerton has an inconsistent alignment and width
along the frontage of the subject site. The applicant is seeking a vacation and will rededicate property to
create a more consistent alignment.
17. Bremerton does narrow north of the site adjacent to where the Ridgeview Plat was proposed. The City
Council will be determining the status of that plat during an appeal procedure. Staff has nuted that
Bremerton does need to serve this proposed plat.
18. The density for the plat would be 8.25 dwelling units per acre after subtracting sensitive areas (creek
corridor) and roadways.
19. The subject site is located within the Renton School District. The project is expected to generate
approximately 28 school age children. These students would be spread across the grades and would be
assigned on a space available basis.
20. The development will increase traffic approximately 10 trips per unit or approximately 640 trips for the
64 single-family homes. Approximately ten percent of the trips, or approximately 64 additional peak
hour trips, will be generated in the morning and evening.
21. The appl icant has submitted a Noise Analysis Report for the project to determine if noise from the
nearby but non-adjacent Post Office would be a factor for residential development of the subject site.
The report was done since the Hearing Examiner recommended that the proposed Ridgeview Plat
immediately north of the subject site but also directly abutting the Post Office be rejected due to
incompatible noise generated. by the adjacent Post Office.
22. The summary of the report contains the following language:
"The ambient noise measurements conducted at the Elmhurst site's north edge
demonstrate that the site is suitable for residential development...
While there are routine loading and unloading activities and other activities at
the post office that generate occasional environmental noise, this study has
clearly shown that the intensity and duration ofthe noise generated by the post
office is insufficient to significantly impact residential use of the Elmhurst site.
(Footnote 2) ...
Footnote 2: Anticipated future development of the Ridgeview Court site and the
vacant parcel immediately to the north of the west half of the Elmhurst site will
significantly screen the Elmhurst site from post office-generated noise, further
reducing its intensity on the Elmhurst site."
Elmhurst Prelilllinary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 10
23. Stormwater will be collected in a pond in Tract, A which will serve as both a detention and water
quality facility. The pond, which is located in the southwest corner of the site, will be adjacent to
Maplewood Creek. Energy would be dissipated using a "bubble-up" system with the overflow running
to the creek. It would meet the 1998 King County standards, Level 2 flow control.
24. Staff has recolllmended that the pond be screened and landscaped. The screen is to form a visual barrier
but one that does not interfere with traffic. Staff recommended the materials to use and to avoid chain
link fencing.
25. The subject site will be served by City water and sewer services. Utility line extensions to serve the site
will be required and governed by code.
26. Staff has approved a street modification allowing narrower roadways. Since this narrows what would
be parking strips or landscape areas, staff has recommended the addition oftrees
27. The owner of the adjacent property north of the subject site was concerned about access to a portion of
his propelty behind the post office. That property fronts along NE 4th Street and access is possible from
there. [t was noted that the current owner's predecessor in interest created the odd-shaped parcel by
segregating off the post office site leaving the remainder.
CONCLUSIONS:
I. The proposed plat appears to serve the public use and interest. Due to a recomlllendation by this office
that another residential development (Ridgeview Court) adjacent to the post office was inappropriate,
the applicant was concerned that post office noise might create issues for developing the subject site.
Those noises might be an issue but it appears that the distance between the subject site and the post
office site should help attenuate the noise. The subject site can be distinguished from the Ridgeview
COUlt parcel by a nUlllber of factors. The subject site is zoned for residential purposes and is shielded by
the adjacent Ridgeview Court property, which as a transitional property can be used for commercial
purposes. [n addition, open space that now lies between the subject site and post office could be
developed with uses that further attenuate the noise. That is new structures could occupy the
intervening open space and block post office noises. The greater distance and the potential for
intervening buildings were not factors that could help the other property. The noise studies that were
conducted were specifically conducted for the subject site and cannot be relied on for determining
illlpacts on other properties and other properties cannot count on the development of intervening
bu i Idings that could eventually buffer this site from the post office.
2. The proposed plat appears to create reasonably rectangular lots. A fairly regular grid roadway and
block system rather than a deadend cul-de-sac will also serve the 64-lot plat. The smaller lots of the R-
10 zone will still provide detached single-family housing choices to those who want less yard
maintenance and smaller homes.
3. The plat will offset its illlpacts on fire, parks and transportation services by paying mitigation fees. It
will also contribute to the tax base of the City when developed with homes. The additional population
and traffic will be feit in this currently sparsely developed area but those impacts were anticipated when
the Zoning was adopted for the area.
4. The applicant will be planting trees on the lots while also preserving the stream course and the current
vegetation in buffers surrounding the creek. It appears that filling that occurred on the subject site can
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 11
remain and might have be permitted to allow appropriate sewer service. The applicant wili have to
demonstrate that the materials are su itable for foundation support.
5. The applicant will have to satisfy the City's needs for access to and along Bremerton to NE 4th Street.
6. In conclusion, the proposed plat should be approved by the City Council.
RECOMMENDATION:
The City Council should approve the 64-lot Preliminary Plat subject to the following conditions:
1. The appl icant shall comply with the conditions imposed by the ERe.
2. The applicant shall have to demonstrate that the on-site fill materials are suitable for foundation support.
3. The applicant shall obtain a demolition permit and complete all inspections and approvals for all
buildings located on the property prior to the recording ofthe final plat. The satisfaction of this
requirement is subject to the review and approval of the Development Services Project Manager.
4. All lots within the plat shall be required to have a minimum of one new approved tree, with a minimum
caliper of 1-1/2 inches (deciduous) or 6-8 feet in height (conifer), and shrubs (or equivalent) planted
within the front yard. The applicant shall be required to set forth a restriction on the final plat stating
this requirement. Each application for a single family building pennit shall include a plan noting the
location and type of plant materials within the front yard. All front yard landscaping shaH be planted
prior to final building permit inspection. The satisfaction of this condition is subject to the review and
approval ofthe Development Services Division Project Manager.
5. The right-of-way for Bremerton Ave. NE along Parcel #518210-0042 (327 Bremerton Ave. NE) shall be
dedicated prior to the recording of the Elmhurst Final Plat. The satisfaction ofthis requirement is
subject to the review and approval of the Development Services Project Manager prior to recording of
the final plat.
6. A homeowner's association or maintenance agreement shall be created concurrently with the recording
of the final plat in order to establish maintenance responsibilities for all shared improvements. A draft
of the documents(s), if necessary, shall be submitted to the City of Renton Development Services
Division for review and approval by the City Attorney and Property Services section prior to recording
of the final plat.
7. Tract A shaH be fenced, landscaped, and irrigated (unless drought tolerant plants are used). The
property lines of Tract A fronting Road A, Lot 22 and 23 shall include a landscaped visual barrier so as
to not interfere with sight distance triangles including plant materials which would provide a year-round
dense screen within three (3) years from the time of planting. Also, the property lines along Lots 22 and
23 shall be fenced with a six-foot high solid wood fence, or other approved material (no chain link).
Tract A fronting Road A shaH be fenced with either a wrought iron, or chain link with vinyl covering, or
other decorative wood fence. The applicant shall submit a landscape plan and fence design identifying
construction and plant materials for the review and approval of the Development Services Project
Manager prior to installation. Fences and landscaping shall be installed prior to recording of the final
plat.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 12
ORDERED THIS 29th day of March 2005.
HEARING EXAMINER
TRANSMITTED THIS 29th day of March 2005 to the parties of record:
Susan Fiala
1055 S Grady Way
Renton, WA 98055
Liberty Ridge LLC
Attn: Mike Merlino
9125 10th Ave S
Seattle, W A 98108
Lou Larsen
Pacific Engineering and Design LLC
4118 Lind Avenue
Renton, W A 98055
Terrance Flaig
President of Fernwood North HOA
PO Box 3106
Renton, W A 98056
Kayren Kittrick
1055 S Grady Way
Renton, W A 98055
Katie Walter
Shannon and Wilson
400 N 34th Street, Suite 100
Seattle, WA98103
C. Thomas Foster
Langley Fourth Ave Associates LLC
5460 Southcenter Blvd, Suite 106
Seattle, W A 98188
Cliff Williams
5326 SW Manning
Seattle, W A 98116
TRANSMITTED THIS 29th day of March 2005 to the following:
Mayor Kathy Keolker-Wheeler Stan Engler, Fire
Rose Woodall
248 Union Ave NE
Renton, W A 98059
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th St., Ste. 1900
Bellevue, WA 98004
Michael Yantis
Yantis Acoustical Design
720 Olive Way, Suite 1400
Seattle, WA 98101
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Larry Warren, City Attorney
Larry Meckling, Building Official
Planning Commission
Transportation Division
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
King County Journal
Pursuant to Title IV, Chapter 8, Section I OOGofthe City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., April 12, 2005. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
Elmhurst Preliminary Plat
File No.: LUA-04-l62, PP, ECF
Marth 29, 2005
Page 13
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of$75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m., April 12, 2005.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Councilor final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This means that parties to a land use decision may not communicate in
private with any decision-maker concerning the proposal. Decision-makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in pUblic. This public communication permits all
interested parties to know the contents ofthe communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
~ ~ IfII
0 ) \..
R
of", ~-II~J(J 10k :ii'
-(
n",.,t 19·1l{ ® , . a,'
____ J ® 2> .. .. G ® ® ® ~ ... ~ ~
LJ.i ~ ti 4: <:> '"
lO
N
'. 01=
(j
<> <t: <C -N <:> " n.{3 "! '" ' ... , V N
~ ~-;-
® ~ ti <C
... ~O 2: S1_
••
(Y) ®
(\J
~ a.: ~ {to"On: @
1O .,.....
(j "(
~ -U® :/~' ~<t
V l ~o::
'>lW) r;54"J-
® ~ 5
_'IlK ~ ~
.-.r,t_OHS -r;::
ad II i r ~ ~ ~!II; ~3
M 1j §~ i~ ~ Ii :J
n~ II~
~ I JIll -'J:!!
s WH f
,
! \. __ . -_" j ___ ,,/ I _--\
SEC. 15, TWP. 23 N., RNO. 5 E., w.M.
\
\ \ F"ERNWOOO\\~~~ ~ .......... _~
------------
VUE:
T--'---r-io--n-
I_AURELHURI~ T PHASE 1 I 1
(UNOER CO~STRIJcnON) : 1 --_.-....... _.1 __ ." ." -ll
2 :11 9 : 1 1
I 'I .. ~ '''' --···1; .. " N"",_ -N' '-"+-1 3 , 8 I II I __ L ___ _
I
1
··· __ J
1
·· ____ ·
5 6
___ l ..... __ _
'1'1'1
~ .. ~'" bii-;-I
\WorI1O IQ.\IJI
«:AJ..6 I r • 60'
\I!!I'ITlCAI.. OA T'W
0'"' (#"""TC:Wo N.l\O .. ocwrcur jjrrtJDtVAJ. • r
~
IA'" ~~ CQlMrr ~T I ~"IQ rwwo .-uH()t PI ~ KtHO COVNrr ....... CZ' MA.SJ OI$C AT 1HC J"1NZT
IHlP.srcTlQH OF HI 4TH rt'fItm.wo '"'''' "'lot:. J[ ~c JJ.lC HQlnHIQ'I' ~ or ~ I~ ~ .z.:w., tWt« Ie.. w.,w. ClZVA"JJCIH-...... 111 flIT.
fE1 COI"ft»t ON ..-.r , .. ,' JOCIJlrrtIDT at' nc IIOT COI..Wtl 01' CA. 1[.
.(lI1IA"7fQIr.t..fi17Mrrcr.
~t;,~
'MUC NQIIlH. &\lID ~ &OIAL .... JtONHt I'I'TQjI (~ ~'''' ~ "'''11"1<0'''' lJONC ~"ua. .. OCW\CNlMlt ANIIU " ... .1ICI.II' OO&.w1PQ,oonut .. ~ ,AJJr,~~NJ ,211H-r.'NtOU:::~ ~~~#.
IlAAtt1W lNt HOIIIlICAIT 0IIIIJirfGIf " 1R7tCN ' .. ~ tJ we.,,". ~ ... CAlf " "DC *U.oWCT7f.wMlWrl. lHf NOIt7H AJJlIICAH IMltoW '" fNJltH1 (HAlt ~) .. CCJOIIDiMolD ..,.. rc&.»cIo TO ~t'~~ ~~~A:~lHAJ= .... ~~O"~1H XAU ,~ ot' t.OO(IOQttn ...., AI'I'tJC ro TIC CftIp ~ra "", ..". MCICHJ .rMrICD
~"-
~~ ~~ I ~.@ nh~iU
~
~IIII
·h ~.]
§" U 0-", ... n u
:
~ ~ ~I Hi i~~,~
".~CTIrrtO"JOIIC:IIr4
t/II'J.'MoI ,Y! .JQO
ISIU[ 0 ... Ttl -....ot-04
.. aT "EV.!
'-""Ca.ANN:>
"'-"" ~CfJTTt'IQ
OlO'4~O' ... "Q.J
P03
_001"1
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201,251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.G-acre site. Two tracts for open space and
stonn drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestem portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES:
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
1. A Geotechnical Engineer shall detennine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc.,
dated August 3D, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
professional and property documented and reported to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the eXisting three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat. oX ~ !5
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (Le. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fenCing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (Le.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
LEGAL DESCRIPTION
PARCEL A:
THE SOUTH I 10 FEET OF THE EAST 2 15 FEET OF THE FOLLOWING DESCRIBED PROPERTY:
THE NORTH Y2 OF THE SOUTHEAST 'l4 OF THE NORTHWEST 'l4 OF THE NORTHWEST 'l4 OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE NORTH Y2 OF TRACT 5, MARTINS
ACRE TRACTS, ACCORDING TO THE UNRECORDED PLAT THEREOF);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCELB:
THE SOUTH Y2 OF THE SOUTHEAST 'l4 OF HE NORTHWEST 'l4 OF THE NORTHWEST 'l4 OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EASTERLY 7.5 FEET FOR ROAD;
(ALSO KNOWN AS THE SOUTHERLY Y2 OF TRACTS 5 AND 6, MARTINS ACRE TRACTS, ACCORDING TO
THE UNRECORDED PLAT THEREOF);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCELC:
THE NORTH Y2 OF THE SOUTHEAST 'l4 OF THE NORTHWEST 'l4 OF THE NORTHWEST 'l4 OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
AND EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE REMAINDER;
(ALSO KNOWN AS THE NORTH Y2 OF TRACTS 5 AND 6, MARTINS ACRE TRACTS, ACCORDING TO THE
UNRECORDED PLAT THEREOF; EXCEPT THE SOUTH 110 FEET OF THE EAST 215 OF SAID TRACT 5);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
Q:web/pw/devserv/fonns/planning/masterapp.doc
R-IO
N ;:s I"
~
~
~ ~ f.e
'" -t:t:I , t:t ;: ~.
RMH
SE 142nd St.
RC(P)
(P)
G6 • 22 T23N R5E W 112
ZONING
15 T23N R5E W 1/2 -5315
David L Halinen, P.E.
davidhalinen@halinenlaw.com
HAND-DELIVERED
HALINEN LAW OFFICES, P.S.
A Professional Service Corporation
Bellevue Place / Bank of America Bldg.
10500 NE 8th, Suite 1900
Bellevue, Washington 98004
March 14, 2005
Fred Kaufinan, City of Renton Hearing Examiner
1055 S. Grady Way, Seventh Floor
Renton, Washington 98055
Re: Proposed "Elmhurst" Residential Subdivision
(425) 454-8272
Fax (425) 646-3467
CITY OF RENTON
1 <~·\H ..
" \c,' 1'. Y""'l
F1ECEIVED JHS
~nY {.~LERK·S OFFICE
Applicant's Submittal of a Noise Analysis Report To Be Part of the Preliminary Plat
Hearing Record
Dear Mr. Examiner:
In view of the Post Office noise-related concerns set forth in your recent preliminary plat
recommendation to the Renton City Council concerning the "Ridgeview Court" residential
subdivision (Renton File No. LUA04-131, PP, SA-H, ECF),a my client Liberty Ridge L.L.C. has
had acoustical engineer Jerry Lilly of JGL Acoustics conduct noise level measurements at two
points along the north edge of the Elmhurst site (the edge closest to the Post Office). Mr. Lilly
has evaluated his measurements against the U.S. Department of Housing and Urban
Development's exterior noise standard that ordinarily must be met by all residential development
projects that involve HUD financial support (see Title 24, Part 51, Subpart B, Section 51.103 of
the Code of Federal Regulations). He has not only determined that the measured noise levels are
well below the HUD standard, he has specifically considered the alleged special noises generated
at the Post Office and has determined that they are insufficient to significantly impact residential
use of the Elmhurst site. He documents his findings and conclusions in his March 12,2005 letter
to the Elmhurst applicant, a copy of which I herewith submit for your review and the Elmhurst
preliminary plat hearing record.
Sincerely,
HALINEN LAW OFFICES, P.S.
Enclosure
cc: Susan Fiala, Senior Planner, Renton Development Services (with copy of enclosure)
Kayren Kittrick, Development Engineering Supervisor, Renton Development Services
(with copy of enclosure)
C:\CF\2418\043\Noise\Hearing Examiner.L Tl.doc
• The east half of the Elmhurst site abuts the south of the Ridgeview Court site and the west half of the Elmhurst site
is located approximately 147 feet south of the site of the U.S. Post Office facility.
March 12,2005
Liberty Ridge L.L.C.
9125 10th Avenue South
Seattle, Washington 98108
c(rV OF RENTON
~jA~ 1 J" '''f''n~' " .. . £Uu" 2',bt:> {',~
RECEIVED J.A1S
CITY CLERK'S OFFICE
Subject: Your Proposed "Elmhurst Residential Subdivision", Renton, W A
Environmental Noise Study
Gentlemen:
As you know, I am an acoustical engineer that specializes in environmental noise
analysis. (See the attached copy of my professional resume.) This report presents the
results of an ambient noise study that I conducted this last week for your proposed
Elmhurst Residential Subdivision development project at 201 Bremerton Avenue NE in
Renton, Washington. You requested that I conduct the study to determine if the existing
ambient noise conditions at the subject property are within recognized acceptable limits
for residential development. I conclude that they are.
Before discussing the outcome of the actual noise measurements that I took at the site, I
start out below with an overview of environmental noise descriptors and an explanation
of residential noise standards to put my noise measurements into context.
Environmental Noise Descriptors
Noise is always present in the environment. Noise is generated by both natural
phenomena (e.g., water flowing in a stream or river or wind) and man (e.g., speech,
motor vehicles, aircraft, and ventilation fans). Noise can have both positive and negative
impacts on the environment. The steady sound of a distant waterfall or a quiet fan can
provide a soothing background noise to promote sleep and/or "mask" annoying sounds
that may be in the environment. Sounds that are too loud, too abrupt, or simply unwanted
(e.g., music from someone else's property) may disrupt sleep, impede speech
communication, or simply create annoyance.
The level of environmental noise (i.e., the level that is proportional to loudness as
perceived by humans) is measured in terms of A-weighted decibels, abbreviated dBA.
Most outdoor environments have noise levels that fall into the 30 to 100 dBA range.
Occasionally you will find noise levels outside this range, but it is a very rare occurrence.
A noise level of 0 dBA is the approximate threshold of human hearing. Noise at or below
this level exists only inside specially designed acoustical test chambers. At the other
extreme, the approximate threshold of pain for most humans is 120 dBA. The noise of
gun fire at close range can exceed this level for a brief period of time. A level above 120
JGL Acoustics, Inc.
5266 NW Village Park Drive
Issaquah, W A 98027
(425) 649-9344 (voice)
(425) 649-0737 (fax)
jerry@jglacoustics.com
. ~ ..
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 2
dBA is also typical of a military jet engine during take-off, if the listener is less than 100
feet of the aircraft. Table 1 presents a summary of typical sound levels associated with . . vanous nOIse sources.
Table 1. Typical Sound Levels
Noise Source Distance (feet) Noise Level (dBA)
Military Jet @ Takeoff 100 100 to 120
Chain Saw 5 90 to 100
Heavy Truck @ 50 mph 50 80 to 90
Automobile @ 50 mph 50 65 to 75
Normal Speech 5 55 to 65
Indoor Air-Conditioner 5 45 to 55
Refrigerator 5 35 to 45
Ticking Clock 5 25 to 35
It is also important to understand the significance of noise level changes and how they are
assessed, particularly when evaluating environmental noise impacts. Although a doubling of
the number of equal noise sources yields a 3 dB increase in the total noise energy level, it takes
an increase of 10 dB to create a perceived doubling of a noise's loudness. This relationship
applies to all types of noise (except for very low frequency noise, such as noise from gas fired
boilers and industrial fans, which is not germane to this study). Therefore, increasing the level
of noise from 40 dBA to 50 dBA would be perceived as a doubling of the loudness, as would
an increase from 78 dBA to 88 dBA. Conversely, reducing a given noise level from 94 dBA
to 84 dBA would be perceived as a halving of the loudness. A 5 dBA increase or decrease is
generally perceived as clearly noticeable. A change in level of only 1 dBA is generally too
small to be detected, except under very special (laboratory-like) conditions. Ordinarily, it
takes a 3 dBA change to be noticed by a casual listener. These ''rules of thumb" are applicable
to sounds of similar quality. If a new noise source with a unique character to it is added to an
existing environment, the new source often can be heard at very low levels. In fact, sounds
containing pulsating tones (e.g., truck back-up beepers) can easily be heard at sound levels as
low as 10 to 15 dBA below the hourly average ambient noise level.
Generally speaking, the noise level at any location is almost never constant. The noise
level will typically fluctuate with time and location. However, when averaged over a
significant time period (e.g., several minutes or an hour), most outdoor environments will
exhibit a reasonably steady noise level. The most significant outdoor noise level statistic
is the energy average noise level, abbreviated Leq (which stands for equivalent sound
level). Leq is defined as the steady (constant) sound level that has the same total
acoustic energy as the actual time-varying sound level. An Leq can be measured over
any specified time interval, but usually an interval somewhere in the range of 1 minute to
1 hour is used. Other important noise level statistics include Lmax (which is the
maximum sound level during a specified interval of time), Lmin (which is the minimum
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 3
sound level during a specified interval of time), and~. ~ is a statistic defined as the
sound level that is exceeded 90% of the time during the specified time interval (or, from
the converse perspective, the noise level is below the ~ value only 10% of the time
during the specified time interval). When considering environmental noise duration of
more than an hour, 40 is usually controlled by a large number of noise sources that are
located very far away from the measurement location. Thus, 40 is often called the
"background noise level" as opposed to the "ambient noise level" (a level that includes
all noise sources, both near and far away).
There is one other important noise level statistic: the day-night average sound level,
which is abbreviated Ldn or DNL. The Ldn is a 24-hour average noise level (with a
built-in "penalty" for nighttime noise) that is most often used in reference to land use
compatibility. By convention, the day-night sound level is expressed in units of dB (not
dBA like Leq is) even though the measured values are actually A-weighted decibels.
Residential Noise Standards
There are no mandatory federal or state environmental noise regulations restricting land
development in the State of Washington. However, the U.S. Department of Housing and
Urban Development (HUD) has established an exterior noise standard that ordinarily
must be met by all residential development projects that involve HUD financial support.
(See Title 24, Part 51, Subpart B, Section 51.103 of the Code of Federal Regulations.)
The HUD exterior noise threshold for acceptability is a day-night average sound level of
65 dB. If the day-night average noise level at a project site is less than or equal to 65 dB,
the site is considered acceptable for residential development from a noise standpoint. If
the exterior day-night average noise level at a site exceeds 65 dB, steps must be taken to
reduce the exterior noise (e.g., increasing the setback from the noise source or
constructing a noise barrier to shield the project from the noise source) in order to
participate in most HUD programs. If it is not feasible to reduce the exterior noise level,
HUD can condition program participation upon an upgrading of a building'S exterior
shell in order to provide an interior day-night average sound level that is less than 45 dB.
While compliance with HUD standards is mandatory only for HUD projects, these
standards are sometimes adopted by local governments. For example, the City of
Bellevue, Washington has adopted restrictions on residential development within the city
limits of Bellevue for projects located in areas where the exterior day-night average
sound level exceeds 65 dB. (See Bellevue City Code Section 9.18.045.) The City of
Renton does not have any restrictions as to whether or not residential land development
may occur on a parcel due to the ambient noise conditions on the parcel.
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 4
Regulatory Limits on Noise Generation
In distinction to an ambient noise level-related residential development standard like the
HUD standard, the State of Washington has promulgated regulations limiting the
generation of environmental noise on parcels of land. (See WAC 173-060.) The Renton
City Council adopted those state regulations by reference in RMC 8-7-2 (Maximum
Environmental Noise Levels). (In this report, I refer to those regulations as the "Noise
Ordinance". The purpose of the Noise Ordinance is not to restrict land development
(especially development of low noise generating uses like residential subdivisions) but,
rather, to restrict the extent of noise that can lawfully be transmitted from a noise
generating property across property lines to adjacent parcels. Unlike the HUD
residential development noise standards (standards that take into account all sources of
noise received at a residential development site), the Noise Ordinance applies only to the
particular noises generated on the noise-generating property under consideration. Thus,
for example, noise from aircraft in the sky and traffic noise on public streets and
highways are exempt from Noise Ordinance limits. Many other noise sources are also
exempt from Noise Ordinance limits, including construction noise, property
maintenance-related noise and noise from emergency equipment, just to mention a few
such sources.
In general, the Noise Ordinance limits are much more restrictive than the HUD
residential development standard. For example, if two adjacent properties are zoned
residential, under the Noise Ordinance the maximum noise level (for a noise source that
does not vary with time) allowed to be transmitted to the adjacent receiving property is
55 dBA during the day and 45 dBA at night. (Higher levels are permitted if the source is
located on commercially zoned property or industrially zoned property.) "Nighttime" is
usually defined as 10:00 pm to 7:00 am on weekdays. If the noise in question is not
steady with time, the maximum allowable noise level can be up to 5 dBA higher than the
steady noise limit if the total duration of the higher noise level does not exceed 15
minutes in anyone-hour time period. Similarly, the maximum allowable noise level can
be up to 10 dBA higher than the steady noise limit if the total duration of the noise does
not exceed 5 minutes in anyone-hour time period, and the maximum allowable noise
level can be up to 15 dBA higher than the steady noise limit if the total duration of the
noise does not exceed 1.5 minutes in anyone-hour time period. It is the responsibility of
the owners of noise-generating properties to ensure that the noise radiating from their
properties is in compliance with the Noise Ordinance. Table 2 summarizes the Noise
Ordinance limits for residential receiving properties.
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 5
Table 2. Noise Ordinance Limits for Residential Receiving Properties (dBA)
Source Property Commercial Commercial Re~jde~Re.sr~entl'an
Noise Dllration Daytime Nighttim~ Da~e Nighttime
Continuous (steady with time) 57 47 55 45
Up to 15 minutes per hour 62 52 60 50
Up to 5 minutes per hour 67 57 65 55
Up to 1.5 minutes per hour 72 62 70 60
Site Description
The Elmhurst site is a 9.6-acre property Photo 1. Aerial of parcels north of Elmhurst site.
that is planned to be subdivided into 64
residential lots ranging in size from
3,801 square feet to 5,870 square feet.
The proposed site is bounded on the
east by Bremerton Avenue NE and
bounded on the south and west by
existing residential developments. The
east half of the north portion of the
Elmhurst site is adjacent to a roughly 3-
acre parcel (Assessor's Parcel No.
5182100042) that has an abandoned
residence on it. (That parcel is the site
of the proposed Ridgeview Court
residential subdivision) The west half
of the north portion of the Elmhurst site
abuts a vacant parcel (Assessor's Parcel
No. 5182100020) that has recently been
cleared in anticipation of development. 1...-_----'
Immediately to the north of that vacant parcel is a parcel (Assessor's Parcel No.
5182100031) on which the new U.S. Post Office that serves the Renton Highlands is
located. Photo 1 shows the north edge of the Elmhurst site (at the bottom of the photo)
and the properties lying to the north. (Photo 1 was taken prior to the recent clearing of
Assessor's Parcel No. 5182100020.) The Elmhurst site is residentially zoned (R-IO)
while all surrounding properties are zoned residential, except those above-mentioned
properties north of the Elmhurst site (including the post office site). Those parcels all
have commercial zoning (Arterial Commercial).
Ambient Noise Measurements
Ambient noise in the Elmhurst site's area is dominated by traffic noise from NE 4th Street
(a principal arterial street), with occasional noise from aircraft and from activities at the
Post Office. Nevertheless, because NE 4th Street lies more than 600 feet north of the
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 6
Elmhurst site and because Bremerton Avenue NE is currently a dead-end street with
virtually no traffic!, traffic noise received on the Elmhurst site is relatively low.
Because (a) noise generated by the post office's operations to the north of the west
portion of the Elmhurst site became an issue in the recent preliminary plat hearing
concerning the proposed Ridgeview Court residential subdivision (and in the City of
Renton Hearing Examiner's Recommendation to the City Council concerning that
subdivision) and (b) the NE 4th Street arterial is parallel with and north of the Elmhurst
site's north boundary, the portion of the Elmhurst site where ambient noise is expected to
be the greatest lies along the west half of the site's north edge. Accordingly, that is
where I took my ambient noise measurements for this study.
Ambient noise was continuously measured at two positions near the north boundary of
the site (see Photo 1 for locations) for a period of 64 hours beginning at 4:00 pm on
Sunday, March 6, 2005 and ending at 8:00 am on Wednesday, March 9,2005. Position 1
Photo 2. Photo of the south side of the post office was located due south of the post
taken from Position 1 office loading dock, and Position 2
was located due south of the post
office's east property line. (See Photo
2 for a ground level photo of the south
end of the post office property taken
from Position 1. The recently cleared
vacant parcel lying between the post
office property and the Elmhurst site
is in the foreground.)
The measurement microphones were
positioned 10 feet above existing
grade. Each of them was equipped
with a foam windscreen with spikes to
deter birds from alighting on them
and distorting the noise data being collected. Sound level data at Position I was collected
using a Bruel & Kjaer model 2238 data logging sound level meter. Sound level data at
Position 2 was collected with a Larson Davis model 700 data logging sound level meter.
Both instruments were calibrated immediately prior to the measurements using the same
Bruel & Kjaer model 4230 portable acoustic calibrator. Plots ofthe raw data collected by
each instrument are presented in Appendix A and the summary results of the
measurements are presented in Table 3.
I Even after the development of the Elmhurst subdivision connects Bremerton Avenue NE to the south with
other residential proferties, (a) traffic volumes on Bremerton Avenue will be only a small fraction of what
they are along NE 4 Street, (b) the traffic along Bremerton will be residential in nature (not having nearly
the percentage oflarge vehicles (such as trucks and buses) that travel along NE 4th Street) and thus (c) the
noise on the Elmhurst site generated by future traffic along Bremerton A venue NE is anticipated to be
relatively insignificant.
Elmhurst Residential Subdivision Noise Study
March 12,2005
Page 7
Table 3. Measured day-night average noise levels (Ldn) at Positions 1 and 2
The data summarized and presented in Table 3 demonstrates that the existing day-night
average ambient noise level at Positions 1 and 2 is at least 7 dB below the HUD standard
for residential land use. Keeping in mind that a difference of only 3 dB represents a
doubling of acoustic energy, it would take more than a quadrupling of the existing traffic
volumes in the area to cause a 7 dB increase in the day-night average ambient noise level
here.
The graphs presented in Appendix A show the measured ambient noise level as a
function of time over the duration of the noise monitoring. Figures A-I through A-5
represent the noise level at Position 1. Each data point on those figures represents a 2-
second average (Leq) noise level. As you can see from those figures, there are occasional
events where the ambient noise level exceeds 70 dBA. For the reasons explained below,
nearly all ofthose events are most likely caused by aircraft.
Figure A-6 represents the noise level at Position 2 as a function of time. Each data point
represents a one-hour time period, and there are three curves. The curve marked by black
squares represents the hourly average (Leq) sound level, the curve marked by red
triangles represents the hourly maximum sound level, and the curve marked by blue
circles represents the hourly minimum sound level. The data presented in Figure A-6
clearly show a significant decrease in the average and minimum noise levels during the
late night and early morning hours. However, this trend does not extend to the hourly
maximum sound levels. Figure A-6 shows those sound levels in the 60 to 80 dBA range
at all hours of the day and night. The average hourly Lmax measured over the entire 64-
hour time period is 67.4 dBA.
I was also able to use the collected data to determine whether or not the post office is
operating in compliance with the Noise Ordinance. This determination was laborious due
to the significant presence of noise sources that are exempt from the Noise Ordinance
(e.g., traffic on local streets and aircraft). However, because I was fortunate enough to
have not only recorded but also personally witnessed (and noted the time of) two events
at the post office loading dock (each of which involved a large delivery truck), I was able
to make that determination. One of those two events took place on Monday afternoon
and the other took place on Wednesday morning.
Figure 1 presents the measured A-weighted sound pressure level at Position 1 for a
twenty-minute period ending at 4:50 pm on Monday afternoon. At about 4:43 pm, I
Elmhurst Residential Subdivision Noise Study
March 12,2005
Page 8
personally observed a semi-truck and trailer combination briefly honk its hom prior to
leaving the post office property via the drive on the east side of the post office building.
Figure 2 presents the measured A-weighted sound pressure level at Position 1 for a
twenty-minute period ending at 7:40 am on Wednesday morning, just prior to my
removal of the noise monitoring equipment from the site. During that 20-minute time
period, I observed a semi-truck and trailer combination arrive, back into the loading dock,
open the rear door and drop the tailgate. I also heard the sound of carts rolling in and out
of the trailer to remove materials. Each of these events is identified in Figure 2.
Table 4. Noise Ordinance compliance analysis (post office truck noise at Position 1).
Table 4 presents the results of noise ordinance compliance analyses for the two one-hour
time periods encompassing the data presented in Figures 1 and 2 (starting and ending on
the respective hours). The results of these analyses indicate that the noise from the
delivery truck and trailer combination and the loading/unloading activities at the loading
dock did not exceed the Noise Ordinance's daytime limits at the north property line of the
Elmhurst site. It is important to note that this data is unedited, which means that it also
includes noise from sources that are exempt from the Noise Ordinance. In fact, noise
from a single jet aircraft was noted during the 7:25 am to 7:30 am time period (see Figure
1). If noise from this jet was not present during this measurement, the recorded number
of seconds above 57 dBA would have been much lower than the value measured.
The noise generated by the heavy trucks that were observed on the post office site did not
exceed the Noise Ordinance limits at Position 1, but these events occurred during the day.
At night, the Noise Ordinance limits are 10 dBA lower than during the daytime. (See
Table 2 on page 5.) In order to assess the potential impacts of nighttime noise, Table 5
presents a complete list of each and every individual nighttime noise event that exceeded
the 62 dBA maximum sound level specified in the Noise Ordinance at Position 1 along
with the duration of the event and the most likely source of the noise. These nighttime
events are marked by blue circles in the Appendix A figures. Each entry in Table 5 is
also supported by a graph in Appendix B, with the graphs depicting the time signature of
each event. The time signature is excellent primary evidence as to the identification of
Elmhurst Residential Subdivision Noise Study
March 12, 2005
Page 9
the noise source. As you can see from Figures 1 and 2, delivery truck noise at the post
office loading dock is characterized by maximum sound levels in the 55 to 65 dBA range
with peak durations of a few seconds or less. In the case of a honking hom, the
maximum noise level is between 65 and 70 dBA with a duration of less than 2 seconds.
On the other hand, aircraft noise is characterized by a slowly-varying sound level with
event durations on the order of 30 seconds to 90 seconds (or more) with maximum sound
levels as high as 80 dBA, depending upon the altitude and speed of the aircraft.
While the maximum sound level during an event is very well defined, the event duration
is subject to some interpretation. In this context, we are looking for major differences in
the duration in order to give us an indication of the appearance of the time signature. The
duration listed in Table 5 represents the total duration of the event; it should not be
construed as the total time period over 62 dBA.
Table 5. Nighttime noise events above 62 dBA
It is interesting to note that there were only 13 noise events that exceeded a noise level of
62 dBA at Position lover the 27-hour overall nighttime measurement period consisting
of 9 hours each night for three nights. On Monday night there were only 4 events that
met this criterion, and on Tuesday night there was only one event that met the criterion.
Out of all 13 of those events, only one could not be identified as aircraft noise from the
time signature and that particular event had a maximum sound level that was only 1.8
dBA above the 62 dBA threshold. If that particular event was caused by a truck at the
post office loading dock, the post office would have technically been in violation of the
Noise Ordinance. Nevertheless, the event's impact on the perceived nighttime noise is
relatively minor in comparison to the aircraft noise.
Elmhurst Residential Subdivision Noise Study
March 12,2005
Page 10
Summary & Conclusions
The ambient noise measurements conducted at the Elmhurst site's north edge
demonstrate that the site is suitable for residential development. Not only does the day-
night average sound level at the proposed site meet the HUD standard for residential use,
the existing exterior noise is at least 7 dBA lower than the HUD standard at the site's
north edge, where noise conditions are expected to be the worst. All other portions of the
site are further away from NE 4th Street and the post office and thus would have lower
ambient noise levels than those at Positions 1 and 2.
While there are routine loading and unloading activities and other activities at the post
office that generate occasional environmental noise, this study has clearly shown that the
intensity and duration of the noise generated by the post office is insufficient to
significantly impact residential use of the Elmhurst site.2 Post office loading dock noise
is expected to be in full compliance with the Noise Ordinance at the west half of the
Elmhurst site's north edge at least during daytime hours. At night, there may (or may
not) be occasional peaks from loading dock activity that technically exceed the Noise
Ordinance limits for brief sounds, but these peaks are very rare and the level of these
peaks is well below the level of the far more common noise peaks generated by aircraft in
the community. As a result, I anticipate no noise impacts on the proposed Elmhurst
development from activities on the post office property to the north. In fact, the vast
majority of the environmental noise at the proposed site is generated by traffic on NE 4th
Street and by aircraft, not the post office, and those noises are not at levels that will pose
a problem to residential use ofthe Elmhurst site, either.
If you have any questions regarding these findings and conclusions, please do not hesitate
to give me a call.
Sincerely yours,
JGL Acoustics, Inc.
~~~
Jerry G. Lilly, P.E., FASA
President
Member INCE, NCAC, ASHRAE, ASTM
Enclosures
2 Anticipated future development of the Ridgeview Court site and the vacant parcel immediately to the
north of the west half of the Elmhurst site will significantly screen the Elmhurst site from post office-
generated noise, further reducing its intensity on the Elmhurst site.
Elmhurst Residential Subdivision Noise Study
March 12,2005
Page 11
90
80
i ~ 70
S
! 60 ::I III III ! CL
" 50 c ~ fI)
40
30
:::i: :::i: a.. a..
0 II'l (') (') ;.r ;.r
90
80
i ~ 70
]
! 60 ::I III ~ CL
" 50 c ~ fI)
40
30
:::i: :::i: « «
0 II'l N N ;...: ;...:
Elmhurst Residential Subdivision
Figure 1. Delivery Truck Noise at Position 1
Tru Honks Hom &
:::i: :::i: a.. a..
0 II'l ... ... ;.r ;.r
Time of Day (March 7, 2005)
Elmhurst Residential Subdivision
Figure 2. Delivery Truck Noise at Position 1
Semi·Truck Enters P rking lot (no hom)
Truck Enters oading Dock
:::i: :::i: « « g II'l (') ;...: ;...:
Time of Day (March 9, 2005)
:::i: a..
~ ;.r
:::i: «
0 ... ;...:
APPENDIX A
"'l"'" .., C
C 0
Q);:::; E 'c;;
0.0 on..
"Q)'" > co
Q) Q)
C .~
-0 .! Z ..,.., c c
Q) Q)
"C .-.-.c m E 0::< ..,
~~ ~ . .c< E e -~ W .2>
LL
o CD
1
o CJ)
o LO
(lIdw) paads PU!M
o ("I') o C\I o ..-o
1I\I'v' 00:9
1I\I'v' OO:g
1I\I'v' 00:£
1I\I'v' 00: l
1I\I'v' 00: ~
1I\I'v' 00: l ~
II\Id 00: ~ ~
II\Id 00:0 ~
II\Id 00:6
~--+------=~ II\Id OO:g
-----+----""1--II\Id 00:9
o 0 0 0 0 ro ~ CD LO ~
hf8P) laAal aJnssaJd punos
o ("I')
-It)
0 ""0 0 Q) N Q)
.... ft Q. en
""0 CD c .c: ~ (J
'-
I n:I
:!!: ->-...-... () n:I Q) c (J)
I .... C\I 0 -CI) CT E Q)
i= -oJ
I
or-
+I C
C 0 cu+:i E 'u;
c.0 o a.. a; +I > CO cu cu C .~
-0 .! z
+1+1
C c cu cu "C .-.-.c ~ E 0::<
+I ~N
::::J • ,c<
E ! -::::J W C') .-u.
o <D
o (J)
o 1.0
(4dw) p88d S PU!M
o N o ...-o
II\Id 00:£
II\Id 00:z;
II\Id 00: ~
II\Id 00:z; ~
II\IV 00: ~ ~
II\IV 00:0 ~
II\IV 00:6
II\IV OO:g
~---+------+ II\IV OO:L
IL_..k.....i!:I!S II\IV 00:9
o 0 000 ro ~ <D 1.0 ~
("8P) 181\81 8JnSS8Jd punoS
o
('I')
.-... ..c a.
E ---It) "0 0 Q) 0 Q) ('II a. ....... C/')
J: "0
0 c ... ~ cu
:!:
I ->. cu .-... c ()
'to-Q)
0 (/)
I
Cl) N
E --
i= 0-Q)
....J
I
....
+I C
C 0 Cl)+=i E .Ci)
c.0
00.
-+I Cl) CO > Cl) Cl)
C .~
-0 .! z
+1+1 C c
Cl) Cl) "C .-.-.c ~ E O::<C
+I I!!M ::::s I ,c<C
E e -::::s W C) .-LL
o CD
o (J)
o 10
(lIdw) paads pUIM
o N o ...-o
..,j----+---4 11\1\1' 00:9
------I---~ 11\1\1' 00:9
~--~ 11\1\1' OO:V
11\1\1' 00:£
11\1\1' OO:l
11\1\1' 00: ~
11\1\1' OO:l~
II\Id 00: ~ ~
II\Id 00:0 ~
II\Id 00:6
Il=------I-----=-I!!!'+ 11\1 d 00:8
~--+----+ II\Id OO:L
~------l-----+ II\Id 00:9
o 0 0 0 0 o ('t) 00 ~ CD 10 ~
hf8P) laAal aJnSSaJd punos
-"C
t.l) Q)
0 Q)
0 Q.
N en
co "C c
r--~ .c
I ~ CG ~ ----U
>-Q) en CG I c N -.... 0'" 0 Q) CI) ...J E
i= I
~
+' C
C 0
Q);:; E 'en
c.0 o a..
Ci)+' > co
Q) Q)
C .!l
- 0 .! Z +'+, C c Q) Q)
"C .-.-.c ~ E ~<C
+' ~~ :l I ,c<C
E e
jjj :l .2' u..
o CD
o CJ)
o L()
(lIdw) paads PU!M
o
C\I
o
T""" o
II\Id 00:9
II\Id 00:9
II\Id oo:po
II\Id 00:£
II\Id OO:l
II\Id 00: ~
II\Id OO:l~
II\I'V 00: ~ ~
II\I'V 00:0 ~
II\I'V 00:6
;..-+---+---+ II\I'V 00:8
---+-----I---~ II\I'V OO:L
--+ ____ --4 ___ 1-II\I'V 00:9
o 0 0 0 0 00 ~ CD L() ~
hfap) laha1 aJnSSaJd punos
-U)
0 0 "0 N Q) as Q)
.c a. en u ... "0 ca C :!: ~ ->-
I ca c .... 0 -()
(1) Q)
E II) I
j:: C\I -0" Q)
....J
I
o CD
o 0>
o I.C)
(lIdw) paads PU!M
o ('t) o N o
T""" o
t--------1--__j_ V\lV' 00:9
i;".-----f----+ V\lV' 00: L
$F--+----t-V\lV' 00:9
.-+--~."j-V\lV' OO:g
~---=--V\lV' 00: V
~--f-V\lV' OO:Z
-"'0 It) Q) o Q) o 0-
N en
a) "'0
C
->-res
~
I
---. ()
Q)
(/)
I
V\lV' OO:Z ~ e N -0-Q)
...J
o
(1)
E -+-----=~ V\ld 00: ~ ~ i=
V\ld OO:O~
V\ld 00:6
V\ld 00:9
==--------=~~==I--V\I d 00: 9
I
o 0 000 o ('t) ro ~ CD I.C) ~
("8P) laAal aJnSSaJd punos
N
... C C 0 Q);:i
E 'en c.0 On.
0;'" > C'G
Q) Q) c .~
- 0 .!!! z ...... c c
Q) Q)
"C .-.-.c ~ E £k::« ... ~ui :::::J I .c«
E e w :::::J en .-LL
I-----+----+----::..+---+-~_______jf____::oe-__+ II\IV oo:v
I------+---+----Nl----+-____ ---+---.-+ II\IV OO:Z ~
1-----+----+------=",..----+---------1-II\Id 00:9
I-------t----+-------'~-_+_--___ _t __ __+_---I-II\Id oo:v
f-----+--<IIII4=---+------1 ___ -ja+----+ II\Id OO:Z ~
'-----+-----bl~--+--~I-.a_::_----+---+ II\IV 00:9
i------+----+----=~---+---____ --.. f__-__+ II\IV oo:v
r-----+---+--~-+----+ ____ ----+-__ --+ II\IV OO:Z ~
1-----+--_+_----=""4---+----____ +---__ ~f__-____+_ 11\1 d 00:9
I-----+--~=+-----+----____ +--_~f__-____+_ II\Id oo:v
I--------t---... ,----+------II __ -___ I-----I-II\Id oo:z ~
1-------t------+--:lIII---+----__ +---ta-I-----+ II\IV 00:9
r------+---+--~---+---~ __ -l-... ---+-II\IV oo:v
:-----t.~==___+_--+-__Ia;:..+----+-_____ -_+ II\IV OO:Z ~
'-----+------+---__w.--+--_________ --8--I--____+_ 11\1 d 00:9
I-----I----~:::=...--+--__I_-_+__..::::::a-_+ II\Id oo:v
o
(J)
o 000 0 ro ~ ~ ~ ~
hf8P) 1~U\a1 aJnsSaJd punoS
-It) c 0 E 0 N -l ar + CD
.c >< co (,) E ... res -l ~
+ -~ ...: C 0-Q) -.... a> Q)
0 -l E
(1) + ~ E
i= ~
"0 C :::J 0 III
OJ C :;::; ~
OJ Q) -"~
a a I'-
a> "0 0 E
III "5 co 0
c
0 ~ co ....J
.s=. -"~
"0 Q)
t5 ~ "0 (.)
co -co 0
APPENDIXB
Elmhurst Residential Development
Figure 8-1. Ambient Noise at Position 1
90 -,--<~-'---~~~<~<'-<'
80 I /
-I~ ~ ~ 70 I
Q;
Aircraft #1 at 10:27:03 fM
(Lmax = 74.8 dBA)
> ~ ~ 1"1
" ''1IIIU'
~ 60 , •.
" ",.. " .. " ,
t/)
Q)
~ I • D.. 1/\ .. I "C 50 I.. C ~ o en
40 +I-------------------+-------------------+------------------~------------------~
30
~ ~ ~ ~ ~ a.. a.. a.. a.. a..
a L{) a L{) a C\I C\I C") C") "'Q"
b b b b b ..-..-..-..-..-
Time of Day (March 7, 2005)
Elmhurst Residential Development
Figure 8-2. Ambient Noise at Position t
-~
90
80 I I
Aircraft #2 ® 10:50:33 PM
(Lmax = 7~.5 dBA)
I 1111 ~ 70 IU~L----------------t------------~ ~, t
..J " II
CD
li 60 .11 I
.. , . I -I .. A , ... £ " I I , " 50 I I C g
tn
40+1----------------~----------------~----------------~----------------~
30
:?: :E ~ ::E :?: a.. a.. a.. a.. a..
0 l() 0 l() 0 ....,. ~ l() l() 0
0 0 0 0 ~
~ ~ ~ ~ ~
Time of Day (March 7, 2005)
90
Elmhurst Residential Development
Figure B .. 3. Ambient Noise at Position 1
Aircraft #3 @ 12:27:15 AM
(Lmax = 75.0 dBA)
001 /
-II ~ -~~~~~~~~----~~~~---i--------------~j-~~~~~~~ :!:!. 70 I
"i ~ , , ~ 60 I '" ,'1
1
______ _
:::s
:II I I I..
.. , 6:. I AI . "g 50 I
:::s o (I)
40 I --
30
:E «
0 N N
T""
:E «
LO
N N
T""
., 'J! Y· I
:: :E :: <t: « <t:
0 LO 0
('I') ('I') ~
N N N
T"" T"" T""
Time of Day (March 7, 2005)
Elmhurst Residential Development
Figure 8-4. Ambient Noise at Position 1
90 -r---------.--.. --.-. T--------·----~"-.,."-,.,,.. -.. " .. ~----
Aircraft #5 @ 2:26:49 A
(Lmax = 68.5 dBA)
80 +I---------+----------r---------~-~------~
Aircraft #4 @ 2:18:07 AM
~ (Lmax = 62.4 dBA)
III ~ 70 I \ ,.
CI) > CI)
..J e ::l 60 I A: I I
In In CI) ... c..
-g 50 I I I I I A I II 'IIIF
::l o en 106 s
40 I. 'Ifl \ ~ at '."laA I\." • .1f.J/ V 'M . ~ "ill I\,_ .1"'\. JI! 1,/\,J/\ ,lU' . \. .I V I
30
::2: ::2: ::2: ::2: ::2: « « « « «
0 IJ') 0 IJ') 0 ..-..-N N ('i)
N N N N N
Time of Day (March 7, 2005)
Elmhurst Residential Development
Figure 8-5. Ambient Noise at Position 1
90 '~~'-'~"'--Y-'--'~'-'------------, .-" ••. ------
80 +I------------------+------------------r------------------r-----------------~
Aircraft #6 @ 3:18:01 AM
(Lmax = 62.7 dBA)
'--r-----, £a
~ 70
Ci)
> I. ~ .
..J 1 ""01 . l!!60 Illill'. il ",. I I I I I
m I 1
E Q.
-g 50
:l o UJ
40 1111 .. 0' ... or' \J V"4" , yy 1/' .... .." 'I • ,., , •• II ''\I III I Y • , VI 1II
30
::2: ::2: ::2: ::2: ::2: « « « « «
0 LO 0 LO 0 ...--...--N N (")
(vj (vj (vj (vj (vj
Time of Day (March 7, 2005)
Elmhurst Residential Subdivision
Figure 8-6. Ambient Noise at Position 1
90 ·-~·--'··~------···-···-·-···-"---"······-"·-~-----1---"--·------·--·---·-·~--r------,
80
-<t m ~ 70
CD > Q)
-I
! 60 ::::I tn tn Q) ...
D..
'C 50 c: ::::I 0 tn
40
30
~ a..
0 ~
6
T"""
Aircraft #8 @ 10:51 :01 AM
(Lmax = 70.2 dBA)
Aircraft #7 @ 10:47: 111 PM
(Lmax = 66.9 dBA)
~ a..
L!)
~
6
T"""
~ a..
0 L!)
6
T"""
Time of Day (March 7, 2005)
~ ~ a.. a..
L!) 0 L!) 0 6 T""" ..--T"""
-
Elmhurst Residential Subdivision
Figure B-7. Ambient Noise at Position 1
90 -,-----r--._._-----
Unkno~n Source @ 1: 12:45 PM I
(Lmax ~ 63.8 dBA)
80 I \
~ \ m , ~ 70 I
CI) > ~ l--------------------~----------------------t-----------~--------_t----------------~----l ~ 60 I
til til ~ ." •• I • I •• 11 Q. • " II II "C 50 A " I I C I • ::s o UJ
40 I \I' V '~ '¥IF b IV \IV WV \t~.['v II'"",} "Alii III J -" V \ I
30
:2: :2: :2: :2: « « « «
0 L() 0 L()
0 0 T""" T""" .. . .
T""" T""" T""" T"""
Time of Day (March 8, 2005)
:2: «
0 N
T"""
90 -,--------
Elmhurst Residential Subdivision
Figure 8-8. Ambient Noise at Position 1
Aircraft #9 @ 3:52:55 AM
(Lmax = 71.8 dBA)
80+1----------------~----------------~r---------+-------r---------------~
~ 70 l,------------------+------------------t--------~r_------[_----------------l 'G) > (1)
.J lI~nR e 60 I :s U)
U)
I!! • "'" an',', • /I D.. !/-'WI IJ I I, I I I I I , III I I I\~" I • -g 50 I" , 'I lAo I J :s o UJ
40 I -I
30
~ ~ ~ ~ ~ « « « « «
0 1.0 0 1.0 0 -.::t -.::t 1.0 1.0 0
~ ~ ~ ~ ~
Time of Day (March 8, 2005)
90 -,--------'
Elmhurst Residential Subdivision
Figure 8-9. Ambient Noise at Position 1
80+1----------------+---------------~----------------4---------------~
Aircraft fit1 0@5:30:29 AM ~\ Unknown Source@5:39:43AM
;( (Lmax 63.0 dBA) (Lmax = 63.8 dB) ) m ~ J ~ 70
G) > CI)
-; I AA 1\1 I :; 60 I
tn tn CI)
~
D.. n -\I ro\ IY~ 'WI V" V '" y~ /1\1\ ,1-' f(-' • I I 'tJ 50 P' 1\1, ",A JY \ JW\nv'J 11.1\.., 4\ 1(;, \ , C \ ,ifF U~ J
::l o UJ
40+1----------------+---------------~----------------~--------------~
30
~ ~ ~ ~ ~ « « « « «
0 LO 0 LO 0 N N (\') (\') ~
Lri Lri Lri Lri Lri
Time of Day (March 8, 2005)
Elmhurst Residential Subdivision
Figure B-10. Ambient Noise at Position 1
90 ----------
80 +I------------------~------------------+-----------------~------------------~
-Aircraft #11 @ 1 :24:471 AM ....
(Lmax = 6601 dBA) ~ , m , ~ 70 I
Ci) >
S ., • ! 60 1 ~ ~
f I D..
-g 50 I II ~ IIUI
~ o en
40 1I r 'INlI"'1;'1UI 10 11\ '1"" ~"I" ~"Il" I II M'II. • .. 4,\, \ ,,[ \IV \ I \" VI
30
:2: :2: :2: :2: :2: « « « « «
0 L!) 0 L!) 0 ...-...-N N ("t) 00 00 ...-...-...-...-...-
Time of Day (March 9, 2005)
PROFESSIONAL RESUME OF JERRY G. LILLY
JERRY G. LILLY
EDUCATION:
M.S. in Engineering Acoustics, 1975, Pennsylvania State University
AB. in Mathematics, 1972, Whitman College
EXPERIENCE:
1983-Present: President ofJGL Acoustics, Inc. providing consulting services to architects,
real estate developers, public agencies, and industry in sound and vibration control and
environmental noise assessment. The majority of these services are related to four broad
areas of acoustics: 1) sound isolation and interior acoustics in buildings, 2) mechanical
noise and vibration control, 3) environmental noise assessment and control, and 4)
industrial noise control. Other areas of expertise include preparation of environmental
impact statements, construction noise assessment, and expert witness testimony. Typical
projects include hospitals, music buildings, office buildings, theaters, churches, hotels,
educational facilities, industrial facilities, and transportation system improvements.
1979-1983: Acoustical consultant with Towne, Richards & Chaudiere, Inc. in Seattle,
Washington. Served as project manager for several mechanical, architectura~ and industrial
noise control projects.
1977 -1979: Acoustical engineer with the Applied Physics Laboratory at the University of
Washington. Responsible for field measurements and mathematical modeling of
underwater acoustic reverberation for applications to U.S. Navy undersea weapons
guidance systems.
1975-1977: Acoustical Consultant with Paul S. Veneklasen & Associates, Inc. in Santa
Monica, California.
REPRESENTATIVE PROJECTS:
Chase at Centerpoint Office Building, Phoenix, AZ
Bayou Bonfouca EPA Clean-Up Site, Slidel~ LA
Waterfront Landings, Seattle, WA
West Virginia Graduate College, Charleston, WV
Lenexa Products Sound Testing Laboratory, Lenexa, KS
PCI Sound Test Laboratory, Ft. Worth, TX
The Village at Mammoth, Mammoth Lakes, CA
PRO Sports Club, Seattle, W A
Intel FM6 Office Building Vibration, Folsom, CA
1992
1993
1994
1995
1996
1998
2000
2002
2004
Jerry G. Lilly Resume
03/13/05
Page 20f3
EDUCATIONAL AND RESEARCH ACTIVITIES:
Instructor, M.E. 428 "Machinery Noise", Mechanical Engineering Department
at the University of Washington, Winter Quarter 1981.
Instructor, Arch 436-U "Architectural Acoustics", Department of Architecture
at the University of Washington, Spring Quarter 1988.
Lecturer, ASHRAE Professional Development Seminar: "Designing HV AC
Systems to Control Noise and Vibration", 1996 -Present, Philadelphia,
Phoenix, Toronto, Seattle, Montreal, Atlanta, Baltimore, Boston, Austin, Dallas,
Denver, Albuquerque, San Diego, Minneapolis.
PUBLICATIONS:
"Sound Power Levels ofa 36 inch Vertical Plug Fan", Proceedings from Noise-Con 83,
Massachusetts Institute of Technology, Cambridge, MA 1983.
"Absorption Coefficients for Spatially Separated Acoustical Panels", Proceedings from
1984 International Conference on Noise Control Engineering, Honolulu, HI 1984.
"Breakout in HVAC Duct Systems", Sound a11d Vibration, Volume 21, No. 10, Oct. 1987.
"Vibration and Noise", Chapter 22 of Pumping Station Design, ed. R.L. Sanks,
Butterworths, 1989.
"A Sound Reduction Enclosure Without Doors", Proceedings from 1991 International
Confere11ce on Noise Control E11gineering, Sydney, Australia, December 1991.
"Environmental Noise Criteria for Pure Tone Industrial Noise Sources", Proceedings from
Noise-Con 94, Ft. Lauderdale, Florida, May 1994.
"Field Testing of Operable Partitions", Sound and Vibratio11, Vol. 29, No. 11, Nov. 1995.
"Noise Control at an EPA Superfund Cleanup Site", Sound and Vibratio11, Volume 32, No.
12, December 1998.
"Reverberation Chamber Qualification at Low Frequencies", Sound and Vibration, Volume
33, No. 12, December 1999.
"Noise in the Classroom", ASHRAE Journal, Volume 42, No.2, February 2000.
"Recent Advances in Acoustical Glazing", Sound and Vibration, Volume 38, No.2,
February 2004
Jerry G. Lilly Resume
03/13105
Page 3 of3
PROFESSIONAL AFFILIATIONS:
Institute of Noise Control Engineers (Board Certified since 1993)
Acoustical Society of America (Fellow since 2001)
National Council of Acoustical Consultants (President: 1996-1998)
ASHRAE (Member Technical Committee 2.6, Sound & Vibration)
Registered Professional Acoustical Engineer (Oregon, 1983)
WEB SITE: www.jglacoustics.com
AFFIDAVIT OF SERVICE BY MAILING
STATE OF WASHINGTON)
) ss.
County of King )
Nancy Thompson being first duly sworn, upon oath, deposes and states:
That on the 29th day of March 2005, affiant deposited via the United States Mail a scaled
envelope(s) containing a decision or recommendation with postage prepaid, addressed to
the parties of record in the below entitled application or petition.
Signature:
SUBSCRIBED AND SWORN to before me this ~9fAday Of_L!.m'-Ll:l._..L..:rvh~ __ , 2005. II"""""" --III"~H L ';"--_ 11~<b0 .••••• ~ ... '":.. ,\' !V •. _~;$\{'I\I i';.· .. ~ ~ ~(J •• .,_ ...... ·.lP~ ~ /0 t\OlAA,. \.~ ~ ~ :u In~ ~ ~ ~ .. -: ~ ~ ~. PI ~\..\c, I ;;: ~ .... oJ) • VD • 0 \ ~ .... \ 71. ~ "', " ":...,,,, '. "19-° "'" II -=:. ~" ....... ~~ I"~ --... OF 'N ,..S~ 11,1
-................ "'11111
Notary Public in and for the State of Washington
Residing at ~tB , therein.
Application, Petition or Case No.: Elmhurst Preliminary Plat
File No.: LUA 04-162, PP, ECF
The Decision or Recommendation contains a complete list of the Parties of Record.
HEARING EXAMINER'S REPORT
..
March 29,2005
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
Minutes
APPLICANT:
CONTACT:
LOCATION:
SUMMARY OF REQUEST:
SUMMARY OF ACTION:
DEVELOPMENT SERVICES REPORT:
PUBLIC HEARING:
Liberty Ridge LLC
Attn: Mike Merlino
9125 10th Ave S
Seattle, WA 98108
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th Street, Ste. 1900
Bellevue, W A 98004
Elmhurst Preliminary Plat
File No.: LUA 04-162, PP, ECF
201,251, & 257 Bremerton Avenue NE
Approval for a 64-lot subdivision of a multiple parcel, 9.6-acre,
site intended for detached units.
Development Services Recommendation: Approve subject to
conditions
The Development Services Report was received by the
Examiner on March 8,2005.
After reviewing the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding area; the Examiner
conducted a public hearing on the subject as follows:
MINUTES
The following minutes are a summary of the March 15, 2005 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, March 15, 2005, at 9:31 a.m. in the Council Chambers on the seventh floor of
the Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No.1: Yellow file containing the original Exhibit No.2: Neighborhood Detail Map
application, proof of posting, proof of publication and
other documentation pertinent to this request.
Exhibit No.3: Preliminary Plat Plan Exhibit No.4: Tree Cutting and Land Clearing Plan
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 2
Exhibit No.5: Grading and Drainage Plan
Exhibit No.7: Zoning Map
Exhibit No.9: Katie Walter, Professional Resume
Exhibit No. 11: Vacation Petition to City dated
12/27/2004
Exhibit No. 13: Renton City Council minutes dated
2/28/2005
Exhibit No. 15: Deed to the Foster property
Exhibit No. 17: Access Easement Agreement dated
March 9, 2004
Exhibit No. 19: Lawsuit, Snohomish Case Law
Exhibit No.6: Existing Conditions
Exhibit No.8: ERC Mitigation Measures
Exhibit No. 10: Sheet 1 of Preliminary Plat drawing
set showing vacation of 15.5 foot right-of-way along
Bremerton A venue
Exhibit No. 12: Letter from Bonnie Walton dated
3/1/2005
Exhibit No. 14: Noise Report by Mr. Jerry Lilly
Exhibit No. 16: Lot Line Adjustment
Exhibit No. 18: Lawsuit, Kitsap Case Law
-.
Exhibit No. 20: Second Grading Sheet
The hearing opened with a presentation of the staff report by Susan Fiala, Senior Planner, Development
Services, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The site is located in the east portion
of the City of Renton just south of the NE 4th corridor and to the west of Bremerton Avenue NE. The site is
zoned Residential-l O.
On the site there is a Category 3 unregulated wetland located in the southwest portion of the site, which is
proposed to be filled. There are two tracts proposed, Tract A in the southwest corner of the site for the storm
drainage facility and Tract B which continues along the entire southwest and western edge of the property which
would be a Native Growth Protection area. Maplewood Creek runs along this area and continues northward.
There would be a 25-foot enhanced buffer on each side of the creek. Due to any wetland that would be
potentially located within 100 feet of the site, the applicant did an assessment of this wetland in the northwest
corner of the site and that is unregulated Category 3 therefore, this proposal would not be affected with that
wetland.
A Development Agreement was made on this site, it was approved in August of 2004 with several stipulations.
One, this site would be zoned R-IO as well as the Comprehensive Plan Use designation of Residential-Options
(RO). There are also some site-specific restrictions that state that all residential buildings must be single-family,
all lots abutting the south boundary line must be 50 feet in width (Lots 23 through 29), and lastly the net density
cannot exceed 10 dulac. The proposed density for this plat is 8.3 dulac.
The Environmental Review Committee issued a Determination of Non-Significance -Mitigated for the project,
which included fourteen mitigation measures. No appeals of the determination were filed.
The purpose of the Residential Options designation is to create new, lower-density neighborhoods in a
traditional development style while at the same time support infill development. This proposal is consistent with
the Residential Options land use development and the environmental element.
..
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 3
A net density of the development would be 8.3 dwelling units per acre, which is within the allowed range. This
proposal is all detached single-family units and complies with the density and unit mix requirements for R-l 0
zOlllng.
All lots comply with the lot dimension requirements as well as meeting the required setbacks. The proposal's
compliance with these building standards would be verified prior to the issuance of individual building permits.
Several buildings and outbuildings currently exist on the site, the applicant must obtain a demolition permit and
complete all inspections and approvals for all buildings prior to the recording of the final plat.
The R-l 0 zone requires setback areas to be landscaped including the addition oftrees and shrubs to be planted
within the front yard area of all lots within the plat. The satisfaction of this condition is subject to the review
and approval of the Development Services Division Project Manager.
The side lot line of the proposed lots are at right angles to the street line. All lots would gain acce~s to public
roadways either directly, or via private driveway access easements. As proposed, lots comply with arrangement
and access requirements of the Subdivision Regulations.
Each of the lots satisfies the minimum lot area and dimension requirements of the R-l0 zone. All lots located at
the intersection of public rights-of-way would meet code, all would have a radius equal to or greater than 15
feet.
Access is proposed via the Bremerton Avenue NE coming from the south through the Laurelhurst Plat. This
proposed plat required two means of access, depending on the outcome of the Ridgeview Plat, north of the site
along Bremel10n A venue NE, it is a requirement by code that a minimum of 20 feet width of pavement and a
pedestrian walkway be required along Bremerton Avenue NE from the northern property line up to NE 41h
Street. If the right-of-way required to be dedicated by the Ridgeview Court Plat is not in place prior to the
recording of the Elmhurst Plat, the applicant of this plat would be required to dedicate the public right-of-way
along that parcel. There also is a requirement for a dedication ofa minimum of25 feet from the centerline of
Bremerton Avenue NE for this subject plat.
A homeowner's association or maintenance agreement is suggested for the development, which would be
responsible for any common improvements and/or tracts within the plat.
Traffic, Park and Fire Mitigations fees were imposed by the ERC.
The subject site is located within the Renton School District boundaries and they have indicated that they can
accommodate the approximately 28 new students.
The storm drainage/surface water would be located in Tract A in the southwest corner of the property between
Lots 22 and 23. In order to enhance the storm drainage tract it is to be fenced, landscaped and irrigated unless
drought tolerant plants are used. The property lines of Tract A fronting Road A, Lot 22 and 23 should include a
landscape visual barrier and fencing. The property lines along Lot 22 and 23 should include a six foot high solid
wood fence or other approved material (no chain link), the portion to the southwest of Tract A required only the
split rail fence.
Staff recommends approval of the Elmhurst Preliminary Plat subject to five conditions.
David Halinen, 10500 NE 81h Street, Suite 1900, Bellevue, WA 98004 stated that he represents the
owner/applicant Liberty Ridge LLC. There were a couple of questions that arose during Ms. Fiala's testimony,
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 4
in terms of the question of shared driveways, the applicant is planning to have individual driveways, the
purchaser of the project has requested that and that is the applicant's intention to provide those driveways.
Secondly, regarding the small segment of Tract A that abuts the south line of the property, they are willing to
fence that in any way that the City staff would like to have it done.
The applicant has reviewed the proposed conditions for approval and finds them acceptable.
There was a question regarding the unregulated wetland in Tract A, Katie Walter, a wetland scientist, biologist
and botanist is present today and can address that question.
Katie Walter, Shannon and Wilson, 400 N 34th Street, Suite 100, Seattle, WA 98103 stated that she performed
the wetland delineation both on this site and the site to the north back in 1998. The wetland to the north isjust
offsite north along the west property boundary. It is a small wetland, just over 2,000 square feet in size. It was
designated a Category 3 wetland under the City's regulations and the question was with respect to its closeness
to Maplewood Creek. That creek has been channelized in the past, the area was developed early in the 1950's,
and at different periods of time the creek has been channelized and moved and it appears that long before now
that wetland has become isolated from the creek. There is a dirt berm that exists between the creek and that
wetland.
The isolated wetland on site is slightly different in that it appears to have formed on fill as a result of a
stormwater pipe that outlets near the east side of the wetland and it appears that that wetland is isolated, most of
the water that gets to that wetland either infiltrates or evaporates and probably during very large storm events it
may have some overland flow. The creek on site, which runs along the western property boundary has been
heavily channelized, it's about four feet lower on the northern side than the site boundary depending on the
amount offill in different places on that site. On the southern portion it is six to eight feet lower than the actual
site. On the northern two-thirds of that site it's been channelized along the property boundary, it's an ephemeral
stream, it wasn't flowing, in fact it was completely dry in June of2004, and in December of2004 it wasn't
flowing, but there were some puddles of water. It was flowing in 1998 when she was at the site. II does flow
occasionally, but mostly during storm events in the area. The buffer along the creek is heavily vegetated with
blackberries with almost no native vegetation. On the southern end there are a few more trees and some native
vegetation.
Mr. Halinen stated that for the record, the Bremerton Avenue right-of-way abutting the site, there were three
small strips of land along the west edge of Bremerton Avenue designated as a 15.5 foot ROW to be vacated that
is within proposed Lot I. The second strip has a note that also shows 15.5 foot ROW to be vacated from Lot 46
north to Lot 42 up to proposed Road A, and finally the very south end of the site there is a note that says 7.5 foot
existing ROW to be vacated, along the east edge of Lot 29. The applicant filed a petition with the City on
December 27,2004. This is a contiguous strip that Road A will cross and does not need to be vacated.
This matter went before the City Council on February 28 and the Council voted to approve the requested street
vacation with two conditions; area of vacation for the two northerly portions of the original request be set to a
maximum vacation width of 12.5 feet and secondly, the petitioner shall provide satisfactory proof that outside
utilities have received and are satisfied with any easements which are necessary to protect their facilities in the
requested vacation area. Going forward with construction plans, the three-foot adjustment will be made within
the lots and make everything fit.
The reason that a Noise Analysis was done was in view of the Ridgeview Court project to the north, there was
testimony by the manager ofthe abutting postal facility concerning truck and delivery noises that he wanted to
make the City aware of. In that particular case, the Examiner indicated a recommendation for denial of that
project, or in the alternative some special conditions of approval were suggested. That matter is now on appeal
to the City Council by the applicant. While the Elmhurst site is further from the postal site than the Ridgeview
'.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 5
Court, it seemed prudent to have some field noise measurements taken over an extended period of time, 64
hours, so that some hard data would be available. That work was done by Jerry Lilly, who could not be here
today, one of his colleagues, Michael Yantis is here today to provide an overview of the testing.
Michael Yantis, Yantis Acoustical Design, 720 Olive Way, Suite 1400, Seattle, WA 98101 stated that he was
here today on behalf of Jerry Lilly. He visited the project site on Sunday, March 6 with Mr. Lilly. The noise
monitoring stations were set and they were able to review both the location of the stations and the equipment
that was used.
Two noise-monitoring locations were set up on site, one on the north boundary of Elmhurst property and a
second approximately mid point on that north boundary line. Mr. Lilly took data for approximately 64 hours
between March 6 and March 9 at these two locations. Position two took hourly data and position one was
continuous recording of data every 2 seconds. Primary noise sources were traffic on NE 4th Street, aircraft
flyovers, and although the Post Office has been indicated as a noise source in the vicinity, the study indicated
that it was not a primary noise source in the area.
Mr. Yantis continued with an overview of the report. Noise codes do not specifically apply to public roadways
and aircraft because these noises are exempt from the noise codes, developmental regulations help provide
guidelines for jurisdictions and developers and how they might build their developments to make sure that the
residents don't have noise levels that are excessive. Both Bellevue and Snohomish guidelines are based on the
HUD guidelines that provide noise guidelines that are suitable for residential developments. Noise levels above
65 LDN are in the less acceptable category, noise levels under 65 are generally acceptable. The C:ty of Renton
also has a noise ordinance that regulates noise levels between adjacent properties. The results of the
measurements that Mr. Lilly recorded show that the Ldn (day-night average) varied from 56.3 at position 2 to a
high of 57.8 at position I. They are all very close in noise level. In addition to the long-term noise levels that
were measured, Mr. Lilly paid particular attention to noise levels that might be occurring from the Post Office.
While he was on site, there were two events that happened, that were truck events. One event happened at 4:45
pm when a truck left the facility and beeped its horn and the other event was the arrival of a semi-truck trailer
rig that traveled onto the property, dropped its tailgate and unloaded material. Both of these events, although the
noise levels are identifiable, they are a little bit higher than the typical activity happening on the site during that
time. Using Figures from the report, he showed how Mr. Lilly was able to assess what might be an aircraft
event versus some unknown event.
In summary the noise levels that Mr. Lilly measured and reported in his report are suitable for residential use.
There are within the HUD guidelines, maximum noise levels are primarily due to aircraft flyovers and they are
consistent with other residential areas in the vicinity.
Rose Woodall, 248 Union Ave NE, Renton, WA 98059 stated that her property abuts this proposed plat at the
northwest comer out to Union Avenue. She has lived there 33 years and lots of changes have taken place. Her
concern is that her back lot is like a park, if there is a split rail fence, it seems that children could just climb over.
The City of Renton is going to build a park on the west side of Union A venue directly across from her property,
it seems that the children could cut across from this development, through her property and to the park. She
would like to have a fence that kids are not going to be able to crawl over. She is concerned about her liability if
the children jumped in the creek and wade across.
The Examiner explained that the City does not usually require fencing between similar types of uses, in other
words single family and single family. Perhaps you and the applicant can work something out, although a fence
of some type is required to protect the stream buffer.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 6
Cliff Williams, 5326 SW Manning, Seattle, WA 98116 stated he was here representing the property owner of
the development bordering to the northeast, known as Ridgeview Court. They are in support of this
development. It represents a well planned and logical development and transition from the R-8 developments to
the R-l 0 and then up into Ridgeview Court which has been zoned R-20. They have worked together in
coordinating the site developments, the key things addressed are the road profile for Bremerton Avenue, the
sewer service for Ridgeview Court, and also the grading between the property lines on the north side. They
would like to complement the developer on the initiative to undertake this noise study. They find the study
results very encouraging for all parties concerned.
Thomas Foster, Langley Fourth Avenue Associates LLC, 5460 Southcenter Boulevard, Suite 106, Seattle, WA
98188 stated that they own the property to the northwest and adjacent to the Post Office. He submitted a letter
to the City staff yesterday on Iy to encourage the staff to look at the overall development of the area when you
have Ridgeview Court to the east and Elmhurst to the south. They have a small piece of property to the south of
the Post Office that potentially could be landlocked based on the new zoning ofCA that happened in November.
The southwest corner of the property is the end of the wetlands on the property and also the site of their storm
detention pond. Some of the area has been cleared and they are currently under construction development
permit with the City of Renton to complete the requirements for a Short Plat. He was encouraging the statfto
look at the overall development potential of the site and area for pedestrian friendly access and also to provide
for secondary fire access to not only their property but to the other properties as well. If Bremerton was ever to
become blocked a secondary access from their property onto either one of these sites could add additional fire
control possibilities and also would enhance pedestrian access to NE 4th and would help the development of
their property as well.
Terrance Flaig, President of Fernwood North Homeowner's Association, PO Box 3106, Renton, WA 98056
stated that he had a question regarding the grading of the site. Specifically the homeowners that abut the
southern end of Elmhurst are concerned about grading that has been done to this site prior to the beginning of
Elmhurst. When he and his wife moved here, this was zoned residential but there was a business operated here,
McCann Trucking owned this land they were a trucking and excavating business. When the property was sold
to Tydico and as soon as that happened they began to bring in large truckloads of earth and fill without applying
for or receiving any permits. They raised the level of this land considerably, particularly in the area that abuts
Fernwood North to the south of their land. Since this was not done with permits from the City of Renton, they
wonder ifthis is going to be allowed to exist the way it is or if some effort is going to be made to return this
level of the land to what it was before the illegal grading was done. They are concerned because it is quite a bit
higher now than the lots in Fernwood North. The homes that will be built will be towering above them and
provide an unsightly view to the north.
The Examiner stated that they were talking about Lots 32, 33, 34, and 35 in Fernwood North and suggested that
perhaps staff may have some comments about this issue.
Kayren Kittrick, Development Services stated that Elmhurst can be held to dedicate the rights-of-way off
Bremerton when they don't own the property. A secondary access is required by Fire for this site. The
preference is to the north, the owners of the property to the north have been in serious talks and trying to make
sure that their designs met code. It has always been the intent that Ridgeview would go first, or a little ahead, or
at the same time as Elmhurst. When Ridgeview was denied, it was necessary to make sure that that was
secured, that is the secondary access, it is the way that they designed for their secondary access. Whether an
easement would be sufficient if the timing did not work out, the answer is no, the dedication must be for sure, it
is necessary to know that it is going to go through.
Split rail fences are basically to allow for the movement of small animals that would go through that area.
Planning would most likely have some concerns about blocking off that location entirely, but there could be
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 7
some discussions on something that might have small openings. Not quite sure how to solve that particular
problem.
Regarding Mr. Foster and his wish to have secondary access to the north is an issue that they agree on, but there
is nothing that is in the code that would allow for this. The Transportation Division would be very interested in
something through the Ridgeview Court, some type of connection through there. However, in that instance, the
Post Office declined to participate. Ultimately this comes down to some type of agreement between private
property owners in this case. Mr. Foster does have access up to NE 4th, primary access, but he doe:.; need a
secondary access, just not sure what is going to be developed on his property.
The site has been used out of standards both under King County and City of Renton when they took it over.
There is no plan to do any grading or changing of the site height. All grading will be within the site, cut and fill,
nothing new being brought in and nothing being taken out.
Mr. Halinen stated that regarding Mr. Foster's comments and concerns about wanting a secondary access, Mr.
Foster pointed out that the company he represents is a recent purchaser ofthe property that wraps behind the
Post Office. The property was purchased September 2004. In 1999 a Lot Line Adjustment was done and
included the Post Office property and the Langley Property (Mr. Foster). Regarding the secondary access, this
is a problem of self-creation. An Access Easement Agreement was recorded March 9, 2004 proving that the
Post Office did get title. The Lot Line Adjustment was set up to dead end at the back end of the property, they
didn't need to do that, they could have had a loop easement along the east side of the postal property to provide
for secondary access for emergency vehicles. It was set up deliberately, sold the property in its current
condition to someone who would like to have one of the abutters bear the burden of a secondary access. This
should have been considered and dealt with prior to selling off the properties. Elmhurst should not have to bear
the burden of these issues, they should not have to give access through Elmhurst.
Lou Larsen, Pacific Engineering and Design LLC, 4118 Lind Avenue, Renton, WA 98055 stated that there are
four existing lots in Fernwood North, Lots 32, 33, 34 and 35 that abut against the area in question. The pad
elevations are set such that they can get access from Bremerton A venue, they are set to provide sewer
connections to these lots, and to provide access for lot drainage into the detention pond. All this grading occurs
on-site, within the Elmhurst property lines, they do not even come close to the south property line. If the lots
were lowered, they would not drain into the detention pond. Lot 27 will be a little bit higher than what it is
today, Lots 26, 25,24, and 23 are being raised anywhere from three to five feet, depending on where you
measure it. Those elevations are 25 feet into the property where this will occur. Some ofthat could be buffered
out a little, but not very much.
The Examiner stated that it doesn't sound like the City will address what may have happened prior to
annexation.
Ms. Kittrick stated the City will not explore the site levels, it was like that when it came in for site approvals.
They will not require the owner to return to what the property was like years ago.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 11 :24 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 8
FINDINGS:
1. The applicant, Liberty Ridge, LLC, represented by David L. Halinen, filed a request for a 64-lot
Preliminary Plat.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit #1.
3. The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non Significance -Mitigated (DNS-M).
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 20 1,251 and 257 Bremerton Avenue NE. The subject site is located on the
west side of Bremerton approximately 600 feet south ofNE 4th Street.
6. The map element ofthe Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of single-family homes, but does not mandate such development without
consideration of other policies of the Plan.
7. The subject site is currently zoned R-I 0 (Residential Options including detached Single Family uses).
8. The subject site was annexed to the City with the adoption of Ordinance 5092 enacted in ~eptember
2004.
9. The subject site is approximately 9.6 acres or 418,176 square feet. The parcel is rectangular and is
approximately 650 feet long along Bremerton (north to south) by approximately 640 feet deep.
10. The site has been used for construction offices and staging and older homes and outbuildings generally
served office purposes.
II. The subject site slopes generally downward 3 to 5 percent from the north-northwest to the south-
southwest where Maplewood Creek crosses the subject site. The site also has bands of steeper terrain
that vary between 20 to 40 percent. Fill was placed on the subject site in the past and this material
appears to have been placed without benefit of a permit. Neighbors report that it raised the elevation of
the property adjacent to the creek 8 to 10 feet.
12. A Category 3 wetland is located in the northwest corner of the subject site and it is unregulated.
Another wetland located offsite is also unregulated. As noted, Maplewood Creek crosses the southwest
portion of the site.
13. The subject site is mainly cleared of vegetation but small stands or rows of trees are located near the
south and west property lines, near the existing older structures in the northeast corner of the site and
near the creek. Most of the trees with the exception of those in the protected creek corridor would be
removed to allow development at the R-l 0 density permitted by the zoning.
14. The subject site is governed by a separate development agreement. There are site-specific restrictions
that include that all residential buildings be single family, lots abutting the south boundary of the site
(abutting R-8 homes) be not less than 50 feet wide and that the density not exceed 10 units per acre.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 9
15. The applicant proposes dividing the subject site into 64 lots. The lots would be arranged around the
perimeter of the site and in two interior blocks. Lot sizes will vary from 3,801 square feet to 5,979
square feet. The R-l 0 zone requires lots to be not less than 3,000 square feet, lot width to be 30 feet for
interior lots and 40 feet for corner lots and lot depth to be 55 feet. Staff reported that lots would vary
between 40 feet to 54 feet wide and from 95 feet to 1 12 feet deep. The lots along the south property
line will comply with the 50-foot width required by the Development Agreement.
16. Two east to west roads will provide access to the interior of the subject site from Bremerton. These two
roads wi II be connected to each other in a loop by a north to south road running through the western
third ofthe site. A second north to south road will run between the east to west roads in the middle of
the site creating the blockwise lot arrangement. Bremerton has an inconsistent alignment and width
along the frontage of the subject site. The applicant is seeking a vacation and will rededicate property to
create a more consistent alignment.
17. Bremerton does narrow north of the site adjacent to where the Ridgeview Plat was proposed. The City
Council will be determining the status of that plat during an appeal procedure. Staff has noted that
Bremerton does need to serve this proposed plat.
18. The density for the plat would be 8.25 dwelling units per acre after subtracting sensitive areas (creek
corridor) and roadways.
19. The subject site is located within the Renton School District. The project is expected to generate
approximately 28 school age children. These students would be spread across the grades and would be
assigned on a space available basis.
20. The development will increase traffic approximately 10 trips per unit or approximately 640 trips for the
64 single-family homes. Approximately ten percent ofthe trips, or approximately 64 additional peak
hour trips, will be generated in the morning and evening.
21. The appl icant has submitted a Noise Analysis Report for the project to determine if noise from the
nearby but non-adjacent Post Office would be a factor for residential development of the subject site.
The report was done since the Hearing Examiner recommended that the proposed Ridgeview Plat
immediately north ofthe subject site but also directly abutting the Post Office be rejected due to
incompatible noise generated. by the adjacent Post Office.
22. The summary of the report contains the following language:
"The ambient noise measurements conducted at the Elmhurst site's north edge
demonstrate that the site is suitable for residential development...
While there are routine loading and unloading activities and other activities at
the post office that generate occasional environmental noise, this study has
clearly shown that the intensity and duration of the noise generated by the post
office is insufficient to significantly impact residential use of the Elmhurst site.
(Footnote 2) ...
Footnote 2: Anticipated future development ofthe Ridgeview Court site and the
vacant parcel immediately to the north of the west half of the Elmhurst site will
significantly screen the Elmhurst site from post office-generated noise, further
reducing its intensity on the Elmhurst site."
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 10
23. Storm water will be collected in a pond in Tract, A which will serve as both a detention and water
quality facility. The pond, which is located in the southwest corner of the site, will be adjacent to
Maplewood Creek. Energy would be dissipated using a "bubble-up" system with the overflow running
to the creek. It wou Id meet the 1998 King County standards, Level 2 flow control.
24. Staff has recommended that the pond be screened and landscaped. The screen is to form a visual barrier
but one that does not interfere with traffic. Staff recommended the materials to use and to avoid chain
link fencing.
25. The subject site will be served by City water and sewer services. Utility line extensions to serve the site
will be required and governed by code.
26. Staff has approved a street modification allowing narrower roadways. Since this narrows what would
be parking strips or landscape areas, staff has recommended the addition oftrees
27. The owner ofthe adjacent property north of the subject site was concerned about access to a portion of
his propelty behind the post office. That property fronts along NE 4th Street and access is possible from
there. It was noted that the current owner's predecessor in interest created the odd-shaped parcel by
segregating off the post office site leaving the remainder.
CONCLUSIONS:
1. The proposed plat appears to serve the public use and interest. Due to a recommendation by this office
that another residential development (Ridgeview Court) adjacent to the post office was inappropriate,
the applicant was concerned that post office noise might create issues for developing the subject site.
Those noises might be an issue but it appears that the distance between the subject site and the post
office site should help attenuate the noise. The subject site can be distinguished from the Ridgeview
court parcel by a number of factors. The subject site is zoned for residential purposes and is shielded by
the adjacent Ridgeview Court property, which as a transitional property can be used for commercial
purposes. In addition, open space that now lies between the subject site and post office could be
developed with uses that further attenuate the noise. That is new structures could occupy the
intervening open space and block post office noises. The greater distance and the potential for
intervening buildings were not factors that could help the other property. The noise studies that were
conducted were specifically conducted for the subject site and cannot be relied on for determining
impacts on other properties and other properties cannot count on the development of intervening
buildings that could eventually buffer this site from the post office.
2. The proposed plat appears to create reasonably rectangular lots. A fairly regular grid roadway and
block system rather than a deadend cul-de-sac will also serve the 64-lot plat. The smaller lots of the R-
J 0 zone will still provide detached single-family housing choices to those who want less yard
maintenance and smaller homes.
3. The plat will offset its impacts on fire, parks and transportation services by paying mitigation fees. It
will also contribute to the tax base ofthe City when developed with homes. The additional population
and traffic will be felt in this currently sparsely developed area but those impacts were anticipated when
the Zoning was adopted for the area.
4. The applicant will be planting trees on the lots while also preserving the stream course and the current
vegetation in buffers surrounding the creek. It appears that filling that occurred on the subject site can
"
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 11
remain and might have be permitted to allow appropriate sewer service. The applicant wili have to
demonstrate that the materials are suitable for foundation support.
5. The applicant will have to satisfy the City'S needs for access to and along Bremerton to NE 4th Street.
6. In conclusion, the proposed plat should be approved by the City Council.
RECOMMENDATION:
The City Council should approve the 64-lot Preliminary Plat subject to the following conditions:
1. The applicant shall comply with the conditions imposed by the ERe.
2. The applicant shall have to demonstrate that the on-site fill materials are suitable for foundation support.
3. The applicant shall obtain a demolition permit and complete all inspections and approvals for all
buildings located on the property prior to the recording of the final plat. The satisfaction of this
requirement is subject to the review and approval of the Development Services Project Manager.
4. All lots within the plat shall be required to have a minimum of one new approved tree, with a minimum
caliper of 1-1/2 inches (deciduous) or 6-8 feet in height (conifer), and shrubs (or equivalent) planted
within the front yard. The applicant shall be required to set forth a restriction on the final plat stating
this requirement. Each application for a single family building permit shall include a plan noting the
location and type of plant materials within the front yard. All front yard landscaping shall be planted
prior to final building permit inspection. The satisfaction ofthis condition is subject to the review and
approval of the Development Services Division Project Manager.
5. The right-of-way for Bremerton Ave. NE along Parcel #518210-0042 (327 Bremerton Ave. NE) shall be
dedicated prior to the recording of the Elmhurst Final Plat. The satisfaction of this requirement is
subject to the review and approval of the Development Services Project Manager prior to recording of
the final plat.
6. A homeowner's association or maintenance agreement shall be created concurrently with the recording
of the final plat in order to establish maintenance responsibilities for all shared improvements. A draft
of the documents(s), if necessary, shall be submitted to the City of Renton Development Services
Division for review and approval by the City Attorney and Property Services section prior to recording
of the final plat.
7. Tract A shall be fenced, landscaped, and irrigated (unless drought tolerant plants are used). The
property lines of Tract A fronting Road A, Lot 22 and 23 shall include a landscaped visual barrier so as
to not interfere with sight distance triangles including plant materials which would provide a year-round
dense screen within three (3) years from the time of planting. Also, the property lines along 1. ots 22 and
23 shall be fenced with a six-foot high solid wood fence, or other approved material (no chain link).
Tract A fronting Road A shall be fenced with either a wrought iron, or chain link with vinyl covering, or
other decorative wood fence. The applicant shall submit a landscape plan and fence design identifying
construction and plant materials for the review and approval of the Development Services Project
Manager prior to installation. Fences and landscaping shall be installed prior to recording of the final
plat.
Elmhurst Preliminary Plat
File No.: LUA-04-162, PP, ECF
March 29, 2005
Page 12
ORDERED THIS 29th day of March 2005.
HEARING EXAMINER
TRANSMITTED THIS 29th day of March 2005 to the parties of record:
Susan Fiala
1055 S Grady Way
Renton, W A 98055
Liberty Ridge LLC
Attn: Mike Merlino
9125 loth Ave S
Seattle, W A 98108
Lou Larsen
Pacific Engineering and Design LLC
4118 Lind Avenue
Renton, W A 98055
Terrance Flaig
President of Fernwood North HOA
PO Box 3106
Renton, W A 98056
Kayren Kittrick
1055 S Grady Way
Renton, WA 98055
Katie Walter
Shannon and Wilson
400 N 34th Street, Suite 100
Seattle, W A 98103
C. Thomas Foster
Langley Fourth Ave Associates LLC
5460 Southcenter Blvd, Suite 106
Seattle,WA 98188
Cliff Williams
5326 SW Manning
Seattle, W A 98116
TRANSMITTED THIS 29th day of March 2005 to the following:
Mayor Kathy Keolker-Wheeler Stan Engler, Fire
Rose Woodall
248 Union Ave NE
Renton, W A 98059
David L. Halinen
Halinen Law Offices, P.S.
10500 NE 8th St., Ste. 1900
Bellevue, W A 98004
Michael Yantis
Yantis Acoustical Design
720 Olive Way, Suite 1400
Seattle, W A 9810 1
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Larry Warren, City Attorney
Larry Meckling, Building Official
Planning Commission
Transportation Division
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
King County Journal
Pursuant to Title IV, Chapter 8, Section 100Gofthe City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., April 12,2005. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
Elmhurst Preliminary Plat
FileNo.: LUA-04-162, PP, ECF
March 29, 2005
Page 13
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting other specified requirements.
Copies ofthis ordinance are available for inspection or purchase in the Finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m., April 12, 2005.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Council or final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This means that parties to a land use decision may not communicate in
private with any decision-maker concerning the proposal. Decision-makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
...
u.i
lO
(j
~
nl ~ ~! 3
l' ~~ il §~ Ii ~H
-,
!
I
\ __ .. , , ••. .--\ .. __ "/ I
\
~
SEC. 15, TWP. 23 N., RNa. 5 E., WM.
VUe
-LA~RE~H~~P::k~ 1 : -(.U~DE!:._~c:.~~~C!~N] il' I
2 :11 9 : I I
I 'I ,~, .... --···l:"" -----"ti'+l
J II 8 I
--"'--"" -~------+\
I _ .. __ J[". __ _
5
--.... ~-..
\. . \ \ F"(RNWOOD\~~~~, '-~
'1'1'1
~
..~ 1" ~ .... --~ CIIW'HO ...... 1ICtALII. r • 6C'
\oB'I7lCAL. OA TW
_ •• _ ~ •. ~ NA\O., ~~. r
BEHCHI.4R(
~ct:JJH""l'OIHr/""" f'CiJN(J ~ IN J" MHO C()I.JNTf Si.W'Aa: fIItUS or.sc loT 1H( J'7JIIiUT IN7l1tIRTlOH " He f1H I''''UT NIl) ,,,,lW A\II: $C IUIfIQHfJ rHC HQlrYHlIaT CQ/WIIGt or XC1IOH ,... ~ J.ltrrc., 1WIfiIC.sc:.. W • .II.
Q.lVA'DCH_ ...... " lilt
~comw ",...-c , .. ,' .IOII1H1CIf t1' nc ar ca..LIIMI or '-'1[.
1lIv.4'JK»r.1., 4C7." n:rr.
...... OI"~
MUr UOIIlW. aA.D UII'QIrI GI,.OIAL ~ltONWf ,.,.-rtw (~) '""""""' RI) ~ I1.A7I' NOIfJH lONe COQItCWrIAJU A OCW~ NIOU tI'..,.~ 0CUrIJDfQ.000UI' *'" ~.f,.~~~INJ:1TH~u:::g .. ~~mc.
tlUttlHf lt4' NOI'lWC4IT 0CW4f1f fJ' II'CftcW II. ~ JJ /IoICIft'lH, fWKIC' wr " ". ~ ~ 7Ht NQUH AMCllJCNI Donu" " ,...".,,,, (NNI fJIIf) MIG OOCIMIN.UD ICIW routCI ?'O ~'~ ~~~;A::o.~=:"'~~~O"~7H ~~,: ~.::...,."=t:.. '" lNC CWO
,
~i ~~ ~ , ~ Uh~iU
01) V
O,§ ~ '-= 0 " ..... 0 i:l o d 01) cd'""",.,...j •. , ~ 01) <Il i:l 0 u.lO
~
ilill
~I
fj 1 ... !1 u
i
~ ~
~ d i·~u ~jE
F'JtOJ[CT ~O.t 0lOI4
DU ..... ''1'1 .JQC
lau(tI .. Tt:~
SHtIT "tV,1
'"""'" QULI..O/HQ ~ ~CIoJTTt4Q
OlO'.",D'-"~
P03 _'OI"l
CA R-IO r--..---.,,;;:..:-J.l--__ -.1
R-8
...c:I ~ ~ ~ c:::> ~ ~ .f
..--i ~ .~
~ e ~ z
.~ fo4
'0 tJ:I -.t::t V') ~ .. ~
RMH
SE 142nd St.
RC(P)
(P)
G6 ~ 22 T23N R5E W 112 F6 ZONING
15 T23N R5E W 1/2 . 5315
,.
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201, 251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.S-acre site. Two tracts for open space and
stonn drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES:
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
1. A Geotechnical Engineer shall detennine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building pennits, additional geotechnical studies addressing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth ConSUltants, Inc.,
dated August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume" of the 2001 Stonnwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
profeSSional and properly documented and reported to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water DeSign Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat. oX, g
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (i.e.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
. .
"
March 11, 2005
RE: Amended Preliminary Report to the Hearing Examiner
Elmhurst Preliminary Plat, LUA 04-162, PP, ECF
ERRATA
The Preliminary Report to the Hearing Examiner for the subject plat has been revised.
The property is to abide by a Development Agreement, which became effective on
August 24, 2004, which states that the site is subject to the development regulations in
effect at the time the agreement was approved.
This staff report replaces the original report. The sections revised include: Compliance
with the Comprehensive Plan Designation (originally on pages 5 and 6) and the
Landscaping discussion (originally on page 9). In "H. Recommendation", (originally
page 12), Condition # 2 has been revised accordingly.
PUBLIC
HEARING
City of Renton
Department of Planning / Building / Public Works
REVISED PRELIMINARY REPORT TO THE HEARING
EXAMINER
A. SUMMARY AND PURPOSE OF REQUEST:
Public Hearing Date:
Project Name:
Owner/Applicant:
Contact:
File Number:
Project Description:
Project Location:
March 15, 2005
Elmhurst Preliminary Plat
Liberty Ridge LLC (attn. Mike Merlino), 9125 10th Ave. S., Seattle, WA 98108
David L. Halinen, Halinen Law Offices, P.S., 10500 NE 8th St., Ste. 1900, Bellevue,
WA 98004
LUA-04-162, ECF, PP Project Manager: Susan Fiala, AICP
The applicant is requesting Preliminary Plat approval for a 64-lot subdivision of a
multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are
included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for
detached units. All existing buildings would be demolished. Access is proposed via
Bremerton Ave. NE to new internal public streets and private access easements.
One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses
the southwestern portion of the plat.
201, 251, & 257 Bremerton Avenue NE
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
PUBLIC HEARING DATE: MARCH 15, 2005 Page 2 of 12
B. HEARING EXHIBITS:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
Exhibit 6:
Exhibit 7:
Exhibit 8:
Project file ("yellow file") containing the application, reports, staff comments, and other
material pertinent to the review of the project.
Neighborhood Detail Map (dated 12/28/2004)
Sheet P01-Preliminary Plat Plan (dated 12/28/2004)
Sheet P03 -Tree Cutting and Land Clearing Plan (dated 12/28/2004)
Sheet P07 -Grading and Drainage Plan (dated 12/28/2004)
Sheet P08 -Existing Conditions (dated 12/28/2004)
Zoning Map -Sheet F 6 West (dated 12/28/2004)
ERC Mitigation Measures (dated 02/14/2005)
C. GENERAL INFORM A TION:
1.
2.
3.
4.
Owner of Record:
Zoning Designation:
Comprehensive Plan
Land Use Designation:
Existing Site Use:
Liberty Ridge LLC (attn. Mike Merlino), 9125 10th Ave. S., Seattle,
WA 98108
Residential-10 (R-10) Dwelling Units per Acre
Residential Options (RO) per the Development Agreement.
Currently designated Residential Medium Density (RMD) as of
November 10, 2004.
Former construction site with several residential buildings and
associated outbuildings.
5. Neighborhood Characteristics:
6.
7.
8.
Access:
Site Area:
North: Vacant-Proposed Ridgeview Court Plat: CA zoning
East: Single family residential; R-8 zoning
South: Single family residential; R-8
West: Single family residential; R-10 zoning
Bremerton Ave. NE
9.6 acres (418,176 square feet -gross area)
Project Data: Area Comments
Existing Building Area:
New Building Area:
Total Building Area:
N/A
N/A
N/A
All structures to be removed/demolished
N/A
N/A
D. HISTORICAUBACKGROUND:
Action
Annexation
Comprehensive Plan
Zoning
Development Agreement
Street Vacation (Pending)
Land Use File No.
A-02-003
N/A
N/A
N/A
VAC-04-007
Ordinance No.
5092
5093 (R-8) and 5094 (R-10)
5093 (R-8) and 5094 (R-10)
Recording #20040908000083
N/A
Date
09/22/2004
09/22/2004 and
09/23/2004
09/22/2004 and
09/23/2004
08/24/2004
Pending
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
PUBLIC HEARING DATE: MARCH 15,2005
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
Section 4-2-020: Purpose and Intent of Zoning Districts
Section 4-2-070: Zoning Use Table
Section 4-2-110: Residential Development Standards
2. Chapter 3 Environmental Regulations and Overlay Districts
Section 4-3-050: Critical Areas Regulations
3. Chapter 4 Property Development Standards
Section 4-4-030: Development Guidelines and Regulations
Section 4-4-060: Grading, Excavation and Mining Regulations
Section 4-4-070: Landscaping Regulations
Section 4-4-080: Parking, Loading and Driveway Regulations
Section 4-4-130: Tree Cutting and Land Clearing Regulations
4. Chapter 6 Streets and Utility Standards
Section 4-6-060: Street Standards
5. Chapter 7 Subdivision Regulations
Page 3 of 12
Section 4-7-050: General Outline of Subdivision, Short Plat and Lot Line Adjustment Procedures
Section 4-7-080: Detailed Procedures for Subdivision
Section 4-7-120: Compatibility with Existing Land Use and Plan-General Requirements and
Minimum Standards
Section 4-7-150: Streets -General Requirements and Minimum Standards
Section 4-7-160: Residential Blocks -General Requirements and Minimum Standards
Section 4-7-170: Residential Lots -General Requirements and Minimum Standards
6. Chapter 9 Procedures and Review Criteria
7. Chapter 11 Definitions
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element: Residential Options (currently Residential Medium Density) objectives and
policies; Residential Streets objectives and policies; Subdivision of Land objectives and policies.
2. Environmental Element
G. DEPARTMENT ANAL YSIS:
1. PROJECT DESCRIPTION/BACKGROUND
The applicant is proposing to subdivide a 9.6 acre site into 64 lots and two tracts. The preliminary
plat contains three (3) parcels. The 64 lots are intended for the eventual development of detached
single-family homes. The lots range in size from 3,801 square feet to 5,870 square feet.
The site is subject to a Development Agreement that sets forth several site-specific restrictions
including: 1) All residential buildings must be single-family; 2) all lots abutting the south boundary
line must be 50 feet in width; and 3) the net density can not exceed 10 dulac.
Historically the site was a base for a site work construction company followed by a public works
construction company. The existing buildings, all to be removed/demolished, include a house
used as a dispatch office, a small house and garage, and a mobile home. The site also contains
gravel parking and storage areas with remaining stockpiles of fill material, almost 10 feet in
height.
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 4 of 12
Access is proposed via Bremerton Ave. NE to new internal public streets within the plat, Roads A
and B. Street dedications are required. Street improvements including curb, gutter, sidewalk,
lighting and rights-of-way dedication are required.
The applicant has made a separate request for a street vacation of portions of Bremerton Ave.
NE right-of-way currently under process in Property Services. The areas proposed to be vacated
would then provide for an aligned right-of-way and the vacated land would be integrated into
several lots located along Bremerton Ave. NE. The applicant has also requested modifications to
street standards which have been reviewed administratively and approved with conditions.
One non-regulated Category 3 wetland is proposed to be filled. An off-site wetland was
determined to be unregulated. Maplewood Creek crosses the southwestern portion of the plat.
The applicant submitted several studies including: a geotechnical report, a wetland and stream
reconnaissance, a traffic impact analysis, an environmental assessment letter, and a preliminary
storm drainage report. Site preparation for development of the plat would include the removal of
vegetation and trees for roadways, utilities and building pads except within the Native Growth
Protection Area (Tract B)
The site is zoned Residential -10 (R-10) dwelling units per acre. The R-10 zone allows
residential densities that range from a minimum of 4.0 dulac to a maximum of 10.0 dulac. The
proposed plat would arrive at a net density of 8.3 dulac after the deduction of public right-of-way,
private access easements and critical areas (creek) from the gross acreage. The Comprehensive
Plan designates the site as Residential Options (RO).
2. ENVIRONMENTAL REVIEW
Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21 C, 1971 as
amended), on February 14, 2005, the Environmental Review Committee issued a Determination
of Non-Significance -Mitigated (DNS-M) for the Elmhurst Preliminary Plat. The DNS-M included
fourteen (14) mitigation measures. A 14-day appeal period commenced on February 14, 2005
and ended on February 28, 2005. No appeals were filed.
3. COMPLIANCE WITH ERC MITIGATION MEASURES
Based on an analysis of the probable impacts from the proposal, the Environmental Review
Committee (ERC) issued the following mitigation measures with the Determination of Non-
Significance -Mitigated (DNS-M):
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its
use on-site. The satisfaction of this requirement shall be reviewed and approved by
Development Services during construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of
site soils for use as structural fill shall be prepared and submitted. The satisfaction of this
requirement shall be reviewed and approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth
Consultants, Inc., dated August 30, 2004, regarding "Site Preparation and General
Earthwork" and "Utility Support and Backfill." The satisfaction of this requirement shall be
reviewed and approved by Development Services during construction, utility work and
building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's
(DOE) Erosion and Sediment Control Requirements, outlined in Volume 11 of the 2001
Storm water Management Manual.
5. All contractors are to be made aware of the potential presence of environmental
contaminants and instructed to notify the property owner immediately if discolored,
odiferous, or otherwise suspect soil is encountered during excavation activities.
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
Preliminary Report to the Hearing Examiner
LUA·04·162, ECF, PP
Page 5 of 12
6. If suspect soil is encountered during excavation activities, work in these areas is to be
stopped until such time as a qualified environmental professional can assess the observed
conditions and recommend corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at
concentrations exceeding applicable MTCA cleanup levels, then (a) those soils are to be
handled and managed in accordance with MTCA and; (b) the work will be managed and
overseen by a qualified environmental professional and properly documented and reported
to the Department of Ecology (DOE) in accordance with MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet
both detention (Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per
new single·family lot. Credit to be given for the existing three residences. The fee shall be
paid prior to the recording of the final plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new
average daily trip associated with the project. Credit to be given for the existing three
residences. The fee shall be paid prior to the recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new
single-family lot. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall
be planted on 15-foot centers within the 25-foot wide buffer along the east side of the
stream. Two-gallon size tree stock shall be used. Planting should occur in the Fall to allow
plants to develop roots over the Winter. The satisfaction of this requirement shall be subject
to the review and approval of the Development Services Division.
13. During site preparation and construction of improvements and residences, the applicant shall
install silt fencing with brightly colored construction flags to indicate the boundaries of the
stream/creek buffer. The satisfaction of this requirement shall be subject to the review and
approval of the Development Services Division and be completed prior to the issuance of
construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install
permanent fencing (i.e. split-rail fence or other approved barrier) and signage along the
entire edge of the stream/creek buffer. The satisfaction of this requirement shall be subject
to the review and approval of the Development Services Division prior to the recording of the
final plat.
4. STAFF REVIEW COMMENTS
Representatives from various city departments have reviewed the application materials to identify
and address site plan issues from the proposed development. These comments are contained in
the official file, and the essence of the comments has been incorporated into the appropriate
sections of this report and the Departmental Recommendation at the end of the report.
5. CONSISTENCY WITH PRELIMINARY PLAT CRITERIA:
Approval of a plat is based upon several factors. The following preliminary plat criteria have been
established to assist decision makers in the review of the subdivision:
(a) Compliance with the Comprehensive Plan Designation. The subject site is currently
designated Residential Medium Density (RMD) on the Comprehensive Plan Land Use Map.
However, the Development Agreement assigned Residential Options as the Land Use
designation which is discussed below as this was in effect at the time of the Development
Agreement.
City of Renton PIBJPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 6 of 12
The purpose of the Residential Options designation is to create new, lower-density
neighborhoods in a traditional development style while at the same time support infill
development. The proposal is consistent with the RO designation in that it would provide for the
future construction of single family homes. The proposed plat is consistent with the following
Comprehensive Plan objectives and policies for Residential Options and the Environmental
Elements:
Land Use Element
Policy LU-41. Provision of small lot single family detached unit types, townhouses, and multi
family structures compatible with a single family character should be encouraged provided that
density standards can be met. All 64 lots would be for the future construction of detached single
family units with a proposed density of 8.3 dulac which is within the R-10 range.
Policy LU-42. A range and variety of lot sizes should be encouraged. The lot sizes range from
3,801 sq. ft. to 5,870 sq. ft.
Policy LU-4S. Development should occur on a flexible grid street and pathway system to the
extend feasible given the environmental constraints, traffic flow, and the pattern of existing
development. The plat is organized with two larger blocks and lots at the perimeter forming a grid-
like street system due to the presence of the creek bordering the west side and existing
development to the south.
Policy LU-4B. Buildings should front the street rather than be organized around interior
courtyards or parking areas. All lots would have the front yard facing either a private access
easement or public streets.
Policy LU-S1. The net development densities should be 10 dwelling units per acre. If 100% of the
dwelling units are detached, a density bonus may be allowed to a maximum of 13 dwelling units
per acre. The proposed density of the detached Single family home plat would be 8.3 dulac. The
Development Agreement stipulates that the density can not exceed 10.0 dulac.
Policy LU-S3. Detached single family housing ... should be allowed in Residential Options. The
proposal is for the eventual construction of 64 detached single family residences. The
Development Agreement stipulates that all residential buildings must be single family.
Objective LU-N: Promote development of attractive, walkable communities by ensuring that
streets are safe, convenient, and pleasant for pedestrians and will visually enhance
neighborhoods. The proposed plat would include full street frontage improvements including
public sidewalks that connect to the existing neighborhood. To enhance the neighborhood, (see
discussion under Landscaping),
Policy LU-7B. Street trees should be planted along residential streets. The public roads would be
at a reduced right-of-way from standard 50 feet to 42 feet for the internal residential roads and
Bremerton Ave. NE. This reduction reducesleliminates the planting strip along the frontages;
thus, additional landscaping on each lot is recommended as a plat condition (see discussion
under Landscaping).
Environmental Element
Objective EN-C: Protect and enhance the City's rivers, major and minor creeks and intermittent
stream courses. The Environmental Review Committee imposed a mitigation measure on the
project requiring enhancement of the 25 feet stream buffer with additional landscaping.
(b) Compliance with the Underlying Zoning Designation. The 9.6 -acre site (gross area)
consists of three parcels is designated Residential -10 Dwelling Units per Acre (R-10) on the
City of Renton Zoning Map. The proposed development allows for the future construction of up to
64 dwelling units along with associated plat improvements.
Density -The allowed density range in the R-10 zone is a minimum of 4.0 to a maximum of 10.0
dwelling units per acre (dulac). The method of calculating net density is as follows: A calculation
City of Renton PIBJPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 70f12
of the number of housing units andlor lots that would be allowed on a property after critical areas
and public rights-of-way and legally recorded private access easements are subtracted from the
gross area (gross acres minus streets and critical areas multiplied by allowable housing units per
acre). Required critical area buffers and public and private alleys are not subtracted from gross
acres for the purpose of net density calculations.
After the deduction of the public rights-of-way, critical areas (creek) and private access easement,
the proposal would arrive at a net density of 8.3 dwelling units per acre (418,176 sq. ft. -79,992
sq. ft. = 338,184 net sq. ft.l7.76 net acres) thus (64 units/7.76 acres = 8.25 dulac).
There is no unit mix proposed for the subject plat as stipulated in the Development Agreement
which states that only single family detached units may be constructed. The proposed plat
complies with density and unit mix requirements for R-10 zoning designation and the
Development Agreement.
Dwelling Unit Mix -When proposing full subdivisions, the R-10 zone requires the provision of a
minimum of 50% to a maximum of 100% of detached or semi-attached dwelling units. However,
as previously stated, the applicant is proposing 100% detached single-family units.
Lot Dimensions -Density requirements take precedence over the minimum lot size standards.
For detached dwelling units the minimum lot size is 3,000 sq. ft. per unit. The minimum lot width
is 30 ft. for interior lots and 40 ft. for corner lots and 55 ft. for the minimum lot depth.
The lot widths would range from 40 ft. to 54 ft. and lot depths ranging from 95 to 112 ft. Lot sizes
would be greater than the minimum of 3,000 square feet; the smallest lot would be 3,801 square
feet and the largest would be 5,979 square feet.
The Development Agreement stipulates that those lots abutting the existing Fernwood North
development must be no less than 50 feet in width. Lots 23 through 29 are equal to or greater
than 50 ft. and thus comply with the Agreement.
All lots comply with the lot dimension requirements. The plat would create 64 lots and two tracts
with the following sizes:
Lot Area (square feet) Proposed Access
1 4,896 Road A
2 3,801 Road A
3 3,801 Road A
4 3,801 Road A
5 3,801 Road A
6 3,801 Road A
7 3,801 Road A
8 3,801 Road A
9 3,801 Road A
10 3,801 Road A
11 3,808 Road A
12 4,685 Road A
13 5,979 Road A
14 5,870 Road A
15 4,926 Road A
16 3,829 Road A
17 3,852 Road A
18 3,819 Road A
19 3,907 Road A
20 3,984 Road A
21 4,863 Road A
22 5,132 Road A
23 4,861 Road A
24 4,750 Road A
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
Lot
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
Tract A-
Detention
Tract B-
NGPE
Area (square feet)
4,750
4,750
4,750
4,750
4,776
4,742
3,844
3,848
3,851
4,835
4,107
3,948
3,824
3,801
3,801
3,801
4,611
4,773
3,921
3,921
3,921
3,921
4,018
4,212
4,907
4,154
3,978
5,261
5,353
4,980
5,040
4,613
4,085
4,181
4,086
4,623
4,183
4,226
4,756
5,522
32,922
32,627
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 8 of 12
Proposed Access
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road B
Road B
Road B
Road B
Road B
Road B
Road B
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road B
Road B
Road B
Road B
N/A
N/A
Setbacks -The R-10 zone requires a minimum front yard setback of 10 feet for the primary
structure and 20 feet for attached garages which access from the front yard street (on streets
created after March 1, 1995), rear yard setbacks of 15 feet, interior side yard setbacks of 5 feet
for detached dwellings, and side yard along street setbacks of 10 feet for the primary structure
and 20 ft. for attached garages which access from the side yard street. The plat plan shows
building envelopes meeting the required setbacks.
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DA TE: MARCH 15, 2005
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 9 of 12
The proposal's compliance with these building standards would be verified prior to the issuance
of individual building permits.
Building Standards -The R-10 zone permits one residential structure per lot. The R-10 zone also
allows attached and semi-attached buildings with one per lot. Each of the proposed lots would
support the construction of one detached unit within the R-10 zone. Accessory structures are
permitted at a maximum number of two per lot at 720 square feet each, or one per lot at 1,000
square feet in size. Accessory structures are permitted only when associated with a primary
structure located on the same parcel.
Several buildings and outbuildings are shown as existing on the site. Staff recommends as a
condition of approval that the applicant obtain a demolition permit and complete all inspections
and approvals for all buildings located on the property prior to the recording of the final plat.
Building height in the R-10 zone is limited to two stories and 30 feet for primary structures and 15
feet for detached accessory structures.
The R-10 zone restricts lot coverage for detached units to 70% and the total impervious area is
limited to 75%.
The proposal's compliance with these building standards would be verified prior to the issuance
of individual building permits.
Landscaping -The R-10 zone requires setback areas to be landscaped, excluding driveways and
walkways except for detached, semi-attached, or two attached residential units. The subject plat
would be all detached single family units, however, in keeping with the objectives and policies of
the Comprehensive Plan Land Use element, Objective LU-N and Policy LU-78 concerning
planting of trees along residential streets, (see previous Comprehensive Plan discussion) and
due to the loss of existing vegetation, staff recommends as a condition of plat approval that
additional landscaping (trees and shrubs) be planted within the front yard area of all lots within
the plat.
All lots within the plat are required to have a minimum of one new approved tree, with a minimum
caliper of 1-1/2 inches (deciduous) or 6 - 8 feet in height (conifer), and shrubs (or equivalent)
planted within the front yard. Also, the applicant will be required to set forth a restriction on the
final plat stating this requirement. Each application for a single family building permit must
include a plan noting the location and type of plant materials within the front yard. All front yard
landscaping shall be planted prior to final building permit inspection. The satisfaction of this
condition is subject to the review and approval of the Development Services Division Project
Manager.
(c) Compliance with Subdivision Regulations.
Lot Arrangement: Side lot lines are to be at right angles to street lines, and each lot must have
access to a public street or road. Access may be by private access easement per the
requirements of the Street Improvement Ordinance.
The side lot lines of the proposed lots are at right angles to street lines. All lots would gain access
to public roadways either directly, or via private driveway access easements. As proposed, lots
comply with arrangement and access requirements of the Subdivision Regulations.
Lots: The size, shape and orientation of lots shall meet the minimum area and width
requirements of the applicable zoning classification and shall be appropriate for the type of
development and use contemplated.
The lots are generally rectangular in shape. Lots 1 through 29 are oriented along the perimeter of
the plat with two interior blocks containing Lots 30 through 64.
Each of the proposed lots satisfies the minimum lot area and dimension requirements of the R-10
zone. The plat plan does include setback lines for each lot showing potential building envelopes
and when considering the required setbacks, as well as access pOints for each lot, the proposed
lots appear to have sufficient building area for the development of detached single family homes.
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 100f12
Property Corners at Intersections: All lot corners at intersections of dedicated public rights-of-
way, except alleys, shall have minimum radius of 15 feet.
The proposed subdivision would create Lots 1, 29, 30, 34, 41, 42, 49, 56 and 60 to be located at
the intersection of public rights-of-way. The proposed radius for these lots would meet code, all
would have a radius equal to or greater than 15 feet.
(d) Reasonableness of Proposed Boundaries
Access and Street Improvements: Access to the site is proposed via Bremerton Ave. NE coming
from the south through the new subdivision Laurelhurst. Access to north on Bremerton Ave. NE
was noted to by the applicant that it would be installed as part of another proposed subdivision,
Ridgeview Court (LUA 04-131). Two means of access are required to the plat. In the event that
the street frontage improvements for Ridgeview Court are not completed prior to final recording
of this plat, code requires that a minimum of 20 feet width of pavement and a pedestrian
walkway will be required along Bremerton Ave. NE from the northern boundary of the project to
the intersection with NE 4th Street.
Furthermore, if the right-of-way required to be dedicated by the Ridgeview Court Plat is not in
place prior to the recording of the Elmhurst Plat, the applicant of this plat would be required to
dedicate the public right-of-way along that parcel, PID # 518210-0042 (327 Bremerton Ave. NE).
To ensure access to the north of the subject plat to NE 4th Street, is in place, staff recommends
this as a condition of plat approval and reviewed and approved by the Development Services
Project Manager.
New internal roads, labeled as Road A and B and one new private access easement would
serve the plat. Dedication of a minimum of 25 feet of right-of-way (from the quarter section
centerline) will be required fronting the site with the extension of Bremerton Ave NE and street
improvements for all public roads including curb, gutter, sidewalk and street lighting are required.
To ensure common improvements are maintained, staff recommends the establishment of a
homeowner's association or maintenance agreement for all common improvements, including but
not limited to: utility and access easements, stormwater facilities and tracts, as a condition of
preliminary plat approval.
Topography: The site slopes from the north-northwest to the south-southwest at 3 to 5 percent.
Some steep slopes, ranging from 20 to 40 percent exist along the site's south and west property
lines but occur in small bands of 2 to 6 feet vertically. A few soil stockpiles are stored on the north
portion of the site created from previous construction contractors yard operations.
The site is mostly cleared with small strips of conifers/deciduous trees near the south and west
property lines. Some trees are also located among the structures located in the northeast portion
of the site. The tree cutting and land clearing plan depicts the location of a row of pines in the
northeast portion of the site (in new Lot 3) and in the east portion of the site (in new lots 39 and
44). The south portion of the site consists of scattered firs, alder, and deciduous trees. The tree
cutting and land clearing plan indicates that all vegetation from the plat would be removed except
trees located within Tract B containing the stream/creek and associated buffer. The cleared land
would accommodate the construction of homes, roads and storm detention as depicted on the
tree inventory plan which also identifies the location of larger trees.
Relationship to Existing Uses: The subject site currently contains several buildings proposed to
be removed and/or demolished. To the east of the site is one large single-family parcel, Fue Vue
parcel, and Phase 1 of the Laurelhurst Plat. To the west are existing single family residences as
well as to the south. To the north of the site are two undeveloped parcels within the City of
Renton, under the Commercial Arterial zone designation, one of which is the proposed Ridgeview
Court Plat. The proposed single family subdivision is compatible with these existing and proposed
residential uses.
City of Renton P/BIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
(e) Availability and Impact on Public Services (Timeliness)
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 11 of 12
Police and Fire: Police and Fire Prevention staff indicate that sufficient resources exist to furnish
services to the proposed development, subject to the condition that the applicant provide Code
required improvements and fees. The Environmental Review Committee imposed a Fire
Mitigation Fee in order to mitigate the project's potential impacts to emergency services.
Recreation: The proposal does not provide on-site recreation areas for future residents of the
proposed plat. There are no existing recreational facilities in the immediate vicinity of the subject
property and it is anticipated that the proposed development would generate additional users of
existing City park and recreational facilities and programs. As required by the Environmental
Review Committee, a Parks Mitigation Fee will be required prior to the recording of the final plat.
Schools: The site is located within the boundaries of the Renton School District No. 403. Based
on the student generation factor, the proposed plat would potentially result in 28 additional
students (0.44 x 64 = 28.16). The schools would include: Highlands Elementary, McKnight Middle
School and Hazen High School. The school district has indicated that they would be able to
handle to additional stUdents coming from the proposed development.
Storm Drainage/Surface Water: The applicant has submitted a Preliminary Technical Information
Storm Drainage Report prepared by Pacific Engineering DeSign, LLC, dated December 22, 2004
with the land use application. The report states that stormwater runoff from the site would be
collected in a storm drainage system and routed to a detention pond within proposed Tract A
located in the southwesterly portion of the site. The pond will be designed to meet the Level 2
flow control requirements and Basic Water Quality menu as specified in the 1998 King County
Surface Water Design Manual. The pond is proposed to be a combined detention/water quality
''wet pond' and discharges through a "bubble-up" energy dissipater catch basin, with the outflow
draining overland to the southwest through the stream/creek buffer to Maplewood Creek.
Staff recommends as a condition of approval that Tract A be fenced, landscaped, and irrigated
(unless drought tolerant plants are used). The property lines of Tract A fronting Road A, Lot 22
and 23 are to include a landscaped visual barrier so as to not interfere with site distance triangles
including plant materials which would provide a year-round dense screen within three (3) years
from the time of planting.
Also, the property lines along Lots 22 and 23 are to be fenced with a six foot high solid wood
fence, or other approved material (no chain link). Tract A fronting Road A must be fenced with a
wrought iron, chain link with vinyl covering, or decorative wood fence, to reduce the impact of the
drainage tract and the blank, continuous appearance of a fence. The applicant is to submit a
landscape plan and fence design calling out construction materials for the review and approval of
the Development Services Project Manager prior to recording of the plat.
The southwest property line of Tract A is the delineation 25 foot creek buffer which is required to
have a permanent fence and signage installed along its edge prior to recording of the final plat
and to be reviewed and approved by Development Services. This is a mitigation measure
imposed by the Environmental Review Committee.
Water and Sanitarv Sewer Utilities: There is an 8-inch water main in Bremerton Ave NE (north of
parcel No. 1523059030). There is an 8-inch water main stubbed to the west of parcel No.
5182100050 -NE 2nd Place (private street). There is an 8-inch water main stubbed to the west
of parcel No. 5182100051. There is an 8-inch water main installed in Bremerton Ave NE, south
of the project. Existing and new hydrants are required to be retrofitted with Storz "quick
disconnect" fittings.
A sewer main extension along the frontage of Bremerton Ave NE will be required. This sewer
main shall be installed at a depth to allow service to the parcel to the north. Separate side
sewers stubs are required in each building lot. No dual side sewers are allowed. The site is
subject to the East Renton Interceptor Special Assessment District (SAD) and Sanitary Sewer
System Development Charges (SOC) payable at the time the utility construction permit is issued.
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
H. RECOMMENDATION:
Preliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 12 of 12
Staff recommends approval of the Elmhurst Preliminary Plat, Project File No. LUA-04-162, ECF, PP
subject to the following conditions:
1. The applicant shall obtain a demolition permit and complete all inspections and approvals for all
buildings located on the property prior to the recording of the final plat. The satisfaction of this
requirement is subject to the review and approval of the Development Services Project Manager.
2. All lots within the plat shall be required to have a minimum of one new approved tree, with a minimum
caliper of 1-1/2 inches (deciduous) or 6 - 8 feet in height (conifer), and shrubs (or equivalent) planted
within the front yard. The applicant shall be required to set forth a restriction on the final plat stating
this requirement. Each application for a single family building permit shall include a plan noting the
location and type of plant materials within the front yard. All front yard landscaping shall be planted
prior to final building permit inspection. The satisfaction of this condition is subject to the review and
approval of the Development Services Division Project Manager.
3. The right-of-way for Bremerton Ave. NE, along Parcel # 518210-0042 (327 Bremerton Ave. NE), shall
be dedicated prior to the recording of the Elmhurst Final Plat. The satisfaction of this requirement is
subject to the review and approval of the Development Services Project Manager prior to recording of
the final plat.
4. A homeowner's association or maintenance agreement shall be created concurrently with the
recording of the final plat in order to establish maintenance responsibilities for all shared
improvements. A draft of the document(s), if necessary, shall be submitted to the City of Renton
Development Services Division for review and approval by the City Attorney and Property Services
section prior to recording of the final plat.
5. Tract A shall be fenced, landscaped, and irrigated (unless drought tolerant plants are used). The
property lines of Tract A fronting Road A, Lot 22 and 23 shall include a landscaped visual barrier so
as to not interfere with site distance triangles including plant materials which would provide a year-
round dense screen within three (3) years from the time of planting. Also, the property lines along
Lots 22 and 23 shall be fenced with a six foot high solid wood fence, or other approved material (no
chain link). Tract A fronting Road A shall be fenced with either a wrought iron, or chain link with vinyl
covering, or other decorative wood fence. The applicant shall submit a landscape plan and fence
design identifying construction and plant materials for the review and approval of the Development
Services Project Manager prior to installation. Fences and landscaping shall be installed prior to
recording of the final plat.
EXPIRATION PERIODS:
Preliminary Plats (PP): Five (5) years from final approval (signature) date.
SEC. 15, TWP. 23 N., RNG. 5 E., WM.
r§
2 3
MARTI N 'IS
@
8 (3)
1.50 Ac.
t~
2.30Ac. @
-'tillZ 2.30Ac.
=
..........
SEC. 15, 1WP. 23 N., RNO. 5 E., W.M . II. I!f . ~ "ELMHURST" RESIDENTIAL SUBDIVISION
.,II
~~ n 6~ I' ~~
:!~ II~
~ I~:i -~!i
s
illll ~
!
i
_SlTY~7I0H$1 11/W MEA • 1.72 _ CW 14,I1J ... It,
61M'.W ACWCA« -'0' twO(' AoUA IOVTH OF He tND I'L, .4HO I' IWDt AMA HOItlH OFNCINOPl..o.oe .. CW.\eot ... 1L
rof,fL Nt£A • liD ftC. Oft .'.,71 ... It, MOPOSC> ACUSS ~T ~ •
o.OJ 00. ,,2ft .... '"
~l wg. To It Dt\oO.OPWHT ~~)OOUHTY "'COMWHO
DlHlfrr • •• t.013
tOTAL M£A IN) ... i)1f i .. ) -I1It£AAI ,;;) -Aoc:r:ss (.oj
DCHS1Y -~ :071 .. _ ... -.. ,2M ... 0.01 ..... o.OJ ..
DlHlrT'l"-~ 7.7t _
O£HtIJT • ..." IN/_
........... ~lID CAIfOOOY J -IorJl"
1T<A.CTS lJNflECO~{)EO
r zv ~AI't" AICEU 'N.tO \ / "w._r._ .. \ I
IITt:WOIfIiA7IOHr t, D. ... .wA ... .., ..
£~!'~~:fr .. OWHER/N'f'IJCN4T r
J. O\!JWL ~ NtlA (IHCL. VAC41'ED NtIA) • "'0 tIC
.. It/W 10 Ie OQICAJED-r.n .. cnII._:
UIEJtTY .at L.La. 1125 tOfH AK r. ItATJLt WA H1C11 ';:'/.I.'r~~
«OIf:CHNJCAL WI'" _' .......... £HQtNEE1t: '-..IJ1JH 1\ACI' H.£ tilt ... MlCHTYWAI'
="i~~""
"ACInC tHOIHlDfJHG "..,... u.c 4110 LN) A\If".
S/JI!K"r'OI1!: """"'1'OIHlt"""'-J310t tnt AW, •
al-"" _.'1.!i ,;:,/.1.1 11-'" ~A&.(::,'j:'_,=
EHf!ET ICJeX
I'Of i'ffIlMINNt'fM.AT
POI =~~ !'OJ fII!£r eu17WO c:&.U8IG 1UII P04 arTAt. lUI' POt MlWJtJaN AW, IU. NIIJ ItCWI , _ .......
~ M:W) 0t0IS .'''CHI AND ~A~"","", 1'07 GWADWC: AND MAlNA« I'f.N4 f'OI 0I$lJHIJ COOlJONS
tN
~
Yl!ImOAL OATtAW arr OF ~n»c. HAIoO. CQIItnut ItlDtVAL • ,.
~ ...... IOHO CQMn" I'OIHT IIfOmIlU: n1UND "UHCIIIN r KM OOUHTY...,.A« MASI DISC.-IIT 1HC SJRttf IHTrlfICCTlOH OF H£ 47H ntaT N#J ,,.,,,,, AKo • ItIAMIHC 1H£ HOIt"""T CQ1tHDt tI *""'" '4 YO ... IJN.. IWC", W.M. II.I\IMltQfirMo .... "nI't
fr'f com:w fIH .., It. If ax.l1MlD1 t:tF lH[ IIDT CCl.UWH OF OA 1'[. AlVA 'JIiCWIo .".... ,.,..
1!1.481 Ot-1IWINC1
I:a"T:t, -== ~~ ::,::".r::,) A ~ ANtJU Of' OO'N"JO.D-00&M1IRQ.00tMSIr WM
CfW'ItC IICIU!
~ AT A MINCH MIJffK IN J-1fINtI t:O.MTY ~ MA.IS cue. AT H SmaT IITrlfa'Cnew OF He 47M It NID ,,.,1H A\C. 51[, WAIWIIO H HOIfHAlf CCIIIPCII tJF £1JOH I~ fOWrfSPtP 13 HOItJH. IINH1/l • £AST OF nc MI.LAWT7I' wrMIfAN. JHt HOffTH MtIDfICAH
iMJ\M OF IHJ/I'" (HAD ..,,,..,) QW COOItDINAJD lIQ( fOUND TO BE' llOIQUN / IJIHU.JlI AT 1HAT "OIHT. DC w~ OF eolH
JH(' itA I.£~ CQlMRftON 'ACJQt OF a.tttHtU4 AHO DC GlltID ICIU 'ACra. OF I.OOOOQtfI7 WAI ~ TO 1HE' QIM)
SCALE, ,. -50'
:f' 10
COCJIIIOIWA rn 1'OIt .-aw GIIOUHO MTAHCD.
.... UR~,. PHASE: 1
.. :'~ _<:9~~)~f:lJC i~t: ~ ..... .
2 ~!
~ D!8CIPTION
~
;)
4
NOTE I
~7rOH OF SCIIt7t. WA.D AND IltIfII DI1tAt4AGt' 1ft SHECT ftOZ
5 1IQl!~""" ~",;r;~.
~/II.AHKrT
IfIOHT TO IIAn HlCCISMY st.'"' "'" curs QIt rus I.PON SAl) ,...... 1'OIf '~1H
M A\oE.UASQlIW(IIIJ.YDa:£) IftCOl'tDtD »ftIL .l. , ... ,2 UHDDt
IftCOffOINOHo.I«173It.
7HI' IOUlH "0 rrn OF nc lAlT "" mr OF 'DC' fCUOMfNO DaCI1fIItD ~ 1HC HQIIt"" HALT OF 1H£' IOUHAST QUMJDt Of' 7H( HCWlHIII'ST OUAIImt 01" nc HQ1t"""'" CIC.IAW1D OF arcmw IA ~ U HonH. ItAHC 'CAll; ~
IXtIJI'T H £AIT J, .. ffn lHDtfCI" 1'OIf MWlr
(ALSO ItHOItH AI 1Hl toLIDi ffO ID:T OF H CA$T It. n:cr CIT 1h1[ HORJH kAU' ", "'.4CT .. VM1JN ACItt lRMM. ACCCIIWIM' 10 DC' (.Nt[CQ1tDfl) MAT JICIIIfCl';
.lUA1l' It H COLlIN tJF ICWC, ITAJr OF ~
~
7IC SOUJH HALF OF 7NE' IOIJ1H(AST OUMTD ", 7Nt HOtJHMDT QJMmt OF 1H[ HCW1MIUT OUMmt OF I£CTfON '50 7tI.,.. ZJ HaItH. AAHQC , tArT, .AI ...
DCPT HCASrlftLYU ff£TncM'CIf'fOIt~
(ALSO KHOWN AS 1HC' SOUJHIMY HAJJ OF MACTS. AHO .. AWt1W Aatl' tJlAcf3, ACCQ1lQWO: TO nc CHItR'QItCIII) MAT ~
""-4J1'It "... Cl:llMn' (Jf' ItJrIQ, I1AJI' Of' 1M.IIfHd'J'DH
~
JHC I«JIfTH HAlF tIT "*' SCI.IJHEAST WAllJIIII' OF JHl" HCIIf»MSf' CltMRmt '" nc HQltJMIDT ClCl.Mmt OF XCWCW '4 TO ..... IJ HOlt"" ItAHG£ , £AlT. hi
PCrJtT nc lAST J7.' nET lHDI£CF fOIt MW:Ir
AND Dft:PT JHr MXJ1H ftO 1ICT OF ".. IMT '" I'f£T '" lJC' ItDMMIGt.
(AaO KHOJtH ... 7H( NCIf'JH HAAF OF JRAC1S J MID .. ilAJlt7IH AlIff hlAC7I, ACGCItOIWO JD H ~ MAT narQII'; CJ«:£n 7H(
1OCI1H "0 1ICT OF JHf CA6T '" lIlT ",. loW nuCT')I
.wruA'fl' IH JH(' COUNTY OF URI, STAJI' Of WAlJlMl!ltW
~I ~~.; ;~~ iih~u~
~
IIII1
II . ~
~d .§ .. .!j
.flo.. ~] U
~
~
~d ~ <~ i!'~ ~~L
PAOJECT NO.: 0JI064
DR""" IIY: .JCIO
ISSUEDATt: ~
SHUT "[V,:
LJ
I " 020a""'COI-POJ
P01
-.-,. 1 0-•
II I~f 4llill
g Il
" ~ wi
g' ~~ d
_.
:1 §j ~.
~
II 11
t~ 'r~
j I ~:,
-~!i
s Uti!. ~
~
~
!
~
I
! .... 4.~ct·:--:;c~··,,::·=-~ \,(,:fN}~ \"".~~ ~ .-~ ,.
\ __ -L-___ / I
............ ., ...... . .--\
SEC. 15, TWP. 23 N., RNa. 5 E., W.M.
\
\ \ F"(RNWOOD\~~~~ _ "
\ '------
-LA~R~H~:rP:~~ 1 : -
(UNDER C~STRucnON) 1 I
- - -........... -1--""""-ll
2 :11' 9 : 1 1
:1 ~ t --; ---";!.--~-8-~ ... ··"t·t
" 1 --............ _L ___ ._-.... \
1
1
.. · __ J
1
·· __ .. ·· ..
5 6 __ ._L...
'1'1'1 ~
--------GIWHO IC.II.E 8CAU! I r • 60'
~04TIN
..... ~ .......... DJ4 .... 0,0 .. CCII¥7DI.It~-Z'
I!IEHaNNI( = «ICMTY ~ IIIDmIU: fDUIrIO ~., r ItJH(l ccx.wrr .... A(% MASS OI&C AT JH( smErr
MIMr'C1JCW (I ~ 41H J1MIT NI() ' .. JH AIoI:. II[ WA/tIaHG 1H£ Ha.'1HCT CIQWrIDt t:l1tC'7ICW ' .. ~.z.»c.. tw«;C 5£., lUI. G.lVA lJCIH-4N." 1UT.
,,"COnaN ON ... , .. ,' Dl1HIeDT 01' 7JC' lEST CCWWH OF ~1I. G.I\M"JJCN-407 ... fin
BAa. 01' IIIWW:J
JMA' NQltlH. aurD UI'ON ~ ~1IOfrIIrIrM ~ (tPS) 1.AWMt1 MID ~ ITAJI' MIt'" .ztM' CCIQIICtJM1'I1 Ai CCW\CllNDCl' INfII"f tIT anncut" CCIMDIQ.oocwa .. ~ /IJn~MJ ,:':fH~u::.~ 1::"'.:t."*-IUIIItINe KIrfOmC'IofI'CDIICJI'(ltlCnoN Is,. ~,~HOft1H. ItAHGC • WT ~ 'DC M.LAW£TJI' ~ JJC' NOIt1H NItJfICAH
DA'ft.W OF fMl/l'''' (HAD tJIIt) 8lIIIO ~'ID .... fOUHD TO K ,~ ... / r.n ... .w AT )HAT ItCIM: lHE'''KIIIE OF eo7H lHr Sf:A, LnG. CI:IMtC7IOI 'ACftIIt OF a. ...... Uf AHO lHI' QIIJO XALI 'M:TO/f OF r.OCICJOGItI7 1IU N¥UI:D 10 H GIIlJO ~JD fOIl '*DWI MIXNI M'rAHCD,
~j ~~ ; I ~ iu~~~n
OJ)U (J'E j '~j
~ ~ 1 'u ~ ~ ~ ~'.-4.~ 'i" ,., ~ OJ) rJJ .~ ;::: ~ I . ~ ~ 0 n '0: :n u
~ I~II
I
~ ~ II ~ Ii I·~I ti~"
PAO..f.CT NO.1 oaor..
MAW rn oJQC
IISUlDo\lt: ~
SiEET fllltv,!
LNC CLaAIONCI
I'UH CJClInI<ICl
Olfa4~O'-"~
P03 _. ~.
II Irl: aUJii
~ ~ I
11 ~~ II
..........
II §~ ~L ", II 41
n~ II~
j I ~~I -~!i
s
Will! i
:;
!
~
L···\rJ';::1E-i:i
SEC. 15, TWP. 23 N., RNa 5 E., W.M.
FUE VUE:
--l---T-~o--H
LAURELHUR~T PHASE 1 : I ~~~~~?rrIJC7N.!.-n
:1 II --..... --11-..... _ .. - - --t'''1 -:-.-l~--i
W'h. __ .l
Il'N ~ .. --------CWorHoICAI.I!
SCALE ' r • 110'
~DATtN .......... ..,...tJ!f. HA~ U c:onQ.It MlIJItYN,. .. r
fIIIINC:HJAIII( .-toHII 0tJUNrt' ttOINT , MHnaa IN Z' NING COIJHJY .... .4CC MAD QrIC AT JHE I1NZT (7 HI 4TH SlRCrT AlII) ,..",., AW. !f: 1INfK1H() THe IMHDt OF &'C1JOH ,,,,. roIWtIHP aow, IWIOC Ie.. 1(61-...... 71: 'DT. "comw tIN .. ,.,,' ICIUlNIIIT OF J)K lOT C:CUIIIN OF ~l't. ""*JICIIIrf-«J1M 'lET.
8A88 01" 8&AIWG
~
&UoITNIr _ ..-r . ...".---If-. ___ r
~ ~"' ___ r
............
;r. BMW
"''''''' • .. """~-'"
iii '" """
~ ~ .",.. • W/ICLD lDOIWt UD ----L
__ r __
-1 __ r_r __
Im::ill _ ... -.. --... ----........
~~ .,.
~~ : I~~ in~~n~
ooU o'2~ .~ ..
t;: 0 •
~ 00 Vl !:= 0 G'~'9'~
~o j.r .j ...
~
'fi u
;
I
~
id
II ~ II ~.i~ ~I~W!!
""OJ[C:T HO.! 08QI.4
O'U.~II~ ~
IIIUlOATtl ~
It<aT ..", o , . .... OZOIo4GA01-.-o7
PO? _7C11.
II. In ~~
JI
~~ il
11 §~ Ii g;n
n~ II~
s Will! I
i
~
!
..........
~"
I /
1.--..... J--.,/ ---\
SEC. 15, TWP. 23 N.,
1
" ~ ",
'\
"~, \ "-...... _-
I
I // ~ \ '( \ ,
::-:;.-;;;.;;;----------
--, --~-10-H-
LAUI'E:LHUR T f'H~.SE 1 I I
(UNDER co STRlICTION) : I -'2---:1-......... 9- ---1"1
II -----t-<
;I 8 I
4
1 ___ •••• ..1
1
__ , __
5 ~ e -~~~.~, ...
I
I
Ii __ \ ::i-' ~___ I, ~ --681
1
',~' _·-t -~-.. tTI .. ,,,
trJ ~ .. . .. . -.-.---
GIW'Ie ICAU! ~.r·«J·
\'E!fmCW. CMTW
"II'" ..... _,ON. NA\o.. CJOtnDr.M' wllJt\fAl. • Z'
-.otIWIK
=: O/JIMTY I'fJMT I MNn"" :?&c"=':~='~~_:t:_c~~ HOt1HtCST COlINa " SC1JON J~ row.. .1»1., IfANQ£ It.. W""" 1UYAncw. .... ,. NIT.
fJrcom:w 1M'" , .. ,' IQI1MCIT 0' H' JCST COLUWH 0' c..n:. a..rY.llJClllrll-C1 •• ,.."
&48Ic;,.~
::a~t==~~~<::! .4
CCIH\CJtGDfCZ NKIU " DO'II'3O.W ~ *"S ~ Nrlrr===",IIIJ .:':1N~wr:.:: .4~DIIC. It/AI/ffIOHG 1H£ HQll'HE4JT oc.wa Of' .K'C1JOH fa. ~ Z:J HGW1H. IW4« • fAIT '" JIC -.....mr ADlCIWL DC HOIfTH AII£IfICJ,H IMJ'LII tIT ,...,,, .. , ()(AQ &1/11) MID ~7IS .,.. fO(JHO 70
" liOtClN I r.1'N&JIf AT 7JMT ~T. H IH\CIUIf' OF ~1H 1Ht SlA tna. CCIMtC7JCW 1AClDt 01' o."""CH NID lHI' MO ~ 'AC1O/f ", f.COCIOOIrl7 .... AMJ£D 10 JJC' OWO COCII'tOfrUo lD Fat ..,.., MCUCJ crsTAHCD.
Qt~~=,Na I =-co:~ ----ft. DIIIo ___ ft.
o
~I ~~ I ' ~ Uh~n~
bll U = ...:l .11':1 (J'e::...:l ~! t+:: 0 ~ ] '() g ~ d ~........ II ,., ~ bll <IJ • = 0 ~ , ~ On .... ~l
~
~d I
§
~ II I
~d I·-I d~.
",UCT NO.1 oat............
DIV........ oJQC
~O"lII~
804EET 1IttV.:
LJ
r ... Cl20641;CD1-",OI poa
....,. • CfI •
R-IO
g ~
"." ~ th 5 e ~ z
S E-t
'I) ..... tid , t:t V) ~., ~
RC(P)
(P)
~ w F6 1_
15 T23N R5E W 1/2 . 5315
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201, 251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and
storm drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All eXisting
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES:
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc.,
dated August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
professional and properly documented and reported to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the eXisting three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (i.e.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 8th day of March, 2005, I deposited in the mails of the United States, a sealed envelope
containing Preliminary Report to the Hearing Examiner documents. This information was sent to:
Mike Merlino -Libery Ridge LLC Owner
David Halinen Contact
Rose Woodall Party of Record
Fernwood North H.A. Party of Record
Terrance Flaig Party of Record
Sara & David Scott Party of Record
(Signature of sender~~~
STATE OF WASHINGTON )
) SS
COUNTY OF KING ) "' ............ """\\", --~~\':-::.~.~~~IIII .: ~,1">. \58/ •• :'7Q I,
I certify that I know or have satisfactory evidence that Stacy Tucker : /o~~ °tv ~'" ~ '~
signed this instrument and acknowledged it to be his/her/their free and voluntary atHoP'lffi&!~ti··~
purposes mentioned in the instrument. ~ ~ ~ ,ou. ...... '" ~} -n §
Dated: 3/a'j/o (' e-;4; ~ ~\. aUG j
Notary (Print): _____ ---w ....... rrnn'17rll--.,_-----------
My appointment expires: MARILYN KAMCHEFF
MY APPOINTMENT EXPIRES 6-29-07
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
COMMENCING AT 9:00 AM,
CITY OF RENTON
HEARING EXAMINER
PUBLIC HEARING
March 15, 2005
AGENDA
COUNCIL CHAMBERS, 7TH FLOOR, RENTON CITY HALL
The application(s) listed are in order of application number only and not necessarily the order in which they will be
heard. Items will be called for hearing at the discretion of the Hearing Examiner.
PROJECT NAME: Elmhurst Preliminary Plat
PROJECT NUMBER: LUA-04-162, PP, ECF
PROJECT DESCRIPTION: The applicant is requesting Preliminary Plat approval for a 64-lot
subdivision of a multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are
included. The site is zoned Residential -10 dulac and is to abide by a Development Agreement. The
lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public
streets and private access easements. One non-regulated Category 3 wetland would be filled.
Maplewood Creek crosses the southwestern portion of the plat.
PROJECT NAME: Kennydale Elementary Reconstruction
PROJECT NUMBER: LUA-05-004, CU-H, SA-H
PROJECT DESCRIPTION: The applicant is requesting Hearing Examiner Conditional Use permit
and Site Plan approval to construct a two-story structure approximately 60,400 sq. ft. to replace the
existing elementary school building, which is to be demolished. The site is 6.73 acres located at 1700
NE 28th Street. The project area will remain primarily in the southern two-thirds of the site with
parking and vehicular access reconfiguration. Parking Modification is required. The School District is
lead agency for the Environmental (SEPA) Review. The applicant is requesting a conditional use
permit, as required by code, to increasing the gross floor area more than 10 %. The subject property
is located within the Residential-8 (R-8) zoning designation, Public Land (P) Overlay District.
HEX Agenda 3·1S-0S.doc
PUBLIC
HEARING
City of Renton
Department of Planning / Building / Public Works
PRELIMINARY REPORT TO THE HEARING EXAMINER
A. SUMMARY AND PURPOSE OF REQUEST:
Public Hearing Date:
Project Name:
Owner/Applicant:
Contact:
File Number:
Project Description:
Project Location:
March 15, 2005
Elmhurst Preliminary Plat
Liberty Ridge LLC (attn. Mike Merlino), 9125 10th Ave. S., Seattle, WA 98108
David L. Halinen, Halinen Law Offices, P.S., 10500 NE 8th St., Ste. 1900, Bellevue,
WA 98004
LUA-04-162, ECF, PP Project Manager: Susan Fiala, AICP
The applicant is requesting Preliminary Plat approval for a 64-lot subdivision of a
multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are
included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for
detached units. All existing buildings would be demolished. Access is proposed via
Bremerton Ave. NE to new internal public streets and private access easements.
One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses
the southwestern portion of the plat.
201,251, & 257 Bremerton Avenue NE
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
)reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
PUBLIC HEARING DATE: MARCH 15,2005 Page 2 of 12
B. HEARING EXHIBITS:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
Exhibit 6:
Exhibit 7:
Exhibit 8:
Project file ("yellow file") containing the application, reports, staff comments, and other
material pertinent to the review of the project.
Neighborhood Detail Map (dated 12/28/2004)
Sheet P01-Preliminary Plat Plan (dated 12/28/2004)
Sheet P03 -Tree Cutting and Land Clearing Plan (dated 12/28/2004)
Sheet P07 -Grading and Drainage Plan (dated 12/28/2004)
Sheet P08 -Existing Conditions (dated 12/28/2004)
Zoning Map -Sheet F 6 West (dated 12/28/2004)
ERC Mitigation Measures (dated 02/14/2005)
C. GENERAL INFORM A TlON:
1.
2.
3.
4.
Owner of Record:
Zoning Designation:
Comprehensive Plan
Land Use Designation:
Existing Site Use:
Liberty Ridge LLC (attn. Mike Merlino), 9125 10th Ave. S., Seattle,
WA 98108
Residential-10 (R-10) Dwelling Units per Acre
Residential Options (RO) per the Development Agreement.
Currently designated Residential Medium Density (RMD) as of
November 10, 2004.
Former construction site with several residential buildings and
associated outbuildings.
5. Neighborhood Characteristics:
6.
7.
8.
Access:
Site Area:
Project Data:
North: Vacant-Proposed Ridgeview Court Plat: CA zoning
East: Single family residential; R-8 zoning
South: Single family residential; R-8
West: Single family residential; R-10 zoning
Bremerton Ave. NE
9.6 acres (418,176 square feet -gross area)
Area Comments
Existing Building Area: N/A
N/A
N/A
All structures to be removedldemolished
N/A New Building Area:
Total Building Area:
D. HISTORICAUBACKGROUND:
Action
Annexation
Comprehensive Plan
Zoning
Development Agreement
Street Vacation (Pending)
hexrpt_Elmhurst.doc
Land Use File No.
A-02-003
N/A
N/A
N/A
VAC-04-007
Ordinance No.
5092
N/A
5093 (R-8) and 5094 (R-10)
5093 (R-8) and 5094 (R-10)
Recording #20040908000083
N/A
Date
09/2212004
09/22/2004 and
09/23/2004
09/22/2004 and
09/23/2004
08/24/2004
Pending
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
~reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
PUBLIC HEARING DATE: MARCH 15, 2005
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
Section 4-2-020: Purpose and Intent of Zoning Districts
Section 4-2-070: Zoning Use Table
Section 4-2-110: Residential Development Standards
2. Chapter 3 Environmental Regulations and Overlay Districts
Section 4-3-050: Critical Areas Regulations
3. Chapter 4 Property Development Standards
Section 4-4-030: Development Guidelines and Regulations
Section 4-4-060: Grading, Excavation and Mining Regulations
Section 4-4-070: Landscaping Regulations
Section 4-4-080: Parking, Loading and Driveway Regulations
Section 4-4-130: Tree Cutting and Land Clearing Regulations
4. Chapter 6 Streets and Utility Standards
Section 4-6-060: Street Standards
5. Chapter 7 Subdivision Regulations
Page 3 of 12
Section 4-7-050: General Outline of Subdivision, Short Plat and Lot Line Adjustment Procedures
Section 4-7-080: Detailed Procedures for Subdivision
Section 4-7-120: Compatibility with Existing Land Use and Plan-General Requirements and
Minimum Standards
Section 4-7-150: Streets -General Requirements and Minimum Standards
Section 4-7-160: Residential Blocks -General Requirements and Minimum Standards
Section 4-7-170: Residential Lots -General Requirements and Minimum Standards
6. Chapter 9 Procedures and Review Criteria
7. Chapter 11 Definitions
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element: Residential Medium Density (formally Residential Options) objectives and
policies; Residential Streets objectives and policies; Subdivision of Land objectives and policies.
2. Community Design Element
3. Environmental Element
G. DEPARTMENT ANAL YSIS:
1. PROJECT DESCRIPTION/BACKGROUND
The applicant is proposing to subdivide a 9.6 acre site into 64 lots and two tracts. The preliminary
plat contains three (3) parcels. The 64 lots are intended for the eventual development of detached
single-family homes. The lots range in size from 3,801 square feet to 5,870 square feet.
The site is subject to a Development Agreement that sets forth several site-specific restrictions
including: 1) All residential buildings must be single-family; 2) all lots abutting the south boundary
line must be 50 feet in width; and 3) the net density can not exceed 10 dulac.
Historically the site was a base for a site work construction company followed by a public works
construction company. The existing buildings, all to be removed/demolished, include a house
used as a dispatch office, a small house and garage, and a mobile home. The site also contains
gravel parking and storage areas with remaining stockpiles of fill material, almost 10 feet in
height.
hexrpt_Elmhurst.doc
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
~reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
PUBLIC HEARING DATE: MARCH 15,2005 Page 4 of 12
Access is proposed via Bremerton Ave. NE to new internal public streets within the plat, Roads A
and B. Street dedications are required. Street improvements including curb, gutter, sidewalk,
lighting and rights-of-way dedication are required.
The applicant has made a separate request for a street vacation of portions of Bremerton Ave.
NE right-of-way currently under process in Property Services. The areas proposed to be vacated
would then provide for an aligned right-of-way and the vacated land would be integrated into
several lots located along Bremerton Ave. NE. The applicant has also requested modifications to
street standards which have been reviewed administratively and approved with conditions.
One non-regulated Category 3 wetland is proposed to be filled. An off-site wetland was
determined to be unregulated. Maplewood Creek crosses the southwestern portion of the plat.
The applicant submitted several studies including: a geotechnical report, a wetland and stream
reconnaissance, a traffic impact analYSiS, an environmental assessment letter, and a preliminary
storm drainage report. Site preparation for development of the plat would include the removal of
vegetation and trees for roadways, utilities and building pads except within the Native Growth
Protection Area (Tract B)
The site is zoned Residential -10 (R-10) dwelling units per acre. The R-10 zone allows
residential densities that range from a minimum of 4.0 dulac to a maximum of 10.0 dulac. The
proposed plat would arrive at a net density of 8.3 dulac after the deduction of public right-ot-way,
private access easements and critical areas (creek) from the gross acreage. The Comprehensive
Plan designates the site as Residential Options (RO).
2. ENVIRONMENTAL REVIEW
Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as
amended), on February 14, 2005, the Environmental Review Committee issued a Determination
of Non-Significance -Mitigated (DNS-M) for the Elmhurst Preliminary Plat. The DNS-M included
fourteen (14) mitigation measures. A 14-day appeal period commenced on February 14, 2005
and ended on February 28,2005. No appeals were filed.
3. COMPLIANCE WITH ERC MITIGATION MEASURES
Based on an analysiS of the probable impacts from the proposal, the Environmental Review
Committee (ERC) issued the following mitigation measures with the Determination of Non-
Significance -Mitigated (DNS-M):
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its
use on-site. The satisfaction of this requirement shall be reviewed and approved by
Development Services during construction.
2. At the time of building permits, additional geotechnical stUdies addressing the suitability of
site soils for use as structural fill shall be prepared and submitted. The satisfaction of this
requirement shall be reviewed and approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth
Consultants, Inc., dated August 30, 2004, regarding "Site Preparation and General
Earthwork" and "Utility Support and Backfill." The satisfaction of this requirement shall be
reviewed and approved by Development Services during construction, utility work and
building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's
(DOE) Erosion and Sediment Control Requirements, outlined in Volume 1/ of the 2001
Storm water Management ManUal.
S. All contractors are to be made aware of the potential presence of environmental
contaminants and instructed to notify the property owner immediately if discolored,
odiferous, or otherwise suspect soil is encountered during excavation activities.
hexrpt_Elmhurst.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
:Jreliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 5 of 12
6. If suspect soil is encountered during excavation activities, work in these areas is to be
stopped until such time as a qualified environmental professional can assess the observed
conditions and recommend corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at
concentrations exceeding applicable MTCA cleanup levels, then (a) those soils are to be
handled and managed in accordance with MTCA and; (b) the work will be managed and
overseen by a qualified environmental professional and properly documented and reported
to the Department of Ecology (DOE) in accordance with MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet
both detention (Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per
new single-family lot. Credit to be given for the existing three residences. The fee shall be
paid prior to the recording of the final plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new
average daily trip associated with the project. Credit to be given for the existing three
residences. The fee shall be paid prior to the recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new
single-family lot. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall
be planted on 15-foot centers within the 25-foot wide buffer along the east side of the
stream. Two-gallon size tree stock shall be used. Planting should occur in the Fall to allow
plants to develop roots over the Winter. The satisfaction of this requirement shall be subject
to the review and approval of the Development Services Division.
13. During site preparation and construction of improvements and residences, the applicant shall
install silt fencing with brightly colored construction flags to indicate the boundaries of the
stream/creek buffer. The satisfaction of this requirement shall be subject to the review and
approval of the Development Services Division and be completed prior to the issuance of
construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install
permanent fencing (i.e. split-rail fence or other approved barrier) and signage along the
entire edge of the stream/creek buffer. The satisfaction of this requirement shall be subject
to the review and approval of the Development Services Division prior to the recording of the
final plat.
4. STAFF REVIEW COMMENTS
Representatives from various city departments have reviewed the application materials to identify
and address site plan issues from the proposed development. These comments are contained in
the official file, and the essence of the comments has been incorporated into the appropriate
sections of this report and the Departmental Recommendation at the end of the report.
5. CONSISTENCY WITH PRELIMINARY PLAT CRITERIA:
Approval of a plat is based upon several factors. The following preliminary plat criteria have been
established to assist decision makers in the review of the subdivision:
(a) Compliance with the Comprehensive Plan Designation. The subject site is designated
Residential Medium Density (RMD) on the Comprehensive Plan Land Use Map. However, the
Development Agreement assigned Residential Options as the Land Use which has been changed
to RMD; thus the RMD policies are discussed below as these were in effect at the time of
application.
hexrpt_Elmhurst.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
'reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 6 of 12
The purpose of the Residential Medium Density designation is intended to create the opportunity
for neighborhoods that offer a variety of lot sizes, housing, and ownership options. The proposal
is consistent with the RMD designation in that it would provide for the future construction of single
family homes. The proposed plat is consistent with the following Comprehensive Plan objectives
and policies:
Land Use Element
Residential Medium Density
Policy LU-161. Support residential development incorporating a hierarchy of streets. Street
networks should connect through the development to existing streets, avoid cul-de-sac or dead-
end streets, and be arranged in a grid street pattern ( or a flexible grid street system if there are
environmental constraints). The streets would be connected to existing street in the new
Laurelhurst Plat to the east and the plat layout is a modified grid with streets generally east-west
and north-south.
Policy LU-162. Development densities in the Residential Medium Density should range from
seven (7) to eighteen (18) dwelling units per acre, as specified by implementing zoning. The
proposed net density for 64 lots for detached single family homes on the R-10 parcel would be
8.3 dulac.
Community Design Element
Policy CD-5. Renton's public and private open space should be increased in size through
acquisition of additional land or dedication of Native Growth Protection Area easements. The
applicant is proposing to dedicate Tract B as a NGPE as it contains Maplewood Creek and its
associated buffer.
Objective CD-M: Develop a system of residential streets, sidewalks and alleys that serve both
vehicles and pedestrians. The proposed plat would include full street frontage improvements
including public sidewalks that connect to the existing neighborhood.
Policy CD-61. Residential streets should be constructed to the narrowest widths (distance from
curb to curb) feasible without impeding emergency vehicle access. The public roads would be at
a reduced right-of-way from standard 50 feet to 42 feet with 32 feet of pavement for the internal
residential roads.
Environmental Element
Objective EN-C: Protect and enhance the City's rivers, major and minor creeks and intermittent
stream courses. The Environmental Review Committee imposed a mitigation measure on the
project requiring enhancement of the 25 feet stream buffer with additional landscaping.
(b) Compliance with the Underlying Zoning Designation. The 9.6 -acre site (gross area)
consists of three parcels is designated Residential -10 Dwelling Units per Acre (R-10) on the
City of Renton Zoning Map. The proposed development allows for the future construction of up to
64 dwelling units along with associated plat improvements.
DenSity -The allowed density range in the R-10 zone is a minimum of 4.0 to a maximum of 10.0
dwelling units per acre (dulac). The method of calculating net denSity is as follows:
A calculation of the number of housing units andlor lots that would be allowed on a property after
critical areas and public rights-of-way and legally recorded private access easements are
subtracted from the gross area (gross acres minus streets and critical areas multiplied by
allowable housing units per acre). Required critical area buffers and public and private alleys are
not subtracted from gross acres for the purpose of net density calculations.
After the deduction of the public rights-of-way, critical areas (creek) and private access easement,
the proposal would arrive at a net density of 8.3 dwelling units per acre (418,176 sq. ft. -79,992
sq. ft. = 338,184 net sq. ft.l7.76 net acres) thus (64 unitsl 7.76 acres = 8.25 dulac).
hexrpt_Elmhurst.doc
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
'reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 70f12
There is no unit mix proposed for the subject plat as stipulated in the Development Agreement
which states that only single family detached units may be constructed. The proposed plat
complies with density and unit mix requirements for R-10 zoning designation and the
Development Agreement.
Dwelling Unit Mix -When proposing full subdivisions, the R-10 zone requires the provision of a
minimum of 50% to a maximum of 100% of detached or semi-attached dwelling units. However,
as previously stated, the applicant is proposing 100% detached single-family units.
Lot Dimensions -Density requirements take precedence over the minimum lot size standards.
For detached dwelling units the minimum lot size is 3,000 sq. ft. per unit. The minimum lot width
is 30 ft. for interior lots and 40 ft. for corner lots and 55 ft. for the minimum lot depth.
The lot widths would range from 40 ft. to 54 ft. and lot depths ranging from 95 to 112 ft. Lot sizes
would be greater than the minimum of 3,000 square feet; the smallest lot would be 3,801 square
feet and the largest would be 5,979 square feet.
The Development Agreement stipulates that those lots abutting the existing Fernwood North
development must be no less than 50 feet in width. Lots 23 through 29 are equal to or greater
than 50 ft. and thus comply with the Agreement.
All lots comply with the lot dimension requirements. The plat would create 64 lots and two tracts
with the following sizes:
Lot Area (square feet) Pro Dosed Access
1 4,896 Road A
2 3,801 Road A
3 3,801 Road A
4 3,801 Road A
5 3,801 Road A
6 3,801 Road A
7 3,801 Road A
8 3,801 Road A
9 3,801 Road A
10 3,801 Road A
11 3,808 Road A
12 4,685 Road A
13 5,979 Road A
14 5,870 Road A
15 4,926 Road A
16 3,829 Road A
17 3,852 Road A
18 3,819 Road A
19 3,907 Road A
20 3,984 Road A
21 4,863 Road A
22 5,132 Road A
23 4,861 Road A
24 4,750 Road A
25 4,750 Road A
26 4,750 Road A
27 4,750 Road A
28 4,750 Road A
29 4,776 Road A
30 4,742 Road A
31 3,844 Road A
32 3,848 Road A
hexrpt_Elmhurst.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
Lot
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
Tract A-
Detention
Tract B-
NGPE
Area (square feet)
3,851
4,835
4,107
3,948
3,824
3,801
3,801
3,801
4,611
4,773
3,921
3,921
3,921
3,921
4,018
4,212
4,907
4,154
3,978
5,261
5,353
4,980
5,040
4,613
4,085
4,181
4,086
4,623
4,183
4,226
4,756
5,522
32,922
32,627
'reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 8 of 12
Proposed Access
Road A
Road A
Road B
Road B
Road B
Road B
Road B
Road B
Road B
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Bremerton Ave. NE
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road A
Road B
Road B
Road B
Road B
N/A
N/A
Setbacks -The R-10 zone requires a minimum front yard setback of 10 feet for the primary
structure and 20 feet for attached garages which access from the front yard street (on streets
created after March 1, 1995), rear yard setbacks of 15 feet, interior side yard setbacks of 5 feet
for detached dwellings, and side yard along street setbacks of 10 feet for the primary structure
and 20 ft. for attached garages which access from the side yard street. The plat plan shows
building envelopes meeting the required setbacks.
The proposal's compliance with these building standards would be verified prior to the issuance
of individual building permits.
Building Standards -The R-10 zone permits one residential structure per lot. The R-10 zone also
allows attached and semi-attached buildings with one per lot. Each of the proposed lots would
support the construction of one detached unit within the R-10 zone. Accessory structures are
permitted at a maximum number of two per lot at 720 square feet each, or one per lot at 1,000
square feet in size. Accessory structures are permitted only when associated with a primary
structure located on the same parcel.
hexrpt_Elmhursl.doc
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
)reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 9 of 12
Several buildings and outbuildings are shown as existing on the site. Staff recommends as a
condition of approval that the applicant obtain a demolition permit and complete all inspections
and approvals for all buildings located on the property prior to the recording of the final plat.
Building height in the R-10 zone is limited to two stories and 30 feet for primary structures and 15
feet for detached accessory structures.
The R-10 zone restricts lot coverage for detached units to 70% and the total impervious area is
limited to 75%.
The proposal's compliance with these building standards would be verified prior to the issuance
of individual building permits.
Landscaping -The R-10 zone requires setback areas to be landscaped, excluding driveways and
walkways except for detached, semi-attached, or two attached residential units. The proposal's
compliance with this standard would be verified prior to the issuance of individual building
permits.
According to RMC 4-4-070, landscaping is required for this subdivision. Due to the transition to
the new code, at the time of submittal the requirements did not call out a conceptual landscaping
plan and thus were not included in the submittal for Preliminary Plats. Several of the general
landscape requirements include but is not limited to: on-site landscaping is generally required
along all street frontages, except for walkways and driveways; when rear or side yards are along
property lines abutting a street, a minimum of five (5) feet of planting area in the public right-of-
way; use of drought resistant plant materials. Specific landscape requirements are also applicable
to the plat including those related to: trees, soils, drainage, plants and berms as outlined in the
landscaping regulations.
Furthermore, prior to the issuance of building permits, detailed landscape plans must be
submitted and approved.
To ensure that landscaping requirements are complied with for the preliminary plat, staff
recommends as a condition of plat approval that a conceptual landscape plan be prepared by a
registered landscape architect, or a certified nurseryman, or other similarly qualified professional.
and be submitted to the Development Services Project Manager prior to final plat recording.
(c) Compliance with Subdivision Regulations.
Lot Arrangement: Side lot lines are to be at right angles to street lines, and each lot must have
access to a public street or road. Access may be by private access easement per the
requirements of the Street Improvement Ordinance.
The side lot lines of the proposed lots are at right angles to street lines. All lots would gain access
to public roadways either directly, or via private driveway access easements. As proposed, lots
comply with arrangement and access requirements of the Subdivision Regulations.
Lots: The size, shape and orientation of lots shall meet the minimum area and width
requirements of the applicable zoning classification and shall be appropriate for the type of
development and use contemplated.
The lots are generally rectangular in shape. Lots 1 through 29 are oriented along the perimeter of
the plat with two interior blocks containing Lots 30 through 64.
Each of the proposed lots satisfies the minimum lot area and dimension requirements of the R-10
zone. The plat plan does include setback lines for each lot showing potential building envelopes
and when considering the required setbacks, as well as access points for each lot, the proposed
lots appear to have sufficient building area for the development of detached Single family homes.
Properly Comers at Intersections: All lot comers at intersections of dedicated public rights-of-
way, except alleys, shall have minimum radius of 15 feet.
The proposed subdivision would create Lots 1, 29, 30, 34, 41, 42, 49, 56 and 60 to be located at
the intersection of public rights-of-way. The proposed radius for these lots would meet code, all
would have a radius equal to or greater than 15 feet.
hexrpt_Elmhurst.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
(d) Reasonableness of Proposed Boundaries
'reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 10 of 12
Access and Street Improvements: Access to the site is proposed via Bremerton Ave. NE coming
from the south through the new subdivision Laurelhurst. Access to north on Bremerton Ave. NE
was noted to by the applicant that it would be installed as part of another proposed subdivision,
Ridgeview Court (LUA 04-131). Two means of access are required to the plat.
In the event that the street frontage improvements for Ridgeview Court are not completed prior
to final recording of this plat, code requires that a minimum of 20 feet width of pavement and a
pedestrian walkway will be required along Bremerton Ave. NE from the northern boundary of the
project to the intersection with NE 4th Street.
Furthermore, if the right-of-way required to be dedicated by the Ridgeview Court Plat is not in
place prior to the recording of the Elmhurst Plat, the applicant of this plat would be required to
dedicate the public right-of-way along that parcel, PID # 518210-0042 (327 Bremerton Ave. NE).
To ensure access to the north of the subject plat to NE 4th Street, is in place, staff recommends
this as a condition of plat approval and reviewed and approved by the Development Services
Project Manager.
New internal roads, labeled as Road A and B and one new private access easement would
serve the plat. Dedication of a minimum of 25 feet of right-of-way (from the quarter section
centerline) will be required fronting the site with the extension of Bremerton Ave NE and street
improvements for all public roads including curb, gutter, sidewalk and street lighting are required.
To ensure common improvements are maintained, staff recommends the establishment of a
homeowner's association or maintenance agreement for all common improvements, including but
not limited to: utility and access easements, stormwater facilities and tracts, as a condition of
preliminary plat approval.
Topography: The site slopes from the north-northwest to the south-southwest at 3 to 5 percent.
Some steep slopes, ranging from 20 to 40 percent exist along the site's south and west property
lines but occur in small bands of 2 to 6 feet vertically. A few soil stockpiles are stored on the north
portion of the site created from previous construction contractors yard operations.
The site is mostly cleared with small strips of conifers/deciduous trees near the south and west
property lines. Some trees are also located among the structures located in the northeast portion
of the site. The tree cutting and land clearing plan depicts the location of a row of pines in the
northeast portion of the site (in new Lot 3) and in the east portion of the site (in new lots 39 and
44). The south portion of the site consists of scattered firs, alder, and deciduous trees. The tree
cutting and land clearing plan indicates that all vegetation from the plat would be removed except
trees located within Tract B containing the stream/creek and associated buffer. The cleared land
would accommodate the construction of homes, roads and storm detention as depicted on the
tree inventory plan which also identifies the location of larger trees.
Relationship to Existing Uses: The subject site currently contains several buildings proposed to
be removed and/or demolished. To the east of the site is one large single-family parcel, Fue Vue
parcel, and Phase 1 of the Laurelhurst Plat. To the west are existing single family residences as
well as to the south. To the north of the site are two undeveloped parcels within the City of
Renton, under the Commercial Arterial zone designation, one of which is the proposed Ridgeview
Court Plat. The proposed single family subdivision is compatible with these existing and proposed
residential uses.
(e) Availability and Impact on Public Services (Timeliness)
Police and Fire: Police and Fire Prevention staff indicate that sufficient resources exist to furnish
services to the proposed development, subject to the condition that the applicant provide Code
required improvements and fees. The Environmental Review Committee imposed a Fire
Mitigation Fee in order to mitigate the project's potential impacts to emergency services.
Recreation: The proposal does not provide on-site recreation areas for future residents of the
proposed plat. There are no existing recreational facilities in the immediate vicinity of the subject
property and it is anticipated that the proposed development would generate additional users of
hexrpt_ Elmhurst.doc
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15,2005
'reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 11 of12
existing City park and recreational facilities and programs. As required by the Environmental
Review Committee, a Parks Mitigation Fee will be required prior to the recording of the final plat.
Schools: The site is located within the boundaries of the Renton School District No. 403. Based
on the student generation factor, the proposed plat would potentially result in 28 additional
students (0.44 x 64 = 28.16). The schools would include: Highlands Elementary, McKnight Middle
School and Hazen High School. The school district has indicated that they would be able to
handle to additional students coming from the proposed development.
Storm Drainage/Surface Water: The applicant has submitted a Preliminary Technical Information
Storm Drainage Report prepared by Pacific Engineering Design, LLC, dated December 22, 2004
with the land use application. The report states that stormwater runoff from the site would be
collected in a storm drainage system and routed to a detention pond within proposed Tract A
located in the southwesterly portion of the site. The pond will be designed to meet the Level 2
flow control requirements and Basic Water Quality menu as specified in the 1998 King County
Surface Water Design Manual. The pond is proposed to be a combined detention/water quality
"wet pond' and discharges through a "bubble-up" energy dissipater catch basin, with the outflow
draining overland to the southwest through the stream/creek buffer to Maplewood Creek.
Staff recommends as a condition of approval that Tract A be fenced, landscaped, and irrigated
(unless drought tolerant plants are used). The property lines of Tract A fronting Road A, Lot 22
and 23 are to include a landscaped visual barrier so as to not interfere with site distance triangles
including plant materials which would provide a year-round dense screen within three (3) years
from the time of planting.
Also, the property lines along Lots 22 and 23 are to be fenced with a six foot high solid wood
fence, or other approved material (no chain link). Tract A fronting Road A must be fenced with a
wrought iron, chain link with vinyl covering, or decorative wood fence, to reduce the impact of the
drainage tract and the blank, continuous appearance of a fence. The applicant is to submit a
landscape plan and fence design calling out construction materials for the review and approval of
the Development Services Project Manager prior to recording of the plat.
The southwest property line of Tract A is the delineation 25 foot creek buffer which is required to
have a permanent fence and sign age installed along its edge prior to recording of the final plat
and to be reviewed and approved by Development Services. This is a mitigation measure
imposed by the Environmental Review Committee.
Water and Sanitary Sewer Utilities: There is an 8-inch water main in Bremerton Ave NE (north of
parcel No. 1523059030). There is an 8-inch water main stubbed to the west of parcel No.
5182100050 -NE 2nd Place (private street). There is an 8-inch water main stubbed to the west
of parcel No. 5182100051. There is an 8-inch water main installed in Bremerton Ave NE, south
of the project. Existing and new hydrants are required to be retrofitted with Storz "quick
disconnect" fittings.
A sewer main extension along the frontage of Bremerton Ave NE will be required. This sewer
main shall be installed at a depth to allow service to the parcel to the north. Separate side
sewers stubs are required in each building lot. No dual side sewers are allowed. The site is
subject to the East Renton Interceptor Special Assessment District (SAD) and Sanitary Sewer
System Development Charges (SDC) payable at the time the utility construction permit is issued.
H. RECOMMENDA TlON:
Staff recommends approval of the Elmhurst Preliminary Plat, Project File No. LUA-04-162, ECF, PP
subject to the following conditions:
1. The applicant shall obtain a demolition permit and complete all inspections and approvals for all
buildings located on the property prior to the recording of the final plat. The satisfaction of this
requirement is subject to the review and approval of the Development Services Project Manager.
hexrpt_Elmhurst.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
PUBLIC HEARING DATE: MARCH 15, 2005
)reliminary Report to the Hearing Examiner
LUA-04-162, ECF, PP
Page 12 of 12
2. The applicant shall have a conceptual landscape plan prepared by a registered landscape architect,
or a certified nurseryman, or other similarly qualified professional and be submitted to the
Development Services Project Manager for review and approval prior to final plat recording.
3. The right-of-way for Bremerton Ave. NE, along Parcel # 518210-0042 (327 Bremerton Ave. NE), shall
be dedicated prior to the recording of the Elmhurst Final Plat. The satisfaction of this requirement is
subject to the review and approval of the Development Services Project Manager prior to recording of
the final plat.
4. A homeowner's association or maintenance agreement shall be created concurrently with the
recording of the final plat in order to establish maintenance responsibilities for all shared
improvements. A draft of the document(s), if necessary, shall be submitted to the City of Renton
Development Services Division for review and approval by the City Attorney and Property Services
section prior to recording of the final plat.
5. Tract A shall be fenced, landscaped, and irrigated (unless drought tolerant plants are used). The
property lines of Tract A fronting Road A, Lot 22 and 23 shall include a landscaped visual barrier so
as to not interfere with site distance triangles including plant materials which would provide a year-
round dense screen within three (3) years from the time of planting. Also, the property lines along
Lots 22 and 23 shall be fenced with a six foot high solid wood fence, or other approved material (no
chain link). Tract A fronting Road A shall be fenced with either a wrought iron, or chain link with vinyl
covering, or other decorative wood fence. The applicant shall submit a landscape plan and fence
design identifying construction and plant materials for the review and approval of the Development
Services Project Manager prior to installation. Fences and landscaping shall be installed prior to
recording of the final plat.
EXPIRATION PERIODS:
Preliminary Plats (PP): Five (5) years from final approval (signature) date.
hexrpt_Elmhurst.doc
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
~~ , ...19 iO~N ---------~"r'llr=~-------..-~~ ..... , ~iffi~!EN.E~~ TH;:4fj£:;m;; ST,,;rnii+So;;::AA'ii'fHi '.,¥,..··m··· "" I ~rt iIA03 i 133.n '.I i
ti,j
~; .,' ." ... -.--1.\(1) Ii,' ~ • '(h,~. ~ ~ \..!.J ~ 1
" (2) '33"" ~ ,0 ~ ~ '0 (3) ~]I'H~
Z o
z
o
llJ.ttl
~
2
i ~
~ ~
T 30 MAR TIN 'IS
! :: <8 (203.831 ;U .... ~ nn . ." I~ ~1 jr:t~fJ
~ .
~
~J ~ D
0
'"
~..........:
'ftl.71 \. 195
~.,-.·~~~I~UII
100 i so i iSlii5 140 I
;~~ ~ !
(2)
3
4 /l~~~'""" F~~~-B"",~ ~ '1 -;;; tJ.t Itt oq-G& ' ~
ACREI TRACT
® I
).."'CORP. &.> ILIMIT
\.
, " III r16:4-~ ------..0 Ii -~ l!i .;
"'" N :1 3
Uo ®
~6
~14 5op. 882065
~ ~~' Ac. (I)
D zr' @ 8
@)
,
(4)
e lJ5t @)
@J
1.50 Ac.
@
,0 ®
608.11 ", . ,
\C 1; ::I m
4.32 Ac. ~
£09.418
----~::.::.:::::.:::=
~2
2.30Ac.
,~.",
BOAc.
@
r.;-.,
Ji
~~ :t
51r ~~
~LQ. II'W'
j I J::I -~!i
s Will
E
!
i
.........
SEC. 15, TWP. 23 N., RNO. 5 E., w.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
DCNSITY Co\U:Ut.4I1OHS :
R/W AR£A .. r.n ocz. OR 14.'ZJ .. tt. snt£W ACIIt£AGt .. fO' \IWDf' AA£A SOU1H OF Nt ZND PL. itHO f' MIDl Nt£A NOIfTH OFNEbClPL. .. dotocMJ,aoItIq. tt. 7t)TAL AREA .. ',.0 oc. OR .'6,,'78 ... tt. PROPOSED ACC£SS £ASDIOrIT NI£A .. D.OJ 00. 1.28' .. ft.
~l :.':~ 10 't ot\£l.OPWfNT ~=)COIMTY R£COIfOIHO
DENSl'TY.. ... L07S
roTA£. Nf£A (oe) -R/W (oc) -SlREAAI (oc) -ACCDS (oc)
DtHSrTY .. '4 L07S
I.to /It: -1.72ot: -0.01 oe -o.o.J tIC
DOISTY .. 'of LOn
7." 00
OlNSfY .. U5 tAll_
SnE IIIF'OIfW.IION :
r.D:.StJEMEA-.....
2. ~ :r\E)A~:ft oe
30 OeAL!. snr.ut£4 (JNa.. VACA JED AREA) .. ..to oc
.. It/W 10 IIC omrcAlED-f.72 ..
OWH£R/IoI'PUCANT : l.I8[Jf1'Y RIDOC LLC. '"5 10TH A~ S. SEATllL WA. .. 01
a\tl. ENGINEER :
'f:t .. k1'~;;'f'D
P,UG,tNT AND SIOlWALK NORTH (I aJMAIt$T TO
J( JNSTALUJ) W CC»WNCTfOH
IIflH IffOGIf\4EW CCUtr
GE'01E'CHNICAL ruTH COHSUlTAN7I. INC. fNQIHEER: r~IJllH PLACl' H.£. Slnt 201
SUR>ODR :
~':1~110 comtC POIH7r _~
JJ70f 'TN A\!', S ~AL(~ ~-'f:t
8H:ET1CJEX
POt PlfDAllNAIrf PLAT
F'02 ccwosnr UWTY PUN ~~AIl~1'f.AN
YlCNTYMAP
~~~;~J~~~~~T~*i;: MlP ----------. P05 MOIfJtJ'OH A\£ H.L AND IIOAO • _NfYPI!MLE POe R04D CROSS .tt'C'IJOHS AND IKW)AI'ttflJIIfHAItYI'ftOn.£ POT GRADlNQ AND DlWHAQ£ I'I.AH
.... DOS1ING """"""'" .... _y
~ DIS1WO: 8OI.NMIfY
rut:' VU[ tN
~ --------QlW'HCIICALE
SCALE. 1" -50'
---1---7· 10
LAUm:LHUF<!tr PHASE 1
(UND[!X C()~STRucnON) '2 .. __ ._.)!. ......... -......... .
:3
4-
NOTE·
F"CR L0CA7rOH OF sn£Jt. WAD AND
S7QIfU DftAWAQ[' sa SHEeT fJ02
D
~/kAHI<ET
RIGHT 10 MJi([ HEC£SSARY SLGf'£S FOIt CUB QIt nu.s /JII'ON SAl) IIROIISES FCR 'JflH A\£ s.r. AS GRANTED flY DaD
RECMOlD APU J, 'HZ UHODf ~No.54OT.»f.
~DA7UI
aTY OF R£NJ'ON. HAW. COH1DCJR wmtVAL • ,.
Bf!NCH.WI(
lASt, KIHO COlMTY POIHT , IffHTJII:U: FOUND I"UHOI IN :s" ICING COUNTY stftf"ACE' MASS DISC AT 7H£ smaT JlmtS[ClKW OF HE 4lH STRaT AND ,.lH A\IE'. SE IrWfIOHG 7H£ HQItlHw!sT 0CWIDt OF src7JOH , ... TO'" 2JH.. IWKIt 5£., lUI. IU'VAlJQfrIII 4U.78 nET. .,.,
5£T oorn:w QIH !PI([ 11.1' SOUlHlDT OF n£ ,,"T OOUMH OF QAl[.
IU'VAncw-407." mr.
BAaS OF BEAFfNO
JIIkIE NOIt7H. BASI]) UPON «'09AL. POStTIOMHO S'IS7DI (QPS) LAA&RT QRJ) WASHItHOTDH STAlE HOItlH ZON£ ~AJES. A 00N\0Gt:NC£ AJKJt.E OF OO'5I'JO.a-COUNmtQ.ooc ... WAS
APPUat AT A. A.IHl!H IIIA1tJ( IN :s" DIC CCUrfTY SURFACE MASS DfSC,
AT 1H[ STR£ET w1tl'SEC1KIH OF He 4lH Sf. AHO 1<UJlH A'wE SE. UAIfKIH(; 7Ht HOIfTHtAST CO/fH£It OF SEC7JON ,5, 7011HSHP 23 NOIt7H, tUHQ£ 5 EAST II JHt III.LAMETTE' MeJINOMN. 7H£ NOR1H AJIERICAH
DA n.w OF '''''./I''' (HAD &Jt7r) GRID COORDIHA 7ES M€R£ FOUND TO 8C 18OIC11 ... / fJIII2Z.JZI AT »fAT POINT. 1HE'M£JIrS£ OF 801H 7H£' $(A, L£Wl. COM£CnoN FAC7tIR OF o.tHllfUof. AND 7H£ GRfD SCALE FACTQIt OF I.OOOClQ2ft7 WAS APPU£D 10 7HE GRID
COQ1IOINAl[$ nJIt ~ GIIOUtCJ DfSTANCfS.
LEQAL 0E8CRI'TI0N
~ 1HE SOUTH flO mr Of' 1HE' lAST 115 FCCT OF 7H£ FDUOWHG DESCIUlD PIfOIIDfTr': 7Ht' NOR7H HALF OF JHE' SQlJH£AST QUARTER OF tHE NOIt7H1I[ST <XJMlD' OF tHE NOItJMIDT CllJM'D OF SEC110H 7.5, TOtIIHSHIP 2J HOIflH. /fAN« 5 £AST, 1k.iL;
DCD'T H CAST 31.5 FaT 1HDfrOF FOIt RCMD:
(N.!IfJ IC'HOMN AS 7H£' SOUJH ffl:1 nrr OF 7HE CAST 215 FIET OF 'D£ HOR7H HALF OF MACT J" Al.U'7JH ACItE ~ ACCXII'IDM; TO 1HE' ~ PLAT »CJIIPlII'.
St7UA 7[ w 7HC COLWTY OF 014. $TA JE' OF WASHtHCTtW.
~
lHE' .5OCI1H HALF OF 1Ht SOU1HEAST OUNI'mt OF 7H£ HOIf1Ha£'ST OUM'mt OF 1)£ HM1HlIEtT QUARD OF S£C1JOH IS, 101NlHP Z3 HCWmf, IW«J£ 5 EAST, b.;
CXC£PT 1HC CASlERL y 1.5 FrET JHEIIf£CF nJIt R(W):
(ALSO KNOWN AS 7H£ SOUTH£Ri. 't' HALF OF 'lRACTS 5 AND It AlARm AeM' MAc1S. ACCClIfDINO 70 tHE ~ ,.,...T 7HDf[OF.
srruAl£ IN JHl' COUNTY OF ICJIQ. STAlE' OF ~ltIH
~
1HE' HQItlH HALF OF 1H[ SOU7H£AST OUAlfmt OF »-IE HOff7HME'ST QUM"IDf OF JHE' NOIt7HIlEST OU.AoR1EJt OF stC1J(IH 15. mllNSHf' 2J NORm RANQ£ " £AST, lUI.:
r:xcDT 1J£ CAST 31.$ nrr 1H£R£OF FOR ROAD:
AND EXCEPT THC SOUTH liD ncr OF JH[ EAST 215 nrr OF lNC tfOIAMIIR.
(ALSO KNOWN AS 1Hl NORTH HALF OF JRAClS 5 AND .. UNf1tH ACRE MAclS. ACCQItOWG 10 1H£ tI'«falIfIJ£D PLAT JHERECfi' DtCfPT JHC
SOCJ7H 110 F!rT OF 1H£ £UT 215 fEET OF loUD 7RACT 5,)
sntMl'[ IN JH[' COUNTY OF ICIrIG, STAl'[ OF WASHINGltIN'
~I ~~ j !J ~5i~ ~~~ ih~~U~
Ol)U ~~ U·C~ t;:~ ..... ~ U~ til ...... ~ Ol) [f.I ~ ~ ~O
i
ilill
~
~~ ~i
.~~ ~~ "'il
.aiel ....
.. ;
.llo: ~] u
!
~
~
~d ~.~. ~~~I
ORA'MIi BY': ..JQC
lSSUEOATt: ~
SHEET REV.:
LJ
, " 020~4HC01-P03
P01
.-T1()p11
II I!I: ~llili
! ~l " ~ ~I
il~1 ~
"'H
~~
j I ~~I -~!i
a
Will! t
~
t
!
i
IIE\1IIONS
... ..,
!
I I
I \ : J '--. --_L_ -.,,."-
SEC. 15, TWP. 23 N., RNa. 5 E., w.M.
FUE VUE:
--1---r-1o--H-
LAURELHUR~T PHASE 1 I I
(UNDER CO/<lSTRUCTION) : I --T---2------T ---9--11
I 1 1 I _. "~ --_·t:··M H"_ -.•. " •••• f-i
I
I I
\ \ \ FERNWOOD\~~~ , "--
\ ".................. ..............
'1'1'1
~
.-.-.---CIW'HO IIC.AU!
8CAl.E: r • fJO'
I&f7JCAL. DATtN
..... .... ...... Q14 HAlO _ 00NTr1JJR MJaVAL -Z'
EIENCHIARIC "',., IOHO OIXMTr P'OIHT I IfIJmI52:
FClf.N) ~ " r ItIHt: COUNTY stWAC£ MASS t:MSC AT lH[ S1REET 1N7fIISECTION OF HE 47H S7MET AND f.fIITH A\o£ ~ IIMIONG 1H£ HQ1rJHa.DT 0QIltCJIt f:' SEC1JCW 'of. 7OIHSNf' 2.W.. IWIt% 5£, w..IiI. .£L£VAJJtW-45478 nz1:
... '" scr oomw ON PICE' ,t.,' SCCIJHKST OF 1H£ !CST tXJ..UI,M OF GATE.
ELfYAlJCIH-;f(J7." FEET.
8A8II OF IEAIWQ
nftJI' NarlH. Ma'D II"ON ~ ~'IJOMHQ ~ (QIIIS) l..AIIEItT QIIfO ~ STAlE' NOIt1H ZONe CCIQIlOWAJES. A CCW\OGEHCE' NIOI.L OF (I(J'M'~ CXIIMlEJIQ..OQI .u
AI'fIUlD AT A 1'UNCH fW/II( " r IONO COJNTY sutf"ACf' MASS IXSC, AT H SlMIT .wma:rcncw OF HE .IN ST. AND 148JH 04\0£ 5£.
IrWfItINtI JHt HCWJHCAJT c:c:IIIIN£It OF SEC1ICW 15. ~ 23 NOfUH .. ttAH« • EAST OF 1Ht ~ ~ »£ NOiIfTH AII£/fICAH
DAJUM OF '''''/1''' (HAD &JIlt) GIIID CCIOfIOfNAJD IIER£ FOC.N) 70 IJ£ taoH.1. ... / '.l11UL3JS' AT lHAT "OIa 1Hf: M£RS[ OF 80TH JHE SEA tna. c:cwtf'CJJCW FACn:w OF o.INNIIH AND THE "'" SCN.E FAC'1Qt CF f.OOOOQ2fI7 WAS N¥'tJED 11) JJC' GIWO ClOCII1tDWA.JES' fO/f SHOIH CiIfICXN .TANCES.
~I ~~ ; !~~ iihn;~
ooU I:l...:l (J.t: ...:l f.!:: Il) ~ .... Il) .... (J1:l ~ ~o
~
1111
-fj 00] -~ .. l~ Is:: :E1 u
I
I
~ II ~d I·~I ~I;il
~;
DIU" 1'1'= .JQO
1SSUi: DA 1[: 1e-OI-OI
SH£ET REV.:
LAIC> a..ANCI
I'I..AH ~ClUI'1..a
020&4TR01-P03
P03
..-T;scpa
II Irf allill
~
! I
~~ ii :18~ Ii
~H
j I J.~I -~!i
s
Wll t
~
!
~
..........
/
\ ~ .t /
\ I J '-----. \ ='::!!.rx-" -_.--'---
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
FUE VUE
--1---T-lo--;-T-
LAURELHUR~T PI'IASE 1 : I
(UNDER CO~STRIJCTION) I I
.-. --2---!r --g-····il
:1 I I - ---"--1,-_ ... _-- -_·t-I
3 ~ 8 I ._.~ ___ ._, I
I 7
.... __ ._-
I f)
_ L __ ......... .
It'N ~
k· -i;;J-J T _. .
ClIW'HC ..........
SCALE"-(f()'
~OATUW
_ •• _ .-..DH, HAW .. 0CIHJ0LIIt 1HlaVAt. _ Z'
EIENCHIAIIK ."'" ~ txJlMTY I'OIIT I MNnI.R
FOUND P'fIHQIIN r KfHG CQJHTY St.IFACl' MASS tvsC AT THE S1JII!ET
INtt1tSEC1JOH " HE 4-TN S7JlflET N«J 1~ A~ 5E IWfI<IHO H HQ1tJ'HlCIT CIQIIWDt OF .!!C7D 1~ lOMNSt*' ~ IWIG£ 5£.. lUI. G.lVAncw-........ nIT. .,.,
SET COm:w tIN SlICE , .. , • .axnHIBT OF THe JEST COLUMN OF &UE.
~1JON-401." nu.
~ CJI< lIEA/WQ
nturNClllt1H. &U!D1.PON'GtC8Al.P'OISlICIMHGS't'S1DI(GPS) ~ IiWID ~ STAlE' HQR1H ZONE COOftDWAJES A CON'rf1KJ£Nr:£ ANtiU OF CIO'5I'JO..a" CCXMDfQ.000WSI' IIU API'fJ£D AT A FtWCH IIAIfK IN ~ KWG CCIJNT"f SUfl'"Ac:t MASS J:¥SC. AT THe SlRGT li7DSE'CnGW OF tIC 4TH Sf. AND 14lt1H ,,\0£ SE. WARKM 7H£ HtJIIl''JhtA$T COIWDf OF SE'ClJCW fS. 1OIWSf,p Z~ HOIt'JH. twKiJC 5 £AIT OF JIi£ M..LMETJ[' IIERDNI. ThE' IOfTH NIIEJ!IICAN
0A1UII tT ftlJ'/tNf (HAD &J/»f) GRID COORD'~AJES KR£' f"CICHI ro
II£' 1101OJ. ... / 'JlUu,m AT JHAT POWT. H 1H\CJtS[' OF 80JH 1Hf S[A LE\!l CCIM[C7ICH TAC7tJIt OF CUtlN,a" AND THe GIIItO SCALE FACTQ1t OF f.OCIOOO2I87 WAS A/¥ItJEl) 10 1HE tiN)
CCJQ1fQIHA 7U FOIf SHOtIN GItCUID asTN«%S
/..EOlH:)
......... -~ • ......... _MMICIE ..... IN' H'IIIWfT ASIIEIAY
L 4W'. _eMAIl If/lDPCItM'Y r &.OIIaW ABWLr .. ,.,....,.,.
~ saw
• c:.nPI'l
Ii>
Ii>
....l....
--1
[.":;~;!
I!ii.!i'IiiI
IIIIIIIIIII
C8nN'IW/JIIIIUIUJC:JCJIOUJ
.. TIN" ,
C8nN' •• ..-.,aLOaClllOLI)
-.-.-.-....... ~ """"'1MMrUU)
MCP'c.D ..... y 0ItAII CCIffCCJJCIH
-"' ...... _ ... ---
~~ m. ~~ ; I~~ iU~n;~
bl)U U.a ~ .ga
tQ U ~ § ~1! ~O j~
i
1111
~! ¢~
PRo.£CT NO.:
:El u
I I
i
~ Ii r·~1 ~I;i!
DRAWN BY: .JOIC
ISSUiDATt": ~
SH£ET REV.:
L::J , . ....
02O&4GR01-P07
P07
_701'8
i • kLn'
ai II I i
.,II
~~ II 8~ t~
..........
~~'\
"u i~l ! . d I-~-~~I .. ~ fw-
~ Ir~1 ~'i
s i1ill I
~
I;
!
~
,-
\
I
\ \ / l.. .. ~J ......... , ... " ....
\ \ \~
\ '. -'-. "
----~
SEC. 15, TWP. 23 N., RNa 5 E., W.M.
'--....... -
~
" '-~'-
\\'~~-~~~,
I
I
\ ,
1
I
1
" ",
--1 --~-1(-i H-
LAURELHURI T PHA( . .3E 1 I I
(UNDER C' srRUCIONl : I --Z'''-Y-'-g-~ -"11
l! II --3--'T-~---t~ ~ 1
_. -4---:----,---"\ . \ , \ , \
-5-----..lr-6--r
UHDfR' CONS CnoH 1
.. ~~~~ ..... _i.4
\ I I I I
I /
trJ ~ . .. --------QIIAI'tC 8CAI.E
SCALE' r • 50'
ancAL. OATUW
WIT \P _rDH. HAIoD _ CCWJDUIt IN1IJtVAl -Z'
f3ENCHoIAFI( ....,
lONG ctJUHrY /'OINT , IfINTII5I:
FQJIIJ I'f.INa4 II so lOtIO ODI.MTY SLW'ACE MASS DfSC Ai T 1H£ S1N£ET lHJUfS[CJJCW OT HE 41H S1Pf£El' ANJ '48tH A\!£. 5[ IINfIOHG 1HC Hat'rHIDT CQIINJt OT SIECJJCW '4. ~ ZJN.. fItANCt£ IE.. ...... 1UVAYJCW-..... ,. I'IlT. .,.,
JCT c:om:w tal PWl' , .. ,' SCIUTHIDT OF 7HC lOT CC1I.J.IIIH OF QA1E. a.tYAmw-401 •• nn
BASIS Of' I!IEAIfNO
lJIUf'NtJIffH. MSmIl"ONGl.C8At.POSf'fttJNIHQ$'I'S'I!JI{fiPS) ~T GItID 1MJII,WG7QH STA1r HOIffH ZONC COORDWAJES. A
CXW\l£llfGEM:f' NIQL " 00'II".lCUt"' CCUIlIlfCL.OarO WAS APfIUfI) AT A NNCH IJA/fK " so KIH(J COUNTY SUltf'AC% MASS DGC;. AT JHC STJIIaT WlEltl£ClJOH OF NC 4-fH ST.. AND f4alH A\IE !IF.
IWfItJHQ JHC ~ CQtNEI' OF SECTJOH '5. l'DMHSHIP 2J HOIUH. tfN#JE 5 EAS1 CF nc IIR.LA6IfTJE' AIDIfOIAH. H" HC»fTH MI£JfICAH OAJUW OF ,N,J/I'" (WAD ~) GIlD COC\lIIICfHAJES tIP£' FOlN) 70 BE 1aot(U. ... I ',}JfQ2..lf1 AT fHAT II'OINT. 7HC 1H\oPSE OF BOTH 'tHE $[A U\fl. COIfICC7ION FAC10If OF o......,au AND nc QrIO SCAt£ FAClQIt ", f.Q000Q2,., WAS AI'fItJD) TO IN: QIIfO
aoatOIM4D fO/f SHOtIH GIItOUNO DfSTAHCtS
DCOIOIINIIID JO& APPROVAL
______ oate ___ IBY· ____ _
_______ Date ____ BY. ____ _
D
~~ uil ~~ Ii i ~ ~~ ~ ~~~ uh~*;1
bll~ (J'E ~ '~:I
t+:: ~ ~~ ~lS.d~ J~ ~~o :j ...
~1
~
1l1li I I ~ ~~ ~~ ~ II ~·~I ~llil . ~
""OJECT NO.:
DRA ... 1Yt ~
ISSUE DAm -..ot-04
SHEn ftEV.:
LJ , " 02054£cOl-poe
P08
.-r10fll1
R-l
R-IO
,.q
~ -+-" ~ 0 ~ ~
~ T"-i
t: ~ ~ ~
~ ~
S foe
~ tI'J ,
~ ~ ~
RMH
SE 142nd St.
RC(P)
(P)
G6 .. 22 T23N RSE W 112
~ ZONING ----Renton 0iV Umit,l o ~naoocALSBIlnD 1'H '6... 200 f.?0 F 6 1:4800
15 T23N R5E W 1/2 , 5315
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO{S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201, 251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and
storm drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES:
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc.,
dated August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
professional and properly documented and reported to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (Le. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (Le.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
Wheeler, Mayor
March 3, 2005
David Halinen
Halinen Law Offices, PS
10500 NE 8th Street ste: #1900
Bellevue, W A 98004
SUBJECT: Elmhurst Preliminary Plat
LUA04-162, PP, ECF
Dear Mr. Halinen:
CIT~ ~F RENTON
PlanningIBuildinglPublic Works Department
Gregg Zimmerman P.E., Administrator
This letter is to inform you that the appeal period ended on February 28. 2005 for the
Environmental Review Committee's (ERC) Determination of Non-Significance -Mitigated for
the above-referenced project.
No appeals were filed on the ERC determination. This decision is final. The applicant must
comply with all ERC Mitigation Measures issued in the Report and Decision dated
February 8, 2005.
A Hearing Examiner Public Hearing has been scheduled for March 15, 2005, where Plat
Conditions may be issued. The applicant or representative(s) of the applicant are required to be
present at the public hearing. A copy of the staff report will be mailed to you one week before
the hearing. If you have any questions, please feel free to contact me at (425) 430-7382.
For the Environmental Review Committee,
~~
Susan Fiala
Senior Planner
cc: Liberty Ridge LLC -Attn: Mike Merlino / Owner ~
Rose Woodall, Fernwood North H.A., Terrance Flaig, Sara & David Scott / Parties of r
~~ .~ #7
------l-O-SS-s-o-u-th-G-r-ad-y-W-a-y---R-e-nt-o-n,-W-a-sh-i-ng-t-on-98-0-S-S------~ * This paper contains 50% recyded material, 30% post consumer AHEAD OF THE CURVE
u:f(
Kathy Keolker-Wheeler, Mayor
February 23, 2005
David Halinen
Halinen Law Offices, PS
10500 NE 8th Street #1900
Bellevue, WA 98004
Subject: Elmhurst Preliminary Plat
LUA-04-162, PP, ECF
Dear Mr. Halinen:
CITY~F RENTON
PlanninglBuildinglPublic Works Department
Gregg Zimmerman P.E., Administrator
Enclosed is a copy of the comments for the subject plat from Property Services review of
the project. The memo lists changes required for the final plat approval. Please forward
as necessary.
If you have questions, please contact me at (425) 430-7382.
<,.-
Susan Fiala
Senior Planner
cc: Liberty Ridge LLC I Owner
Project File
. \l~ \ ~ ~~ d-\')' ~ \ 0
\~
y
------------l-O-S-S-So-u-th-a-r-a-dy-W--ay---R-e-n-to-n-,W-a-s-hl-.n-gt-on--9-80-S-S-------------~ * This paper contains 50% recycled material, 30% post consumer AHEAD OF THE CURVE
, .
DATE:
TO:
FROM:
SUBJECT:
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
February 18, 2005
Susan Fiala
SonjaJ. Fesse~ .
Elmhurst Preliminary Plat, LUA-04-:V12, PP
Format and Legal Description Review
Bob Mac Onie and I have reviewed the above referenced preliminary plat submittal and have the
following comments:
Comments for the Applicant:
The east line of the subject plat is not clearly defined on the drawing (note in a bold line, as the
other sides are already shown). Show where said east line crosses "ROAD A". It is understood
that there is street vacation (V AC-04-007) currently being processed by the city that affects said
east line of the plat.
Include "CITY OF RENTON, KING COUNTY, WASHINGTON" in the indexing line (top of
drawing sheet).
Information needed for final plat approval includes the following:
Note the City of Renton land use action number and land record number, LUA-OX-XXX-FP and
LND-1O-0427, respectively, on the drawing sheets, preferably in the upper right-hand corner.
The type size used for the land record number should be smaller than that used for the land use
action number. Please note that the land use action number for the final plat will be different
from the preliminary plat number and is unknown as of this date.
Note two ties to the City of Renton Survey Control Network. The geometry will be checked by
the city when the ties are provided.
Complete City of Renton Monument Cards, with reference points of all new right-of-way
monuments set as part of the plat.
\H:\File Sys\LND -Lund Subdivision & Surveying Records\LND-1 0 -Plats\0427\RV050203.doc
, .'
February 18, 2005
Page 2
Provide plat and lot closure calculations.
Note the date the existing monuments were visited, per WAC 332-130-150, and what was found.
Required City of Renton signatures, for plat approval, include the Administrator of
Planning/Building/Public Works, the Mayor and the City Clerk. An approval block for the city's
Finance Director is also required.
Appropriate King County approval blocks need to be noted on the plat drawing.
Include a dedication/certification block on the plat drawing.
All vested owners of the plat property need to sign the final plat document. Include notary blocks
as needed.
Indicate what has been, or is to be, set at the corners of the proposed lots.
On the final plat submittal, remove all references to topog lines, existing utility facilities and
other items not directly impacting the subdivision.
Remove all references to building setback lines. Setbacks will be determined at the time of
issuance of building permits.
Note encroachments, if any.
Note all easements, agreements and covenants of record on the drawing.
Note discrepancies between bearings and distances of record and those measured or calculated, if
any.
The city will provide addresses for the proposed lots after the preliminary plat is approved. The
addresses (and street names) need to be noted on the drawing.
Remove all references to density and zoning information from the drawing.
If there is a Restrictive Covenants, Conditions & Restrictions document for this plat, then
reference the same on the plat drawing and provide a space for the recording number thereof.
Note that if there are restrictive covenants, agreements or easements to others (neighboring
property owners, etc.) as part of this subdivision, they can be recorded concurrently with the plat.
The plat drawings and the associated documents are to be given to the Project Manager as a
package. The plat document will be recorded first (with King County). The recording number(s)
for the associated document(s) (said documents recorded concurrently with, but following the
plat) need to be referenced on the plat drawings.
If there is to be a Homeowners' Association (HOA) for this plat, the following language
concerning ownership of "Tract A" (the detention area) applies to this plat and should be noted
on the final plat drawing as follows:
H:\File Sys\LND -Land Subdivision & Surveying Records\LND-IO· Plats\0427\RY050203.doc\cor
· .
February 18, 2005
Page 3
Upon the recording of this plat, "Tract A" is hereby granted and conveyed to the Plat
of Elmhurst Homeowners' Association (HOA) for a detention facility. All necessary
maintenance activities for said Tract will be the responsibility of the HOA. In the
event the HOA is dissolved or otherwise fails to meet its property tax obligations, as
evidenced by non-payment of property taxes for a period of eighteen months (18)
months, then each lot in this plat shall assume and have an equal and undivided
ownership interest in the Tract previously owned by the HOA and have the attendant
financial and maintenance responsibilities.
If there is no HOA, then use the following language on the final plat drawing:
Lots 1 through 64, inclusive, shall have an equal and undivided ownership interest in
"Tract A".
The foregoing statement is to be accompanied by language defining the maintenance
responsibilities for any infrastructure located on the Tract servicing the plat, or reference a
separate recording instrument detailing the same.
The new private 20' access and utilities easement over Lot 13 is for the benefit of Lot 14. Since
the new lots created via this plat are under common ownership at the time of plat recording, there
can be no new easement created until ownership of the lots is conveyed to others, together with
and lor subject to specific easement rights.
Add the following Declaration of Covenant language on the face of the subject plat drawing, if.
the previous paragraph applies:
DECLARATION OF COVENANT:
The owner of the land embraced within this plat, in return for the benefit to accrue
from this subdivision, by signing hereon covenants and agrees to convey the
beneficial interest in the new easement shown on this plat, to any and allfuture
purchasers of the lots, or of any subdivisions thereof This covenant shall run with
the land as shown on this plat.
The new private access and utilities easement requires a "NEW PRIVATE EASEMENT FOR
INGRESS, EGRESS AND UTILITIES MAINTENANCE AGREEMENT" statement noted on
the plat drawing. See the attachment.
An updated Plat Certificate (to be dated with the 45 days time-period prior to City Council action
on the subject plat).
Fee Review Comments
The Fee Review Sheet for the preliminary plat is provided for your use and information.
H:\File Sys\LND -Land Subdivision & Surveying Records\LND-IO -Plats\0427\RY050203.doc\cor
Title for both of the following paragraphs:
NEW PRIVATE EASEMENT FOR INGRESS, EGRESS & UTILITIES
MAINTENANCE AGREEMENT
Use the following paragraph if there are two or more lots participating in the agreement:
NOTE: NEW PRIVATE EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND
UTILITIES IS TO BE CREATED UPON THE SALE OF LOTS SHOWN ON THIS
PLAT. THE OWNERS OF LOTS SHALL HAVE AN EQUAL AND
UNDIVIDED INTEREST IN THE OWNERSHIP AND RESPONSffiILITY FOR
MAINTENANCE OF THE PRIVATE ACCESS EASEMENT APPURTENANCES.
THESE APPURTENANCES AND MAINTENANCE RESPONSffiILITIES INCLUDE
THE REPAIR AND MAINTENANCE OF THE PRIVATE ACCESS ROAD,
DRAINAGE PIPES, AND STORM WATER QUALITY AND/OR DETENTION
FACILITIES WITHIN THIS EASEMENT, PRIVATE SIGNAGE, AND OTHER
INFRASTRUCTURE NOT OWNED BY THE CITY OF RENTON OR OTHER
UTILITY PROVIDERS. MAINTENANCE COSTS SHALL BE SHARED EQUALLY.
PARKING ON THE PAVING IN THE ACCESS EASEMENT IS PROHffiITED,
UNLESS PA VEMENT WIDTH IS GREATER THAN 20 FEET.
Use the following paragraph if there is one lot subject to the agreement:
NOTE: NEW PRIVATE EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND
UTILITIES IS TO BE CREATED UPON THE SALE OF LOTS SHOWN ON THIS
PLAT. THE OWNER OF LOT SHALL HA VE OWNERSHIP AND
RESPONSffiILITY FOR MAINTENANCE OF THE PRIVATE ACCESS EASEMENT
APPURTENANCES. THESE APPURTENANCES AND MAINTENANCE
RESPONSffiILITIES INCLUDE THE REPAIR AND MAINTENANCE OF THE
PRIV ATE ACCESS ROAD, DRAINAGE PIPES, AND STORM WATER QUALITY
AND/OR DETENTION FACILITIES WITHIN THIS EASEMENT, PRIV ATE
SIGNAGE, AND OTHER INFRASTRUCTURE NOT OWNED BY THE CITY OF
RENTON OR OTHER UTILITY PROVIDERS. MAINTENANCE COSTS SHALL BE
SHARED EQUALLY. PARKING ON THE PAVING IN THE ACCESS EASEMENT
IS PROHffiITED, UNLESS PAVEMENT WIDTH IS GREATER THAN 20 FEET.
PROPERTY SER' S FEE REVIEW FOR SUBDIVISIONS 1005 -o<;e-
APPLICANT:~~~~~~-c~~~~~~~ ______________________ _ RECEIVED FROM ______ ------;~--;---
(date)
JOB ADDRESS: 201 '"BB.e:M~b.L A;vE blE WO#_'7~'7,--,a""",-",<c...,5-..<-_____ _
NATURE OF WORK: G4-LdI 1-oL-1G; -PC,~U=:'-MHUBS+ ~) LND # /0 -04e7
)(. PRELIMINARY REVIEWot SUBDIVISIONIiY'iONG PLAT, Nl~'"EITMORE INFORMATION: -LEGAL DESCRIPTION
SHORT PLAT, BINDING SITE PLAN, ETC. PID #'s .. VICINITY MAP
-FINAL REVIEW OF SUBDIVISION, THIS REVIEW REPLACES SQUARE FOOTAGE .. OTHER
PRELIMINARY FEE REVIEW DATED FRONT FOOTAGE
SUBJECT PROPERTY PARENT PID# 5182.10-0049 J -coSo -
-0051
NEW KING CO. TAX ACCT.#(s) are required when
assigned by King County.
It is the intent of this development fee analysis to put the developer/owner on notice, that the fees quoted below may be applicable to the subject site upon
development of the property. All quoted fees are potential charges that may be due and payable at the time the construction permit is issued to install the on-site and
off-site improvements (i.e. underground utilities, street improvements, etc.) Triggering mechanisms for the SDC fees will be based on current City ordinances and
determined by the applicable Utility Section.
Please note that these fees are subject to change without notice. Final fees will be based on rates in effect at time of Building Permit/Construction Permit
application.
The existing house on SP Lot # , addressed as has not previously paid
---:-:-_-". SDC fees, due to connection to City utilities prior to existance of SDC fee Ord. SP Lot# will be
subject to future SDC fees if triggering mechanisms are touched within current City Ordinances.
We understand that this subdivision is in the preliminary stage and that we will have the opportunity to review it again before recordation.
Th ~ II d ~ d NOT' I d . ~'d . ~ h f e 0 owmg quote ees 0 mc u e mspectlon ees, Sl e sewer permits, r w permit ees or t e cost 0 water meters.
SPECIAL ASSESSMENT DISTRICT PARCEL METHOD OF ASSESSMENT ASSESSMENT
DISTRICTS NO. NO. ASSESSMENT UNITS OR FEE
Latecomer A~reement (pvt) WATER -0-
Latecomer Agreement (pvt) W ASTEW ATER -0-
Latecomer Agreement (pvt) OTHER -0-
/
Special Assessment DistrictlW A TER /-0-
1:A'bT ~ I/..lfl=:ACEPlbFl ~ bee4.SZ)( UUI"'/'5-r (;4-"T'eO
Special Assessment DistrictlW ASTEW ATER 1~.e::eT
Joint Use Agreement (METRO) -
Local Improvement District * -
Traffic Benefit Zones $7S.00 PER TRIP, CALCULATED BY TRANSPORTATION -
FUTURE OBLIGATIONS -
SYSTEM DEVELOPMENT CHARGE-WATER .. Estimated # OF UNITS/ SDC FEE -Pd Prevo .. Partially Pd (Ltd Exemption) -Never Pd SQ. FTG.
Single family residential $1,525/unit x a.4-.$ cn.«:£lO.OO
Mobile home dwelling unit $1220/unit in park
Apartment, Condo $91S/unit not in CD or COR zones x
Commercial/Industrial, $0.213/sq. ft. of property (not less than $1,525.00) x
Boeing, by Special Agreement/Footprint of Bldg plus 15 ft perimeter (2,800 GPM threshold)
SYSTEM DEVELOPMENT CHARGE - W ASTEW ATER" Estimated
.. Pd Prevo -Partially Pd (Ltd Exemption) .. Never Pd
Single family residential $900/unit x (b4. $ 57.<;;00.00
Mobile home dwellin~ unit $720/unit x
Apartment, Condo $S40/unit not in CD or COR zones x
Commercial/Industrial $0.126/sq. ft. of property x(not less than $900.00)
SYSTEM DEVELOPMENT CHARGE -SURFACEWATER .. Estimated
.. Pd Prevo .. Partially Pd (Ltd Exemption) .. Never Pd
Single family residential and mobile home dwelling unit $71S/unit x G,4 $4-5 7~.0C>
All other properties $0.249/sq ft of new impervious area of property x
(not less than $71S.00)
I PRELIMINARY TOTAL $
'< I\) III 0 III 0 H U1
H
*If subject property is within an LID, it is developers responsibility to check with the Finance Dept. for paid/un-paid status. III <: .....
Square footage figures are taken from the King County Assessor's map and are subject to change. III .:
Current City SDC fee charges apply to ___________________ _ ;l
0
EFFECTIVE January 1, 2005
City of Renton Department of Planning / Building / Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: COMMENTS DUE: JANUARY 28,2005
APPLICATION NO: LUA04-162, PP, ECF
PROJECT TITLE: Elmhurst Prelimina Plat
SITE AREA: 9.6 acres BUILDING AREA ross: NIA
LOCATION: 201,251, & 257 Bremerton Ave NE I WORK ORDER NO: 77365
SUMMARY OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval for a 64-lot
subdivision of a multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are included. The site is zoned
Residential -10 dulac and is to abide by a Development Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and
intended for detached units. All existing buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal
public streets and private access easements. The applicant is requesting modifications to street standards and vacation of right-of-
way. One non-regulated on-site wetland would be filled. Maplewood Creek crosses the southwestern portion of the plat.
A. ENVIRONMENTAL IMPACT (e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary Environment Minor Major Information Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services Y
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
8. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas where additional information is needed to properly assess this proposal. cfb b-KJ Z~/O~rJr
Signature of Director or Authorized Representative Date
STATE OF WASHINGTON, COUNTY OF KING }
AFFIDA VIT OF PUBLICATION
PUBLIC NOTICE
Lily Nguyen, being first duly sworn on oath that she is a Legal Advertising
Representative of the
King County Journal
a daily newspaper, which newspaper is a legal newspaper of general
circulation and is now and has been for more than six months prior to the date
of publication hereinafter referred to, published in the English language
continuously as a daily new:>paper in King County, Washington. The King
County Journal has been approved as a Legal Newspaper by order of the
Superior Court of the State of Washington for King County.
The notice in the exact form annexed was published in regular issues of the
King County Journal (and not in supplement form) which was regularly
distributed to its subscribers during the below stated period. The annexed
notice, a
Public Notice
was published on Monday, 2/14/05
The full amount of the fee charged for said foregoing publication is the sum
of $106.00 at the rate of $16.00 per inch for the first publication and NI A per
inch for eaclKla~equeRt-insertion.
Lily Nguyen
Legal Advefsing Representative, King County Journal
SUbscribedrtn ,sworn to me this 14th day of February, 2005. \\\\\\\111111 /1//11// a ,,\\ <2J'" G H E A 1111,., ~ 2/\ ~> -}.............. ~ ~ v \...----. $ ... -(\ t;,XP.f&.r ••• ~
..::::-_ ~ ~ .• c...,·C i -. ~ ,
Tom A. Meagher 3.:: .:". //' ~ '>;-~ ,/ \ 0 %
Notary Public for the State of Washington, Residing in Redm.ofr(l~. ~~~t~lf:-> '" j ~ ~
Ad Number: 858320 P.O. Number:", " p'\~~: -.... :::
• v ""-:c' Cost of publishing this notice includes an affidavit surcharge.'./, .... ""' 'I; .... 0 $" >" t>··· .... ~ .... ··~'?-~
'<'j' < TE Of \\\"
III; \\\\ . ./ '/f iiI \ \ \ \ \
NOTICE OF ENVIRONMENTAL
DETERMINATION
ENVIRONMENTAL REVIEW
COMMITTEE & PUBLIC HEARING
RENTON, WASHINGTON
The Environmental Review
Committee has issued a
Determination of Non-Significance-
Mitigated for the following project
under the authority of the Renton
Municipal Code.
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
Location: 201, 251, & 257
Bremerton Avenue NE. The appli-
cant is requesting Preliminary Plat
approval for a 64-lot subdivision of
a multiple parcel, 9.6-acre site. The
lots range in size from 3,801 sq. ft.
to 5,870 sq. ft. and intended for
detached units. All existing build-
ings would be demolished. One
non-regulated Category 3 wetland
would be filled. Maplewood Creek
crosses the southwestern portion of
the plat.
Appeals of the environmental
determination must be filed in writing
on or before 5:00 PM on February 28,
2005. Appeals must be filed in writing
together with the required $75.00
application fee with: Hearing
Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98055.
Appeals to the Examiner are governed
by City of Renton Municipal Code
Section 4-8-110.B. Additional infor-
mation regarding the appeal process
may be obtained from the Renton City
Clerk's Office, (425) 430-6510.
A Public Hearing will be held by the
Renton Hearing Examiner in the
Council Chambers, City Hall, on
March 15,2005 at 9:00 AM to consider
the Preliminary Plat. If the
Environmental Determination is
appealed, the appeal will be heard as
part of this public hearing. Interested
parties are invited to attend the pub-
lic hearing.
Published in the King County Journal
February 14,2005. #858320
ENVIRONMENTAL DETERMINATION & PUBLIC HEARING
ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE -MI,TIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: Elmhurst Preliminary Plat
PROJECT NUMBER: LUA04-t62, PP, ECF
LOCATION: 201,251. & 257 Bremerton Avenue NE
DESCRIPTION: The applicant Is requ •• tlng Environmental (SEPA) Review and Preliminary Plat approval
for a 64-lot subdivision of a mUltiple parcel, 9.6-acre lite. Two tracts for open space and storm drainage are
Included. The ,ft. I. zoned Relldentlal· 10 dulac and I. to abide by a Development Agreement. The lots range In
size from 3,801 sq. ft. to 5,870 sq. n. and Intended for detached unit •. All existing buildings would be
demolished. Access 'I proposed via Bremerton Ave. NE to new Internal public .treet. and private access
"Iementl:. One non-regulated Category 3 wetland would be fllled. Maplewood Creek cro •• el the southwestern
portion 01 the plat.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT
THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE
ENVIRONMENT.
Appeals 01 the environmental determination must be 11led In writing on or before 5:00 PM on February 28, 2005.
Appeals must be filed In writing together wfth the required $75.00 application fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton
Municipal Code Section 4-8--110.B. Additional Information regarding the appeal process may be obtained from the
Ranton City Clerk'. Office, (425) 430-6510,
A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR
MEETING IN THE COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1055 SOUTH GRADY
WAY, RENTON, WASHINGTON, ON MARCH 15, 2005 AT 9:00 AM TO CONSIDER THE PRELIMINARY PLAT. IF THE ENVIRONMENTAL DETERMINATION IS APPEALED, THE APPEAL
WILL BE HEARD AS PART OF THIS PUBLIC HEARING.
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEVELOPMENT
SERVICES DIVISION AT (425) 430-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
Ple •• e Include the project NUMBER when calling for proper file Identification.
CERTIFICATION
I, (CJta.&trl~ , hereby certify that ~ copies of the above document
were pos~y me in I conspicuous places or nearby the described property on _---~~-R~~'2"\\ ~ ~ ~ du -... ~~ ....... ~." or:::: J" I ... 9:-'''-"':,SIO "=.~ I DATE: ~ II u.u SIGNED: 'tf CJU,Y {~...:~~'\ A.t~~ •• %'"
/ ; : 0 NOTAbl1 ~\ {T\ ~ ~.() 'Tr .JJ.~I ~. -._ m'''''1 AIfEST: Subscribed and sworn before me, a Not~ry Public, in and for the State <)f]Washington resi..di /.: I:JI • C/) • I ~:-Hle . on the .3 day of A/arel') g'OO \ . U(d 'aJ1 ; n) ~ U'l'" 'u'BUC .... 1
---'="-'N""'O=-T A""'R""y::.L..dpU""B~LQIC,..!:.l...S.wI ¥-'~~~15':~~"";""" of, 19-0Q . ...-~ .f
\~o; .......... <?>~ -
"\ WAS\-\\~ _0' \.\.,"' ....... '"~--
ENVIRONMENTAL DETERMINATION & PUBLIC HEARING
ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE -MITIGATED (DNS-M)
I
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: Elmhurst Preliminary Plat
PROJECT NUMBER: LUA04-162, PP, ECF
LOCATION: 201,251, & 257 Bremerton Avenue NE
DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval
for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and storm drainage are
included. The site is zoned Resldentiai -10 dulac and Is to abide by a Development Agreement. The lots range in
size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing buildings would be
demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and private access
easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the southwestern
portion of the plat.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT
THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE
ENVIRONMENT.
Appeais of the environmental determination must be filed in writing on or before 5:00 PM on February 28, 2005.
Appeals must be flied in writing together with the required $75.00 application fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton
Municipal Code Section 4-8-110.B. Additional Information regarding the appeal process may be obtained from the
Renton City Clerk's Office, (425) 430-6510.
A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR
MEETING IN THE COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1055 SOUTH GRADY
WAY, RENTON, WASHINGTON, ON MARCH 15, 2005 AT 9:00 AM TO CONSIDER THE
PRELIMINARY PLAT. IF THE ENVIRONMENTAL DETERMINATION IS APPEALED, THE APPEAL
WILL BE HEARD AS PART OF THIS PUBLIC HEARING.
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEVELOPMENT
SERVICES DIVISION AT (425) 430-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
Please Include the proJect NUMBER when calling for proper file Identification.
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 10th day of February, 2005, I deposited in the mails of the United States, a sealed envelope
containing Determination of Non-Significance -Mitigated documents. This information was sent to:
If~:':~i;~\~ .~1~~~i;N~e';" . }0;~~~~ it; ... ~ <;'< t';;" ., Rep;~seriting;;r ....
Agencies See Attached
David Halinen -Halinen Law Offices contact
Sara & David Scott party of record
Terrance Flaig party of record
Fernwood North H.A. party of record
Rose Woodall party of record
Mike Merlino -Liberty Ridge owner
(Signature of Sender)_: ___ ' -"-~-,,," • .:...~ _' ---,,-_';;...' .... ,,;_' '..;...1 _' _____________ _
STATE OF WASHINGTON
SS
COUNTY OF KING
I certify that I know or have satisfactory evidence that Holly Graber
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Notary (Print): /IdnQ ~v~ £. 4lekund CY-
My appointment expires: 3--1'1-0(;
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
template -affidavit of service by mailing
Dept. of Ecology *
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
WSDOT Northwest Region *
Attn: Ramin Pazooki
King Area Dev. Serv., MS-240
PO Box 330310
Seattle, WA 98133-9710
US Army Corp. of Engineers *
Seattle District Office
Attn: SEPA Reviewer
PO Box C-3755
Seattle, WA 98124
Jamey Taylor *
Depart. of Natural Resources
PO Box47015
Olympia, WA 98504-7015
KC Dev. & Environmental Servo
Attn: SEPA Section
900 Oakesdale Ave. SW
Renton, WA 98055-1219
Metro Transit
Senior Environmental Planner
Gary Kriedt
AGENCY (DOE) LETTER MAILING
(ERe DETERMINATIONS)
WDFW -Stewart Reinbold * Muckleshoot Indian Tribe Fisheries Dept. *
clo Department of Ecology Attn: Karen Walter or SEPA Reviewer
3190 160th Ave SE 39015 -172nd Avenue SE
Bellevue, WA 98008 Auburn, WA 98092
Duwamish Tribal Office * Muckleshoot Cultural Resources Program *
4717 W Marginal Way SW Attn: Ms Melissa Calvert
Seattle, WA 98106-1514 39015 172nd Avenue SE
Auburn, WA 98092-9763
KC Wastewater Treatment Division * Office of Archaeology & Historic
Environmental Planning Supervisor Preservation*
Ms. Shirley Marroquin Attn: Stephanie Kramer
201 S. Jackson ST, MS KSC-NR-050 PO Box 48343
Seattle, WA 98104-3855 Olympia, WA 98504-8343
City of Newcastle City of Kent
Attn: Mr. Micheal E. Nicholson Attn: Mr. Fred Satterstrom, AICP
Director of Community Development Acting Community Dev. Director
13020 SE 72nd Place 220 Fourth Avenue South
Newcastle, WA 98059 Kent, WA 98032-5895
Puget Sound Energy City of Tukwila
Municipal Liason Manager Steve Lancaster, Responsible Official
Joe Jainga 6300 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431 PO Box 90868, MS: XRD-01W Tukwila, WA 98188
Seattle, WA 98104-3856 Bellevue, WA 98009-0868
Seattle Public Utilities
Real Estate Services
Title Examiner
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and
cities will need to be sent a copy of the checklist, PMT's, and the notice of application. *
Also note, do not mail Jamey Taylor any of the notices she gets hers from the web. Only send
her the ERC Determination paperwork .
• template -affidavit of service by mailing
!
,
.~~
Kathy Keolker-Wheeler, Mayor
February 10, 2005
David Halinen
Halinen Law Offices, PS
10500 NE 8th Street #1900
Believue,WA 98004
SUBJECT: Elmhurst Preliminary Plat
LUA04-162, PP, ECF
Dear Mr. Halinen:
CITV.F RENTON
PlanninglBuildinglPublic Works Department
Gregg Zimmerman P.E., Administrator
This letter is written on behalf of the Environmental Review Committee (ERG) and is to advise you that
they have completed their review of the subject project. Th~ ERC issued a threshold Determination of
Non-Significance-Mitigated with Mitigation Measures. Please refer to the enclosed Mitigation Measures
document.
Appeals of the environmental determination must be filed in. writing on. or before 5:00 PM on
February 28, 2005. Appeals must be filed in writing together with the required $75.00 application fee
with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the
Examiner are governed by City of Renton Municipal Code Section 4-8-110.B. Additional information
regarding the appeal process may be qbtained from the Renton City Clerk's Office, (425) 430-651 O.
A Public Hearing will be held by the Renton Hearing Examiner ii1 the Council Chambers on the
seventh floor of City Hall, 1055 South Grady Way, Rei1ton, Washington, on March 15,2005 at 9:00
AM to consider the Preliminary Plat. The applicant or representative(s) of the applicantis required to
be present at the public hearing. A copy of the staff report will be mailed to you one week before the
hearing. If the Environmental Determination is appealed, the appeal will be heard as part of this public
hearing.
The preceding information will assist you in planning for implementation of your project and enable you to
exercise your appeal rights more fully, if you choose to do so. If you have any questions or desire
clarification of the above, please call me at (425) 430-7382.
For the Environmental Review Co~ittee,
~~ ./
Susan Fiala
Senior Planner
cc: RoseWoodall, Fernwood North H.A., Terrance Flaig, Sara & David Scott IParties of Record
Liberty Ridge LLC -Mike Merlino / Owner
Enclosure
------------l-O-S-S-So-u-fu-G-r-a-dy-Wl--ay---R-e-n-to-n,-w-a-s-hi-n-gt-on--9-80-5-5------------~ * This paper contains 50"10 recycled material, 30% post consumer AHEAD OF THE CURVE
~re
Kathy Keolker-Wheeler, Mayor
February 10, 2005
Washington State
Department of Ecology
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
CITY· F RENTON
Planning/BuildinglPubli~ Works Department
Gregg Zimmerman P.E., Administrator
Subject: Environmental Determinations
Transmitted herewith is a copy of the Environmental Determination for the following project reviewed by
the Environmental Review Committee (ERG) on February 8, 2005:
DETERMINATION OFNON-SIGNIFICANCE -MITIGATED
PROJECT NAME:
PROJECT NUMBER:
LOCATION:
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
201, 251, & 257 Bremerton AvenueNE
DESCRIPTION: The applicant is requesting Environmental (SEPA) .Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-
acre site. Two tracts for open space and storm drainage are included. The
$ite i$ zoned Residential -10 dulac and is to abide by a Development
Agreement. The lot$ range in size from 3,801 sq. ft. to 5,870 sq. ft. and
intended for detached units. All existing building$ would be derrtolished.
Access i$ proposed via Bremerton Ave. NE to new internal public streets
and private acceSs easements. One non-regulated Category 3 wetland
would be filled. Maplewood Creek croSSes the southwestern portion of
the plat.
AppeaJs of the environmental determination must be filed in Writing on or before 5:00 PM on
February 28, 2005. Appeals must be filed in writing together with the required $75.00 application fee
with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the
Examiner are governed by City of Renton Municipal Gode Section 4-8-110.B. Additional information
regarding the appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
If you have questions, please call me at (425) 430-7382.
z~m~~ee,
Susan Fiala
Senior Planner
cc: King County Wastewater Treatment Division
WDFW, Stewart Reinbold
David F. Dietzman, Department of Natural Resources
WSDOT, Northwest Region
Duwamish Tribal Office
Karen Walter, fisheries, Muckleshoot Indian Tribe (Ordinance)
Melissa Calvert, Muckleshoot Cultural Resources Program
US Army Corp. of Engineers
Stephanie Kramer, Office of Archaeology & Historic Preservation
Enclosure ~ --~----lO-5-5-S-ou-th-G-ra-dy-W.-ay---R-e-n-to-n-, W.-as-h-in-gt-o-n-9-80-5-5---~--R E N TON
® This pa""r contains 50% recycled material, 30"" post consumer AHEAD OF THE CURVE
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
ADVISORY NOTES & CONDITIONS
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201,251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and
storm drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LEAD AGENCY: The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the appeal
process for environmental determinations.
Planning
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division. The Development Services Division reserves the
right to rescind the approved extended haul hours at any time if complaints are received.
Fire
1. A fire hydrant with 1,000 GPM fire flow is required within 300 ft. of all new single-family structures. If the
building square footage exceeds 3,600 sq. ft. in area, the minimum fire flow increases to 1,500 GPM and
requires two hydrants within 300 ft. of the structures.
2. Fire Department access roads are required to be paved, 20 ft. wide. Dead end roadways over 150 ft. in
length are required to have an approved turnaround.
3. Street addresses shall be visible from a public street.
4. Separate plans and permits area required for removal of any existing combustible liquid or hazardous
material tanks.
Building
1. Demolition permits are required.
Plan Review -Surface Water/Storm Drainage
1. The Surface Water System Development Charges (SOC) is $715 per building lot. This fee is payable at the
time the utility construction permit is issued.
Plan Review -Water
1. A water main extension to the north, to connect to the existing 8-inch in Bremerton Ave NE will be required.
2. Water mains extensions within the new streets interior to the plat will be required for this project.
3. New water service stubs to each lot must be installed in conjunction with the above water main extension
prior to recording of the plat.
4. Existing and new hydrants will be required to be retrofitted with Storz "quick disconnect" fittings.
,
5. The Water System Develo. ,mt Charge (SOC) would be triggered a ! single-family rate of $1,525 per
new single-family per building lot. This fee is payable at the time the utility construction permit is issued.
Plan Review -Sanitary Sewer
1. A sewer main extension along the frontage of Bremerton Ave NE will be required. This sewer main shall be
installed at a depth to allow service to the parcel to the north.
2. These parcels are subject to the East Renton Interceptor Special Assessment District (SAD). Fees are
collected at the time the utility construction permit is issued.
3. The Sanitary Sewer System Development Charges (SOC) is $900 per building lot. This fee is payable at the
time the utility construction permit is issued.
Plan Review -Street Improvements
1. Dedication of a minimum of 25 feet of right-of-way (from the quarter section centerline) will be required
fronting the site with the extension of Bremerton Ave NE. Street improvements including, but not limited to
pavement, curb/gutter, sidewalks, streetlights street signs and landscape will be required.
2. Street improvements including, but not limited to paving, sidewalks, curb and gutter, storm drain, landscape,
street lighting and street signs will be required along the new proposed streets.
3. A minimum 20-foot pavement and pedestrian walkway will be required along Bremerton Ave NE from the
northern boundary of the project to the intersection with N E 4th Street.
4. Corner lots shall dedicate a minimum radius of fifteen feet.
5. All wire utilities shall be installed underground per the City of Renton Undergrounding Ordinance.
Plan Review -General
1. All plans shall conform to the Renton Drafting Standards.
Property Services
1. To be provided under separate cover.
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
MITIGATION MEASURES
APPLICATION NO(S): LUA04-162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
APPLICANT: Liberty Ridge LLC, Mike Merlino
LOCATION OF PROPOSAL: 201,251, & 257 Bremerton Avenue NE
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and
storm drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LEAD AGENCY:
MITIGATION MEASURES:
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during
construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use
as structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc.,
dated August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and
Backfill." The satisfaction of this requirement shall be reviewed and approved by Development Services
during construction, utility work and building construction.
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion
and Sediment Control Requirements, outlined in Volume II of the 2001 Storm water Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed
to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered
during excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such
time as a qualified environmental professional can assess the observed conditions and recommend
corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and; (b) the work will be managed and overseen by a qualified environmental
professional and properly documented and reported to the Department of Ecology (DOE) in accordance with
MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention
(Level 2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family
lot. Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily
trip associated with the project. Credit to be given for the existing three residences. The fee shall be paid
prior to the recording of the final plat.
11. The applicant shall pay th Jpropriate Parks Mitigation Fee based (., 530.76 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final
plat.
12. Evergreen and deciduous trees (i.e. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (i.e.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
APPLICATION NO(S): LUA04-162, PP, ECF
APPLICANT: Mike Merlino, Liberty Ridge LLC
PROJECT NAME: Elmhurst Preliminary Plat
DESCRIPTION OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and
Preliminary Plat approval for a 64-lot subdivision of a multiple parcel, 9.6-acre site. Two tracts for open space and
storm drainage are included. The site is zoned Residential -10 dulac and is to abide by a Development
Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing
buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal public streets and
private access easements. One non-regulated Category 3 wetland would be filled. Maplewood Creek crosses the
southwestern portion of the plat.
LOCATION OF PROPOSAL:
LEAD AGENCY:
201, 251, 257 Bremerton Avenue NE
The City of Renton
Department of Planning/Building/Public Works
Development Planning Section
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c).
Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of
Section 4-6-6 Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified
during the environmental review process.
Appeals of the environmental determination must be filed in writing on or before 5:00 PM on February 28, 2005.
Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton,
1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code
Section 4-8-110.B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's
Office, (425) 430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
Dennis Culp, Administrato
comm.unitY:;:7ervic s .... /;1
./. ~. ,/~ ,;}, ,I /./
t>!, /., '. 4# ~~
Lee eler, Fire Chief
Renton Fire Department
February 14, 2005
February 8, 2005
z.lq)oS"
DATE I ,
DATE r /
DATE
ENVIRONMENTAL REVIEW COMMITTEE
MEETING NOTICE
February 8, 2005
To: Gregg Zimmerman, Planning/Building/Public Works Administrator
Dennis Culp, Community Services Administrator
Lee Wheeler, Fire Chief
From: Jennifer Henning, Development Planning
'Mi¢jihg'Date: Ty~sday,FebrlJary 8, 2005
~~:fon: 9,:OQAM .",
Sixth FloorConference Room #620
Agenda listed below.
Elmhurst Preliminary Plat (Fiala)
LUA04-162, PP, ECF
The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval for a 64-lot subdivision of a
multiple parcel, 9.6-acre site. Two tracts for open space and storm drainage are included. The site is zoned
Residential -10 dulac and is to abide by a Development Agreement. The lots range in size from 3,801 sq. ft. to 5,870
sq. ft. and intended for detached units. All existing buildings would be demolished. Access is proposed via
Bremerton Ave. NE to new internal public streets and private access easements. One non-regulated Category 3
wetland would be filled. Maplewood Creek crosses the southwestern portion of the plat.
Savannah at the Park (Wei/)
LUA04-163, PP, ECF
The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval for a 10-lot subdivision of a
1.73-gross acre site. The proposal is located within the Residential - 8 (R-8) zoning designation. The net acreage of
1.25 has a density of 8.0 duo The lots are intended for the eventual development of detached single-family homes -
lots ranging in size from 4,500 square feet to 6,855 square feet. A single-family home exist on site but is proposed to
be removed. Access is proposed via 42-foot wide cul-de-sac street off the west side of Union Ave. NE. One private
easement is proposed within the plat to provide access to 3 lots. The site does not contain any critical areas
according to the City's Critical Areas map.
Annie's Place Short Plat (Hal/)
LUA04-164, SHPL-A, ECF
The applicant is requesting Environmental (SEPA) Review and Administrative Short Plat approval for a 3-lot
subdivision of a 1.08-acre site located in the Residential - 8 Dwelling Unit Per Acre (R-8) Zone. The subject site is
currently developed with an existing single-family residence and detached garage, which are proposed to removed
or demolished as a result of this project. Upon short plat completion, the three lots are intended for the future
construction of single-family residences.
cc: K. Keolker-Wheeler, Mayor
J. Covington, Chief Administrative Officer
A. Pietsch, EDNSP Administrator ®
B. Wolters, EDNSP Director ®
J. Gray, Fire Prevention
N. Watts, P/B/PW Development Services Director ®
F. Kaufman, Hearing Examiner
S. Engler, Fire Prevention ®
J. Medzegian, Council
S. Meyer, P/B/PW Transportation Systems Director
A. Lind, Economic Development
L. Warren, City Attorney ®
STAFF
REPORT
City of Renton
Department of Planning / Building / Public Works
ENVIRONMENTAL REVIEW COMMITTEE
A. BACKGROUND
ERC MEETING DATE
Project Name:
Owner/Applicant:
Contact:
File Number:
Project Description:
Project Location:
Exist. Bldg. Area gsf:
Site Area:
RECOMMENDA TlON:
Project Location Map
February 8, 2005
Elmhurst Preliminary Plat
Liberty Ridge LLC, Mike Merlino, 9125 10th Ave. S., Seattle, WA 98108
David Halinen, Halinen Law Offices, P.S., 10500 NE 8th St., Ste. 1900, Bellevue, WA
98004
LUA-04-162, ECF, PP Project Manager: Susan Fiala, AICP
The applicant is requesting Environmental (SEPA) Review and Preliminary Plat
approval for a 64-lot subdivision of a multiple parcel, 9.6 acre site. Two tracts for
open space and storm drainage are included. The site is zoned Residential -10
dulac and is to abide by a Development Agreement. The lots range in size from
3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing buildings
would be demolished. Access is proposed via Bremerton Ave. NE to new internal
public streets and private access easements. One non-regulated Category 3 wetland
would be filled. Maplewood Creek crosses the southwestern portion of the plat.
Continued on next page
201,251,257 Bremerton Ave. NE
All to be removed/demolished Proposed New Bldg. Area: N/A
9.6 acres (gross area) Total Building Area gsf: N/A
Staff recommends that the Environmental Review Committee Issue a Determination
of Non-Significance -Mitigated (DNS-M).
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLAT
REPORT OF FEBRUARY 8, 2005
Envir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 20(9
Project description continued: The site is subject to a Development Agreement that sets forth several site-specific
restrictions including: 1) All residential buildings must be single-family; 2) all lots abutting the south boundary line must
be 50 feet in width; and 3) the net density can not exceed 10 dulac. Historically the site was a base for a site work
construction company followed by a public works construction company. The existing buildings, all to be
removedldemolished, include a house used as a dispatch office, a small house and garage, and a mobile home. The
site also contains gravel parking and storage areas with remaining stockpiles of fill material, almost 10 feet in height.
The preliminary plat contains three (3) parcels and is proposed to be subdivided into 64 lots and two tracts. The
proposal is for the eventual construction of detached single-family residences. The 64 lots are intended for the
eventual development of detached single-family homes. The lots range in size from 3,801 square feet to 5,870 square
feet.
Access is proposed via Bremerton Ave. NE to new internal public streets within the plat, Roads A and B. Street
dedications are required. Street improvements including curb, gutter, sidewalk, lighting and rights-of-way dedication
are required. The applicant has made a separate request for a street vacation of portions of Bremerton Ave. NE right-
of-way currently under process in Property Services. The areas proposed to be vacated would then provide for an
aligned right-of-way and the vacated land would be integrated into several lots located along Bremerton Ave. NE. The
applicant has also requested modifications to street standards which have been reviewed administratively. One non-
regulated Category 3 wetland is proposed to be filled. An off-site wetland was determined to be unregulated.
Maplewood Creek crosses the southwestern portion of the plat.
The applicant submitted several studies including: a geotechnical report, a wetland and stream reconnaissance, a
traffic impact analysis, an environmental assessment letter, and a preliminary storm drainage report. Site preparation
for development of the plat would include the removal of vegetation and trees for roadways, utilities and building pads
except within the Native Growth Protection Area (Tract B)
The site is zoned Residential-10 (R-10) dwelling units per acre. The R-10 zone allows residential densities that range
from a minimum of 4.0 dulac to a maximum of 10.0 dulac. The proposed plat would arrive at a net density of 8.3 dulac
after the deduction of public right-of-way, private access easements and critical areas (creek) from the gross acreage.
The Comprehensive Plan designates the site as Residential Options (RO).
B. RECOMMENDATION
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials
make the following Environmental Determination:
DETERMINATION OF
NON·SIGNIFICANCE
Issue DNS with 14 da A eal Period.
Issue DNS with 15 day Comment Period
with Concurrent 14 day Appeal Period.
C. MITIGATION MEASURES
DETERMINATION OF
XX NON· SIGNIFICANCE· MITIGA TED.
xx Issue DNS-M with 14 da A eal Period.
Issue DNS-M with 15 day Comment Period
with Concurrent 14 day Appeal Period.
1. A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during construction.
2. At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use as
structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
3. The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc., dated
August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and Backfill." The
satisfaction of this requirement shall be reviewed and approved by Development Services during construction,
utility work and building construction.
ERC_ElmhurstPP.doc
City of Renton PIB/PW Department
ELMHURST PRELIMINARY PLA T
REPORT OF FEBRUARY 8, 2005
Envir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 30'9
4. The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion and
Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual.
5. All contractors are to be made aware of the potential presence of environmental contaminants and instructed to
notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered during
excavation activities.
6. If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such time as
a qualified environmental professional can assess the observed conditions and recommend corrective measures.
7. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations exceeding
applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in accordance with MTCA
and; (b) the work will be managed and overseen by a qualified environmental professional and properly
documented and reported to the Department of Ecology (DOE) in accordance with MTCA.
8. The project shall comply with the 1998 King County Surface Water Design Manual to meet both detention (Level
2 flow control) and water quality improvements.
9. The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new single-family lot.
Credit to be given for the existing three residences. The fee shall be paid prior to the recording of the final plat.
10. The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new average daily trip
associated with the project. Credit to be given for the existing three residences. The fee shall be paid prior to the
recording of the final plat.
11. The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-family lot. Credit to
be given for the existing three residences. The fee shall be paid prior to the recording of the final plat.
12. Evergreen and deciduous trees (Le. Douglas fir, western hemlock, and big leaf maple) shall be planted on 15-foot
centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock shall be used.
Planting should occur in the Fall to allow plants to develop roots over the Winter. The satisfaction of this
requirement shall be subject to the review and approval of the Development Services Division.
13. During site preparation and construction of improvements and residences, the applicant shall install silt fencing
with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The satisfaction of
this requirement shall be subject to the review and approval of the Development Services Division and be
completed prior to the issuance of construction/utility permits.
14. After the development of roadway and utility improvements, the applicant shall install permanent fencing (Le. split-
rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The satisfaction
of this requirement shall be subject to the review and approval of the Development Services Division prior to the
recording of the final plat.
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the appeal
process for environmental determinations.
Planning
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise
approved by the Development Services Division. The Development Services Division reserves the right to rescind
the approved extended haul hours at any time if complaints are received.
Fire
1. A fire hydrant with 1,000 GPM fire flow is required within 300 ft. of all new single-family structures. If the building
square footage exceeds 3,600 sq. ft. in area, the minimum fire flow increases to 1,500 GPM and requires two
hydrants within 300 ft. of the structures.
2. Fire Department access roads are required to be paved, 20 ft. wide. Dead end roadways over 150 ft. in length are
required to have an approved turnaround.
3. Street addresses shall be visible from a public street.
4. Separate plans and permits area required for removal of any existing combustible liquid or hazardous material
tanks.
Building
1. Demolition ermits are re uired.
ERe _ElmhurstPP.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLA T
En vir ental Review Committee Staff Report
LUA-04-162, ECF, PP
REPORT OF FEBRUARY 8, 2005 Page 4 0(9
Plan Review -Surface Water/Storm Drainage
1. The Surface Water System Development Charges (SDC) is $715 per building lot. This fee is payable at the time
the utility construction permit is issued.
Plan Review -Water
1. A water main extension to the north, to connect to the existing 8-inch in Bremerton Ave NE will be required.
2. Water mains extensions within the new streets interior to the plat will be required for this project.
3. New water service stubs to each lot must be installed in conjunction with the above water main extension prior to
recording of the plat.
4. Existing and new hydrants will be required to be retrofitted with Storz "quick disconnect" fittings.
5. The Water System Development Charge (SDC) would be triggered at the single-family rate of $1,525 per new
single-family per building lot. This fee is payable at the time the utility construction permit is issued.
Plan Review -Sanitary Sewer
1. A sewer main extension along the frontage of Bremerton Ave NE will be required. This sewer main shall be
installed at a depth to allow service to the parcel to the north.
2. These parcels are subject to the East Renton Interceptor Special Assessment District (SAD). Fees are collected
at the time the utility construction permit is issued.
3. The Sanitary Sewer System Development Charges (SDC) is $900 per building lot. This fee is payable at the time
the utility construction permit is issued.
Plan Review -Street Improvements
1. Dedication of a minimum of 25 feet of right-of-way (from the quarter section centerline) will be required fronting the
site with the extension of Bremerton Ave NE. Street improvements including, but not limited to pavement,
curb/gutter, sidewalks, streetlights street signs and landscape will be required.
2. Street improvements including, but not limited to paving, sidewalks, curb and gutter, storm drain, landscape, street
lighting and street signs will be required along the new proposed streets.
3. A minimum 20-foot pavement and pedestrian walkway will be required along Bremerton Ave NE from the northern
boundary of the project to the intersection with NE 4th Street.
4. Corner lots shall dedicate a minimum radius of fifteen feet.
5. All wire utilities shall be installed underground per the City of Renton Undergrounding Ordinance.
Plan Review -General
1. All plans shall conform to the Renton Drafting Standards.
Property Services
1. To be provided under separate cover.
D. ENVIRONMENTAL IMPACTS
In compliance with RCW 43.21 C. 240, the following project environmental review addresses only those
project impacts that are not adequately addressed under existing development standards and environmental
regulations.
1. Earth/Environmental Assessment
Impacts: The applicant has submitted a Geotechnical Engineering Study prepared by Earth Consultants, Inc., dated
December 2, 2004. The report provides information and recommendations pertaining to foundations, soils,
groundwater and erosion. The applicant also submitted an Environmental Data letter concerning the Model Toxics
Control Act (MTCA) of the site as prepared by Environmental Partners, Inc., (EPI) dated November 18, 2004.
The site slopes from the north-northwest to the south-southwest at 3 to 5 percent. Some steep slopes, ranging from
20 to 40 percent exist along the site's south and west property lines but occur in small bands of 2 to 6 feet vertically. A
few soil stockpiles are stored on the north portion of the site created from previous construction contractors yard
operations.
The geotechnical report states that the test pits indicate that the majority of the site is underlain by fill with depths up
to 15 feet and increase in depth toward the south and west site boundaries. The fill consists of medium dense silty
sand with gravel and contained variable amounts of construction debris and organic matter such as tree limbs and
trunk pieces. To ensure that the fill used for the development is suitable, staff recommends as a mitigation measure
that a Geotechnical Engineer determine the suitability of the existing on-site fill.
ERC _ Elmhurstpp .doc
City of Renton P/B/PW Department
ELMHURST PRELIMINARY PLA T
REPORT OF FEBRUARY 8, 2005
Envir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 50(9
Furthermore, due to the variability and extent of fill encountered in the test pits, staff recommends that at the time of
building permits, additional geotechnical studies, addressing the suitability of site soils for use as structural fill, are to
be prepared and submitted.
The King County Soil Survey indicates the site is underlain by Alderwood series glacial till soils. However, the
subsurface exploration indicated native soils have outwash sand and gravel.
Approximately 12,000 cubic yards of cut (including 4,000 cubic yards of residual soil stockpiles) and 13,000 cubic
yards of fill is estimated to be completed to allow for the development. The SEPA checklist indicates that generally,
cut material from the site would be used as fill.
The site is mostly cleared with small strips of conifers/deciduous trees near the south and west property lines. Some
trees are also located among the structures located in the northeast portion of the site. The tree cutting and land
clearing plan depicts the located of a row of pines in the northeast portion of the site (in new Lot 3) and in the east
portion of the site (in new lots 39 and 44). The south portion of the site consists of scattered firs, alder, and deciduous
trees. The tree cutting and land clearing plan indicates that all vegetation from the plat would be removed except trees
located within Tract B containing the stream/creek and associated buffer. The cleared land would accommodate the
construction of homes, roads and storm detention as depicted on the tree inventory plan which also identifies the
location of larger trees.
The geotechnical study stated that the site is suitable for the construction of single-family residences using
conventional spread and continuous foundation systems bearing on competent site soils or on granular structural fill
used to modify site grades. With the amount and depth of fill on the site, portions of this fill were found to contain
organic and construction debris which may be unsuitable for use as structural fill and will require to be replaced with a
granular structural fill, according to the study.
Groundwater seepage was not encountered at the test pits during the field work in July of 2004. The report states that
if seepage is encountered in foundation excavations, the bottom of the excavation should be sloped to one or more
shallow sump pits. The collected water can then be pumped from these pits to a positive and permanent discharge.
The geotechnical report evaluated site preparation and earthwork and stated that stripped materials should not be
mixed with materials to be used as structural fill; pond be lined with a compacted till liner of 18-inches; and other
issues relating to earthwork. Also, if utility trenches encroach into the soil layer that is the native graded sand and
gravel, that caving could occur. To ensure, that the site prep is completed as outlined in the report, staff recommends
as a mitigation measure that the applicant comply with the "Geotechnical Engineering Study" regarding "Site
Preparation and General Earthwork" and "Utility Support and Backfill".
In order to reduce the potential for erosion and control sedimentation to the site and to adjacent properties, staff
recommends additional mitigation including that the project be designed and comply with the Department of Ecology's
(DOE) Erosion and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management
Manual.
The Environmental Assessment letter discussed the previous investigative and remedial actions including the tank
removals in 1991 and 1995; subsurface investigation in 2000; and current site conditions. The letter states that the
data does no suggest that contaminants are present at the subject property at concentrations exceeding cleanup
levels. The letter continues to state that as with all sites, unknown or undiscoverable conditions may be encountered
during construction and redevelopment. The applicant's consultant, EPI, outlines three contingencies which should be
implemented prior to and during redevelopment activities, as outlined below, and which staff recommends as
mitigation measures.
• All contractors are to be made aware of the potential presence of environmental contaminants and instructed to
notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered during
excavation activities.
• If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such time as
a qualified environmental professional can assess the observed conditions and recommend corrective measures.
• If the presence of environmental contaminants is confirmed within the suspect soils at concentrations exceeding
applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in accordance with MTCA
and; (b) the work will be managed and overseen by a qualified environmental professional and properly
documented and reported to the Department of Ecology (DOE) in accordance with MTCA.
ERC _ ElmhurstPP .doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLAT
REPORT OF FEBRUARY 8, 2005
Mitigation Measures:
Envir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 60f9
• A Geotechnical Engineer shall determine the suitability of the existing on-site fill prior to its use on-site. The
satisfaction of this requirement shall be reviewed and approved by Development Services during construction.
• At the time of building permits, additional geotechnical studies addressing the suitability of site soils for use as
structural fill shall be prepared and submitted. The satisfaction of this requirement shall be reviewed and
approved by Development Services.
• The applicant shall comply with the "Geotechnical Engineering Study" prepared by Earth Consultants, Inc., dated
August 30, 2004, regarding "Site Preparation and General Earthwork" and "Utility Support and Backfill." The
satisfaction of this requirement shall be reviewed and approved by Development Services during construction,
utility work and building construction.
• The project shall be required to be designed and comply with the Department of Ecology's (DOE) Erosion and
Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual.
• All contractors are to be made aware of the potential presence of environmental contaminants and instructed to
notify the property owner immediately if discolored, odiferous, or otherwise suspect soil is encountered during
excavation activities.
• If suspect soil is encountered during excavation activities, work in these areas is to be stopped until such time as
a qualified environmental professional can assess the observed conditions and recommend corrective measures.
• If the presence of environmental contaminants is confirmed within the suspect soils at concentrations exceeding
applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in accordance with MTCA
and; (b) the work will be managed and overseen by a qualified environmental professional and properly
documented and reported to the Department of Ecology (DOE) in accordance with MTCA.
Policy Nexus: SEPA Environmental Regulations, RMC 4-4-130 Tree Cutting and Land Clearing Regulations.
2. Surface Water
Impacts: The applicant has submitted a Preliminary Technical Information Storm Drainage Report prepared by Pacific
Engineering Design, LLC, dated December 22,2004 with the land use application.
The report states that stormwater runoff from the site would be collected in a storm drainage system and routed to a
detention pond within proposed Tract A located in the southwesterly portion of the site. The pond will be designed to
meet the Level 2 flow control requirements and Basic Water Quality menu as specified in the 1998 King County
Surface Water Design Manual. The pond is proposed to be a combined detention/water quality "wet pond' and
discharges through a "bubble-up" energy dissipater catch basin, with the outflow draining overland to the southwest
through the stream/creek buffer to Maplewood Creek.
In the review of the upstream tributary area, the report states that except for Maplewood Creek's intermittent flows to
the south along the westerly portion of the site, off-site storm water does not currently enter the site and is not
anticipated to do so in the future.
The report's review of the downstream analysis indicates that at the proposed detention pond outfall location, the
stream is a heavily vegetated drainage corridor, about 4 to 6 feet deep. From that point, the drainage corridor runs
approximately 600 feet to a 36-inch CMP that crosses Bremerton Place NE. At the upstream end of Bremerton PL NE
crossing, a "birdcage" inlet structure is located and consists of two 12-inch inlet pipes entering a 60-inch concrete
manhole and a 36-inch diameter CMP outlet pipe. Rock rip rap has been installed from the top of the birdcage to the
inlet ends of the two 12-inch diameter pipes. The creek channel immediately upstream of the Bremerton PL NE
crossing is a broad, grass-lined channel about 8-feet deep.
The conveyance system of the site runoff is proposed to be collected by means of yard drains, catch basins and roof
drains. Collected runoff would be conveyed to the detention facility within pipelines designed to 25-year peak flows
and checked for flooding conditions at the 100-year event. Water quality for the project would be provided by means
of a wet pond associated with the detention facility.
The proposed dead storage volume provided would be 54,451 cf (52,257 cf required) for water quality. To provide for
the required volume and maintain the frequency and duration of storm runoff from the project, live storage provided
would be 75,938 cf (49,285 cf required).
ERC_ElmhurstPP.doc
City of Renton PI8/PW Department
ELMHURST PRELIMINARY PLA T
REPORT OF FEBRUARY 8, 2005
En vir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 70f9
Due to downstream flooding and erosion problems, the project is to be designed per the 1998 King County Surface
Water Drainage Manual. Staff recommends this as a mitigation measure that the storm drainage system is designed
to meet both detention (Level 2 flow control) and water quality.
Mitigation Measures: The project shall comply with the 1998 King County Surface Water Design Manual to meet both
detention (Level 2 flow control) and water quality improvements.
Policy Nexus: SEPA Environmental Regulations, 1998 King County Surface Water Design Manual.
3. Fire Protection
Impacts: Fire Prevention staff indicates that the applicant provide required improvements and fees to offset the
impacts associated with the new development. The proposal to add 64 new residential lots to the City would impact
the City's Fire Emergency Services. Therefore, a Fire Mitigation Fee of $488.00 per new single-family lot is required
with credit given for the three existing residences. The fee is estimated at $29,768.00 ( 64 new lots - 3 existing
residences x $488.00 = $29,768.00) and is required prior to the recording of the final plat.
Mitigation Measures: The applicant shall pay the appropriate Fire Mitigation Fee based on a rate of $488.00 per new
single-family lot. Credit given for the three existing residences. The fee shall be paid prior to the recording of the final
plat.
Policy Nexus: SEPA Environmental Regulations; Fire Mitigation Fee Resolution No. 2913, Ordinance 4527.
4. Access/Transportation
Impacts: A Traffic Impact Analysis (TIA) was prepared by Transportation Planning and Engineering, Inc., dated
December 2, 2004 and submitted with the land use application. The report reviewed existing conditions and projected
Level of Service (LOS) conditions at year 2007.
The roadways/intersections evaluated for the proposed development included: NE 4th St/Union Ave. NE, NE 4th
St.lBremerton Ave. NE, NE 4th STJDuvall Ave. NE. The current Levels of Service range from C to D. Of the NE 4th
Street intersections analyzed, Union and Duvall Ave. NE would remain at Level C. The 4th and Bremerton northbound,
left turn would go from a Level D to a Level E, with an unsignalized intersection.
The 64 lot plat would generate an estimated 583 net daily trips (612 trips minus 29 existing trips from 3 existing
residences) with 48 AM and 65 PM peak trips on an average weekday.
Primary access to the site is proposed via NE 4th Street to Bremerton Avenue NE. A new internal road system is
proposed. Two new public roads, labeled as Roads A and B, would be constructed with a reduced right-of-way of 42
feet and 32 feet of pavement with sidewalks on both sides. One private access easements/shared driveway is
proposed to serve Lots 13 and 14.
The proposal would result in an increase in traffic trips to the City's street system; therefore, the appropriate Traffic
Mitigation Fee will be imposed. The Traffic Mitigation Fee is calculated at a rate of $75.00 per additional generated trip
per new single-family lot at a rate of 9.57 trips per lot home. Credit to be given for the three existing residences. For
the proposal, the Traffic Mitigation Fee is estimated at $43,725.00 (64 new lots - 3 existing = 61 lots x 9.57 trips = 583
trips x $75 per trip = $43,725.00). The fee is payable prior to the recording of the final plat.
Mitigation Measures: The applicant shall pay the appropriate Traffic Mitigation Fee based on $75.00 per each new
average daily trip associated with the project. Credit to be given for the existing three residences. The fee shall be
paid prior to the recording of the final plat.
Policy Nexus: SEPA Environmental Regulations; Transportation Mitigation Fee Resolution No. 3100, Ordinance 4527.
5. Parks & Recreation
Impacts: The proposal does not provide on-site recreation areas for future residents of the proposed plat. Recreation
within the vicinity includes: Maplewood Neighborhood Park; Heatherdowns Park and Maplewood Golf Course.
It is anticipated that the proposed development would generate future residents that would utilize the City's parks,
recreational facilities and programs. Therefore, a Parks Mitigation Fee based on $530.76 per each new single-family
ERC_ElmhursIPP.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLAT
REPORT OF FEBRUARY 8, 2005
En vir ental Review Committee Staff Report
LUA-04-162, ECF, PP
Page 80f9
lot would be required for the proposal. The fee is estimated at $32,376.36 (64 new lots - 3 existing residences = 61
lots x $530.76 per lot = $32,376.36) and is payable prior to the recording of the final plat.
Mitigation Measures: The applicant shall pay the appropriate Parks Mitigation Fee based on $530.76 per new single-
family lot. Credit to be given for three existing residences. The fee shall be paid prior to the recording of the final plat.
Policy Nexus: SEPA Environmental Regulations; Parks Mitigation Fee Resolution No. 3082, Ordinance 4527.
6. Wetlands and Streams
Impacts: The applicant submitted a Wetland and Stream Reconnaissance as prepared by Shannon & Wilson, Inc.,
dated December 22, 2004. The report indicated that one non-regulated wetland is located on-site, one off-site non-
regulated wetland is within 100 feet of the north property line and one stream, Maplewood Creek, exist on site.
Wetland A was delineated as 3,130 sq. ft. in area. The report states this is a palustrine, emergent wetland and is
highly disturbed, formed on top of fill and is dominated by reed canary grass, an invasive plant species. This Category
3 wetland would not be regulated as is it less than 5,000 sq. ft. in area, it is an artificial wetland intentionally created
from a non-wetland area according to the reconnaissance report. This wetland is proposed to be filled.
An off-site wetland, Wetland 8, exists north of the northwest corner of the site and covers 2,140 sq. ft. and is within
100 feet of the subject site; therefore the applicant assessed the wetland to determine any impacts from the subject
development. The reconnaissance states that the wetland is vegetated with slough sedge, ninebark, willow and
aspen. It is hydrologically isolated from the nearby creek and is less than 5,000 sq. ft. in size and has been disturbed
in the past. The report states that it is not a regulated wetland and does not require a buffer and is also classified as a
non-regulated Category # 3 wetland according to the City's regulations.
The stream located at the southwest corner of the site is a small tributary of the Cedar River known as Maplewood
Creek and is mapped and depicted as an unclassified stream. No flow was observed during the site visit in June of
2004 and during December 2004 site visit, ponded water was observed but no flow as noted by the applicant's
consultant. The report states it is an ephemeral stream. The channel bottom is generally un-vegetated and lined with
gravel, mud and cobbles. The channel is entrenched with steep sides along the northern two-thirds of the site and is
straight and channelized along the property edge. In the southern portion of the site, the creek is not as channelized
as further upstream but is about six to eight feet lower than the remainder of the site.
Streams are regulated under the Tree Cutting and Land Clearing Ordinance. No tree cutting, land clearing or
groundcover management except for enhancement or other wise permitted is allowed within a minimum of 25 feet of
the ordinary high water mark (OHWM) of creeks or within 15 feet of the top of the bank of same. The site is within 200
feet of the OHWM of Maplewood Creek. The creek/stream and buffer is proposed to be within Tract 8 (a native
growth protection area) to protect the critical area. To ensure that the slope to the creek remains undisturbed during
construction and after site development, except for work needed for storm management facilities, staff recommends
the following mitigation measures:
• Evergreen and deciduous trees (Le. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter.
• Install silt fencing with brightly colored construction flags to indicate the boundaries of the stream/creek
buffer prior to the issuance of construction permits.
• A split rail fence or other approved barrier and signage will be also be required to be permanently installed
along the stream/creek buffer to denote the critical area and prevent intrusion into the wetland area and
buffers.
Mitigation Measures:
• Evergreen and deciduous trees (Le. Douglas fir, western hemlock, and big leaf maple) shall be planted on
15-foot centers within the 25-foot wide buffer along the east side of the stream. Two-gallon size tree stock
shall be used. Planting should occur in the Fall to allow plants to develop roots over the Winter. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division.
ERC_ElmhurstPP.doc
City of Renton PIBIPW Department
ELMHURST PRELIMINARY PLAT
Envir ental Review Committee Staff Report
LUA-04-162, ECF, PP
REPORT OF FEBRUARY 8, 2005 Page 90'9
• During site preparation and construction of improvements and residences, the applicant shall install silt
fencing with brightly colored construction flags to indicate the boundaries of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division and be completed prior to the issuance of construction/utility permits.
• After the development of roadway and utility improvements, the applicant shall install permanent fencing (Le.
split-rail fence or other approved barrier) and signage along the entire edge of the stream/creek buffer. The
satisfaction of this requirement shall be subject to the review and approval of the Development Services
Division prior to the recording of the final plat.
Policy Nexus: SEPA Environmental Regulations, RMC 4-4-130 Tree Cutting and Land Clearing Regulations, RMC 4-
3-050.M. Wetland regulations.
E. COMMENTS OF REVIEWING DEPARTMENTS
The proposal has been circulated to City Departmental/Divisional Reviewers for their review. Where
applicable, these comments have been incorporated into the text of this report as Mitigation Measures and/or
Notes to Applicant .
....lL.-Copies of all Review Comments are contained in the Official File.
Copies of all Review Comments are attached to this report.
Environmental Determination Appeal Process Appeals of the environmental determination must be
filed in writing on or before 5:00 PM on February 28, 2005. Appeals must be filed in writing together with the
required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055.
Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-110.B. Additional information
regarding the appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
ERC_ElmhurstPP.doc
SEC. 15, TWP" 23 N., RNG. 5 E., W.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
DDISITY CAL.CU.AlJOHS : R/W Nt£A -r.72 _ ow 74,,_» ... rt.
SDr&W ACMAGt -fD' IIfD£' MEA SOVrH OF N£ 1ND PL, AND " IIIDE AR£A NORTH OFNEIHDPf...o.",ocORJ._~ tL 7DTAL AREA -I.eo Co 0It .'1.'11 at-11. PROPOSm ACCESS £A.SEr.IEHT NI£A -dOJoo. 1,281-. It.
~l:illf. To': ~T ===)CCtM1Y R£CCRDINC
D1HS11Y _ U L07S
",TAL ...... I .. ) -I!/W IOC) -."....., leo) -AC<DS IOC)
DDISlTY -,. LOlS
.. eo or -uroc -0.0. 00 -0.0-' 00
D£HS1Y -.!!..!E.!! 7.11_ D£HSIrr _ &25 _1_
MArte 'fJlJt1D ~U!fJt..
snr_lIOH:
r. DC. 8lE NfEA ..... 00
z. t:t:eJ: ~~A~~, GC
.J. OWJWL .5IlE' A¥A (Wa.. VACAlID AIlU.) -UD OCI
4. It/W TO .. DfDfCAJED-I.72 _
OIlH£ll/AI'fI.ICANT :
C/III. EHG/NaIt :
_u." ~ AK' S. .. ..,01 ':rbf'.;j:x'
p.."",.,-
"'"""' ILC f'lO IJNO AI\£' S* R£NJDH. WA HOM 'i:tJ.1"J.~1
GEOJta1MCAL CMYH ca«ll..TAN7S. INC. DIQIN£EIf: taos-,,,,JH 1tA« H.£ SUTl' 20'
SI.ffIaIlI! :
~.A1~
CEHntr' IttJINJE sunnINQ .JJ7Dt t1H.4.\I£ , ~(::J=-'=
SI-EET tc:IEX
1"01 I'REI..UN.MY fILA T P02 CCWO:SnE' UJIJTr' I'UN = ~NI.~I'UN P05 MSfSt1tW A~ H.£. AND IIQ4D • _yl'ftClFlLE POt IIQ4D atOSS S1EC1KJNS AND
It(W) A I'fII£lJWWfY MG'U' P07 IItADfHOAND~1"f.Nf POI DlS1M CQIGJXWS
\£ROOAL DATtN
VlCHTYMAP
~ r~
aN OF IfEIfJ'at HAW}. ccwnut .w1ERVAl. _ C
EIENCHIA1IC .....,
ICING COUNTY POINT I J£Nn&S2:
FOUND ~ IN r lONG CXUfT'( SUlFACE MASS I¥SC AT H S1REET ~ OF HE 47H S1RUT AND 144TH AI\£, S£ IIA/fPtWQ JHE CXMHEJt OF SEC1J(W , .. ~ 2.K. IWKJC sr.. U <f64.1InET.
!I1E< SET COTTOH GIN SPfICI IU' SIOII1'MEST OF H lOT COIJ.M OF QUE.
ll£VADCW-407." faT.
8ASIS OF 8EAIWQ
.-.-.---ClIWHC 8CALE
SCALB r -lSO"
--1----;r· 10
LAlJREI.J-iUR~T PHASE 1
1iJ.:+"r ~l!.~.r:~~ ..::9~S.!~.lJ.c.nON ~ ••
2 ~!
L.EQAL t:eCIff'TION
PARCEL Ai
:)
ii
NOTe.
~1ICH OF sna. WAD AND SRlRII DMfMG[ 5Et SHEET P02
_A/lAHIIrT £ASO/ENT
RrOHT TO IINC£ H£'CDSMY ILOIID 1'OIt am OR nLS UPON SAID I'ffOIISD lOR ,.liTH
--A\£. 1.£ AS art.WJED 8Y DEED II£COftDtD N'ffI.. J. 18ft tHIIJt "fCQItCI&¥G No. 5407ltI.
H IOU1H 110 tar OF H lAST 115 frET OF 1Ht FCI.L.OMWG DfSaII8tD PWQI'Pn'I THE' NOItfH HALF OF H SOCiJHE'AST GUAItlEJt OF H NCWJHIIDT GUMmt OF lHF: NOR"""'" GUAIf1E:R OF S£ClKIH r$. JOtIHSHIP IJ NCItm IWIQ£. 5 EAST. IItM.:
C«D'T lHE' r.ur »06 fEET YH£IIfECf' FOIf «CMDi
(ALSO KNOWN AS 1H( SOUfH "0 FrET OF THE' EAST Z" FrET OF 7H£' NORfH kAU' OF lIItACT ,. ~ ACIIIE' lItACTS. ~ m H l.M£OOIItflm ItAr JHEJlEOF.
SJUAl[ " 1Hl' CCtMTY OF IC»4G. STA7I' OF WASHINC'ftW.
PARCEL B:
THE scum HAlF OF JH[ SOUlN£AST GUNtmt OF 1H£ HQlrfHMfST QUAltJa OF JHE' NDRfHlCST CIUAR7IJt OF SEC7XW I,. ~ IJ ~ RANGE :s £ASr. IW;
EXCIJItT JH[ EASl!JU. Y 7.5 fEET JHER£Of' FOIf ROAD:
(ALSO ICNOIIH AS TNt SOU1NOtt.Y HALF OF 7RAClS 5 AND .. WAltJW AQIII' ntAcla ACClOIfI*iG m nc lJrIIlCORDQ) "-AT HREOF.
SJUAl'l' IN DC t:x:AMT'f OF I(JrfQ. ITA1£' OF 1l'A.ShWG1tW
~
THE HOIf1H HALF OF lh1E' SOUJNEAJT CXIARJEJt OF THE HQltfMIEST tXlARmt
OF .". MlfrHlEST OUNtD OF SCJJCW '" ~ as HOt1H. RANGE 5 £AS7; ......
£XCPT 'H CAST J7.5 FrET rHIRtOF FOR ~
AND rx.ctPT 1HE IDV7H ''0 fEET OF ".. EAST Zf5 FEET OF H' IIO&ANlPf.
(N.SIJ ICHOIH AS lHE' HORlH HAlF OF 1RACJS 5 AND S. 1lAlt1JN ACR( JRAc7!. ItCCOItDINIJ YO H lHff'COftPED PLAT na!'OF': D«'D'T TH£
SCJU1H no nET OF H' EAST 215 fIlET OF SAl) lItACT 5)
S'lUA l[ IN 1H£ COCMTY OF STA1!'OF~
~I ~~ i i. ~ ~~~~ ~~~ n~~~~~~
e.oU s:=~ ·ltl 0"1: ~ ~.s !E~~~ tIl]
o s:= (d (0:1..... • co ~e.o . ~ C~ ~J
~
ilill
~
i~ fW ~~ • Ii!
:n u
i I ~
~d ~.~J ci!il
DftIt'Mffh': ..JCIIC
ISSUE Olt 1[; 12--Ot-04
SHEET REV.:
c:J , ...
O2OS4HC01-P03
P01
....,. 1 ()III •
m1SIONlI
I I ~,~,,-~J-J/~
SEC. 15, TWP. 23 N., RNa 5 E., W.M.
\
\
\~o::.T~!, ~
\ ................. ...........
/
I
~ ~ • . -.-.---<JW'HC 8CALE
SCALE I r • 50'
aJJCAL D,41W
ON ~ IIIHlUII" NA.\O. CCW1tUt MEJtVAL -r
SENCHIIAII( .....,
ItJHO CXlCMlY PONT , ft£Hn1R FrXIHD I'UHCH IN r KING COUNTY .... AC£ BRASS DISC AT 1HE SJRaT ~ncw '" HE 47H STREET NiO '.am A\£. Sl' ItWfJONQ H ,"",JHMDT COIfNDt OF S£'C7J(W ,~ Y'OMHSHP 2.W., ItANQ£ «.. lUI. EL£VAJJCW-414..,. 1fET.
3m SET C01TClN tlN .-.cE la,· IQI1MIDT OF JhIE' lEST c::GI.I.IW OF ~JE. a.£VADOH-407'" nET.
8o\SfS OF SIWINQ
JIItU[ NOIItJN. IA.sm UPOH Q.CIML I'OSITIOMHC SYSmI (GPSJ I.Al&JtT GIlD IMSJ«tIGJtw SfAo1£' NOR," ZONC COOROINAJES A COHGGENCr' ANQU OF OOV.JQ..UI-CClUHlERClOOOlSf' WAS AI'PI.lE.O AT A PUNCH IINf1< IN r «M t:rAINTY fUtFACE 8AASS ~ AT 1HC SlJIaT IHlaS£CJJQH OF N£ fJH ST. AND f"," Al£. IE.
JWIKIN(J THE HDlflNCAST CQ1INEJt '" XCJJCW I". lOIWShP U NQIIfJH. RNKiE 5 £AST OF H ~ AIERUW. H NOIUH MIERICAN QAJUIi' OF ,1&J,It'" (WAD 1J/»1) GIlD CCICRlftMJES IER£ FDUND 10 IE ID01"'/ t.JItn2.JZJ AT NT POIIT. THE MEJfSE' OF 80fH H IrA t.na. CiOIII£C1ICW FM:rOIt '" 4.....,42 .. AND DC' GIlD SCALE F'ACJtW QF J.CJOIXIG2J'17 WAS N'f'U£D lD JH£' GRID ~lES RJR SHOIH GfIOLN) DfSTN«D.
/..EOEIC)
IIWfNtr IEIEJt CUNCIIIT
• ....,..,.---..... MrIttf1lWlrASma'l
L CN'. *JIJt IMIf w/IIIRItMY ~ &QIIII'J" AlmA., .. lIIt_
~ ..-
• .. TIN'
• c:.~'''''''''LDCICINCJ'''
~ .. """
tel
-L--I
[~J:'iiil .. ..
.. TIN • """'" LDI»G II) __ r
-~--... ,...,.... .. alWW4Y IWMI CII:NB1XW _ ... -_ .... ---
~I
!I ! ! I iih~ilf
~
1111
.J ~~ J:~
¢m
PRO.IECT NO.:
IJ li "" .. ~1
I I ~
~d I.~~ ~i;il
ORA .. 8'1':. -.JQO
ISSUE DATE: 1I-0I-04
SHEET REV.:
LJ , '" 02054CU01-P02
P02
....-r.0fII.
RE\1SIONS
SEC. 15, TWP. 23 N., RNa 5 E., w.M.
VUE
,: --1---r-10--;r-
: LAURELHUR~T PHASE 1 : I
.' (UNDER CO~STRUCnON) 1 I .... " - -_ ...•. " .. _1-_ ... " --11
2 II 9 : 1 1 Ii r I -"3---::---8-'"
i ---..... ---1--------4-J
, I
\,-.. --J' --J' -.."
\
\ \ FERNWOOD\~~~ _ ~
\ ----, ---)--
\
.--\
~ ~ --------GIW'HC IICAI.E
SCALE,r-fJ()'
\&mCAL D4T1.11
ow OF ROi~ HAW" c:cwn:.ur ~mtvAL -r
8ENCHIA/f( .....,
KJNO CWHTr I'0Il1 11IOma5.2:
FOI.M) PCMCH IN r lONG COUNTY SUlFAC£ MASS DISC AT IN£ S1R£ET .w7ERSE'ClJGW OF Nt f7H SntaT AND '..,lH A\IE Sf MNffCNJ JHf HCILIt1MIEST CICItfD OF SECJICW If, JOIHSHIP 2JH.. ftANG£ M.. w.AI. ElEYAlxw-....... ,. FEET.
sm S£T cornw tJIN SI'fKE ,a,' SOUlHlEST OF H lEST CCIWMH OF GAlE.
ElEVA DeW-.fOUl nrr.
BASIS OF BEAFWO
:=aHtf:., ~:t::t~ ~<:f A
CCW\PCEHCf' NKU OF OOV'Ja.J.r CQ.W~ 1MS AfIAJ£D AT A PUNCH JWfK II r «NJ 0t:UnY.....,.AC£ MASS ~ AT lH£' SlR£ET WlEIIS£C1'IOH OF He 41H sr. AND '..,lH A\iE S£. IiMRIONO 'IHt NCWJHI'AST' CQWrG OF SEC1'ION J5, ~ ~l HORJH, ItNH1£ , £AS1 OF 1Ht ~ AIfJtAW JHE' NORfH AIIERJC.M DAJUM OF f.t&J/I'" ('NAD ~) GRIJ CClCIfIDtMJD ... nul) 10 It 11OIO.J. ... /1J1Ma.ur AT !HAT I'OHT. 'H' MUSE' OF BOJH 7HI ItA L£\o!1. COMrCncw fAC7Q!t OF o.lHN1aH AND JH[' GIlD SCAIZ FACTtJIt OF f.DOOOQffD WAS AMJ£D JO DC GRID COQiI:II(A,JES R1If SM:NH GRCXIC) DlSTNGS.
~I ~~ j i ~ ~~ ~ ~~~ nh~!;~
) Ii ~
~
;111
~
~~ ~~ lU~
PROJECT NO.:
:fJ 1 ...
:f§ u
I
~ ~
~d ~·jl ~iUI
ORA .. 8'1': tJQC:
ISSUEOATE: ~
atEET REV.:.
LNDa..aANIQ
PUN ~CUT1WQ
O2OMTR01-POJ
P03 _301'.
SEC. 15, TWP. 23 N., RNO. 5 E., w.M.
\
\
\~o.::.~~I_ ~
\ '--.. ----
FUE WE
--I --~-10-H-
LAI.JRELHUR T PI·IASE t : I (iJ~DER..5:o._ 2T~I?~!-+1
2 II 9 :1
11 : I --.... --\_ .. __ .... ___ -LI
3 ! 8 :
---.-.~."-----I
I 4
..
~ ~ . -.-.---0RArHC 8CAI..E
SCALE I r • 60'
\SmeAL 0A7tII
.... r .... fIC,I'IlCH. HA.o u CCWJDC.R MaVA&. -Z'
EIENCHIARK ....,
KINO COUNTY POINT , RDlnl5l:
FfIH) I'fJNCH II J" ICIHO CQM1Y SIW.4CE' MASS DISC AT 1HI SJRaT INtt1fSECDOH OF HE 47H SlRaT JND ,.-.m A\IE SC IrWfKlHQ H
NOItTHICST aw.o Of SR1fQIrI '''' fOMHIh\O 2.W.. RAN« M.. lUI. nEVAJIIOH-",,11 nn
111m SET COTTtW GrH SI'II(£ ,t.,' SClUTHIIOT OF lH[ ICST COI.UIfH OF GAtE.
Q.£VA lJCW-407." fEET.
8I\SIS OF BEAFfHQ ==:0 ~ :tflt~lKf:::=:"'l:f A CCW\EJfQENCC ANQ.E OF 00'U'JG.,2I-~DG1.0QI0IISC WAS ..v.uED AT A PUNCH MAIfK II SO ICJNO OOUNTY sutl"A(;£ fRAIr oac. AT 1Ht S1R£ET 1H1£RS£C7JON OF Nt 47H Sf. AND 14TH A~ S£. IIAARICINO N HQR'lH£AST CQIfN£R Of SCCOOH 15. 'RJtIHSMP 23 NCW1H. RN«1t 5 £ASr OF lHE' I&LAWTlE' t«JtPAH. lHE NOR7H NI£JItJCAH DAnMI OF IMJ/I'" (HAD &l/t1) QIIO CCICIR£II1NAJD IIUf£' RXH) 10 IE 1I0I0.1_/ f.JIA22..w AT 1HAT POINT. lH£' W\OSE OF 80JH lHf SEA l.£\G.. COIffIfCJJCW 'ACTOR OF o,tHNIIH AI4IJ JH£ GftI:I SCAL£ FAC'IOft OF 1,CJOOC)CW17 WAS AJIPU£D JD DC' CRD COClIIDWA JES' Fat SHOIW GROCNJ DlSTANC£S.
~
SMrNtr ... az.w:xn · ----Jt-. "HYI'JIIW(f'ASSII&Y
L ~"'--y ..........
" ..-
• .. T«I
• .. T« I ..,.... ."... ....
Ii) "T«.
tel .. T« • ..,....."... .... -.......". ....l.... -,.-.-.. ---I ..-..u .. "...r DMW CCNII01JCIH
Ldift] -,..-IIllilim -,..-IIlIl!III!D -......,
~I ~~ ; !~~ i~i~~~m~ li~Lu.~~CL
bl)U I:l...:l U·t: ...:l t+:: (I ~ .... (I 0 UI:l ~ ..... ~gr
i
~d
If ~u
JI :n u
I
I
i ~! ¢~
~d 1·~8 ~ml
PftO.ECT MO.: 4
DRAINI1\ ..taO
ISSUE DATE: 12-Ot-04
SHEET REV.:
L:J , " O~O'-P07
P07
~7Cf"
I L In gUJii
JI
~
&~ Ii 8~ l~ ~~
R£'IISIONS
lI_ d II---=--.~ -"
~ \..
a
Uill I
~
1;;
\
SEC. 15, TWP. 23 Ny
... (f.IM£GU.AJID CAJRQI'Y S -I.'" SF)
\
\
\ "'.
~
'\
'-'-'
"--",
-........ --'" "-
-."" -'\ .... --·----1 --' =:-\~-./-\ I .. "
\
'-,., "'--.... I "-.. --J,W"" ~-~-. .. -r· .-"--"". 'y~" .. ./ -·· .. r--... -.-.. ..l.J--~~ ..... -""~. "-.~ .. -~;:; .. ::---.... -:2....-.--:.."':"",;,,;;;;: .. -.!!f. .. 1""-' .•• ..:. .... .... ......... ~ ... ~·"\ .. r \ \. ,~ ... ~:..)(( . ~;:-_. ~-7\~"~~'=>!\ :::;;gj~5it('~,
!
\ I \--.. -...... J--.. /
i
I
---\
\ ,
;;;;;;;;,;;.;:;.;---------
--1 --~-10-1 -H-
LAURCLHUR' 1 PHASE 1 : 1
(UNDER co SrRlICTIQN) I 1 ---........ -_1-.. -......... -___ """I
2 i\ 9 : ! I
:, II ----. -,-------H
.3 i 8 : u I ''''': .. -. _. ___ 1 .... ___ _
4 '
___ ~L---5 A .-0
.~ ... ~~~~.-
\
.-.-.---
GAAPHC ac.w! 9CALE,r-ff()'
\'St'IJCAI. DA 7UW
.... __ ..... Qt(, ~W. COH1UI.Ir InERVAL _ r
BENCHIAIIC ....,
lONG CCJLWrr POINT I R£NTIIU: FaJHD PCJHOIIN r IOHQ COCJNr( SUlFAC£ BRASS DISC AT 1H£ SlNZT INrtRSECTJOH OF He 4JH SlR£ET AND ,...,111 A~ S£ IrfAItKJIW1 H HQltJHIC'ST COIfNDt OF S£C1KIN 'of. ~ 2JH.. RAN« K. lUI. G.£VAnc:w-.... 71 FEET.
."., SET cantIN GIN SPIC!' 'I.,' SOUlHI£ST OF 1N[ lEST c:a.UWH OF GATE. El.£VA new-407." 1EE't
BASII9 OF fEAIfNQ
lJIfU!' NOIt1H. &4sm UPON Gl.OIAL HJSIJIONING $'IS1DI (GPS) LAAlJaT G:IItI) ~ STA7£' NOIfrH ZON£ COCROWAlES. A CXW\OG£NC£' NK.U OF OO'5I'JO.a" ~ 1MS IJ'PfJ£D AT AI I'UNCH IINfK IH r InHO COUNTY .... AC;£' MASS aa:. AT J)£ smar W1aSCCDCW OF He 4TH ST. AND fWlH A1£. ~
IINfXM(J 1HE HQltlHE'AST CQIfNEJIf OF SEClJCW 1& ~ IS NCWJH, IWIGIf 5 fAIT OF JIC ~ AIDIDAN. JHE' IIOIfJH NI£IfICAH OAJLII OF INJIIIM (ItWJ ~) GM) COt\IIIDNAoJD IlERE'rotH) TO
BE 1I0I0.1,.. , 1.J11t1AJZI AT NT PCIfIT. Jh1E' IMR$C OF eoJH 1Nr $(A LlWl. CCIIIlWClICW fM:1Olf Of 4...,,12. AND 1Nr OlD ~ FAClQIt tI f.OOCICI02t87 WAS APfIUEI) TO H ., COCR:IIIN.41D FOIt SHOIIH GIItOLNI tlST.wca.
BlCO_BD POll _ROVAL BY, ____ _
BY, ____ _
D
~~ ~~ , ,.~ ~h~ ~~~ n~~~U~
"O()
~
~III
S! ¢~
P"o.ECT NO.: C
fa .,j
.j I",
~1
I I ~
~d ~.il ~ml
DRA .. 8'1': .,IQC
ISSUEDATE: ~
SHEET RtV.:
LJ , ...
02064ECOI-P08 POB
_acooa
R-l
R-IO
.J:l ~ -+-> ~ a ~ -.::::t' .. ........ r;IJ ~ ~ ~ t.a ~ .'. ~ .~.
~ tI'J •
~ ~ N
RMH
SE 142nd St.
RC(P)
(P)
G6 .. 22 T23N R5E W 112 e =~"'VD8 'fH--~-~o -wo F6 1:4800
15 T23N R5E W 1/2 . . 5315
..
David L Halinen, P.E.
davidhalinen@halinenlaw.com
HALINEN LAW OFFICES, P.S.
A Professional Service Corporation
Bellevue Place / Bank of America Bldg.
10500 NE 8th, Suite 1900
Bellevue, Washington 98004
February 1,2005
VIA UPS NEXT-DAY AIR AND
VIA E-MAIL (nwatts@.ci.renton.wa.us)
City of Renton Development Services Division
Department of PlanninglBuildinglPublic Works
1055 S. Grady Way, Sixth Floor
Renton, Washington 98055
Attn: Neil Watts, P.E., Director
Re: Liberty Ridge L.L.C. 's Proposed "Elmhurst" Residential Subdivision
(City of Renton File No. LUA-04-162, PP, ECF)
(425) 454-8272
Fax (425) 646-3467
Liberty Ridge's Proposal for Tree-Lining the Buffer of the Ephemeral Stream as An
Alternative to An Increase in the Buffer Width from 25 Feet to 35 Feet
Dear Mr. Watts:
I am again writing on behalf of my client Liberty Ridge L.L.C., the preliminary plat
applicant for the proposed "Elmhurst" Residential Subdivision. Yesterday, while speaking to
Susan Fiala of your staff concerning the status of the Elmhurst proposal, she mentioned to me
that the Environmental Review Committee will be considering the imposition of a SEP A
mitigating condition that would increase the width of the 25-foot wide code-required buffer
along the ephemeral stream crossing the site's east edge to 35 feet. My client is very concerned
about such a condition because it would negatively impact the proposed lot layout.
Following my phone discussion with Susan Fiala, we consulted the manager of Shannon
& Wilson's Natural Resources Manager, Katie Walter, concerning the issue. (Ms. Walter
conducted the stream and wetland analysis of the Elmhurst site.) She has prepared a letter
addressing the issue (see the accompanying copy of her letter) in which she explains why
installation of a mix of evergreen and deciduous trees at IS-foot centers within the 25-foot buffer
would provide better environmental protection for the stream corridor than would the
contemplated increase in buffer width.
In view of Ms. Walter's letter, my client would be willing to accept the following
mitigating condition as an alternative to an increase in the stream buffer width:
Evergreen and deciduous trees (such as Douglas fir, western hemlock, and big
leaf maple) shall be planted on approximately IS-foot centers within the 25-foot
wide buffer along the east side of the stream. Two-gallon size tree stock shall be
used. Planting should occur in the fall to give the plants time to develop roots
over the winter. The satisfaction of this requirement shall be subject to the review
and approval of the Development Services Division prior to the recording of the
plat.
..
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
February 1, 2005
Page 2
Please let me know if you have any questions regarding this matter. I request that this
letter and the attached letter from Shannon & Wilson be presented to the Environmental Review
Committee.
Sincerely,
HALINEN LAW OFFICES, P.S.
Enclosure
cc: Liberty Ridge L.L.c.
Attn: Don Merlino (via e-mail, with copy of enclosure)
Attn: Michael Merlino (via e-mail, with copy of enclosure)
Lou Larsen, Pacific Engineering Design, LLC (via e-mail, with copy of enclosure)
Katie Walter, P.W.S., Natural Resources Manager, Shannon & Wilson, Inc.
(via e-mail, with copy of enclosure)
Gregg Zimmerman, Administrator, Renton PlanninglBuildinglPublic Works
(via UPS Next Day Air and e-mail, with copy of enclosure)
Jennifer Henning, Principal Planner, Renton Development Services Division
(via UPS Next Day Air and e-mail, with copy of enclosure)
Susan Fiala, Senior Planner, Renton Development Services Division
(via UPS Next Day Air and e-mail, with copy of enclosure)
C:\CF\2418\043\Stream and Wetland\Watts.LTl.doc
..
February 1, 2005
Liberty Ridge LLC
9125 10th Avenue South
Seattle, W A 98108
Attn: Mr. Michael Merlino
RE: BUFFER MITIGATION ALTERNATIVES FOR "ELMHURST" RESIDENTIAL
SUBDIVISION, RENTON, WASHINGTON
It is my understanding that the City of Renton is considering a State Environmental Policy Act
(SEPA) mitigating condition that would increase the stream buffer from 25 feet (the City code
required width) to 35 feet along the ephemeral stream (part of the upper reach of Maplewood
Creek) within the Elmhurst site. The stream follows the western site boundary from the
northwestern property comer to near the site's southwest comer, at which point it turns east on
the site and then heads to the southeast, off of the site. This letter provides an alternative that I
think would be more effective than an increase to the buffer width.
BACKGROUND INFORMATION CONCERNING THE STREAM
During both of my site visits (June and December of 2004), I examined the subject stream. The
stream was completely dry during my June visit, and during my December visit, the stream had
no flowing water, just some shallow puddles in places. As I pointed out in my December 22,
2004, letter report, the stream's channel bottom is generally unvegetated and lined with gravel,
mud, and cobbles. The channel is entrenched with steep side slopes along the northern two-
thirds of the site. That stretch of the stream is straight and is channelized along the Elmhurst
site's edge. In the southern portion of the site, the creek is not as channelized as farther
upstream, but it is about 6 to 8 feet lower than the remainder of the site. Riparian vegetation
along the creek is generally dominated by Himalayan blackberry except near the southern end
of the property, where ther~ is an overstory of black cottonwood and some Douglas fir, with an
understory of Douglas spirea and clustered rose. The creek is reported to have fish migration
barriers downstream of the project area.
400 NORTH 34TH STREET' SUITE 100
P.O. BOX 300303
SEATTLE, WASHINGTON 98103
206·632'8020 FAX 206·695·6777
TOO: 1·800'833·6388
21-1-12146-001
Liberty Ridge LLC
Attn: Mr. Michael Merlino
February 1, 2005
Page 2
SHANNON &WILSON,INC.
ALTERNATIVE RECOMMENDATION
I recommend that the buffer be maintained at 25 instead of 35 feet, but with revegetation of the
25-foot-wide buffer. Because the stream and buffer have been heavily disturbed over the past
50 years or more, there are very few trees left within the buffer. By providing native tree
species through revegetation, the functional gain to the stream would be much more significant
than an additional 10 feet of buffer with existing marginal vegetation. The addition of trees
provides a better opportunity for future structural complexity, shading of the stream, better
habitat for birds and small mammals, and improved downstream system health.
Such an approach would involve planting both evergreen and deciduous trees such as Douglas
fir, western hemlock, and big leaf maple. The trees should be planted on approximately 15-foot
centers, with 2-gallon-size stock. Planting should occur in the fall to give the plants time to
develop roots over the winter and, therefore, have less mortality in their first summer after
planting.
If you have any questions or comments, or require additional information, please contact me at
(206) 695-6738.
Sincerely,
SHANNON & WILSON, INC.
Katie L. Walter, P.W.S.
Associate
Natural Resources Manager
KLW:DNClklw
c: Lou Larsen, Pacific Engineering Design, LLC
21·1·12146-00 l·lA.doc/wpleel 21-1-12146-001
City of Renton Department of Planning I Building I Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: pD..(1£.s" COMMENTS DUE: JANUARY 28, 2005
APPLICATION NO: LUA04-162, PP, ECF DATE CIRCULATED: JANUARY 14,2005
APPLICANT: Liberty Ridge LLC PROJECT MANAGER: Susan Fiala
PROJECT TITLE: Elmhurst Preliminary Plat PLAN REVIEW: Juliana Fries
SITE AREA: 9.6 acres BUILDING AREA (gross): NIA
LOCATION: 201,251, & 257 Bremerton Ave NE WORK ORDER NO: 77365
SUMMARY OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval for a 64-lot
subdivision of a multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are included. The site is zoned
Residential -10 dulac and is to abide by a Development Agreement. The lots range in size from 3,801 sq. fl. to 5,870 sq. fl. and
intended for detached units. All existing buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal
public streets and private access easements. The applicant is requesting modifications to street standards and vacation of right-of-
way. One non-regulated on-site wetland would be filled. Maplewood Creek crosses the southwestern portion of the pial.
A. ENVIRONMENTAL IMPACT (e.g. Non-Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy! Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS
'71/UAA-CUZ f/l-() ~~ ~ £):<J
C.
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas where dditional info ation is needed to properly assess this proposal.
DatE(
A. ENVIRONMENTAL IMPACT (e.g. Non-Code) COMMENTS
"It is anticipated that the proposed development would generate future residents
that would utilize existing City park and recreation facilities and programs. The
City has adopted a Parks Mitigation Fee of $530.76 per each new single family
lot to address these potential impacts."
Parks Mitigation Fee
Susan Fiala
Senior Planner
Development Services
1055 So Grady Way
Renton, Wa.98055
Re: File #LUA04-626
Dear Ms. Fiala,
1124/05
I am cncl~sing a copy fif the proposed pIau, showing illy prop~rty highlighted in
yellow. My concern is that this new development be fenced. That is going to be the
only way to protect my privacy. There is a small stream between the two properties
that should be protected also. I have lived here for over 32 years and I appreciate
you taking my concerns into consideration. I will wait for more information about
up coming meetings. Hope to hear from you.
Rose Woodall
248 Union Ave N.E.
Renton, Wash. 98059
(425-255-9584)
• . '
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project.
These recommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above.
The applicant will be required to pay the appropriate Transportation Mitigation Fee;
The applicant will be required to pay the appropriate Fire Mitigation Fee; and
The applicant will be required to pay the appropriate Parks Mitigation Fee.
Comments on the above application must be submitted in writing to Susan Fiala, Senior Planner, Development
Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on January 28, 2005. This matter is also
tentatively scheduled for a public hearing on March 15.2005. at 9:00 AM, Council Chambers. Seventh Floor. Renton City
Hall, tOSS South Grady Way, Renton. If you are interested in attending the hearing, please contact the Development
Services Division, (425) 430-7282, to ensure that the hearing has not been rescheduled. If comments cannot be
submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the
proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record
and receive additional information by mail, please contact the project manager. Anyone who submits written comments
will automatically become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Susan Fiala, Senior Planner, Tel: (42~) 430-7382
I PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION I
R-IO
R-8
If you would like to be made a party of record to receive further information on this proposed project, complete
this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055.
File No./Name: LUA04-162, PP, ECF / Elmhurst Preliminary Plat
NAME~~~~.
MAILINGADDRESS:fi &~ ~~ /VF
TELEPHONE NO.: ¥~!J--4.£5--9S8tJ
City of Re. . n Department of Planning I Building I Public KS
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVI EW I NG DEPARTMENT: ltns/r'UcJJ"{)("'\ COMMENTS DUE: JANUARY 28, 2005
APPLICATION NO: LUA04-162, PP, ECF DATE CIRCULATED: JANUARY 14, 2005
j'i
APPLICANT: Liberty Ridqe LLC PROJECT MANAGER: Susan Fiala
PROJECT TITLE: Elmhurst Preliminary Plat PLAN REVIEW: Juliana Fries JAN I 7 2005
SITE AREA: 9.6 acres BUILDING AREA (gross): NIA
LOCATION: 201,251, & 257 Bremerton Ave NE I WORK ORDER NO: 77365
SUMMARY OF PROPOSAL: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat approval for a 64-lot
subdivision of a multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are included. The site is zoned
Residential -10 dulac and is to abide by a Development Agreement. The lots range in size from 3,801 sq. ft. to 5,870 sq. ft. and
intended for detached units. All existing buildings would be demolished. Access is proposed via Bremerton Ave. NE to new internal
public streets and private access easements. The applicant is requesting modifications to street standards and vacation of right-of·
way. One non-regulated on-site wetland would be filled. Maplewood Creek crosses the southwestern portion of the plat.
A. ENVIRONMENTAL IMPACT (e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas where 'ditional information is neede to prop.,erly assess this proposal.
Date
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 14th day of January, 2005, I deposited in the mails of the United States, a sealed envelope
containing NOA, Environmental Checklist, PMT's documents. This information was sent to:
Agencies
(Signature of Sender): ~
7
STATE OF WASHINGTON
) SS
COUNTY OF KING )
See Attached
I certify that I know or have satisfactory evidence that Stacy Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated: 3 -3~ or---=-----"""'"------Notary Public in and for the Sate of Washington
Notary (Print): Ad/)/ltt"L4'~ e. /4/e)(CtYI d -e y-". ,'-~ " c.: My appointment expires: ,;/ -/7 -0 t;? f~ !-i
I
\! {~-' < " " .',
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
template' affidavit of service by mailing
Dept. of Ecology *
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
WSDOT Northwest Region *
Attn: Ramin Pazooki
King Area Dev. Serv., MS-240
PO Box 330310
Seattle, WA 98133-9710
US Army Corp. of Engineers'
Seattle District Office
Attn: SEPA Reviewer
PO Box C-3755
Seattle, WA 98124
Jamey Taylor'
Depart. of Natural Resources
PO Box 47015
Olympia, WA 98504-7015
KC Dev. & Environmental Servo
Attn: SEPA Section
900 Oakesdale Ave. SW
Renton, W A 98055-1219
Metro Transit
Senior Environmental Planner
Gary Kriedt
AGENCY (DOE) LETTER MAILING
(ERe DETERMINATIONS)
WDFW -Stewart Reinbold * Muckleshoot Indian Tribe Fisheries Dept.
c/o Department of Ecology *
3190 160th Ave SE Attn. SEPA Reviewer
Bellevue, WA 98008 39015 -172nd Avenue SE
Auburn, WA 98092
Duwamish Tribal Office * Muckleshoot Cultural Resources Program
4717 W Marginal Way SW .
Seattle, WA 98106-1514 Attn: Ms Melissa Calvert
39015 172nd Avenue SE
Auburn, WA 98092-9763
KC Wastewater Treatment Division * Office of Archaeology & Historic
Environmental Planning Supervisor Preservation*
Ms. Shirley Marroquin Attn: Stephanie Kramer
201 S. Jackson ST, MS KSC-NR-050 PO Box 48343
Seattle, WA 98104-3855 Olympia, WA 98504-8343
City of Newcastle City of Kent
Attn: Mr. Micheal E. Nicholson Attn: Mr. Fred Satterstrom, AICP
Director of Community Development Acting Community Dev. Director
13020 SE 72nd Place 220 Fourth Avenue South
Newcastle, WA 98059 Kent, WA 98032-5895
Puget Sound Energy City of Tukwila
Municipal Liason Manager Steve Lancaster, Responsible Official
Joe Jainga 6300 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431 PO Box 90868, MS: XRD-01W Tukwila, WA 98188
Seattle, W A 981 04-3856 Bellevue, WA 98009-0868
Seattle Public Utilities
Real Estate Services
Title Examiner
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and
cities will need to be sent a copy of the checklist, PMT's, and the notice of application .•
Also note, do not mail Jamey Taylor any of the notices she gets hers from the web. Only send
her the ERC Determination paperwork.
template -affidavit of service by mailing
DATE: January 14, 2005
LAND USE NUMBER: LUA04·162, PP, ECF
PROJECT NAME: Elmhurst Preliminary Plat
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat
approval for a 64-lot subdivision of a multiple parcel. 9.6 acre site. Two tracts for open space and storm drainage are
Included. The site Is zoned Residential· 10 dulac and is to abide by a Development Agreement. The lots range in size
from 3,801 sq, ft. to 5,870 sq. ft. and Intended for detached units. AU existing buildings would be demolished. Access is
proposed via Bremerton Ave. NE to new Internal public streets and private access easements. The applicant is requesting
modifications to street standards and vacation of right-at-way. One non-regulated on-site wetland would be filled.
Maptewood Creek crosses the southwestern portion of the plat.
PROJECT LOCATION: 201, 251, & 257 Bremerton Avenue NE
OPTIONAL DETERMINAT10N OF NON·SIGN1FICANCE, MITIGATED (DNS·M): As 1he Lead Agency. the City 01 Ren1an
has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore. as
permitted under the RCW 43.21C.ll 0, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is Hkely to be issued. Comment periods for the project and the proposed DNS-M are Integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M.
APPUCATION DATE: December 28, 2004
NOTICE OF COMPLETE APPLICATION: January 14, 2005
APPUCANTJPROJECT CONTACT PERSON: David L Halinen, Te1: (206) 443·4684
Em!: davldhalinenChalinenlaw.com
Rev ... Requested: Environmental (SEPA) Review, Preliminary Plat Approval
Other PermIts which may be required: Construction and Utility Permits
Requested Studies: Geotechnical, Wetland. Drainage and Traffic Reports
Location where application may be reviewed: Plannlng/Bulldlng/Publlc Works Department, Development Services
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton. WA
98055
PUBLIC HEARING: Public hearing Is tentatively scheduled for March 15 2005 before the Renton
Hearing Examiner in Renton CounCil Chambers. Hearings begin at 9:00 AM on
the 7th floor of the new Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW:
Zoning/land Use:
Environmental Documents that
Evaluate the Proposed Project:
Development Regulations
Used For Project Mitigation:
The subject site Is designated ResidentIal Options on the City of Renton
Comprehensive Land Use Map and Residential -10 dulac (R-10) on the City's
Zoning Map. This designation encourages and permits single-family residential
development at a net density range of 4.0 to 10.0 dulac. The proposal for 64 lois
would result in a net density of 8.3 dulac after the required deductions. The
proposed subdivision is consistent with the land use designation.
Environmental (SEPA) Checklist
The project will be subject to the City's SEPA ordinance. Zoning Code, Public
Works Standards, Subdivision Regulations, Intemational Building and Fire Codes
and other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: The following Mitigation ~ea~ures will likely be imposed on the proposed project.
These ~ecommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above.
The applicant will be required fo pay the appropriate Transportation Mitigation Fee;
The applicant will be requIred to pay the appropriate Fire Mitigation Fee; and
The applicant will be requi/"9d to pay the appropnate Parks Mitigation Fee.
Comments on the above application must be submitted In writing to Susan Fiala. Senior Planner, Development Servl~s Division. 1055 Sout~ Grad~ Way. Renton. WA 98055. by 5:00 PM on January 28, 2005. This matter is also
tentatively scheduled for a pubhc heanna on March 15 2005 at 9:00 AM, Council Chambers, Seventh Floor, Renton City
Hall, .1055 ~~h Grady Way, Renton. If you are interested in attending the hearing, please contact the Development
Serw:9s DJVisl~~, (425) 430-72.82~ to ensure that the hearing has not been rescheduled. If comments cannot be
submitted in wntlng by the date In~lcated above, you may still appear at the hearing and present your comments on the
proposal before .the H~arlng E~amlner. If you have questions about this proposal, or wish to be made a party of record
and receive additional information by mall, please contact the project manager. Anyone who SUbmits written comme t
will automatically become a party of record and will be notified of any decision on thiS project. n s
CONTACT PERSON: Susan Fiala, Senior Planner, Tel: (425) 430·7382
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
If you would like to be m~de a party of record to receive further information on this proposed project, complete
this form and relurn to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055.
File NoJName: LUA04·162, PP, ECF I Elmhurst Preliminary Plat
NAME: ____________________________________________________ ___
MAILING ADDRESS: _______________________________________________ _
TELEPHONE NO.: ________________ _
CERTIFICATION
I, Sbl~~ , hereby certify that 3 copies of the above document
were po d by me in K conspicuous places or nearby the described property on
DATE: ~I{{r£
NOTICE OF APPLICATION
AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE-MITIGATED (DNS-M)
DATE: January 14, 2005
LAND USE NUMBER: LUA04-162, pp, ECF
PROJECT NAME: Elmhurst Preliminary Plat
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and Preliminary Plat
approval for a 64-lot subdivision of a multiple parcel, 9.6 acre site. Two tracts for open space and storm drainage are
included. The site is zoned Residential -10 dulac and is to abide by a Development Agreement. The lots range in size
from 3,801 sq. ft. to 5,870 sq. ft. and intended for detached units. All existing buildings would be demolished. Access is
proposed via Bremerton Ave. NE to new internal public streets and private access easements. The applicant is requesting
modifications to street standards and vacation of right-of-way. One non-regulated on-site wetland would be filled.
Maplewood Creek crosses the southwestern portion of the plat.
PROJECT LOCATION: 201,251, & 257 Bremerton Avenue NE
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton
has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21 C.ll 0, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M.
APPLICATION DATE: December 28, 2004
NOTICE OF COMPLETE APPLICATION: January 14, 2005
APPLICANT/PROJECT CONTACT PERSON: David L. Halinen, Tel: (206) 443-4684
Eml: davidhalinen@halinenlaw.com
Review Requested:
Other Permits which may be required:
Requested Studies:
Location where application may
be reviewed:
PUBLIC HEARING:
CONSISTENCY OVERVIEW:
ZoninglLand Use:
Environmental Documents that
Evaluate the Proposed Project:
Development Regulations
Used For Project Mitigation:
Environmental (SEPA) Review, Preliminary Plat Approval
Construction and Utility Permits
Geotechnical, Wetland, Drainage and Traffic Reports
Planning/Building/Public Works Department, Development Services
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98055
Public hearing is tentatively scheduled for March 15, 2005 before the Renton
Hearing Examiner in Renton Council Chambers. Hearings begin at 9:00 AM on
the 7th floor of the new Renton City Hall located at 1055 South Grady Way.
The subject site is designated Residential Options on the City of Renton
Comprehensive Land Use Map and Residential -10 dulac (R-l0) on the City's
Zoning Map. This designation encourages and permits single-family residential
development at a net density range of 4.0 to 10.0 dulac. The proposal for 64 lots
would result in a net density of 8.3 dulac after the required deductions. The
proposed subdivision is consistent with the land use designation.
Environmental (SEPA) Checklist
The project will be subject to the City's SEPA ordinance, Zoning Code, Public
Works Standards, Subdivision Regulations, International Building and Fire Codes
and other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project.
These recommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above.
The applicant will be required to pay the appropriate Transportation Mitigation Fee;
The applicant will be required to pay the appropriate Fire Mitigation Fee; and
The applicant will be required to pay the appropriate Parks Mitigation Fee.
Comments on the above application must be submitted in writing to Susan Fiala, Senior Planner, Development
Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on January 28, 2005. This matter is also
tentatively scheduled for a public hearing on March 15, 2005. at 9:00 AM, Council Chambers, Seventh Floor, Renton City
Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Development
Services Division, (425) 430-7282, to ensure that the hearing has not been rescheduled. If comments cannot be
submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the
proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record
and receive additional information by mail, please contact the project manager. Anyone who submits written comments
will automatically become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Susan Fiala, Senior Planner, Tel: (425) 430-7382
I PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATiON I
R-10
If you would like to be made a party of record to receive further information on this proposed project, complete
this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055.
File No.!Name: LUA04-162, PP, ECF / Elmhurst Preliminary Plat
NAME:
MAILING ADDRESS:
TELEPHONE NO.: ________ _
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 14th day of January, 2005, I deposited in the mails of the United States, a sealed envelope
containing Acceptance Letter documents. This information was sent to:
Liberty Ridge LLC -Attn: Mike Merlino
David Halinen
(Signature of Sender)~~ ~
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
Owner/Applicant
Contact
I certify that I know or have satisfactory evidence that Stacy Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated: 3 --3 iY=) ---""---''''--..;;;;"".,''----Notary Public in and for the Sate of Washington,',
.. }~~", >'~:' .. <'~',~ ,.:, ..... :. 'I' ;~",::~ •• ~'\{\"'!
Notary (Print): v1c:if7Cint-' ,ri{ e k:c..I1CU y ~ '" : (1 .. "J II'C1Y i~':::O:
My appointment expires: 3 -11 ~ 0 {;, i, I, J' ': ;
'>~ •• ~:
Elmhurst Preliminary Plat
LUA04-162, PP, ECF
template -affidavit of service by mailing
tAR ..II. . -
CITY )F RENTON
PIanningIBuildinglPublic Works Department
Gregg Zimmerman P.E., Administrator Kathy Keolker-Wheeler, Mayor
January 14, 2005
David Halinen
Halinen Law Offices, PS
10500 NE 8th Street #1900
Bellevue, W A 98004
Subject: Elmhurst Preliminary Plat
LUA-04-162, PP, ECF
Dear Mr. Halinen:
The Development Planning Section of the City of Renton has determined that the
subject application is complete according to submittal requirements and, therefore, is
accepted for review.
It is tentatively scheduled for consideration by the Environmental Review Committee on
February 8,2005. Prior to that review, you will be notified if any 'additional information is
required to continue processing your application.
In addition, this matter is tentatively scheduled for a Public Hearing on March 15, 2005
at 9:00 AM, Council Chambers, Seventh Floor; Renton City Hall, 1055 South Grady
Way, Renton. The applicant or representative(s) of the applicant are required to be
present at the public hearing. A copy of the staff report will be mailed to you one week
before the hearing.
Please contact me at (425) 430-7382 if you have any questions.
Sincerely,
/~ ,At?:2t4 "~
Susan Fiala
Senior Planner
cc: Liberty Ridge LLC / Owner
--------::l~OS-=-:S:-:S:::-o-uth~G:-ra'"""'d;-y-::W.c;-a-y '"""'-R=-e-n"-to-n-=, W.=a"-s7hi;-"n-'gt-on--=C9S=OC-=S-=-S ------~ * This paper contains 50% recycled material, 30% post consumer AHEAD OF THE CURVE
·~Pe
Kathy Keolker-Wheeler, Mayor
January 14, 2005
Superintendent's Office
Renton School District #403
300 SW 7'h Street
Renton, WA 98055-2307
Subject:
CITY. RENTON
PIanningIBuildinglPublic Works Department
Gregg Zimmerman P.E., Administrator
RECEIVED
JAN 19 2005
fRANSPORTATlON f)l=pT
The City of Renton Development Services Division has received an application for a 64-lot sing 1-
family subdivision located at 201, 251, & 257 Bremerton Avenue NE. Please see the enclosed
Notice of Application for further details.
In order to process this application, the Development Services Division needs to know which
Renton schools would be attended by children living in residences at the location indicated
above. Please fill in the appropriate schools on the list below and return this letter to my
attention, Development Services Division, City of Renton, 1055 South Grady Way, Renton,
Washington 98055 by January 28, 2005.
Elementary School:
Middle School: '/ke----. ~.£.r
High School: ~
Will the schools you have indicated be able to handle the impact 'U. the additional students
estimated to come from the proposed development? Yes No __ _
Any Comments: ___________________________ _
Thank you for providing this important information. If you have any questions regarding this
project, please contact me at (425) 430-7382.
Sincerely,
Susan Fiala
Senior Planner
_E_n_C_1. -----;-;1 O~5;-;;-5-;::;S-ou--:-t.h-;::;G:-ra-;d-y-;;W";""ay---,-R:::-e-n"":"to-n""", W:;-;-as.h7'in-g-:-to-n--;9~8~05-::-:5:-------~ * This paper contains 50% recycled material, 30% post consumer AHEAD OF THE CURVE
LIST OF SURROUNDING
PROPERTY OWNERS
WITHIN 300-FEET OF THE SUBJECT SITE
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231
'IYO~~tltr
/)~ ~~~(.q <.;(' ~ Jt1o~-19~ ~ <'if G ~C~ ;001
PROJECT NAME: ELMHURST RESIDENTIAL SUBDIVISION ~~
APPLICATION No:_-=Oo....Lf..:---'I=lo-'!::2.'---__________________ _
The following is a list of property owners within 300 feet of the subject site. The Development Services
Division will notify these individuals of the proposed development.
NAME ADDRESS
SEE ATTACHED LIST.
Q:/web/pw/devserv/forms/planning/owners.doc
ASSESSOR'S PARCEL
NUMBER
08/27103
Applicant Certification
I, David L. Halinen, hereby certify that the above list(s) of adjacent property owners and their addresses
were obtained from:
X Title Company Records
Signe~ Date ! 2./'2.1 /o+: I
NOTARY
ATTESTED: Subscribed and sworn before me, a Notary Public, in and for the State of was~iton,
residing at 71fCtJ$/f / Ii!A= on the ,;( / if day of P~Ui?'};JL , 20 . ~' . --\,\\"'," 'SA' I"",
Signed .,," 6.~. q J:. '"
J ~ •• ~ , ..... "'1. ~"
(Notary blic) :..~ y",~ ~:';." ,,<-: "'-:, '" .,.., ,0.". __ , .~._"",,,
: ! ""0' TAR'" \ -: .., . ,,,., . ,.~ --: : ~., .-,:\:. : -:~~ ... ,'PUDL\e i~ff .... ~ .....• .pJ."~"
-:. ..., ~ ~## "lb. " ...... ,. ra:: ~ .,.,., '/! ""'n-t"'" ~""'" ';" OF W~,~ \\,," '" ", ""11""
****For City of Renton Use****
CERTIFICATION OF MAILING
,-
, :>} . <AIINIi!'F .:::1 .( ." ,/,' ;; OWfjm': .' ".""" Sml.'Mdreu . / ",.+" City ':iiii~:cbde '. iil:V.1Ue , .. Phone,No. " I"";;",,,·, • r.ialfJ\a(j~, """:,,,,,,,,,,. ;. 'Mall:CltylStale "MaiIZlP " Land~,
1 152305-9192 PIPPIN CORTESS 0 $94,000 4251228-9292 310 BREMERTON AVE NE RENTONWA 98059 MOBILE HOME PP
2 152305-9015 CONNER HOMES CO $211,000 846108TH AVE NE STE 202 BELLEVUEWA 98004 MOBILE HOME PP
3 152305-9214 CONNER HOMES CO $147,000 846108TH AVE NE STE 202 BELLEVUEWA 98004 MOBILE HOME PP
• 519210.0020 LANGLEY 4TH AVENUE ASSOCS LLC NrCx:.kV1 ~ -1/2-'i(\u-i $1,171,400 4225 4TH AVE NORTHEAST RENTONWA 98055 COMMERCIAL ACREAGE
5 252550.0720 FERNWOOD NORTH HOMEOWNERS A $1,500 PO BOX 2384 RENTONWA 98056 RESIDENTIAL ACREAGE
• 152305-9213 CONNER HOMES CO $92,000 846 108TH AVE NE STE 202 BELLEVUEWA 98004 RESIDENTIAL ACREAGE
7 518210.0081 WOODALL ROSE $103,000 248 UNION AVE NE RENTONWA 98059 RESIDENTIAL ACREAGE
• 518210·0068 WOODALL ROSE $85,000 248 UNION AVE NE RENTONWA 98059 RESIDENTIAL ACREAGE , 519210.0085 PATRIANCA SALVADOR C $1,000 2759TH PLSW EVERETIWA 99203 RESIDENTIAL LOT ,. 519210-0031 U S POSTAL SERVICE $1,544,600 17200 116TH AVE SE RENTONWA 98058 US POSTAL SERVICE
11 25255O.Q400 GULLEKSON EDWARD 0 & SANDRA L 111 BREMERTON PL NE RENTON 98059 $206,000 PO BOX 3104 RENTONWA 98056 SFR
12 252550.0280 TRAN CHUONG M & TIEN G 116 BREMERTON PL NE RENTON 98059 $227,000 116 BREMERTON PL RENTONWA 98059 SFR
13 252550.0290 HENDRICKSON JON MORGAN 150 BREMERTON PL NE RENTON 98059 $223,000 150 BREMERTON PL NE RENTONWA 98059 SFR
14 252550.0390 DORER GERALD C & SUSAN R 151 BREMERTON PL NE RENTON 98059 $227,000 4251981.0698 151 BREMERTON PL NE RENTONWA 98059 SFR
15 252550.0430 BRAUN TIMOTHY J & ANDREA M 152 WHITMAN CT NE RENTON 98059 $220,000 152 WHITMAN CT NE RENTONWA 98059 SFR
16 252550.0530 GRIFFIN CLIFFORD 0 154 VASHON PL NE RENTON 98059 $227,000 154 VASHON PL NE RENTONWA 98059 SFR
11 252550.0520 LAMBERT JOHN A 155 WHITMAN CT NE RENTON 98059 $219,000 15 S GRADY WAY RENTONWA 98055 SFR
18 252550.0300 STRICKER STEVEN A & DEENA M 156 BREMERTON PL NE RENTON 98059 $217,000 156 BREMERTON PL NE RENTONWA 98059 SFR
lJ 252550.0440 JAMES EDWARD N JR 156 WHITMAN CT NE RENTON 98059 5227,000 158 WHITMAN CT NE RENTONWA 98059 SFR
2. 252550.0380 ROYCE HENRY L 157 BREMERTON PL NE RENTON 98059 $220,000 157 BREMERTON PL NE RENTONWA 98059 SFR
21 252550.0620 SALVATORI KELLY 159 VASHON PL NE RENTON 98059 5227,000 159 VASHON PL NE RENTONWA 98059 SFR
22 252550.0540 CUNANAN JOSEPH M 160 VASHON PL NE RENTON 98059 $222,000 5019 NE 18TH CT RENTONWA 98059 SFR
" 252550.0370 KOVAL DAUNA M 161 BREMERTON PL NE RENTON 98059 $207,000 161 BREMERTON PL NE RENTONWA 98059 SFR
24 252550.0510 CUNNINGHAM JAMES 0 JR & GAIL 161 WHITMAN CT NE RENTON 98059 5227,000 161 WHITMAN CT NE RENTONWA 98059 SFR
2S 252550.0450 ROSKO ANDREW 184 WHITMAN CT NE Ncl '/1'" I/f';;r,rl.(, i/?b/O:; RENTON 98059 $232,000 1900 NE 48TH ST APT Bl0l RENTONWA 98056 SFR
26 252550.0360 FLAIG TERRANCE L 165 BREMERTON PL NE RENTON 98059 5227,000 PO BOX 3106 RENTONWA 98056 SFR
27 252550·0550 MARCELLIS JOANNE C 166 VASHON PL NE RENTON 98059 $229,000 166 VASHON PL NE RENTONWA 98059 SFR
28 252550.0500 MADAJ WARREN J 167 WHITMAN CT NE RENTON 98059 $219,000 167 WHITMAN CT NE RENTONWA 98059 SFR .. 252550.0350 RUTLEDGE SCOTI A & JULIE M 169 BREMERTON PL NE RENTON 98059 5206,000 169 BREMERTON PL NE RENTONWA 98059 SFR
3. 252550.0310 TELETNIK KAMILLA 170 BREMERTON PL NE RENTON 98059 $223,000 170 BREMERTON PL NE RENTONWA 98059 SFR
31 252550.Q460 SAJOUS RENEE 170 WHITMAN CT NE RENTON 98059 $227,000 170 WHITMAN CT NE RENTONWA 98059 SFR
32 252550.0580 HUYNH THANH 172 VASHON PL NE RENTON 98059 5219,000 lnVASHONPLNE RENTONWA 98059 SFR
33 252550·0340 SCHRADER-NADA KATHLEEN S 173 BREMERTON PL NE RENTON 98059 5215,000 4251217·1203 173 BREMERTON PL NE RENTONWA 98059 SFR
34 252550.0490 LO NIGEL S C & LINDA E 173 WHITMAN CT NE RENTON 98059 5227,000 173 WHITMAN CT NE RENTONWA 98059 SFR
3S 252550.0470 FREDERICKSEN TODD A & TRACIE C 176 WHITMAN CT NE RENTON 98059 $239,000 176 WHITMAN CT NE RENTONWA 98059 SFR
" 252550.0570 ERBECK GEOFF A 178 VASHON PL NE RENTON 98059 5227,000 178 VASHON PL NE RENTONWA 98059 SFR
37 252550.0330 LAZCANO GILDARDO 179 BREMERTON PL NE RENTON 98059 5230,000 179 BREMERTON PL NE RENTONWA 98059 SFR
" 252550.0480 JAMERO PETER M JR 179 WHITMAN CT NE RENTON 98059 $227,000 179 WHITMAN CT NE RENTONWA 98059 SFR
" 252550.0580 SCHROEDER GORDON & MARSHA 183 VASHON PL NE RENTON 98059 5220,000 183 VASHON PL NE RENTONWA 98059 SFR
•• 252550.0320 WONG GLEN W K & TESSIE 185 BREMERTON PL NE RENTON 98059 $219,000 4251271·2515 185 BREMERTON PL NE RENTONWA 98059 SFR
41 519210.0069 WOODALL ROSE 230 UNION AVE NE RENTON 98059 $168,000 248 UNION AVE NE RENTONWA 98059 SFR
42 519210.0080 WOODALL ROSE 248 UNION AVE NE RENTON 98059 $244,000 248 UNION AVE NE RENTONWA 98059 SFR ., 518210.0042 RIDGEVIEW COURT LLC 327 BREMERTON AVE NE RENTON 98059 $193,000 PO BOX 2401 KIRKLANDWA 98083 SFR .. 152305·9035 BLISS VIOLET F 330 BREMERTON AVE NE RENTON 98059 $223,000 4251255-2782 330 BREMERTON AVE NE RENTONWA 98059 SFR
" 518210.0071 CRONIN TERESA A 4115 NE 2ND PL RENTON 98059 $196,000 4115 NE 2ND PL RENTONWA 98059 SFR .. 518210.0092 DELMAR JODI J 4207 NE 2ND PL RENTON 98059 $214,000 4207 NE 2ND PL RENTONWA 98059 SFR
" 518210·0083 LOSCH JOHN H & MARGARETIA J 4213 SE 2ND PL RENTON 98059 $219,000 4213 NE 2ND PL RENTONWA 98059 SFR
4. 252550.0420 STONECE 4308 NE 1 ST PL RENTON 98059 $231,000 PO BOX 2401 RENTONWA 98058 SFR .. 252550.0410 MCKAY MICHELLE M 4314 NE 1ST PL RENTON 98059 $227,000 4251228·8207 4314 NE 1ST PL RENTONWA 98059 SFR
5. 152305-9030 VlJE FUE 13004136TH AVE SE RENTON 98059 $276,000 13004136TH AVE SE RENTONWA 98059 SFR
51 518210.0050 LIBERTY RIDGE LLC 13013136TH AVE SE RENTON 98059 $374,000 912510TH AVE S SEATILEWA 98108 SFR
Win20ata® Page: 1 of 1
~~MHvfl"l •
, , DJLf-115
WA04-/&2.
City of Renton
LAND USE PERMIT
CITY OF AENTON
RECEIVED
DEC 2 8 200~
MASTER APPLICATIONBUlLDINGDIV/SloN
PROPERTY OWNER(S) PROJECT INFORMATION
NAME: Liberty Ridge L.L.C. (Attn: Mike Merlino) PROJECT OR DEVELOPMENT NAME: "Elmhurst"
Residential Subdivision
ADDRESS: 9125 10th AVE S
PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE:
CITY: SEATTLE, WA ZIP: 98108 .. 01 BREMERTON AVE NE, RENTON, WA 98059
~ hie." I.( to /j
.;)51 I. II Ie. C. It t/
TELEPHONE NUMBER: (425) 226-1000 KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
5182100049,5182100050 and 5182100051
APPLICANT (if other than owner) EXISTING LAND USE(S): Three existing residential buildings
NAME: Same as owner and former construction company buildings
PROPOSED LAND USE(S): Single-family (detached)
COMPANY (if applicable): residential subdivision
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
ADDRESS: Residential Options (RO)
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION CITY: ZIP: (if applicable): No change
TELEPHONE NUMBER EXISTING ZONING: R-10, subject to existing Development Agmt.
CONTACT PERSON PROPOSED ZONING (if applicable): No change
NAME: David L. Halinen SITE AREA (in square feet): 418,176 +1-sq. ft.
SQUARE FOOTAGE OF ROADWAYS TO BE DEDICATED
COMPANY (if HALINEN LAW OFFICES, P.S.
applicable ):
ADDRESS: 10500 NE 8th St., Suite 1900
FOR SUBDIVISIONS OR PRIVATE STREETS SERVING
THREE LOTS OR MORE (if app$Cable): 74,923 +1-sq. ft.
p~'_ 1,2.I(>( t=n VCok (£.2. )OC cM.;Y ~~;:'
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
ACRE (if applicable): 8.25
BELLEVUE, WA ZIP: 98004 NUMBER OF PROPOSED LOTS (if applicable): 64
TELEPHONE NUMBER AND E-MAIL ADDRESS: NUMBER OF NEW DWELLING UNITS (if applicable): NIA
(206) 443-4684 davidhalinen@halinenlaw.com (each of the proposed lots will ultimately have one single-family
detached dwellinal
Q:web/pw/devserv/forrns/planninglmasterapp.doc
,."
'. '1
PRC -:CT INFORMATION (contini I) ~-----------------------,
NUMBER OF EXISTING DWELLING UNITS (if applicable): 3 PROJECT VALUE: $10,400,000
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable): Not yet known
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQUARE FOOTAGE (if applicable):
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): None o AQUIFER PROTECTION AREA ONE
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL o AQUIFER PROTECTION AREA TWO
BUILDINGS (if applicable): None o FLOOD HAZARD AREA
SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): None o GEOLOGIC HAZARD
NET FLOOR AREA OF NON-RESIDENTIAL BUILDINGS (if
applicable): N/A
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE
NEW PROJECT (if applicable): N/A o
LEGAL DESCRIPTION OF PROPERTY
___ sq.ft.
___ sq.ft.
___ sq.ft.
sq. ft.
___ sq.ft.
(Attach legal description on separate sheet with the following information included)
SITUATE IN THE NW QUARTER OF SECTION 15, TOWNSHIP 23N, RANGE 5 EAST, IN THE CITY OF
RENTON, KING COUNTY, WASHINGTON.
TYPE OF APPLICATION & FEES
List all land use applications being applied for:
1. Preliminary Plat ~ 3.
2. Environmental Review ~ 4.
Staff will calculate applicable fees and postage: $
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s) GARY M. MERLINO, declare that I am (please check one) _ the current owner of the property involved in this application or _XX_
a Manager authorized to act for Liherty Ridge L.L.C., a Washington limited liabi!1ty company, the ::::Jrrent cwr.e~ of the subject real proparty, (please
attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith provided are in all respects
true and correct to the best of my knowledge and belief.
Q:web/pw/devserv/forms/planning/masterapp.doc
I certify that I know or have satisfactory evidence that GARY M. MERLINO signed this
instrument and acknowledged it to be his free and voluntary act for the uses and purposes
mentioned in the instr ent.
otary Public in and for the S,tate ofWaShingt~ ,
Notary (Print) 6\1 DV\I lP! \ It.~
My appointment eXPires:._-.:::5~\~\L..:.~~O:..LP2.c..-__
LEGAL DESCRIPTION
PARCEL A:
THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE FOLLOWING DESCRIBED PROPERTY:
THE NORTH I;2 OF THE SOUTHEAST ~ OF THE NORTHWEST ~ OF THE NORTHWEST ~ OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE NORTH I;2 OF TRACT 5, MARTINS
ACRE TRACTS, ACCORDING TO THE UNRECORDED PLAT THEREOF);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCELB:
THE SOUTH I;2 OF THE SOUTHEAST ~ OF HE NORTHWEST ~ OF THE NORTHWEST ~ OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EASTERLY 7.5 FEET FOR ROAD;
(ALSO KNOWN AS THE SOUTHERLY Yz OF TRACTS 5 AND 6, MARTINS ACRE TRACTS, ACCORDING TO
THE UNRECORDED PLAT THEREOF);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCELC:
THE NORTH I;2 OF THE SOUTHEAST ~ OF THE NORTHWEST ~ OF THE NORTHWEST ~ OF SECTION 15,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
AND EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE REMAINDER;
(ALSO KNOWN AS THE NORTH I;2 OF TRACTS 5 AND 6, MARTINS ACRE TRACTS, ACCORDING TO THE
UNRECORDED PLAT THEREOF; EXCEPT THE SOUTH 110 FEET OF THE EAST 215 OF SAID TRACT 5);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
Q:web/pw/devserv/forms/planninglmasterapp.doc
DENSITY
WORKSHEET
City of Renton Development Services Division
1055 South Grady Way-Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231
1. Gross area of property:
2. Deductions: Certain areas are excluded from density calculations.
These include:
Public streets··
Private access easements··
Critical Areas·
Total excluded area:
3. Subtract/ine 2 from line 1 for net area:
4. Divide line·3 by 43,560 for net acreage:
"14/'t~ square feet
, a 'Z.(c» , square feet
~laoe, square feet
2. 1,~/99'2.
3., ;?Sl \C04-
4. ,l.1tp
';';-:::!t-'MENr
CITY OF REtr~%NtNG
DEC 2 8 200~
RECEIVED
square feet
square feet
square feet
acres
, 5. Number of dwelling units or lots planned: 5. _____ unitsllots
6. Divide line 5 by line 4 for net density: 6. S.2.5 = dwelling units/acre
·Critical Areas are defined as "Areas determined by the City to be not suitable for
development and which are subject to the City's Critical Areas Regulations
including very high landslide areas, protected slopes, wetlands or floodways."
Critical areas buffers are not deducted/excluded.
** Alleys (public or private) do not have to be excluded.
Q:\WEB\PW\DEVSERV\Fonns\Planningldensity.doc Last updated: 11/08/2004 1
, "
DATE:
TO:
FROM:
SUBJECT:
CITY OF RENTON
FIRE PREVENTION BUREAU
MEMORANDUM ~'t
February 9, 2004
Susan Fiala, Senior Planner
Jim Gray, Assistant Fire Marshal t
Elm Hurst Preliminary Plat, 201 &1 257 Bremerton Ave NE
Fire Department Comments:
1. A fire hydrant with 1000 GPM fire flow is required within 300 feet of
all new single-family structures. If the building square footage exceeds
3600 square feet in area, the minimum fire flow increases to 1500 GPM
and requires two hydrants within 300 feet of the structure.
2. A fire mitigation fee of $488.00 is required for all new single-family
structures.
3. This plat requires a secondary emergency access due to the dead end
roadway over 700 feet in length. Secondary access must be by a
minimum 20 foot paved roadway.
3. Fire Department access roadways require a minimum 20 Foot paved
roadway with an approved fire department turnaround for interior lots.
See attached diagram.
4. All building addresses shall be visible from the public street
5. Separate plans and permit are required for the removal of all above
ground and underground flammable and combustible product tanks.
Please feel free to contact me if you have any questions.
" ' ,
. FIRE APPARATUS ACCESS ROADS
RENTON FIRE PREVENTION BUREAU x '1~t;-'13()-7000
........................... ................. ............. . ::~.::.".::: .. z;.:.: •• :::~:p.:::.:y:.:: . • : .... ;Jf.'r.f :::: •• w/~·'r.I··,o,oo',o .. : ... ':/..~.:::: .. : ... ~¥.: ........ . . ' :: ...... :::: .. : .... ··1· .. :::: ...... ::::·, ............................. ................ ............. . ................ ............. . ................ ............. .
. Jllltl% ............................... :::~~ .
.. ~~:~::::~~~~~~~~~~~~t~~~ift~~ii~;~; :~~~:::~:~::::ft; ::::."::::..-::::."::::."::.'::::::::::. :0':::' ':::::.' '. . :::::: ...... :::::::::::::: .. ::::: .. ::: .. :. ::::." ::::.':::
.... :.:.:.:.:.:.:-:.:.:.:.:.:-:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.: .. ::::' .. '.:.:.:.:.:.
~. ~···:::::~qm~t!~i!tl~~~~;@idtI!Mim~i ,~ .. t:.: '::':":':':':':'::":':":':':'1"'::"'::':':':':':': •• : ~ I'rJ ............................... .
¥ ~ ~ ~ ~=tI!III)I!II!I)i! !f!IUIfl!!!t
:~:~::~:~:~::::t~ .::;.:~::::::::::::::~:: ............................. ............................... :~~~{filJ.t.~~~: ::~~~:~:t~J:~:~: . . ..
,"::::::::::::,.". ,":::::::,":::,0:.
l 45' ~ 1 1
~~}J6.!'}~~' ~:~~~~~~~r6.~~~~~ ........................... .............. ............. . ............... .............. . :.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:. ---------.v.,.--
( EMER~FNr.V VEHICLE TURNAROtJNb -HAMMER.HEAb 1
, "
CITY OF RENTON MEMO
PUBLIC WORKS
To: Susan Fiala
From:
Date:
Subject:
Juliana Fries (425) 430-7278
February 19,2004
PreApplication Review Comments PREAPP No. 04-018
Elm Hurst Preliminary Plat
NOTE ON PRELIMINARY REVIEW COMMENTS CONTAINED IN THIS REPORT:
The following comments on development and permitting issues are based on the pre-application
submittals made to the City of Renton by the applicant. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official decision makers
(e.g. Hearing Examiner, Boards of Adjustment, Board of Public Works and City Council). Review
comments may also need to be revised based on site planning and other design changes required by the
City or made by the applicant.
I have reviewed the preliminary application for this plat, located at 13209 136th Ave SE and 201 &
257 Bremerton Ave NE. The subject site consists of three lots that are located outside of the City's
boundaries. The following comments would be requirements upon site's annexation into the City of
Renton.
WATER
1. There is an existing 8-inch water main in Bremerton Ave NE (Dwg W-0626), stubbed to the
north of the parcel No. 1523059030 (adjacent to Bremerton Ave NE).
2. There is an 8-inch water main stubbed to the west of parcel No. 5182100050 -NE 2nd Place
(private street -Dwg W-0505).
3. There is an 8-inch water main stubbed to the west of parcel No. 5182100051 (Dwg W-2045).
4. There is an 8-inch water main stubbed to the South East of parcel No. 1523059051 (Dwg W-
0756).
5. Water mains extension within the new streets interior to the plat will be required for this project.
A connection to the existing dead-end 8-inch water main in NE 2nd Place will be required.
Extension of the proposed water mains between lots 5-10 and lots 11-16 to the north property
line will also be required.
6. All new construction must have a fire hydrant capable of delivering a minimum of 1,000 gpm
and must be located within 300 feet of the structures. Fire hydrants are required for this project.
Existing hydrants will require a quick disconnect Storz fitting, ifnot already in place.
7. The derated fire flow in the vicinity is modeled at 2500 gpm (for looped system) with a static
pressure varying around 75 psi.
8. The proposed project is located in the 565-water pressure zone and is outside the Aquifer
Protection Area.
9. New water service stubs to each lot must be installed prior to recording of the plat.
Elm Hurst Preliminary Plat 02/1912004 Page 2
10. The Water System Development Charge (SDC) would be triggered at the single-family rate of
$1,525 per new building lot. These are payable at the time the utility construction is issued.
SANITARY SEWER
1. There is an existing 24" sewer main on NE 4th Street (Dwg S-0503).
2. There is also a 16" (reduces to a 12-inch) sewer main west of parcels No. 5182100050 &
5182100051 (Dwg S-1488).'
3. Sewer mains along the new streets will be required. The sewer main shall be installed at a depth
that will allow sewer mains extensions to the parcels to the east, to provide gravity sewer as far
as possible. Extension of the proposed sewer mains between lots 5 -lOa nd lots 1 1-16 tot he
north property line will also be required.
4. Existing septic systems shall be abandoned in accordance with King County Health prior to
recording of the plat.
5. These parcels are subject to the East Renton Interceptor Special Assessment District (SAD). As
of 2119/04 this fee is $295 per new lot (accrues interest daily). Fees are collected at the time the
utility construction permit is issued.
6. The Sanitary Sewer System Development Charges (SDC) is $900 per lot. These are payable at
the time the utility construction permit is issued.
SURFACE WATER
1. The site drains to Maplewood Creek. Due to downstream flooding and erosion problems, staff
will recommend as a SEPA condition this project to comply with the 1998 King County Surface
Water Design Manual to meet both detention (Level 2 flow control) and water quality (basic)
improvements.
2. According to City of Renton records, appears that a stream runs along parcels No. 5182100050,
5182100051. The drainage report should address the drainage course, with an analysis of the
upstream tributary area and flow that currently drains through the proposed project. Storm
systems should be sized to accommodate the future land use condition flows.
3. The drainage report should also address the ordinary high water mark of the stream (Maplewood
Creek) to establish setbacks and building elevation (where the stream is adjacent to the project).
4. The Surface Water System Development Charges (SDC) are $715.00 per building lot. These are
payable at the time the utility construction permit is issued.
TRANSPORTATION
1. Traffic Mitigation Fee of $75.00 per Average Daily Trip shall be assessed, at a rate of 9.57 trips
per day per new single-family lot.
2. Private streets are allowed for access to six (6) or less lots, with no more than 4 of the lots not
abutting a public right-of-way. Private streets are required to have a 26-feet easement with a 20-
feet pavement.
A joint use driveway may be permitted for access to two (2) lots. The private access easement
shall be a minimum of20-feet wide with 12-feet paved.
3. A Traffic Impact Analysis will be required. The analysis should address impacts on the
signalized intersections of NE 4th StlUnion Ave NE, NE 4th StlDuvall Ave NE, and the
intersection ofNE 4th StlBremerton Ave NE (assuming this intersection will be signalized).
, , . '
. .. '
" . Elm Hurst Preliminary Plat 0211912004 Page 3
4. A minimum 20-foot pavement and pedestrian walkway will be required along Bremerton Ave
NE, north of the proposed development (if no other public access to Duvall Ave NE is
proposed).
5. The proposed street sections for Bremerton Ave N E are not acceptable. Minimum pavement
width from curb-to-curb is 32 feet. Alignment of the curb line will be required. The centerline of
pavement shall coincide with the centerline ofR-O-W.
6. Street improvements including, but not limited to paving, sidewalks, curb and gutter, storm
drain, landscape, street lighting and street signs will be required a long new proposed streets
interior to the plat.
7. Street improvements including, but not limited to min. 28 feet paving, sidewalks, curb and gutter
(on the development side), storm drain, landscape, street lighting will be required along frontage
of all parcels with existing and proposed right-of-way. The R-O-W for the half street
improvements shall be a minimum of 35 feet. This reduced R-O-W may be allowed when is
determined that the adjacent parcel 0 f property has the potential for future development and
dedication of the R-O-W necessary for the completion of the street R-O-W.
8. All wire utilities shall be installed underground per the City of Renton Undergrounding
Ordinance. If three or more poles necessitate to be moved by the development design, all
existing overhead utilities shall be placed underground.
GENERAL COMMENTS
1. All plans shall be prepared according to City of Renton drafting standards by a licensed Civil
Engineer.
2. Permit application must include an itemized cost of construction estimate for these
improvements.
The fee for review and inspection 0 f these improvements is 5% of the first $100,000 of the
estimated construction costs; 4% of anything over $100,000 but less than $200,000, and 3% of
anything over $200,000. Half the fee must be paid upon application.
3. If you have any questions, call me at 425-430-7278
cc: Kayren Kittrick
DATE:
TO:
FROM:
MEMORANDUM
Construction Services, Fire Prevention, Plan Review, EDNSP,
Project Planner
Neil Watts, Development Services Division Director
.~ .. ' .-~, . ,
SUBJECT: New Preliminary Application: 12m }t-rgs"';-;o~( P/qr -(PI ~
LOCATION: /3?C8 /30'rT Av-e <;'t=./;901 i :757 /&"0J«>'tm~ J./lE. (
PREAPP NO. p;eeo~-(18 .
A msg with the applicant has been scheduled for q:{X:) , Thursday, ;q-f1... , in one of the 6th floor conference rooms (new City
Hall). If this meeting is scheduled at 10:00 AM, the MEETING MUST BE CONCLUDED
PRIOR TO 11 :00 AM to allow time to prepare for the 11 :00 AM meeting.
Please review the attached project plans prior to the scheduled meeting with the
applicant. You will not need to do a thorough "permit level" review at this time. Note
only major issues that must be resolved prior to formal land use and/or building permit
application submittal. .
Plan Reviewer assigned is ~~~
Please submit your written cJh,ments to -;&u~~s.W1~.....l...-_____ (Planner) at
least two (2) days before the meeting. Thank you.
H:\Division.s\Develop.ser\Dev & Plan.ing\Template\Preapp2
Revised 9/00 .
. , ,
. , • r '
, .'
CITY OF RENTON
Planning/Building/Public Works
MEMORANDUM
DATE: February 19,2004
TO: Pre-Application File No. 04-018
FROM: Susan Fiala, Senior Planner, (425) 430-7382
SUBJECT: Elm Hurst Preliminary Plat
General: We have completed a preliminary review of the pre-application for the above-referenced
development proposal. The following comments on development and permitting issues are based
on the pre-application submittals made to the City of Renton by the applicant and the codes in effect
on the date of review. The applicant is cautioned that information contained in this summary may be
subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner,
Zoning Administrator, Board of Adjustment, Board of Public Works, and City Council). Review
comments may also need to be revised based on site planning and other design changes required
by City staff or made by the applicant. The applicant is encouraged to review all applicable sections
of the Renton Municipal Code. The Development Regulations are available for purchase for $55.00
plus tax, from the Finance Division on the first floor of City Hall.
Project Proposal: The subject development, consisting of multiple parcels, is currently in under the
jurisdiction of King County. The site is currently undergoing the annexation process (Tydico) for
incorporation into the City Limits of Renton. Rezoning of the site from King County Zoning to City of
Renton's R-10 would occur once annexed.
The proposal is to subdivide 9.45 acres (gross) into single family lots. The site is comprised of three
parcels and contains the Tydico Construction Company's yard, shop and office which would be
removed/demolished as part of the project.
This area west of Bremerton Ave. NE would be rezoned to R-10. This area of 9.45 acres would have
61 single family homes and a detention/water quality pond.
It is noted that a Development Agreement has been drafted (not recorded to date) which stipulates
site-specific conditions. These include the following: 1) All residential buildings shall be detached
single family residential buildings; 2) All future residential lots within the Property that directly abut
the south property line shall have a minimum width of 50 feet; and 3) The net residential density
shall not exceed 10 dwelling units per acre. The agreement also states that the nonconforming use
rights would be relinquished before the effective date of annexation as well as the' cessation of
Tydico's operations on the property.
Zoning/Density Requirements: The subject plat would be within the Residential -10 d/ac zoning
designation. Net density is calculated after deducting designated critical areas, areas intended for
dedication to public rights-of-way, and/or private streets serving more than three units from the gross
area of the site.
The density range required in the R-10 zone is a minimum of 7.0 to a maximum of 10.0 dwelling
units per acre (du/ac). For lots under one-half acre in size, the minimum density requirements do
not apply. The maximum permitted density may be increased to 13.0 dulac provided all detached
single family structures are proposed. According to the pre-application materials, the net acreage
would be 7.7 acres with 61 lots for a density of 7.92 dulac which is above the minimum density
allowed and thus in compliance.
Elm Hurst Preliminary Plat -Pre A" ,cation
February 19, 2004
Page 2of4
All square footages of areas to be deducted must be provided at the time of formal land use
application,
Development Standards:
Minimum Lot Size, Width and Depth -Density requirements take precedence over the minimum lot
size standards, For detached dwelling units the minimum lot size is 3,000 sq. ft. per unit. The
minimum lot width is 30 ft. for interior lots and 40 ft. for..comer lots and 55 ft. for the minimum lot
depth.
Building Standards -The R-10 zone restricts building height to 30 feet and 2-stories. For detached
units, lot coverage by buildings is limited to 70% and total impervious area is limited to 75%.
Setbacks -Setbacks are measured from the property lines to the nearest point of the structure. The
required setbacks in the R-10 zone are as follows:
Minimum front yard with street access garage is 10 feet for the primary structure and 20 feet for
attached garage. For side yards along a street, the primary structure is setback 10 feet with 20 feet
setback for attached garages which access from the side yard along a street. Side yards (interior
lots) have five (5) foot setbacks and the rear yard is a minimum of 15 foot setback O)(oopt for
.pFepeseEl Leis 25-31 wbicA abut R-B zoneE1lots alid tllus reEjblire a 25 foot roar yaFd seteaelc
As no building envelopes are depicted on the drawing, compliance with the R-10 setbacks can not
be evaluated. However, the lots generally appear to have adequate buildable area.
Furthermore, Lots 5 through 16 front a private access easement. For lots fronting private streets or
driveways, staff will likely recommend as a condition of plat approval that setbacks be designated
on the final plat (front, side, rear) and that the house plan allow for access to the driveway.
Lot Coverage -The maximum building coverage per lot for detached units is 70%.
Impervious Surface Area -The maximum impervious area for detached units is 75%.
Special Design Standards -Street patterns should be non-meandering and alleys shall be the
predominant street pattern included in any subdivision provided this does not cause the need for lots
with front and rear street frontages or dead-end streets.
Access, Parking and Circulation: Access to the site would be from Bremerton Ave. NE (to be
improved) and the connection to Bremerton PL NE, located at the southeast corner of the subject
site.
For developments containing more than 20 residential units (RMC 4-6-060.F.1.a.) a minimum of 20
feet of pavement and a pedestrian walkway to an arterial is required. For the subject development,
staff will likely recommend as a condition of approval that the subject plat must comply with one of
the following: 1) the proposed plat to the east (Laurel Hurst) must have final plat recording before
Elm Hurst is recorded in order to provide the necessary means of access; OR 2) 20 feet of
pavement with a pedestrian walkway (asphalt) from the northerly terminus of the plat to NE 4th Street
would be required.
Private streets are allowed for access to six or less lots, with no more than 4 of the lots not abutting
a public right-of-way. The street is to include a minimum easement width of 26 feet with 20 feet of
paving.
Lots 11 through 17 appear that they would use the private street. There are too many lots proposed
to use the private street and too many not abutting a public right-of-way. The lot arrangement will
need to be revised to comply with the private street regulation.
Additionally, staff strongly encourages the applicant to revise the plat layout to provide an internal
road, change the orientation of the lots and eliminate the private streets to create a traditional
neighborhood setting. A sample plat layout is provided in the packet.
H: IOi vision .sIOeveJop.serIOev &pJan. inglSAFIPreApps1200410 18_ E1mHurstPP .doc
" ' , '
, , , "
Elm Hurst Preliminary Plat -Pre Appli
February 19, 2004
Page 3 of 4
Private driveways may serve a maximum of two lots and must have a minimum easement width of
20 feet with 12 feet of paving.
A request for a modification to street standards would be required to be submitted by the
applicant for the proposed reduced right-of-way from 50 to 42 feet. The modification would be
reviewed administratively.
In order to reduce the number of curb cuts, abutting lots should utilize the same curb cut and the
proposed house floor plan should be designed to allow"for the use of the curb cut/driveway. For
example, Lot 17 would be required to use the same curb cut as the curb cut for the private street.
Please note that staff would likely recommend this requirement as a condition of approval for· any
lots within the subdivision having a similar configuration.
Addresses of lots along private streets are to be visible from the public street by provision of a sign
stating all house numbers and is to be located at the intersection of the private street and the public
street.
Each lot is required to accommodate off street parking for a minimum of two vehicles per lot. In
addition, appropriate shared maintenance and access agreement/easements will be required
between lots with shared access.
Driveway Grades: The maximum driveway slopes can not exceed fifteen percent (15%), provided
that driveways exceeding eight percent (8%) are to provide slotted drains at the lower end of the
driveway. If the grade exceeds 15%, a variance from the Board of Adjustment is required.
Environmental Review: The project would require SEPA review due to the number of lots of the
proposed plat (greater than four dwelling units and critical areas). The proposal would be brought to
the Environmental Review Committee for review as it is their charge to make threshold
determinations for environmental checklists. Typically, mitigation of impacts is accomplished through
fees related to issues such as transportation, fire and parks as well as measures to reduce impacts
to environmental elements such as soils, streams, water, etc ..
Sensitive Areas: Based on the City's Critical Areas Maps, the site is located within critical areas,
including: Geologic Hazards (steep slopes), critical habitats (forests and open space) and streams
(Maplewood Creek).
Geologic Hazards -The site appears to contain areas of 15% and 25% slopes as shown on the
City's Slope AnalYSis map. As required by the City's Critical Areas Regulations, a slope delineation
indicating the location of "sensitive" slopes may be required as part of the formal land use
application.
Pursuant to the Renton Municipal Code (RMC4-3-050J) the applicant will be required to obtain a
geotechnical report stamped and signed from a Geotechnical Engineer stating that the proposed
development is suitable with respect to the current site conditions for soils, slopes, etc. In addition,
the report would need to address any special construction reqUirements deemed necessary by the
Geotechnical Engineer.
Through the preliminary plat review process, the City may condition the approval of the development
in order to require mitigation of any potential hazards based on the results of the study. In addition,
pursuant to RMC section 4-3-050.J.3, the geotechnical report submitted with the application may be
required to undergo independent secondary review by a qualified specialist selected by the City at
the applicant's expense.
Streams -Maplewood Creek is not a designated shoreline of the State and does not require a
Shoreline substantial Development Permit. However, code requires a 25 foot setback from the
ordinary high water mark (OHWM) of this creek. No clearing or vegetation removal is permitted
within 25 feet.
Through the SEPA process, staff may recommend a greater setback from the creek to address
potential erosion, slopes and landslide hazards.
H:\Division .s\Develop.ser\Dev &plan. ing\SAF\PreApps\2004\O 18_ ElmHurstPP .doc
Elm Hurst Preliminary Plat -Pre
February 19, 2004
cation
Page 4 of4
Soils -It is noted that gas, diesel and fuel storage tanks are located onsite. The property may
contain contaminants within portions of the site's soils. The applicant will need to contact the
Department of Ecology to determine if remediation is required. The applicant will need verification
that the soils utilized on-site during site preparation are free of contaminants as this will be
necessary prior to the issuance of construction permits for the project. If contaminants are found, soil
remediation in accordance with the Model Toxics Control Act (MTCA) would be needed.
Permit Requirements: The project would require Pr~iminary Plat and Environmental (SEPA)
Review. The review of these applications would be process concurrently within an estimated time
frame of 12 to 16 weeks. After the required notification period, the Environmental Review Committee
would issue a Threshold Determination for the project. When the required two-week appeal period
is completed, the project would go before the Hearing Examiner for a recommendation to the City
Council on the Preliminary Plat. The Hearing Examiner's recommendation, as well as the decision
issued by the City Council, would be subject to two-week appeal periods.
The application fee would be $2,000 for the Preliminary Plat and ~ of full fee for SEPA Review
(Environmental Checklist) which is dependent on project value: less than $100,000 is $200 (1/2 of
$400.00 full fee) and project value over $100,000 is a $500.00 fee(1/2 of $1000.00 full fee) plus
$0.37 per mailing label required for notification to surrounding property owners within 300 feet of the
site. The applicant will be required to install a public information sign on the property. Detailed
information regarding the land use application submittal requirements is provided in the attached
handouts.
Once Preliminary Plat approval is obtained, the applicant must complete the required improvements
and dedications, as well as satisfy any conditions of the preliminary approval before submitting for
Final Plat review. The Final Plat process also requires City Council approval. Once final approval is
received, the plat may be recorded. The newly created lots may only be sold after the plat has been
recorded.
Fees: In addition to the applicable building and construction permit fees, the following mitigation
fees would be required prior to the recording of the plat.
• A Transportation Mitigation Fee based on $75.00 per each new average daily
trip attributable to the project;
• A Parks Mitigation Fee based on $530.76 per new single family lot; and,
• A Fire Mitigation Fee based on $488.00 per new single family lot.
A handout listing all of the City's Development related fees is included in the packet for your review.
Additional Comments: In advance of submitting the full application package, applicants are
strongly encouraged to bring in one copy of each application material for a pre-screening to the
customer service counter to help ensure that the application is complete prior to making all copies.
cc: Jennifer Henning
H :\Division.s\Develop.ser\Dev &plan. ing\SAF\PreApps\2004\O 18_ ElmHurstPP .doc
' .. . .
.. . '
'It>
•
Ie, S'I
.'1 {(
It 9t
11 if)
MJ
~tJ
~ --r.;,d-A . I ~"ft!{
51
S8
~
to
-'
25 2ac ~
fl ~ ~ ~~ ..
JlO 11
'" ~
41f .p ~ &\~ ~ ~ If' " -..... _.
·16 .3Z
M .31
"'~ JO
Ill. Z7 zt :L'
CITY OF RENTON
ECONOMIC DEVELOPMENT
NEIGHBORHOODS, AND STRATEGIC PLANNING
MEMORANDUM
DATE: February 17, 2004
TO: Susan Fiala
FROM:
~1/)V Rebecc~t'ind
STAFF CONTACT: Don Erickson
SUBJECT: Elm Hurst Preliminary Plat, 13209 136th Ave SE; PRE 04-018
The subject area is the Tydico Annexation site between NE 2nd Street, if extended on the south,
NE 3rd Place, if extended, on the north and Bremerton Avenue NE (136th Avenue SE) on the east
and the City boundary to the west. The site is located within unincorporated King County and
zoned R-4, four units per gross acre. When it is annexed into the City it is anticipated to be zoned
R-lO consistent with the Residential Options (RO) land use designation as shown on the
Comprehensive Plan Land Use Map and an adopted Development Agreement. The site currently
houses a heavy construction equipment business and storage yard.
The applicant is proposing to develop 61 lots on the 9.37-acre site. Circulation would be off a
loop road from Bremerton Avenue NE. No potential future access to properties to the north has
been provided. Twenty-six percent of the lots would access off private road easements rather
than the public street. No central space amenity is provided. Pursuant to a development
agreement that is a condition of the prezoning to R-lO, 50-foot wide lots (R-8 standard) have
been provided along the southern property line.
Analysis:
The subject proposal clearly complies with Policy LU-41 since it is 100% single-family detached.
In fact, this zone provides a density bonus for developments that are 100% detached. Although
Policy LU-Sl allows a density bonus of up to 13 units per net acre, in this case, the proposed
maximum density is ± 7.76 units per net acre. This latter exceeds the minimum density of 7 units
per net acre suggested in Policy LU-52.
In terms of Policy LU-43, regarding "Central place public amenities as a focal point within the
development" the subject layout is very deficient. No central place amenity has been provided
for this 61-10t subdivision. When the R-lO zone was written it was based on the Orchards' Plum
Court Demonstration Project and the Village on Union Demonstration Project. Both of these
projects provided "central space amenities" in the form of public open space, which was part of
the justification for allowing the higher density and smaller lot sizes. Staff believes that the
deletion of Lots 50-53, currently isolated in the interior of the central block, would allow both
alley access to Lots 32-43 and Lots 60-61 as well as the creation of a "central place public
amenity". The latter could be in the form of an open space passive park (see attached illustrative
layout). This would enhance the view outlook of all lots in this central block thereby enhancing
the value of these lots while providing a recreational amenity and focus for the residents of the 61
Elm Hurst Preliminary Plat
02/17/04
2
future homes. Such an approach is also supported by Policy LU-76 pertaining to the use of alleys
to improve the public streetscape by reducing curb cuts and Policy LU-80 relating to the
subdivision of land and suggesting that all lots should be required to front on a public street or a
park.
More than a fifth (21 %) of the proposed lots access off of private access easements rather than a
public street. Policy LU-70, discourages such subdivisjons while encouraging interconnecting
networks of streets and pathways that "connect adjacent and future development." Staff believes
that the proposed public street should be connected to the properties to the north in the CS zone.
Whereas the first 300' or so of this zone that fronts on NE 4th Street may develop as 100%
commercial, it is likely that the rear 318' will more likely develop mixed-use or, even possibly,
100% residential. As a consequence, interconnectivity here would be useful in terms of
improving neighborhood identity and pedestrian/vehicle flexibility and convenience (see attached
illustrative layout). It, combined with the deletion of Lots 50-53, would also improve the
streetscape by reducing the number of lots without street frontage from 21 % to 13%. The
applicant should also be required to plant street trees along all residential lots, pursuant to Policy
LU-78.
Recommendation:
Do not support this preliminary plat as currently proposed since it fails to meet much of the
. policy intent of the Residential Options land use designation.
The applicant needs to be encouraged to develop a more cohesive neighborhood layout with
better streetscapes and improved interconnectivity with areas likely to see new development in
the future, such as the areas to the north and east. New homes need to be oriented to the public
streets. Access easements should be used as last resort. In addition, consistent with the intent of
the RO designation, a "central place amenity" should be provided as a trade off for the smaller
lots and higher density allowed. The streetscape could also be significantly improved by
reducing the number of curb cuts on streets by providing alley access wherever possible. The
latter would increase on-street parking for guests, reduce visual clutter, and increase the amount
of front yard space devoted to landscaping and pervious surfaces.
Attachment
cc: Don Erickson
H:\EDNSP\Interdepartrnental\Developrnent Review\Preapps\Cornrnents\RMI\EJrn Hurst Preliminary Plat.doc\d
Elm Hurst Preliminary I
02/16/04
Relevant Comprehensive Plan Objectives/Policies:
Residential Options
3
Policy LU-41. Provision of small lot single family detached unit types, townhouses and multi-
family structures compatible with a single family character should be encouraged provided that
density standards can be met.
Policy LU-43. Central place public amemtles should function as a focal point within the
development and should include features such as a public square, open space, park, civic or
commercial uses. The central place should include passive amenities such as benches and
fountains, and be unified by a design motif or common theme.
Policy LU-4S. Buildings should front the street rather than be organized around interior
courtyards or parking areas.
Policy LU-S1. The net development densities should be 10 dwelling units per acre. If 100% of
the dwelling units are detached, a density bonus may be allowed to a maximum of 13 dwelling
units per acre.
Policy LU-S2. Minimum net development densities should be 7 dwelling units per acre.
Residential Streets
Policy LU-70. Streets, sidewalks, pedestrian or bike paths in a neighborhood development
should be arranged as an interconnecting network. The extensive or predominant use of cul-de-
sacs and pipestems should be discouraged for new development. A "flexible grid" pattern of
streets and pathways should be used to connect adjacent and future development.
Policy LU-73. Residential streets should be constructed to the narrowest widths (distance from
curb to curb) feasible without impeding emergency vehicle access.
Policy LU-74. Street parking should be considered for use as a safety buffer between pedestrians
and moving vehicles and to reduce the need for on-site parking.
Policy LU-76. To visually improve the public streetscape and the safety of perimeter sidewalks
and facilitate off-street parking, construction of alleys providing rear access to service entries and
garages should be encouraged.
Policy LU-7S. Trees should be planted along residential streets.
Subdivision of Land
Policy LU-SO. Land should be arranged in blocks divided into lots with all lots required to front
on a public street or a park.
H:\EDNSP\Interdepartmental\Development Revjew\Preapps\Comments\RM1\E1m Hurst Preliminary Plat.doc\d
. ,
..
" , ij
T .. ----------... --+-_ .. ---.--..,... -~-.--. - -~ r-- - --_J.-: ----.. ------..... , . ~ I . : l. ~
)--..... ---4 1-' -.. ..l.' ~-----.......-...f
. ...-...--.1 ........-..----;r. f---..--........--.....~
.~ ~
\\1\' . A ,. ~ fi?,4P.. u.\
;;r'-~-' ~ -'-'-'r t~.~. .~. ~ ._.-.-. ~ ~ I ~
1
: ~ L ~ -'-'-' « :-' .. ,.~ · . ~-.-.
, ! .=~_. .-.~-= .. ,:': ~~ ~;k3f.s-~~·
. -' _.-.... , .' ,L.3\ ~
I ., _.-. -' // / ,...,', ',,' .6 '..-,
.--' / I I . A~· .. ~
: ~\/.,/.-.... / / ·.if 'I }. ( I 1 ~
/V .f. II· ". /' ' · i II I,' \!
y' / ' I I
\
. t7ereNr/OAJ J ' ,
71?A<!:P I' ~ j
t \. • ; i ; """-~~ I
• _. __ __ J .. --..-
~(! 1fb4p
• I . . . -I \. l J ~.
f " • • I ! . J I . 1 •
1
, ..
( .l .J
4 •
J I . ---. , ... -..
ft..LU91'1e:A riVE ~GV/'3tE-P f-A you! .
W/67 Lot~
"
PROJECT NARRATIVE
"Elmhurst" Residential Subdivision
1. Project Name, Size and Site Location
DEVELOPME
CITY OF 'lJ~~~NING
DEC 2 8 200~
RECEIVED
The "Elmhurst" residential subdivision is a proposed 64-lot residential subdivision on an
approximately 9.6-acre site located in Renton on the west side of Bremerton Avenue NE, south
ofNE 4th Street at 201 Bremerton Avenue NE. The site lies immediately north of the Fernwood
North subdivision, generally northwest of the Laurelhurst Phase 1 residential subdivision that is
currently under construction and south of the site of the proposed Ridgeview Court residential
subdivision (preliminary plat application pending at the City of Renton), which is also along the
west side of Bremerton Avenue NE. The Elmhurst project is proposed to be accessed from
Bremerton Avenue NE with connections to NE 4th Street both (a) directly to the north and (b) via
NE 2nd Street and Duvall Avenue NE to the east through the Laurelhurst Phase 1 subdivision.
The site is located in the South half of Section 15, Township 23 North, Range 5 East in the City
of Renton. The site is comprised of King County Assessor's Parcel Nos. 518210-0049,518210-
0050 and 518210-0051 and three small slivers of excess Bremerton Avenue NE right-of-way
(totaling about 0.11 acres) abutting the site, slivers that the Elmhurst applicant has petitioned the
City of Renton to vacate. (The subject Street Vacation Petition was submitted to the City Clerk's
Office on December 27, 2004.) (In the seemingly unlikely event that the Renton City Council
does not approve the proposed right-of-way vacation, the applicant proposes that minor lot
layout adjustments be made so that the proposed number of lots will not be affected.)
2. Land Use Permits Required for the Proposed Project
Preliminary plat approval is the only land use permit or approval known to be required
for the proposed subdivision.
As explained above, City Council approval is being sought for vacation of three small
slivers of excess Bremerton Avenue NE right-of-way abutting the site to accommodate the exact,
proposed lot layout.
In addition, approval is hereby requested from the City of Renton's Development
Services Division pursuant to Renton Municipal Code Section 4-4-030C.2 for (a) proposed
weekday haul hours for hauling of soil and construction materials between 7:00 a.m. and 5:00
p.m. and (b) Saturday haul hours for such hauling between 8:00 a.m. and 8:00 p.m.
3. Zoning Designation of the Site and Adjacent Properties
The Site. The site is designated Residential Options (RO) and is zoned R-1O (Residential 10
dwelling units per acre) subject to a Development Agreement between the City of Renton and
preliminary plat applicant LIBERTY RIDGE L.L.C .. The Development Agreement sets forth
the following site-specific restrictions applicable to development of the site:
(1) All residential buildings shall be detached single-family residential
buildings (i.e., contain only one residential unit per building);
(2) All future residential lots within the Property that directly abut the
Page 1
December 27,2004
Property's south boundary shall have a minimwn width of 50 feet; and
(3) The net residential density of any development of the Property
shall not exceed 10 dwelling units per acre.
The proposed Elmhurst residential subdivision conforms to all of those restrictions.
Adjacent Properties. The following uses and zones are adjacent to the Elmhurst site:
To the East:
To the West:
To the North:
To the South:
One large existing single-family parcel (the Fue Vue parcel1
Assessor's Parcel No. 1523059030) and Phase 1 of the
Laurelhurst Residential Subdivision, currently under
construction, on lands within the City of Renton zoned
Residential-8 Dwelling Units Per Acre (R-8).
Existing single family residences on parcels within the City of
Renton zoned Residential-lO Dwelling Units Per Acre (R-lO).
Two undeveloped parcels within the City of Renton zoned
Arterial Commercial (CA). (On the easterly of those two
abutting parcels, the City is currently processing an application
for a 20-lot residential subdivision that was submitted under
the name "Ridgeview Court" before the recent change in that
parcel's zoning from Center Suburban (CS) to CA.)
As existing, built-out residential subdivision named "Ferndale
North" on land within the City of Renton zoned Residential-8
Dwelling Units Per Acre (R-8).
4. Current Use ofthe Site and Anv Existing Improvements
For more than forty years (up until just recently), the subject site has served as a base of
operations for a site work construction company followed by a public works construction
company. Several existing buildings are located on the site including (a) a house that was
ultimately used in part as a dispatch office, (b) a maintenance shop/garage building and attached
office, (c) a smaller house with a detached garage, and a longstanding mobile home. A
construction company office is in the process of closing out its use of the two onsite offices. The
existing entrance into the site (which is at the site's northwest comer) is paved and a paved
parking area exists near the buildings that were historically used in conjunction with prior
construction company operations. Gravel parking and storage areas comprise much of the rest of
the site. They were historically used for parking of construction company trucks and
construction equipment and for storage of construction materials. Several remaining stockpiles
of fill material (approximately lO-feet high) are located in the northwest portion of the site-
those stockpiles are planned to be used as fill for the proposed project.
5. Special Site Features
An ephemeral stream (a non-fish bearing upper reach of Maplewood Creek) runs generally from
north to south along and near the project site's westerly edge. Maplewood Creek ultimately
drains into the Cedar River. City of Renton Municipal Code Section 4-4-130D.4.b prohibits tree
cutting, land clearing, groundcover management or the operation of mechanical equipment
Page 2
December 27, 2004
within 25 feet of the ordinary high water mark of creeks and streams except for the development
of public parks and trail systems and enhancement activities.
In addition, an approximately 3,130 square foot (0.07-acre) manmade, unregulated City of
Renton Category 3 (Lower Quality) wetland ("Wetland A") is situated in the southwesterly
portion of the site. It is unregulated both because of its size (Renton's threshold for regulation of
Category 3 wetlands is 5,000 square feet) and because it resulted from an intentionally made
stormwater discharge and detention area in a portion of the site that historically was not a
wetland. This wetland is proposed to be replaced by a portion of Road A (one of the public
streets) and a portion of the project's proposed stormwater detention and water quality pond
facility.
In addition, an approximately 2,140 square foot (0.05-acre) unregulated City of Renton Category
3 (Lower Quality) wetland ("Wetland B") is situated approximately 20-feet north of the site's
northwest comer.
6. Soil types and drainage conditions
Soil Types. The United States Department of Agriculture Natural Resource Conservation
Service (formerly United States Soil Conservation Service) maps for King County indicate that
the proposed development area is underlain by Alderwood Gravelly Sandy Loam (AgC). That
soil type is considered moderately well-drained. Fill exists over most of the site. See the
Preliminary Geotechnical Engineering Study report prepared by Earth Consultants, Inc., dated
December 2, 2004 for additional information.
Drainage Conditions. Stormwater runoff from the previously-developed, northeasterly-most
portion of the site (generally the paved parking lot and the smaller house and mobile home to the
north of it) as well as some of the gravel lot to the west of that area drains to an existing catch
basin located in the north central portion of the site. That catch basin is connected to an 18-inch
diameter CMP culvert to the west that discharges onto a rip rap pad about 40 feet from the site's
west boundary. The drainage discharge from that culvert then travels via overland flow to the
west into the ephemeral stream (as does overland flow from the balance of the gravel lots in the
north portion and west-central portion of the site). The other existing buildings and the paved
areas behind them sheet drain to the south to the exposed east end of an existing 12-inch
diameter storm drain pipe within a localized low area in the south-central portion of the site.
That pipe runs to the west-southwest conveying runoff into an existing low, flat-graded area in
the southwesterly portion of the site (north and east of the stream), an area that provides
stormwater detention. When storm events are large enough, water ponding in that detention area
overtops as a broad sheet of water to the southwest into the stream. (See the Preliminary
[Drainage] Technical Information Report prepared by Pacific Engineering Design, LLC dated
December 22, 2004 that accompanies the preliminary plat application for additional
information. )
7. Proposed Use of the Property and Scope ofthe Proposed Development
As depicted on the preliminary plat, the proposal contemplates (a) the development of 64
residential lots for construction of detached single-family homes, (b) an associated storm water
detention and water quality pond facility to be located within a drainage facilities tract, (c) an
open space (native growth protection area) tract and (d) public streets to access the proposed lots
Page 3
December 27,2004
(with two of the lots, Lots 13 and 14, to share a 12-foot wide driveway). The proposed tracts are
as follows:
I. Tract A (0.76 acres) is planned to contain (a) the proposed stonnwater
detention/water quality pond facility for development of the site. The
stonnwater detention/water quality facility has been designed to provide
discharge flow control (Level 2) and water quality treatment in accordance
with the King County Surface Water Design Manual (1998).
II. Tract B (0.75 acres) is planned as a designated open space (native growth
protection area) to protect the ephemeral stream near the site's west edge.
8. Number. Density and Range o(Sizes ofthe Proposed New Lots
See the lot areas and the Density Calculation table depicted on sheet PO 1 of the Preliminary Plat
drawings prepared by Pacific Engineering Design LLC for an analysis of the 64 proposed lots
and the density of the proposed lots.
Minimum Density. The site is zoned R-lO, which has a minimum density of 7 units per net
acre. As the Density Calculation table illustrates, the overall proposed project will have a net
density of 8.25 dwelling units per acre.
Range of Lot Sizes. The proposed lots range in size from 3,801 square feet to 5,870 square feet.
9. Access
Public Residential Access Streets. Internal access streets will connect to Bremerton Avenue
NE at two locations. Improvements to Bremerton Avenue NE to the north are planned as part of
the Ridgeview Court subdivision and shall enhance the connection to NE 4th Street to the north
of the site. Improvements to the Elmhurst site's Bremerton Avenue NE frontage along the west
side of the street are proposed to be constructed in conjunction with the Elmhurst subdivision.
Along roughly the north half of the Elmhurst site, that will result in a 20-foot wide paved section.
Improvements to the east side of Bremerton A venue opposite roughly the south half of the
Elmhurst site are already being constructed in conjunction with the abutting Laurelhurst Phase 1
subdivision--with the widening proposed along the west side, that portion of Bremerton Avenue
NE will have a 32-foot wide paved section. NE 2nd Street from Bremerton Avenue NE east to
Duvall Avenue NE is already under construction as part of the Laurelhurst Phase 1 subdivision,
providing an alternate route to NE 4th Street.
Emergency Vehicle Access. Emergency vehicle access to the Elmhurst site will be available via
Bremerton Avenue NE from (a) the north (from NE 4th Street), (b) the east (from NE 2nd Street
via connections with Duvall Avenue NE and NE 4th Street) and (c) the south through the
Fernwood North subdivision (via Bremerton Place NE's connection with Bremerton Avenue NE
in Laurelhurst Phase I).
Page 4
December 27, 2004
10. Proposed Off-Site Improvements (Le •• Installation of Sidewalks. Fire
Hydrants. Sewer Main. Etc.)
The only proposed off-site improvements are the Bremerton Avenue frontage improvements
along portions of the site's east boundary. (See the preliminary plat drawings for additional
details.)
11. Total estimated construction cost and estimated fair market value of the
proposed project
The cost of the site grading and infrastructure improvements for the subject project has not yet
been estimated. The proposed residential lots have an estimated value of $10,400,000.
12. Estimated Quantities and Type of Materials Involved If Any Fill or
Excavation is Proposed
The site will require grading to establish flat pad lots, the proposed public streets, and the
proposed stonnwater detention and water quality pond facility. Approximately 12,000 cubic
yards of cut (including the approximately 4,000 cubic yards of residual soil stockpiles stored on
the north portion of the site) and approximately 13,000 cubic yards of fill are anticipated.
Generally, cut material from the site, including the stockpiled soils, is anticipated to be utilized
as fill. Fill material from off site sources will be structural fill. (The fill source is not yet known.)
13. Number. Type and Size o(Trees to be Removed
Approximately 35 evergreen trees in excess of 6-inch caliper (one 14-inch caliper cedar tree,
nine fir trees ranging in caliper from 8 to 28 inches and 25 pine trees ranging in caliper from 6"
to 14 inches) and four deciduous trees in excess of 6-inch caliper (three of which are alders
ranging in caliper from 18 inches to 24 inches and the fourth, of unknown species, has a 20-inch
caliper) are to be removed during site development. The one fir tree and six deciduous trees in
excess of 6-inch caliper lying within proposed Tract B (the open space tract) are proposed to
remain. (See the Tree CuttinglLand Clearing Plan, preliminary plat Sheet P03.)
14. Explanation of Any Land to be Dedicated to the City
Within the Elmhurst site, the proposal's public street rights-of-way will be dedicated to the City
on the final plat.
15. Any Proposed Job Shacks. Sales Trailers. and/or Model Home
During site infrastructure construction, a temporary construction office/trailer will likely be
situated on the project site. A sales trailer and/or one or more model homes may ultimately be
situated on the site.
16. Any Proposed Modifications Being Requested
See the December 21, 2004 letter from applicant Liberty Ridge L.L.C.' s attorney David L.
Halinen setting forth the applicant's request for approval of:
Page 5
December 27,2004
" ...
(1) A reduction in the required right-of-way width for the proposed internal
residential access streets from 50 feet to 42 feet;
(2) A reduction in the required right-of-way width for the west half of the
portion of Bremerton Avenue NE (a residential access street) abutting the
Elmhurst site from 25 feet to 22 feet;
(3) A modification to the Street Standards to permit a reduction in (a) the
required pavement width for the half-street portion of Bremerton Avenue
NE abutting the north half of the Elmhurst site (from 28 feet to 20 feet)
and (b) the required right-of-way width for that same half-street portion of
Bremerton Avenue NE (from 35 feet to 29.5 feet); and
(4) A modification to the Street Standards to permit reduced-width sidewalks
(from 6 feet to 5 feet).
Page 6
December 27,2004
t-{T pLANN
OE.\ ""P~ RE.N10N
nEC 1 ~ 100~
RECE\\JEO Environmental Checklist
Elmhurst Residential Subdivision
City of Renton, Washington
Our Job No. 02054
Submitted to:
City of Renton, Washington
Submitted by:
Liberty Ridge L.L.C.
December 27, 2004
Prepared by
Pacific Engineering Design, LLC
A. BACKGROUND
1. Name of proposed project, if applicable:
"Elmhurst" Residential Subdivision
2. Name of applicant:
Liberty Ridge L.L. C.
3. Address and phone number of applicant and contact person:
Applicant
Liberty Ridge L. L. C.
9125 10th Avenue S.
Seattle, WA 98108
(425) 226-1000
Attn: Michael Merlino
4. Date checklist prepared:
December 27, 2004
5. Agency requesting checklist:
Contact Person
David L. Halinen
Halinen Law Offices, P. S.
10500 NE 8th Street, Suite 1900
Bellevue, WA 98004
(425) 454-8272
City of Renton Development Services Division
6. Proposed timing or schedule (including phasing, if applicable):
Construction of site infrastructure improvements is expected to begin during the spring of
2005 and to be completed during fall 2005. Home construction is expected during fall
2005 and during 2006.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No future additions, expansion, or further activity is proposed related to this proposal.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
The following environmental documents have been prepared directly related to this
proposal:
• Preliminary [Drainage] Technical Information Report prepared by Pacific Engineering
Design, LLC, dated December 22, 2004
• Preliminary Geotechnical Engineering Study report prepared by Earth Consultants,
Inc., dated December 2, 2004
• Traffic Impact Analysis prepared by Transportation, Planning and Engineering, dated
December 2, 2004
• Evaluation and Review of Environmental Data prepared by Environmental Partners
Inc., dated November 18,2004
• Wetland and Stream Reconnaissance report prepared by Shannon & Wilson, dated
December 22, 2004
ENV-CHECKLIST-Elmhurst.F1.doc Page 1 of 19
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
None known.
10. List any governmental approvals or permits that will be needed for your proposal, if
known.
• Issuance of a SEPA Threshold Determination by the City of Renton Environmental
Review Committee
• Administrative approvals by the Administrator of the City of Renton Department of
Planning/Building/Public Works (or his designee) of (a) a proposed reduction in the
required right-of-way width for the proposed interior residential access streets and
the portion of Bremerton Avenue abutting the site, (b) a proposed reduction in the
required pavement width for the portion of Bremerton Avenue NE abutting the north
half of the site and (c) a reduction in sidewalk widths
• City of Renton Preliminary Plat approval
• City of Renton approval of construction plans for site infrastructure improvements
(streets, storm drainage system, sanitary sewer system and water system and site
grading)
• Approval by the City of Renton's Development Services Division pursuant to Renton
Municipal Code Section 4-4-030C.2 of (a) proposed weekday haul hours for hauling
of soil and construction materials between 7:00 a.m. and 5:00 p.m. and (b) Saturday
haul hours for such hauling between 8:00 a.m. and 8:00 p.m.
• Washington State Department of Ecology NPDES Stormwater Permit
• Washington State Department of Natural Resources Forest Practices Permit
• Washington State Department of Fish and Wildlife Hydraulic Project Approval
• City of Renton Clearing Permit (if applicable)
• City of Renton Grading Permit (if applicable)
• City of Renton approval of a street right-of-way vacation (for vacation of three west-
edge strip segments of excess existing Bremerton Avenue NE right-of-way)
• City of Renton Final Plat approval
• Issuance of Building Permits for single-family residences by the City of Renton's
Development Services Division (following later application)
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site.
The proposed project contemplates subdivision of approximately 9.60 acres of land
(including approximately 0.11 acres of existing excess Bremerton Avenue NE right-of-
way proposed to be vacated) into (a) 64 residential lots for single-family detached
homes, (b) public residential access streets, and (c) tracts for drainage facilities and
open space. The project will include site grading to establish (1) a building pad on each
of the proposed lots, (2) the public streets, and (3) an open pond-type storm water
detention-water quality facility (and an associated pond maintenance access road).
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range if known. If a proposal would occur over a range of area, provide
the range or boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should submit any plans
required by the agency, you are not required to duplicate maps or detailed plans
submitted with any permit applications related to this checklist.
ENV-CHECKLIST-Elmhurst.F1.doc Page 2 of 19
The project site is located on the west side of Bremerton Avenue NE at 201 Bremerton
Avenue NE, Renton, Washington 98055. (The site was the previous headquarters of a
construction company named Tydico.) The site is located (a) directly north of the existing
Fernwood North residential subdivision, (b) west and northwest of the north portion of
Phase 1 of the proposed Laurelhurst residential subdivision (which is currently under
construction) and (c) east of the existing Briar Patch residential subdivision and east of
other residential parcels of land lying to the north of that subdivision. The site of the
preliminary plat of Ridgeview Court (an application for which is currently pending at the
City of Renton for review and approval) is located just north of the eastern part of the site
along Bremerton Avenue NE. Except for the proposed street right-of-way vacation, the
site is comprised of three parcels legally described as follows:
PARCEL A:
THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE FOLLOWING
DESCRIBED PROPERTY:
THE NORTH 112 OF THE SOUTHEAST 114 OF THE NORTHWEST 114 OF
THE NORTHWEST 114 OF SECTION 15, TOWNSHIP 23 NORTH, RANGE
5EASTW.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTH 110 FEET OF THE EAST 215 FEET OF
THE NORTH 112 OF TRACT 5, MARTINS ACRE TRACTS, ACCORDING
TO THE UNRECORDED PLA T THEREOF);
SITUA TE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCEL B:
THE SOUTH 112 OF THE SOUTHEAST 114 OF THE NORTHWEST 114 OF
THE NORTHWEST 114 OF SECTION 15, TOWNSHIP 23 NORTH, RANGE
5 EASTW.M.;
EXCEPT THE EASTERL Y 7.5 FEET FOR ROAD;
(ALSO KNOWN AS THE SOUTHERLY 112 OF TRACTS 5 AND 6,
MARTINS ACRE TRACTS, ACCORDING TO THE UNRECORDED PLA T
THEREOF);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
PARCEL C:
THE NORTH 112 OF THE SOUTHEAST 114 OF THE NORTHWEST 114 OF
THE NORTHWEST 114 OF SECTION 15, TOWNSHIP 23 NORTH, RANGE
5 EAST W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
AND EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE
REMAINDER;
(ALSO KNOWN AS THE NORTH 112 OF TRACTS 5 AND 6, MARTINS
ACRE TRACTS, ACCORDING TO THE UNRECORDED PLA T THEREOF;
EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF SAID
TRACT 5);
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
ENV-CHECKLIST-Elmhurst.F1.doc Page 3 of 19
The King County Assessor's Parcel Nos. for those three parcels are 518210-0049,
518210-0050 and 518210-0051.
The legal description of the Bremerton Avenue NE right of way strips proposed to be
vacated is as follows:
That portion of the Southeast quarter of the Northwest quarter of the Northwest
quarter of Section 15, Township 23 North, Range 5 East, Willamette Meridian,
situate in the City of Renton, County of King, State of Washington legally described
as follows:
Those portions of the North half of the Southeast quarter of the
Northwest quarter of the Northwest quarter of Section 15, Township 23
North, Range 5 East, Willamette Meridian described as follows:
Commencing at the Northeast corner thereof;
Thence North 89°08'05" West along the North line thereof, a
distance of 22.00 feet to the True Point of Beginning;
Thence South 00°13'59" East parallel with the East line
thereof, a distance of 69.53 feet to the beginning of a curve
tangent to said line;
Thence Southwesterly a distance of 29.52 feet along the
curve concave to the Northwest, having a radius of 25.00 feet
and a central angle of 67°39'59" to a point of cusp;
Thence North 00°13'59" West parallel with the East line
thereof, a distance of 92.96 feet;
Thence South 89°08'05" East along the South line thereof, a
distance of 15.50 feet to the True Point of Beginning.
Containing 1,339 square feet, more or less.
AND
Commencing at the Northeast corner thereof;
Thence North 89°08'05" West along the North line thereof, a
distance of 37.51 feet;
Thence South 00°13'59" East parallel with the East line
thereof, a distance of 138. 72 feet to the True Point of
Beginning;
Thence continuing South 00°13'59" East parallel with the
East line thereof, a distance of 191.34 feet to the South line
of said North half;
Thence South 89°11'22" East, a distance of 15.50 feet;
Thence North 00°13'59" West, a distance of 168.50 feet to
the beginning of a curve tangent to said line;
Thence northwesterly a distance of 29.53 feet along the
curve concave to the southwest, having a radius of 25. 00 feet
and a central angle of 67°39'59" to the True Point of
Beginning.
Containing 2,869 square feet, more or less.
AND
ENV-CHECKLIST-Elmhurst.F1.doc Page 4 of 19
That portion of the South half of the Southeast quarter of the Northwest
quarter of the Northwest quarter of Section 15, Township 23 North,
Range 5 East, Willamette Meridian, described as follows:
Beginning at the Southeast corner of the Southeast quarter of
the Northwest quarter of the Northwest quarter of Section 15,
Township 23 North, Range 5 East, Willamette Meridian;
Thence North 89°14'40" West, along the South line thereof, a
distance of 7.50 feet to the True Point of Beginning;
Thence North 00°13'59" West, parallel with the East line
thereof, a distance of 81.74 feet to a point of cusp on a curve
concave to the southwest having a radius of 25.00 feet and a
central angle of 3°47'02" and being subtended by a chord
which bears South 25°19'43" East 1.65 feet;
Thence Southeasterly along said curve, a distance of 1.65 feet;
Thence South 25°28'04" East, a distance of 15.95 feet to the
East line thereof;
Thence South 00°13'59" East, a distance of 65.95 feet to the
South line thereof and the True Point of Beginning.
Containing 552 square feet, more or less.
Please see the attached Vicinity Map and project maps for the site location.
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one); flat, rolling, hilly, steep slopes,
mountainous, other: Gently Sloped.
b. What is the steepest slope on the site (approximate percent slope?)
The steepest slope on the site occurs along the west-central portion of the site's
south edge where the slope ranges from about 30 percent to 65 percent but with
an elevation differential of only about 4 to 8 feet. (A few residual soil stockpiles
are stored on the north portion of the site from a prior construction contractor's
yard operations. Those soil stockpiles are now planned to be used to help
balance planned site cutting and filling in conjunction with the Elmhurst project.)
Measured across the site on a diagonal, there is about 20 feet of relief across
720 feet resulting in an average slope of approximately 3 percent.
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and
note any prime farmland.
According to the 1973 King County Soils Survey, the site soils are mapped as
Alderwood gravelly sandy loam, 6 to 15 percent slopes (AgC). (See the
Preliminary Geotechnical Engineering Study report prepared by Earth
Consultants, Inc. for additional information.)
d. Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe.
No.
ENV-CHECKLIST-Elmhurst.F1.doc Page 5 of 19
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
The site will require grading to establish flat pad lots, the proposed public streets,
and the proposed stormwater detention and water quality pond facility.
Approximately 12,000 cubic yards of cut (including the approximately 4,000 cubic
yards of residual soil stockpiles stored on the north portion of the site) and
approximately 13,000 cubic yards of fill are anticipated. Generally, cut material
from the site, including the stockpiled soils, is anticipated to be utilized as fill.
Please see the Appendix for the preliminary site grading plan (Sheet 7 of the 8-
sheet set of preliminary plat application drawings). Fill material from offsite
sources will be structural fill. (The fill source is not yet known.)
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
Erosion could occur due to land clearing activities during construction. However,
erosion controls will be implemented prior to clearing in conformance with an
engineered Temporary Erosion and Sedimentation Control (TESC) Plan to be
submitted to the City of Renton for review and approval along with project site
infrastructure construction drawings. Erosion control measures are expected to
include Best Management Practices, such as construction of drainage ditches,
installation of silt fencing, construction of a sedimentation control pond, and
construction access pads at the site entry and other measures as appropriate.
(Such measures are discussed more fully in (i) the Preliminary Geotechnical
Engineering Study report prepared by Earth Consultants, Inc. and (ii) the
Preliminary [Drainage] Technical Information Report prepared by Pacific
Engineering Design, LLC.)
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
Approximately 60 percent of the site will be covered with impervious surfaces,
including the proposed public roadway, private driveways, sidewalks, and future
single-family residential structures.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if
any:
2. AIR
As noted in Section B.1.f., above, temporary erosion and sedimentation control
Best Management Practices will be implemented to control erosion and
sedimentation during site construction.
Grading of the site is to conform to the recommendations set forth in the
Preliminary Geotechnical Engineering Study report prepared by Earth
Consultants, Inc.
a. What types of emissions to the air would result from the proposal (Le., dust,
automobile, odors, industrial, wood smoke) during construction and when the
project is completed? If any, generally describe and give approximate quantities
if known.
Emissions and dust particulates generated primarily by construction equipment
will be produced during the construction phase of this project. The amount of
such transitory emissions to the air is expected to be minimal. Once the project
ENV-CHECKLIST-Elmhurst.F1.doc Page 6 of 19
is completed, emissions will be those typically associated with a residential
development (such as emissions from furnaces and fireplaces).
b. Are there any off-site sources of emission or odor that may affect your proposal?
If so, generally describe.
The applicant is unaware of off-site sources of emissions or odors that may affect
this proposal.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
3. WATER
During the site work construction phase of the project, watering dusty portions of
the site to help control dust.
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)?
If yes, describe type and provide names. If appropriate, state what stream or
river it flows into.
An ephemeral stream (a non-fish bearing upper reach of Maplewood Creek) runs
generally from north to south along and near the project site's westerly edge.
Maplewood Creek ultimately drains into the Cedar River. City of Renton
Municipal Code Section 4-4-130D.4.b prohibits tree cutting, land clearing,
groundcover management or the operation of mechanical equipment within 25
feet of the ordinary high water mark of creeks and streams except for the
development of public parks and trail systems and enhancement activities.
In addition, an approximately 3, 130 square foot (0. o 7-a cre) manmade,
unregulated City of Renton Category 3 (Lower Quality) wet/and ("Wet/and A" is
situated in the southwesterly portion of the site. It is unregulated both because of
its size (Renton's threshold for regulation of Category 3 wet/ands is 5,000 square
feet) and because it resulted from an intentionally made stormwater discharge
and detention area in a portion of the site that historically was not a wet/and.
In addition, an approximately 2,140 square foot (O.05-acre) unregulated City of
Renton Category 3 (Lower Quality) wetland (Wetland B', is situated
approximately 20-feet north of the site's northwest corner.
(See the Wetland and Stream Reconnaissance report prepared by Shannon &
Wilson for additional information.)
2) Will the project require any work over, in, or adjacent to (within 200 feet of) the
described waters? If yes, please describe and attach available plans.
Yes. First of all, work will be required within 200 feet of the above-noted stream.
However, an open space tract (Tract B) will be created from the site's west
boundary east to the east edge of the 25-foot wide City of Renton code-required
buffer from the stream's east edge. A row of Elmhurst lots (Lots 14 through 22)
as well as the proposed storm water detention and water quality pond facility for
the development (a facility planned to be constructed within proposed Tract A)
are proposed to be constructed up to Tract B's east edge. Homes will be
constructed on Lots 14 through 22 consistent with City of Renton rear-yard
setback requirements. Grading of the lots and Tract A is planned. The planned
ENV-CHECKLIST-Elmhurst.F1.doc Page 7 of 19
outflow from the proposed storm water detention and water quality pond facility
will drain across the 25-foot buffer to the stream. The Renton Development
Services Division has indicated to the applicant an intention to require a westerly
water main connection (from the water main system that is to be installed
beneath the Elmhurst development's streets) across the stream and past the
site:S west boundary to connect to an existing dead-end 8-inch diameter water
main located in NE ~d Place. However, consistent with City of Renton Municipal
Code Section 4-4-130D.4.b's prohibition on tree cutting, land clearing,
groundcover management and the operation of mechanical equipment within 25
feet of the ordinary high water mark of creeks and streams, the applicant hopes
to avoid the stream crossing and, accordingly, the applicant's preliminary water
system design plans do not reflect installation of that connection. If the water
main connection is ultimately required by the City, the connection should be
made during the dry season to minimize impact to the stream. (This ephemeral
stream does not flow during the dry season.)
Second, a portion of the southerly proposed street (Road A) and a portion of the
proposed storm water detention and water quality pond facility are planned to be
located where Wetland A is currently located.
Third, proposed Elmhurst Lot 14 is proposed to be constructed near the site's
northwest corner, about 20 feet south of Wetland B.
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
No fill or dredge material would be placed in or removed from either the
ephemeral stream or Wetland B. Approximately 250 cubic yards of fill will be
placed within Wetland A and approximately 160 cubic yards of material will be
removed from Wetland A.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No.
5) Does the proposal lie within a 1 ~O-year flood plain? If so, note location on the
site plan.
A 100-year flood plain is associated with the ephemeral stream along the west
edge of the site. (See Sheet 1 of the 8-sheet set of preliminary plat application
drawings.)
6) Does the proposal involve any discharges of waste materials to surface waters?
If so, describe the type of waste and anticipated volume of discharge.
No discharges of waste materials are proposed to surface waters. The on-site
storm water facility will treat project-generated stormwater for water quality and
flow control prior to release to the ephemeral stream near the site's southwest
corner.
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water?
Give general description, purpose, and approximate quantities if known.
ENV-CHECKLIST-Elmhurst.F1.doc Page 8 of 19
No groundwater withdrawals or discharges are proposed as part of this project.
2) Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (for example: Domestic sewage; industrial, containing
the following chemicals ... ; agricultural; etc.). Describe the general size of the
system, the number of such systems, the number of houses to be served (if
applicable), or the number of animals or humans the system(s) are expected to
serve.
No waste material will be discharged into the ground. (The proposed project will
discharge domestic sewage into a new public sanitary sewer collection system.)
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.
Project-generated stormwater will be collected in a pipe and catch basin drainage
system and routed to the proposed storm water detention and water quality pond
facility planned to be constructed within Tract A. The stormwater facility will be
designed to the parameters of the City of Renton's design standards and the
King County Surface Water Design Manual (1998) for water quality and flow
control. (Level 2 flow control is proposed in accordance with the King County
Surface Water Design Manual (1998),) The facility is planned to discharge
through a "bubble-up" energy dissipater catch basin, with the outflow then
draining overland to the southwest into the portion of the ephemeral stream (an
upper reach of Maplewood Creek) that crosses the site's west edge. That
stream flows generally south-southeast from the site and ultimately discharges
into the Cedar River near the Maplewood Golf course approximately 1.3 miles
south of the site. (See the Preliminary [Drainage] Technical Information Report
prepared by Pacific Engineering Design, LLC for additional information.)
2) Could waste material enter ground or surface waters? If so, generally describe.
Storm water runoff from paved surfaces may include residue from petroleum-
based products associated with vehicular travel. These pollutants will be treated
in the proposed stormwater detention and water quality pond facility to be located
in Tract A.
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any:
Installation of the proposed storm water detention and water quality pond facility.
4. PLANTS
a. Check or circle types of vegetation found on the site:
-1L deciduous tree: alder, maple, aspen, other -1L evergreen tree: fir, cedar, pine, other
-1L shrubs
-1L grass
__ pasture
__ crop or grain
-1L wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other (at
Wetland Al
__ water plants: water lily, eel grass, milfoil, other
ENV-CHECKLIST -Elmhurst.F1.doc Page 9 of 19
__ other types of vegetation
For additional information, see the Wetland and Stream Reconnaissance report
prepared by Shannon & Wilson.
b. What kind and amount of vegetation will be removed or altered?
Approximately 35 evergreen trees in excess of 6-inch caliper (1 cedar tree, 9 fir
trees and 25 pine trees) and four deciduous trees in excess of 6-inch caliper (3 of
which are alders) will be removed during site development as well as existing
understory and landscaping plants. The one fir tree and six deciduous trees in
excess of 6-inch caliper lying within proposed Tract B (open space tract) are
proposed to remain. As depicted on the Tree Cutting/Land Clearing Plan (see
Appendix, project plan Sheet P03), the majority of existing on-site vegetation lies
along the site's south and west edges. The largely unvegetated remainder of the
site (roughly 95 percent of the site) has previously been cleared and graded.
c. List threatened or endangered species known to be on or near the site.
None.
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
The project's stormwater facility will be planted as required by the King County
Surface Water Design Manual (1998). Following home construction, individual
lots will be landscaped.
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the site or are
known to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other: crows
Mammals: deer, bear, elk, beaver, other:
Fish: bass, salmon, trout, herring, shellfish, other _____ _
b. List any threatened or endangered species known to be on or near the site.
There are no known threatened or endangered animal species on or near the
subject property.
c. Is the site part of a migration route? If so, explain
Yes, the Pacific Flyway.
d. Proposed measures to preserve or enhance wildlife, if any:
Creation of Tract B as a perpetual open space tract along the ephemeral stream.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to
meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
ENV-CHECKLIST -Elmhurst.F1.doc Page 10 of 19
The project is expected to use electric and natural gas energy sources for
heating, lighting, small appliances and other uses as applicable.
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe.
No.
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any:
The future residences will be designed and constructed in conformance with the
Washington State Energy Code. No other energy conservation features are
proposed.
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur
as a result of this proposal? If so, describe.
None known.
1) Describe special emergency services that might be required.
Typical emergency services for single-family residential uses will be required.
2) Proposed measures to reduce or control environmental health hazards, if any:
None.
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
Noises in the area will be those normally associated with residential
neighborhoods. (Existing residences lie to the south and west while new
residential subdivisions are planned to the north, east and southeast.)
2) What types and levels of noise would be created by or associated with the
project on a short-term or a long-term basis (for example: traffic, construction,
operation, other)? Indicate what hours noise would come from the site.
During site construction, the noise of trucks and heavy equipment will create
noise. Construction-related noise will also be created by home construction
activities on the site. Because these activities will be short term, the associated
noise will be short term. Note that for 'lc]ommercial, multi-family, new sinqle-
familv and other non-residential construction" (emphasis added), Renton
Municipal Code Section 4-4-030C.3 provides that "[c]onstruction activities which
require construction or building permits and which are conducted in residential
areas or within three hundred feet (3001 of residential areas shall be restricted ..
. to the hours between seven o'clock (7:00) a.m. and eight o'clock (8:00) p.m.,
Monday through Friday[, w]ork on Saturdays shall be restricted to the hours
ENV-CHECKLIST-Elmhurst.F1.doc Page 11 of 19
between nine o'clock (9:00) a.m. and eight o'clock (8:00) p.m. [and nJo work
shall be permitted on Sundays. "
Over the long term, traffic noise and other noise commonly associated with
single-family residential developments will ultimately be created by the proposed
development.
3) Proposed measures to reduce or control noise impacts, if any:
Limitation of construction activities in accordance with the City of Renton's
permitted work hours.
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
A construction company office currently uses one of the three old houses on the
site and an old office building on the site. The following uses are the uses of
properties adjacent to the site:
To the East:
To the West:
North:
South:
One large existing single-family parcel (the Fue Vue parcel,
Assessor's Parcel No. 1523059030) and Phase 1 of the
Laurelhurst Residential Subdivision, currently under
construction, on lands within the City of Renton zoned
Residential-8 Dwelling Units Per Acre (R-8).
Existing single family residences on parcels within the City
of Renton zoned Residential-10 Dwelling Units Per Acre
(R-10).
Two undeveloped parcels within the City of Renton zoned
Arterial Commercial (CA). (The City is currently processing
an application for 20-lot residential subdivision that was
submitted under the name "Ridgeview Court" before the
recent change in that parcel's zoning from Center
Suburban (CS) to CA.)
As existing, built-out residential subdivision named
"Ferndale North" on land within the City of Renton zoned
Residential-8 Dwelling Units Per Acre (R-8).
b. Has the site been used for agriculture? If so, describe.
The applicant is not aware of any prior agricultural use of the subject property.
c. Describe any structures on the site.
A 2-story single family residence (most recently used as a business office), a
shop/maintenance building with an attached office, a single-family reSidence), a
mobile home, and a detached garage are on the site.
d. Will any structures be demolished? If so, what?
All existing structures will be demolished in conjunction with the proposal.
e. What is the current zoning classification of the site?
ENV-CHECKLlST-Elmhurst.F1.doc Page 12 of 19
Residential-10 Dwelling Units Per Acre (R-10) subject to a Development
Agreement between the applicant and the City of Renton dated July 12, 2004
and recorded under King County Recording No. 20040908000083. The
Development Agreement provides that the following site-specific conditions shall
apply to development of the site:
(1) All residential buildings shall be detached single-family residential
buildings (i.e., contain only one residential unit per building);
(2) All future residential lots within the Property that directly abut the
Property's south boundary shall have a minimum width of 50 feet;
and
(3) The net residential density of any development of the Property
shall not exceed 10 dwelling units per acre.
f. What is the current comprehensive plan designation of the site?
Residential Options (RO).
g. If applicable, what is the current shoreline master program designation of the
site?
This item does not apply.
h. Has any part of the site been classified as an "environmentally sensitive" area?
If so, specify.
As noted above, an ephemeral stream (a non-fish bearing upper reach of
Maplewood Creek) runs generally from north to south along and near the project
site's westerly edge. (See the Wetland and Stream Reconnaissance report
prepared by Shannon & Wilson for additional information.)
i. Approximately how many people would reside or work in the completed project?
Approximately 192 people would reside in the completed project (assuming an
average of 3 residents per single-family residence).
j. Approximately how many people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if any:
None.
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any:
This project has been carefully designed to provide desirable housing and infill
development in conformance with the City of Renton Comprehensive Plan. All
64 of the proposed lots are (a) located within the portion of the site zoned R-10
and (b) designed to be consistent with both (i) the site's R-10 zoning regulations
in effect on the effective date of the above-referenced Development Agreement
and (ii) the site-specific conditions stipulated in the Development Agreement.
ENV-CHECKLlST-Elmhurst.F1.doc Page 13 of 19
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
Sixty-four new single-family detached homes would ultimately be provided, one
for each of the single-family residential lots that are proposed. The homes are
expected to be in the upper middle-income housing bracket.
b. Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low-income housing.
None.
c. Proposed measures to reduce or control housing impacts, if any:
The three existing houses on the site would be demolished.
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas;
what is the principal exterior building material(s) proposed?
The tallest site structures will be single-family residential structures in
accordance with the City of Renton maximum building height regulations for the
R-10 zone. Those regulations limit buildings to "2 stories and 30 ft. in height':
The principal exterior building material( s) of the homes ultimately to be
constructed are not yet known.
b. What views in the immediate vicinity would be altered or obstructed?
This property and local adjacent properties are generally at the same elevation.
No views will be altered or obstructed.
c. Proposed measures to reduce or control aesthetic impacts, if any:
The aesthetics of the site will be markedly improved by the planned project's
elimination of all of the existing buildings, existing paved areas, and existing soil
stockpiles on the site.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
Minor amounts of light or glare may occur from vehicles entering and exiting the
proposed subdivision as well as from internal streetlights along the proposed
residential access streets and from the ultimately-constructed homes. These light
sources are expected to occur during evening and nighttime hours.
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
No.
c. What existing off-site sources of light or glare may affect your proposal?
ENV-CHECKLIST-Elmhurst.F1.doc Page 14 of 19
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
None.
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate
vicinity?
Heatherdowns Park (City of Renton) is located 0.4 miles west of the site on
Union Avenue. Maplewood Park (City of Renton) is located 0.8 miles southeast
of the site. Maplewood Golf Course (City of Renton) is located 1.0 miles south of
the site on the Maple Valley Highway.
b. Would the proposed project displace any existing recreational uses? If so,
describe.
No.
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any:
A parks mitigation fee will be paid to the City of Renton in conjunction with the
development of the project.
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally
describe.
None known.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
No known landmarks or evidence of historic, archaeological, scientific, or cultural
importance are known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if any:
None proposed.
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed
access to the existing street system. Show on site plans, if any.
Bremerton Avenue NE currently serves the site from the north, connecting to NE
4th Street. Internal access streets will connect to Bremerton Avenue NE at two
locations. Bremerton A venue shall be improved to City of Renton standards
along the site frontage. Improvements to Bremerton Avenue NE to the north are
planned as part of the Ridgeview Court subdivision and shall enhance the
connection to NE 4th Street to the north of the site. Improvements to the
ENV-CHECKLIST-Elmhurst.F1.doc Page 15 of 19
Elmhurst site's Bremerton Avenue NE frontage along the west side of the street
will be constructed in conjunction with the Elmhurst subdivision. Improvements
to the east side of Bremerton A venue opposite roughly the south half of the
Elmhurst site are already being constructed in conjunction with the abutting
Laurelhurst Phase 1 subdivision. NE ~d Street from Bremerton Avenue NE
east to Duvall Avenue NE is already under construction as part of the
Laurelhurst Phase 1 subdivision.
b. Is site currently served by public transit? If not, what is the approximate distance
to the nearest transit stop?
Metro Transit routes 105 and 114 serve NE 4th Street as far east as Union
Avenue, 0.15 miles from site. Metro Transit Route 111 serves NE 4th Street as
far east as Lake Kathleen Road. Transit stops are available along NE 4th Street
within one-quarter mile of the site.
c. How many parking spaces would the completed project have? How many would
the project eliminate?
At least two off-street parking spaces will be provided on each of the proposed
lots when homes are developed on the lots.
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private?
Bremerton Avenue NE (a public street) will be extended along the site's east
property line to provide access to the site. The proposed residential access
streets (noted as Roads A and B on the preliminary plat application plans) will
provide internal access to the subdivision from Bremerton Avenue NE. (See also
item 14.a, above.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No.
f. How many vehicular trips per day would be generated by the completed project?
If known, indicate when peak volumes would occur.
As noted in the Elmhurst Residential Subdivision Traffic Impact Analysis
prepared by Transportation, Planning and Engineering, Inc., approximately 612
vehicular trips per day will be generated by the proposed project, with 48 AM
peak hour trips and 65 PM peak hour trips.
g. Proposed measures to reduce or control transportation impacts, if any:
A traffic mitigation fee will be paid to the City of Renton in conjunction with the
development.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example:
fire protection, police protection, health care, schools, other)? If so, generally
describe.
ENV-CHECKLlST-Elmhurst.F1.doc Page 16 of 19
An incremental increased need for public services, including fire protection,
police protection, schools, and other services are expected as a result of the
proposed project. These needs will be typical of single-family residential
development.
b. Proposed measures to reduce or control direct impacts on public services, if any.
A fire mitigation fee will be paid to the City of Renton in connection with the
development. Other services will be paid for by property taxes assessed against
each of the proposed lots.
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse
service, telephone, sanitary sewer, septic system, other.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed.
Puget Sound Energy will provide electricity and natural gas. Water and sanitary
sewer services will be provided by the City of Renton. Qwest Communications
will provide telephone service. Comcast Cable Television will provide cable
television service. Utilities including pipes equal to or exceeding 12 inches in
diameter may be installed on and/or off site during the construction phase of the
development.
The City of Renton has indicated to the applicant that existing off-site sanitary
sewer lines and water lines have the capacity to serve the subject property with
extensions to the serve the project. Water and sewer mains are proposed to be
extended along Bremerton A venue from the south and into the site to serve the
proposed subdivision. (The water main along Bremerton Avenue NE is planned
to be extended to the north to connect to the existing main in Bremerton A venue
NE to the north of the site.)
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information is true
and complete. It is understood that the lead agency may withdraw any declaration of
non-significance that it mi t iss e in reliance upon this checklist should there be any
willful misrepresentation 0 IIf I ck of full disclosure on my part.
Agent for Proponent: I----'v-=-:t:;.......,~--------------
Name Printed:
Date: December 27,2004
ENV-CHECKLlST-Elmhurst.F1.doc Page 17 of 19
Appendix
"Elmhurst" Residential Subdivision
Pacific Engineering Job No. 02054
• Vicinity Map (Thomas Guide page 656)
• Reduced-size set of the 8-sheet Preliminary Plat application drawings
i
:\1'
,~ ,
.1: ,~ ~,
''lI'
','I'·' , ,
:',1
8
t!I :z: ..... ~
0...
I---<
N
5
6\\
:~Ri1ii';:'< ~,l: I~ SW 19TH ST JII:::,~~lf<9-n):iiii~Hj~~I"Ef._'" r,-\! i ~ ~I
i '<;t I Li.J
I
I
I I
I
~
RENTON
;,:
~3JRD ST
~
~
RENTON
c:t:1~ I
t
27TH
,.
V>ll~
i:i
=< ;::
5T
;~
i~
<oJ
·TH ST
7rr~-C'~ :z :l
ST
5W 41ST
SEE~MAP
t7i1~ ".> «
J
_ 5!,iI24111 51
II SE I 125TH 51
SE 12~ wr-Ji
.~ SE 128TH ST
5E 129111 I~ -P-L-
5T -'--t
-+
.,
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
R/W ~ • r.n .. (Jf 74.12.3 ... It. SlJIf£W ~G!' .. 10' IIIIlE' MCA sotnH OF HE M«J PI... NID " IIIDf' NIEA NOIf1H OF HE 2ND PL .. 0.01 _ CW 3._ aq. tt.
70TAl NE"A _ I.eo & (lit 4'1.'71 aq. It. PROP05U) AClCESS EASDlEHT AREA _
D.OJ .. 1.21, ... f't.
~l :,;m To't DMUlPIIDIT ~~CQJHTYR£CCII1ItJM
D04STY .. .. LOTS
"'TAl. Nf£A (00) -II/W (00) -S1lO£AI/ (00) -Accas (00)
DOISTr .. .. LOB
1.10 _ -t.72oc -0.01 DC -0.03 ac
O£NSI.", .. .. Lens
7.71 GIlt
DfN!m' .. 1.25 ell/_
IIE'n.AM) ".. (l,MmlLAJED CAlEOQItY J -RofJl SF')
TRACTS UNRECORDED ,
lwi\ \ / ,J . I
sm:INF'OIIIIAIIOH: fo EX 5rlE AREA .. a. _
2. ~ r,£~A=,~, ac
J. 0\£7WL 517£ ARE'A (INCC.. VACot\1m NfU.) -I.SO oc
.... R/W TO fJ£ DmfCAttD-f.72 DC
f1WNER/Ai'PIJCN(T : U8£R1Y RIDGE u.C,
1125 "'JH A\£, S. !EATn£ 1M NfOll
G£01E'CHMCAL. £Nf1H CXWSUlT~ INC. ~ 1805-fJ81H fltAC£ N.c. 5IJITC 201 ~MAP
a\lll. ENGINEER :
~.Jff"M!"";F
PACfRC ENr1IN£'ERJoIG ~tH:t~\£S.. _ ........
~J.'fk~1
PAWWDiT NIO SJD£W.W(' NafTH OF EUIHUPlST TO BE INSTAL.I.£D II ccw.AIHCnoH
*lH IfIOG£'ME1f' COURT
~.m~18O
SURIEl!lII : Cf:NJR£ POIHT£ SUR\£'I1NQ JJ10f ilM II 1;£ S
! ~ ..
~(~:;-~
8I£ETKJEX
POl PREl.I&fWMY Pi.AoT POl COMPOSlE' unuTY PLAN = ~AIl~PLAN P05 8ROf£RrtW A\£, N.£ NtD ROAD 8 _NfYPRC1RI.£ POe ~ afOSS 5£C17CWS NIO
ROM A PRE1.IAfINARY PROfJL£ P07 QRNJIHO AND DRNNAGE PlAN POll DlsnHC CONDITIONS
\IEImCAL. DATlM
aT'( OF RENTON. HA-m as CONTroR INmwAl .. 2'
BeICH.IARK ... ,.,
KING COUNTY POIHT I RENnlJ52: FOONO PfJN01 IN ;r KrNa COUNTY SUFACE MASS DISC AT 1H£ SlRET IHrrRS£C11ON OF Nf 4711 SlREET AND 148TH II\£. SE MARfCM: 1HE
NOR1HrEST CCIRN£R OF SEC1JON ' .. JDINS:I* 2JN" RANGe 5E.. lUI. a.£VAnoN-4.Sf..18 FEET.
.. m SET COTTON GIN SPIK£ 1f1.'· SOUlHIIEST OF DE' lEST ca.UWH OF IM7E.
£l.EVAJfCIN-.fOUl FEET.
BASIS OF BEAIW'«l
----.. ---1RU£ NORTH. BASED UPON GlOBAl ~ S'rSlDI (tF$) I.ANBERT GRID WASHNQTtIH STAlE Naf'IH ztW£ (lC)(R)WAJES. A
CON\£JtcrNCE ANQ.£ OF OOYJCJ..2r ~ WAS APPU£D itT A PCJNQ4 IIARK IN r lONG CCltMTY 5U'fF'ACE MASS cwsc:. itT THE SlRfET /N"'ff:RSCC1JCW OF' HE 4TH ST. ANO I48TH A\oE ~ WItlfl(1HO THE NORTHCAST c:otNm 01' SEC1JCW 14 'f'DIINSfF 23 HQII'7H, RANQ£ 5 EAST OF 1HE' IIIU...WETJE' AtafJDfAN. H NORm NE1IJCAN
OATIRi OF fNJ/ret' (HAD &l/il) GRID COCR:IINItlES WEl'f£ FDIJM) 1'0 8£ f8OlOJ.m I fJIM22..121 AT THAT POINT. THE M€RSE OF BOTH 1HF SEA l£\fl. CClMECJJOH FAC7af OF o.msNttaH AND H QIII) SCALE FAC7af OF 1.0000021," WAS APPU£l) 10 J)£ QIM)
QIW'HC 8CALE
SCALer-50'
NOTE:
~1JOH OF SOER. WAD ANIJ SnRI DRAWAcr SEE' SHaT POZ
c
UIIIl£I'JHm/lll.ANl<ET £ASaIfJIT
COCIROINA rES FOR !fI01IN QIfO(.fCJ DISTANCES.
LEGAL. DSSC1P17ON
~
7HE SOU7H Iro FlET OF 1'H!' CAST n5 FlET OF 1H£ Fa.l.OMIHO 0f3QIIB[I) PROPOfTr. THE NORTH HAlF OF H SOUHAST' QUNflIJI' OF H HORTHIIDT QUARTER OF THE NORtHWEST QUMTElf OF SEC7JOH 14 7DMSHP 23 NORTH. RAHQ£ 5 EAST. ......
£J«:EPT 7H£' £AST J7~ ncr THE1f£aI' FOR RMD:
(ALSO ICHOJifN AS THE SOUTH ftO ncr OF THE EAST R1lJ F£ET OF 7J£ NORTH IMLF OF' TRACT 4 MltRlIH ACRE' JRltCT$. ACCtIflOfNC TO H tHfECCIIlDED PlAT tHEREOF.
SllVA7!7 IN THE CCltMTY OF ICING, STItl!' OF 1t'AShWG7tW.
~ THE SOUTH HAUl' OF THE SOUTH£AST ClUARmt OF JHE HCI'fTHIEST OUARlER OF THE NORTHftEST QUARlER OF SEC1KJII f4 TOWNSHP 23 NORTH, RANGE 8 EAST. IlAt:
EXCEPT H CAS1ERt.Y 7." ncr THE1fE.OFFDR ~
(ALSO KNOWN AS JH£ SOUnERLY HALF OF lRAClS 5 NID .. 1lAR1W ACRE tRACT$. ACCCIfDWC TO JHE UHRE'C'aIDED PLAT lHER£(F.
SllVA7!7 IN 1H£ COUNTY OF ICM:, STIt 1£ OF ~
PARCEl. c:
THE HOR7H HAlF OF lHE 5OUl'HEAST QUMTBf OF 1HE NOR7HWEST QUARTm OF ȣ NCRTH'IfEST QUARTER OF SEC1KJII 15. TOtIHSHIP 23 NORm. RANGE " EAST. 1f.AI.:
DfCEPT 7HE £.45T ».5 F[E1' 1H£R[(F FOR ROAD:
AND DaPT THE SOOTH ftO F£ET OF JHE EAST 215 F£ET OF 1H£ R£WANlER.
(ALSO KNOWN AS THE NORTH HAlF OF 1RAC1S " AND I. IIAR7W JDf£ tR~ AccamtNG TO 1HE lMR£CCRJ£IJ PLAT JHEREOF; £XCfPT THE' SOOTH no F£ET OF TH£ EAST ZJ5 FIFr OF' SoU) TRACT 5k
SlVA 7!7 IN THE COUNTY OF KWO. STA 7!7 OF W'A5hN11tW
~I ~~J !~8 i~~i~~m~ 'it~t .... u.~i~
co U !=:~ U'i::~ ~G) .... ~ U!=: ~'''' . P. CO rIl !=: G) ~Cl
~
~llli ! :::)
C/)
.J i~ :::)W :Co ::E-.JC/) lU~
'h "'·il .~r;,
:I .~ .~§ ,,-til'" ~n U
I
~
~
~d ~m~~ ~~gi I~
ORA"" BY: JClC
ISSUEOAre ~
SHEET REV.:
LJ , " 02054HC01 -P03
P01
a-EET 1 OF 8
R£VISIONS
1...--~I: 'j1i
~ ~ ~ Il_!.
~ I
~~ 1j ~h ~II! l~ fi'P d ll----,1
~~ II'W'
j I~~I -~'i
s Will E
!
i
\" ----J.---J
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
7
6
\
--------aW'ttC 8CAI..E
SCALE: r • 50'
vemcAL. OAT1JII
arr OF REHTtW. HAW) lJ8 a»mlIR WJERVAl _ 2'
E/ENCHIAFI{
SA'" ICINQ COUNty POINT I RENna51:
FOUND PfM01 IN SO lONG COUNTY stRf"ACE artASS lISC AT lHE S1RIEET INTfRSECJKW OF HE 4TH S1HEET AND 1.am A~ S£ IIARfiCWG JHE
Nat1HWEST CXRNfR OF SEC7JOH '... 7OtINS*' 2.W.. RNIG£:I£. lUI. ELEVATIONa 454.78 FEET. ..,.,
seT COm:w GIN SPICE JlU' SDlIlHKST OF THE WEST CCI.UIIN OF GAlE. ELEVA TJON-407 •• ncr.
BASIS OF 8EAI1Nl
1RUf' NORTH. BASEl) C#'OH GI.08AL POSlJCM«O: smEll (CPS) LAAlBfRT GfiaO 1M.!HYG1tW STA 1E NORTH n»E QXlIfDWA 1ES. A
D';W\£RGDICE' ANrU OF oowJQ.2r ccumRQ.OQCJIS[ 1MS
APPUfl1 AT A PUNCH IIARK II r «HJ COUHTY stfif"ACE BRASS DtSC. AT THe S1R£ET */1ERS£C7JON OF IE 41H Sf. NtD ''-''IH 04\£ S£ lURKING 1HE: NORTHCAST CORNER OF S£CnOH ,~ JDMNShP 23 HOR7H. RANGE 5 EAST OF THE IIIJ..AIIfTlE' AtDfIlIAN. JHE NORTH NIi£RICAN DAJUII OF '''/1111 (HAD &1ftJ'J ClIO ~JES IllER£' FOCMD ro BE 110803._ / 1311122.321 AT lHAT PC'fiT. THC M£RSE: OF 80m 7Hr SEA 1£\£1. CCWREC1JON FACa OF 0.""824 AND 11'£ QIfI) SCAtE FACTOR OF U'OOOO2fS7 WAS APfIlJ£D 10 'D£ GRI) c:ocrfDAtM TES FrIt SHOWN CiROC.N) llfSTANaS
I..EaiK)
SNlTIIrt 5EIEJI fUNIWT · ....,....,....,.~
If-• ,. H1DWIT AlmB..Y
l!..-~~.:DIUr AS1EIB.Y
~
•
•
Ciil
Ciil
-L
--1
E1il
Iii!ll'D
.. ,.,. .......
f1JIt1fI
C8""., ,
C8 nP!', ..,.,...,LDCIGNtIU?
C8""., •
CIt nFE' I If/SEU) LOaCIIC ... .......... -..-,.
fIIIlCIICaD r DOII&'CIIT .MNMaD
PRIGPCISD .. lIft£IMy lRUI ~ -,.....,.,.,. .......... ,.....,.,.,. ...................
~I i 2~ J ,~8 :J~~N Ji.,~ n~~~n~
ooU I:l~ C)'I:: ~ t;: Q) ~ .... 0 .... C)1:l ~ .... ~oo
I:l "" ~O
~ ~llli ~ a m :J CI)
i~ f~ ~m lUa::
.g15 r~ ..1 'll~ l! .B l~ ~ ...
~n u
t ~
~
~ d ~~i~ eiiil
ORA .. BY: .JQC
ISSUE DA.lE: 12-010-04
SHEET REV.:
LJ , ...
02054CU01-P02
P02
....-r2OP.
.........
i.-. \ /
--~'---J
I
I \
\
---\
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
\
\
\'---. FERNWOOD'. NORT.-1 ~
\ --\ ---..., )--
FUE VUE
! --,----;r--l0-·· -1r-~ LAURELHUR~T FHASE 1 : I , ~~?~::~r~j'::r.~~~ Ii
I, ,I
"'~-'---r ---8 -1"'-: ~ ~ - -._._--1---'-"
.oJ 1 7 \
... __ .1
1
. ____ .... _\
5 6 l
. I I I .. ---L __ .. _____ •.. .J
'I ; , ,
! /
! ~
k--LJ-J' 'j -~ ~aI..iN..C SCALE: r • 50'
YEfmCAL OATUW
aTY OF R£NTDN. NA\IO g COHTDUR otf'JDtVAL _ 2'
BENCHIAFf{
""'" IQHQ ot:MMTY POINT I R£NTfaR RUID PfJNCII ., r lONG COUNTY SURFAC£ MASS DISC AT lH£ S77f£ET MERSECJJCW OF HE 4JH S1REET N6J 'fa," ,,~ SE MARK1NO JH[ NQlfJHMEST aJfNE]If OF S£C1J(;W 'of, n:MrISNP DH... RNIQC 2.. lUI. n£VAlXW-4M711 FlET.
.. ll> SET cornw QH SPIKE fa,' SOU1MlEST OF THE lEST COLUIIN OF GAlE. fl£VA m:M-407.tI. FE£T.
BASIS OF 8EAIWQ
7RUE NORm .BASED UPON Gl..OIAL P05T1KWNC ~ (cps) LAA&JtT GRIJ ~1DN STAlE' NORlH zrwc CCJOIONAJES. A CCWaGlEHCE' ANGLE OF 00'58'JCJ.2a-cotMERa.OCfOIIS lIAS
N'PUEIJ AT A PUNQf 6WfK II r KING COLMY SlJiIf"Aa: BRASS DrSC. AT THE S1REET oWlERSECJJCW OF HE 4TH sr. NIIJ JfMH A\I£ st. UNfIOHG 'lHE NORTHEAST CXIRPG OF S£COON 14. lOMNStF 23 NORTH,
RANQE 5 EAST OF lHf MI.J.AMETlE' t.IfRDAN. 7Hf: NORTH AIIERICAM
DAJUII OF fMJ/lfi' (HAD S3/1f) GRID CtXlIDNA1'ES 11M' flX.N) 10 fIE fDO.l_ / 1311122..321 AT THAT POINT. THe IfrMRS£ OF 801H 7HE 5£A, LE\G.. CCRfECJJON 'ACnM' OF o.lItM1aH AND TH£ GRID SCAlE FAcmR OF 1.0000Q2I61 IIMS APPI.JED TO THE GRID ~1ES FOR SHfJWII fJfOlMD DISTANCES.
~I ~~ i i 8~
Q rl; rl;~ :ii~\'\I \'\IfI)g ~-~m~ i $~h~
o.oU I:l~ O·t:: ~ !.+:: Q) A .... Q) ...
0l:l (\I ....
~o.o I:l .., ~Q
~
~lIli ~ Q
~
..J ~~ =>w IO
·fa r~ .~~
8·13 'U ",0.. :n U
t ~ ~
~d ~.i~ ::Em eilil ..J w ~a:
DRAWN BY: ~
ISSUEDAlI: ~
91E£T REV.:
LAND Cl.E5NWID PLAN L:JeurtN:>
020541R01-POJ
P03
EHEI!!T :I ~ •
SEC. 15, 7WP. 23 N., RNa 5 E., W.M.
\
--------~8CALE
SCN.E • r -!ltJO'
YER7ICAL. DA7UIof
atY OF REHPtW. HA.W Il8 CCW'lCfJR MER'VAl. _ 2'
BENCH.W/K .....,
/CI'IQ QXM'Y I'OIfT I RDmal:'
5I1E>
IN r IGHC COUNTY SJlfFACE MASS DISC AT DE' SJR!ET OF H£ 4TH S1RErT AND t481H A~ SE IINtIONQ JHE
IW& OF !£tXW '" ~ 2.ft. RANG[ 5£. .. .fM..7B I'ET.
SET COTTCN QH tiPItE far SIXnHIIEST OF 7H£ lEST Ct'IUIIIN OF GAlE. B.£VAJJCW-~ •• FlET.
BAas OF BEAANI3
~~ === :tl/t~:::::'i=! It. CDMJIIiI£NCE' NG£ OF OO'BI"JIlW CCIM1IJIfaDaInI WAS APPL.ED AT A f'IMOIlIAIM' IN r ICIN'G ctMfTY SU'lFACE' 8RASS ~ AT 1'H£ S1REET IHlERSECJIG'4 (7 III« 47H ST. AND 14m A~ SE. IINfItlHQlHE~ClOIINStOFSE'C'IKIH'" JtHIN5HIP'ZJHORlH. IW«I£ 5 EAST OF lNE' ~ MElIDM. 1H£ NOR1H MI£IIICN( DA'MI OF JJI.lIt_ (HAD &JIM) QIID CCICIfiIIlfNATES IIER£' FOCH) 10 ~'== 'c.L~,g".~=.,~~~801H ~ FAC7Qt OF f,OOtJOC»rt17 WAS N'fILE) JD 1HE' GRI) COCIftWAlES Fat SHOIH GROUHO DISTANCES.
~I ~~ III i ~ ~~i~ U~ ih~~~I~
bl)U (.).~~ ~ Q) ~ .... Q) (.) I
1 tIS'! 'p.,;:lQ> ~Q~
~
~ i
i~ :::>W ~m • II:
.. .5 J!l rj
"'~ "u t1f ·u .3;;:
'S'"'" Uil
I I ~
DRAWN Err. .JQO
ISSUE DAm ....aI-06
SItEET
LJ
02054CU01-P02
P04
8H!I!T '" OF •
r"U I .. o~ ~(Ju
I ,,,~':u I .:u-'::':'y ~
§ I A ~ A a A
§ I A ~ A a A
"ELMHURST"
~ cnYOF , RENTON
=~.=.-~
ELMHURST
BAEMERTON AVE. N.E. AND ROAD B PREl..MNARY PROFI...E
A a 9
fft p
.Oi
~
~
~;z
~ P
<11
IIHHIHH'IIHlr~~J7' 'InTI m ::::::Sl.:: ::::: :::: ::: :: :~'.:~::::: :::.:~: ~
~ I A ~ ~ a 9
~ ~
!II!!I ffi I! ! II ~ ~ " ~ RESIDENTIAL SUBDMSION Pacific 4180 UNO AVE. s.w Engineering ~ WA 118055
DI . 1, LLC ~~ 251-8811 i ~
I
,..
EER1Y NXE LLC. 8125.,.,... EAT1l.E,WA.1I81OI!I PI-fI::)t6 (.4a.5) R2O-1OOO FAXo (4U) ~
AENTON,WA
(425) 251-8880
WEB 6fTB
Civil Engineering, Surveying PACENa.COM
and Planuing CoosuItants
, .
~ ~
uf
10
~ It
i
~
P.: ~
It) -(j
~
SllI1!I(1lSIIO;) SUJUllUld pOI
rlOO"0N30Vd ~S 'lIlI!l=lJ!IIulll!A!::>
o3JJS 83M 0888-1Ql:~)
I188-IS<: (~ J~~ , ...• S~
_ VM'~ ~~~~1I!~U
"M'S "3AV CJ/\I"l osu. oY!O"Bd
VM 'N01NaII
NOISIAICl8ns "lVllN3C1S31:::1
.J.Sl:::lnHV'f13.
~I ~~ ~ ~
h r; ~
~
!I
~ ~ ~ I I R
2
'0(
~~~~~~~~J~
:.:::: §!
.. ~
....... 1
.lHDII:I 3/lOSV 3Nr1HQLWY
~ ~ ~ I i I I~~~==============~========~~~==~==~~~~==~~====~ ~ NOlN~~ ::/0 AJJO
R£\1SIONS
SEC. 15, TWP. 23 N., RNa 5 E., w.M.
,
! \<\~~Ai.4§.i!t~~lt~~i!~~JK~~~~I~§~:~~ -T'=~~ r'11t,'li,' I ---------
F'UE VUE
~e¥~Lfll' 1!1~--'-' --T-,o--n-
. <1 ! I LAURELHUR~T PHASE 1 :' ~_~~'::':"" . ! ... __ :1t (UNDER CO~STRUCT!ON) I I "If'T--F¥-, 1 -"' ...... -----~I-------n; 2 , 9 I
:1 : I .-~~ ..... --:,-._. __ .,.----+'-1
~ 8 I , I
:, I ------_."'-----,--,
I
5 __ --=_~ [ --~--
I
~., i /~--...... ~-.... .... --~ ---
\
110 It 28 III t1IO 100._ lo000ooi I
ClRAI'HC 8CAL.E
8CALE' r -50'
\SmCAL DATUI
arY OF REHnw. HAW). CCW1DI.If ImRVAL _ 2'
E1E!NCHIAIf(
~ IONC CXXMTf PCWIT # RlNT1t152: FOOND PUNCH IN r lONG COlMJY StlFACE" tIMSS DISC AT 1HC SlREET 1NlEHSE'C1JCW OF He 47H STRET NID IelH "''Eo Sf" MARIONC 7HE NClf7H1f£ST CQ1IN!R OF SEC1JCW 'of. 'fOIINSI* 2.Jtt. RAN« .5£.. IlM. Q£VAntw-of5f.71 fED:
"'" SET COTltW GIN SPfItE JR.,' SCU1HlEST OF 1h£ lEST ca.uMN OF GAlE ELEVA 7ION-«J7.fIII nET.
BASIS OF BEARfiIQ
~~:a~~ :t::t~a:;::i=) A
ctW\£RGENC£ ANOLE. OF oov:sa..a-COUNlEJta.OCJOIS£ tMS
SVRFA.C£ MASS os:; ,.aJH A\IE S£.
70WfSHP 23 NCRlH. . NOR7H NI£RICNI GIlD COOROINA 7ES IIIH£' RILNJ 70
fHE'stA-iOO. Ct:iIiRiCfION-;AC'roR7H:J~~~OF~7H
SCALE FACTOR OF ""00002187 WAS APPfJED 70 tHE GRID COCJfEJNA JES FOR SHOWN QROUND OISTAHC£S.
I..EGBD
SNlTNf'f SEIER CUANDUT
• MNTNIY....,.........,
iii-., fIlE' fmJIW(T ASSEIAY
.. -."""-L..:..-Ir/'JIIRIWIY ~ aoKFI" AS8II..Y .. ,.,....,.,.
~ ......
• co nI'£'
C8 T'IFE' I Ir/ICLD l.OQICIC LI)
iii) co nI'£' ,., CBnPE'IIrftICI,DLCJQICNIIW ---L f'IIIIPOSDr~~ --I fIRCIIIa5IP ....... ." """ C':CINC1IJf ...................
I?i53 _ ............
II1IFlml ..................
;t~ all ~< ; i " ~~ d; u~ Qhi~~Dl~ Ii~Lu.~~iL
bIlU t).gj
~ Q) ~ .... Q) Ci ~.S Il;bIl ~O
~
~llli CI)
.ga ji
oIiu .~ ..
jJ
:t! u
~ I
ffi I
.J ~ ~~ ~ d f ~ Ic~1 ::! -~~ ~ ~ ~Inl
PRc)'£CT NO.:
DRAWN B~ .JQC
ISSUE DATE: 12-Ot-CM
SHEET REV,;
~ , '" 02054CR01-P07
P07
&EE!T 7 QPI •
I L In g~
~ I ~ I
~~ fi 8~ J~
RE\1SIONS
"D lU
~~
y I J:~I -~!i
s Uti! i
~
ID
!
i
--~
~-'
'\
" " "--.. -",-._.
-~'-"-
" ~.,
I
I
\ , ,
~' '--1 --T--:;-"T -, . • '. ,0 I r _ l' LAURELHURtp of<, <:~ 1 ' . <y~D~~O_l1\srRu6ioN) ::
2 il-._--Q - --'j-1
! .. " I
I' I --3--····::--..... ~
:1 B i~ -~~ ---~.--____ l
4 I ! "., 1 , ' \ , \ _____ .1_ I
5tNa=C°'--~' -i.
,-~~~ .. jJ , ! '/ ",~_, ___ j!1) I. -,,',-:-r:-d
-',
\
i
\
--------<IW'HC SCALE
8CALE: r • 50'
\Sl7TCAL DATtII
arr OF RDmW. HAM) M OONJDUR MERVAL _ r
8ENCHIA/I(
SASE: IOHQ COUNTY POINT I ROmI5R:
FDUND PUNCH IN J" ICING COUNTY SlR'"ACE MASS DISC AT THE S1R£ZT
IHTfRSECDOH OF HE 4lH S7RfET NIl) 1481H A\£. S£ IIARfONO 1HE NCff1HWEST COI'lNE1I OF' SEC'JJa4 f~ TOIHSfM'.2JN., twIQC !£. 0. flEVA'flON-454.71 FrET.
51'" S£T C07lDN QN SPIC£ 11.1' SOUlHlEST OF THe lEST caJJIIH OF GATE. E1.EVAlJiCH-407." nET.
BASfS OF BEAIW«J
7Rt£ NORTH. BASED UPON Gt08AL P05lTJONING S'I'STEII (QPS) LAA&RT GRID IlASHWCTtW $TAo J[ NORlH ZON£ COQII)WA JES. A
CCW\£RGEHC£ NIA.£ OF OOW'JO.2B" CCJUHmta..(JQI('MSE" WAS
APf'f.B) AT A I't/NQ1I1NfIC IN so KING OOUNTY SURf'"ACE' BRASS DtSC. AT lHE' S'JRfET IYlERSECJJGW OF HE .»1 ST. AND 148tH A\£. SE;. AMRIUNO lH£ NCJIIfTH£AST CO'fN£H OF SEC1KW 15. TOMHSHlP 2J NORlH. fWIGE 5 EAST OF lHt MJ...WfTlE' IIERfDIAH. 7HE NORTH MIERICNf IMlUII OF fMJ/I'II' (HAD Sl/I'I) GRrO COCWDfNAJES IIa£' RX.N) 10
BE IGO.1ne / IJlISI22.J21 AT THAT POM: TH£' M£RS[' Qf' 80'" 7H£ stA U\£L CI1IMm7JOH FACTOR OF C1.1HN182<f. AND THe QIIIJ SCAi£ FACTOR OF 1.0000Q2187 WAS APPUED 10 THE (iftI) COCRDfHA 1ES FOR SHOtIH Ci1ffCIC.H1 DISTANCES.
QIED<EI) RlR COMPUANCE I U<:OIIIIBNDBD 10 aTY STANDARIlS POR ~PROVAL ____________ ~a ______ ~: ________ _
_______ Dale ____ ~: ____ __
0'1e ___ _
•
D
~~ aJs ~< i i 8 2~ d; d;~g :J~ '" "'!DB i~hn~~
b()U
=...:l -fa (J.t::...:l ~ ti:l Q) ~ '"3
.... Q) f"'1 '" ~ ~.s ,~';. ~ b() i,e
JjOJI ~~ ~n u
~
~IIII CIl ~ I 0 m ::l CIl ~ ~~ ~
a:~ ~ d f~ ~m~~ ::E-.JCIl ~I;il wW • a: -PRo.ECT NO.:
DRAWN BY: ~
ISSUE 01. T£: 12-01-04
SHEET REV.: \ I
LJ , -02054EC01-P08
POB
B-EI!T • CP •
"ELMHURST" RESIDENTIAL SUBDIVISION
CONSTRUCTION MITIGATION PLAN
December 27, 2004
A. Proposed Construction Dates (Beginning and Ending Dates):
Construction of project infrastructure is anticipated to occur primarily during the spring and
summer of2005 and be completed by the fall of2005.
B. Proposed Hours and Days of Construction Operations:
The hours and days of site infrastructure-related construction activities would be those set
forth in Renton Municipal Code Section 4-4-030C.3.b: namely, 7:00 A.M. to 8:00 P.M.
Monday through Friday and 8:00 A.M. to 8:00 P.M. on Saturday.
C. Proposed Hauling/Transportation Routes:
Export of excess onsite soils is anticipated to occur as a result of proposed site grading.
Should hauling of material on or off-site become necessary, the transportation routes to be
used would include NE 4th Street and Bremerton Avenue NE and possibly NE 2nd Street
(through Laurelhurst Phase 1) from Duvall Avenue NE.
D. Measures To Be Implemented To Minimize Dust, Traffic and Transportation Impacts,
Erosion, Mud, Noise and Other Noxious Characteristics:
Watering of the site during dry portions of the construction period will limit the quantity of
dust particulates created by workers' vehicles and heavy machinery. Because most of the
portion of the site that is to be developed is located a considerable distance from NE 4th
Street, no substantial impacts on traffic and transportation are anticipated during the
construction of the project's on-site improvements.
Site construction will be done in accordance with an engineered Temporary
Erosion/Sedimentation Control Plan to be submitted to the City for approval along with the
civil construction drawings. Installation of a temporary quarry-spall construction access at
the entrance to the development site during construction will minimize vehicle tire-related
transport of mud from the site onto NE 4th Street during construction. Frequent monitoring
of the entry location and street sweeping will further help control transient mud in relation to
NE 4th Street. Noise and other generally noxious characteristics associated with land
development will be temporary. Due to the proximity of existing neighboring communities
(particularly Fernwood North to the south), construction activities will only take place during
the hours and days of operation noted above. As such, the project's impacts to nearby
residents resulting from construction activities should be minimal.
F. Preliminary Traffic Control Plan:
The project contractor will submit a traffic control drawing to the City of Renton for
approval after actual construction drawings for the site infrastructure have been prepared and
prior to beginning construction.
Page 1 of 1
"ELMHURST" RESIDENTIAL
SUBDIVISION
Renton, Washington
Preliminary Technical Information Report
In Support of the Preliminary Plat
December 22, 2004
Pacific
Engineering
Design, LLC ~'=====
Civil Engineering, Surveying
and Planning Consultants
Pacific Engineering Job No. 02054
PRELIMINARY TECHNICAL INFORMATION REPORT
FOR
"ELMHURST" RESIDENTIAL SUBDIVISION
RENTON, WASHINGTON
December 22, 2004
PREPARED FOR
Liberty Ridge L.L.C.
9125 -10th Avenue South
Seattle, WA 98108
Phone: (425) 226-1000
Fax: (425) 228-4924
PREPARED BY
Pacific Engineering Design, LLC
4180 Lind Avenue SW
Renton, WA 98055
Phone: (425) 251-8811
Fax: (425) 251-8880
TABLE OF CONTENTS
I. PROJECT OVERVIEW .................................................................................................. 1-2
II. OFF-SITE ANALySIS ................................................................................................... 3-16
III. CORE AND SPECIAL REQUIREMENTS ............................................................... 17-18
IV. FLOW CONTROL I WATER QUALITY FACILITY ANALYSIS AND
DESIGN ............................................................................................. 19-37
1. HYDRAULIC ANALYSIS
2. EXISTING CONDITIONS
3. DEVELOPED CONDITIONS
4. DETENTION ROUTING CALCULATIONS
5. WATER QUALITY VOLUME
V. CONVEYANCE SYSTEM ANAL YSIS ........................................................................... 38
VI. EROSION I SEDIMENTATION CONTROL DESIGN .....•.••..•.•.•••..•..•..•...•.•.•.•.•.•.•.....• 39
I. Project Overview
Site Location and Project Proposal
The site of the proposed "Elmhurst" Residential Subdivision is located in Section 15,
Township 23 North, Range 5 East, W.M., northwest of the Bremerton Avenue N.E. /
N.E. 2nd Street intersection that is under construction as part of the Laurelhurst Phase 1
residential subdivision. The site consists of approximately 9.5 acres. The applicant
proposes to subdivide the site into 64 single-family residential lots, public street rights-
of-way, a storm water detention tract (Tract A) and an open space tract (Tract B).
Infrastructure construction to support plat development will consist of streets, curbs,
gutters, sidewalks, drainage facilities and utilities.
Site Use History
For more than forty years (up until just recently), the subject site has served as a base of
operations for a site work construction company followed by a public works construction
company. Several existing buildings are located on the site including a house that was
ultimately used in part as a dispatch office, a maintenance garage and office, a smaller
house with a detached garage, and a longstanding mobile home. The entrance into the
site (which is at the site's northwest comer) is paved and a paved parking area exists near
the buildings used in conjunction with the construction company operations. Gravel
parking and storage areas comprise much of the rest of the site. They were historically
used for parking of construction company trucks and construction equipment and for
storage of construction materials. Several remaining stockpiles of fill material
(approximately IO-feet high) are located in the northwest portion of the site.
Existing Site Conditions
An ephemeral stream (an upper reach of Maplewood Creek) lies along the site's entire
west property line and near the west portion of the site's south property line.
The site slopes from the north-northwest to the south-southwest at a rate ranging from
about of3% to 5%. Some steeper slopes, ranging from approximately 20% to 40%, exist
along portions of the site's south and west property lines but those slopes generally occur
in small bands of only about 2 to 6 vertical feet. The site is mostly cleared with some
small strips of conifers/deciduous trees remaining near portions of the site's south and
west property lines. Some existing trees also lie amongst the buildings in the
northeasterly portion of the site.
Stormwater runoff from the previously-developed, northeasterly-most portion of the site
(generally the paved parking lot and the smaller house and mobile home to the north of it)
as well as some of the gravel lot to the west of that area drains to an existing catch basin
located in the north central portion of the site. That catch basin is connected to an 18-
inch diameter CMP culvert to the west that discharges onto a rip rap pad about 40 feet
from the site's west boundary. The drainage discharge from that culvert then travels via
overland flow to the west into the ephemeral stream (as does overland flow from the
balance of the gravel lots in the north portion and west-central portion of the site). The
other existing buildings and the paved areas behind them sheet drain to the south to the
exposed east end of an existing 12-inch diameter storm drain pipe within a localized low
area in the south-central portion of the site. That pipe runs to the west-southwest
conveying runoff into an existing low, flat-graded area in the southwesterly portion of the
site (north and east of the stream), an area that provides stormwater detention. During
storm events, water ponding in that detention area overtops as a broad sheet of water to
the southwest into the stream.
Adjacent Developments in Process
The parcel ofland to the north of about the eastern 60 percent of the subject site's north
boundary is the parcel that is the subject of a pending application to the City of Renton
for a 20-10t single-family residential subdivision under the name Ridgeview Court. The
Ridgeview Court project site is designed to drain to the west. Phase 1 of the proposed
Laurelhurst residential subdivision, which lies to the east and southeast of the south half
of the Elmhurst site's east boundary, is currently under construction. Except for
discharge from the Ridgeview Court site that will drain into Maplewood Creek upstream
of the Elmhurst site, neither of those two sites will drain into the Elmhurst site. Both of
those other two subdivision developments will have their own detention/water quality
facilities.
Proposed Elmhurst Detention and Water Quality Facility
Stormwater runoff for the Elmhurst proposal will be collected in a storm drainage system
and routed to a detention pond to be constructed within proposed Tract A in the
southwesterly portion of the site. The detention pond will be designed to meet the Level
2 flow control requirements and comply with the Basic Water Quality menu as specified
in the 1998 King County Surface Water Design Manual. The pond will be a combined
detention/water quality "wet pond" and will discharge through a "bubble-up" energy
dissipater catch basin, with the outflow then draining overland to the southwest through
the proposed 25-foot wide stream buffer to the ephemeral stream.
II. Off-Site Analysis
Upstream Tributary Area
Except for Maplewood Creek's intermittent flows to the south along generally the
westerly portion of the Elmhurst site, off-site storm water does not currently enter the site
and is not anticipated to do so in the future.
Downstream Analysis
On November 8, 2004, Pacific Engineering conducted a site visit of the Elmhurst site's
downstream drainage corridor beginning at the site's southwest comer in the area of the
anticipated detention pond outfall. As mentioned in Section I, above, the outfall will
drain via overland flow into Maplewood Creek, the ephemeral stream which flows along
much of the site's west boundary and along a portion of the site's south property
boundary.
At the proposed detention pond outfall location, the stream is a heavily vegetated
drainage corridor approximately 4 to 6 feet deep with a bottom width of about 4 feet (see
photos 1 thru 4, this section). No apparent erosion was evident and no flows were visible
at the time of my site visit. From that point, the drainage corridor runs generally
approximately 600 + feet to a 36" CMP that crosses Bremerton Place NE. At the
upstream end of Bremerton Place NE. crossing, a "birdcage" inlet structure has been
installed (see photos 5 thru 7, this section). This "birdcage" structure consists of two 12"
diameter inletting pipes entering a 60" concrete manhole and a 36" diameter CMP outlet
pipe. Rock rip rap has been installed from the top of the "birdcage" structure to the inlet
ends of the two 12" diameter pipes. The creek channel immediately upstream of the
Bremerton Place NE crossing is a broad, grass-lined channel approximately 8 feet deep
(see photo 4, this section). There did not appear to be any erosion in that channel.
The downstream end of the 36" diameter CMP roadway crossing has been rip-rapped for
a distance of about 40 lineal feet (see photos 8 and 9, this section). At the end of this
riprap stretch, there appears to be some erosion of the creek bottom (see photos 10 and
11, this section). At the time of my visit, the sides of the creek channel in this area were
cut vertically to a depth of about 1 foot. The stream bottom was composed of small
rounded rocks (up to 8" diameter) within and downstream of this erosion area.
Downstream of the Bremerton Place NE roadway crossing, Maplewood Creek flows
within a deep channel approximately 300 feet to the location of the Laurelhurst
subdivision's pond outfall structure. At that location, a catch basin structure with grate
was observed at the channel bottom (see photos 12 thru 14, this section). This structure
appears to be an outfall from the existing Fernwood East subdivision. At the Laurelhurst
pond location, only a small flow was present in the creek and no channel erosion was
evident in the deep, wooded drainage channel.
The following is a description of the downstream corridor from the Laurelhurst pond as
described by CORE Design in its Downstream Analysis found in the Preliminary
Drainage Calculations for the Laure/hurst Preliminary Plat submitted to the City of
Renton's Development Services Division.
Downstream Analysis by CORE Design for the Laurelhurst Subdivision:
See Figure 6 -Downstream Hydrology, as an aid in the following discussion.
On January 14, 2004, a site visit was conducted. The weather was cool, 45
degrees and overcast. The week prior to this site visit was moderately rainy and
cold
The downstream portion of the investigation began at the southwest corner of the
project where the proposed outfall from the pond will be. This area is a steep,
forested slope. The stream channel of the area of the proposed pond outfall is
wooded and steep. The energy dissipater proposed at the edge of the
Maplewood Creek will be located on the opposite side of the stream from an
existing structure that conveys stormwater from the plat to the west along
Bremerton Avenue. This outfall is about 30-feet upstream of the one proposed
On the day of this report the stream was flowing, the water surface was about 10
feet wide with gravel and large cobblestones visible. Slow pools of water show
signs of sediment deposition and steeper stream channel areas show signs of bank
erosion and scour. The stream channel is heavily wooded with alders and low
brush in this area. Approximately 0.3 miles downstream of the proposed pond the
stream valley opened wider and this stream combines with a stream that flows
from the east. This stream conveys the flow from the eastern 5.5 acres of the
project site.
From this location the stream valley opens even more. Isolated pools of sediment
deposition and steeper areas of erosion exist along the channel here. This
continues until 0.8 miles from the discharge point where the stream enters a pond
at the northeast edge of the Maplewood Golf Course.
Downstream Analysis -Special Note
The drainage area located on the eastern edge of the property receives
approximately 5.5 acres of runoff from the project site as detailed in the first
paragraphs of this section. This area, known as Puget Colony Homes, has had
significant storm water runoff complaints, (see King County Drainage Complaint
Map and individual complaint reports) received by the county both before and
recent conveyance system improvements and after. Rather than addingflows to
this problematic basin and exacerbate[sic] the situation, this project proposes to
remove the 5.5 acres from this basin and redirect it to the proposed pond which
discharges to a basin with more capacity. This redirecting of storm water may
reduce the level of problems in the Puget Colony Homes project. Note both these
basins combine approximately 0.3 miles downstream of this project.
SEC. 1. '~--------~--~~~~~
J
.. ,-.. -~ .~ .. -
)
PARK
ST
•
CTH
MHP
MHP
<1-8 <E r----t;:;?---5-7i-H--1-~--.."(""' . ~ st 126TH 1 ~ .;) I ~
~~~A ST ~ ~
ST
4100
NE 3RD CT
PARK
---'="~------------_ --'=
NE ~. 2:
RON REGIS
PARK
#02054
Elmhurst
1 No ber 8,2004
1. Existing vegetated swale/channel of Maplewood Creek in vicinity of
proposed Elmhurst Pond.
2.Existing vegetated swale/channel of Maplewood Creek in vicinity of
proposed Elmhurst Pond.
#02054
Elmhurst
2 No her 8,2004
" " < 3. Existing vegetated swale/channel of Maplewood Creek in vicinity of
proposed Elmhurst Pond.
4. Existing vegetated swale/channel of Maplewood Creek (looking
northwest from birdcage structure on west side of Bremerton Place NE. e
#02054
Elmhurst
3 No ber 8,2004
5. Birdcage structure located in vegetated swale/channel of Maplewood
Creek on west side of Bremerton Place NE.
6. Birdcage structure located in vegetated swale/channel of Maplewood
Creek on west side of Bremerton Place NE.
#02054
Elmhurst
4 No her 8,2004
7. Birdcage structure located in vegetated swale/channel of
Maplewood Creek on west side of Bremerton Place NE.
ID
#02054
Elmhurst
5 No ber 8,2004
8. Discharge pipe on eastside of Bremerton Place NE from birdcage structure.
9. Maplewood Creek drainage channel east side of Bremerton Place NE.
II
#02054
Elmhurst
6 No' her 8,2004
10. Maplewood Creek drainage channel downstream of Bremerton Place
crossing.
11. Maplewood Creek drainage channel downstream of Bremerton Place
crossing.
®
I~
#02054
Elmhurst
7 )er 8,2004
12. Outlet structure from Fernwood Plat into Maplewood Creek drainage
channel (near Laurelhurst pond).
13
#02054
Elmhurst
8 NOl Jer 8,2004
13. Outlet structure from Fernwood Plat into Maplewood Creek drainage channel
(near Laurelhurst pond).
#02054
Elmhurst
9 )er 8,2004
14. Outlet structure from Fernwood Plat into Maplewood Creek drainage channel
(near Laurelhurst pond).
#02054
Elmhurst
10
15. Laurelhurst Pond (under construction).
16. Laurelhurst Pond (under construction).
)er 8,2004
Ie,
III. CORE REQUIREMENTS
SECTION 1.2 OF KCSW
1.2.1 CORE REQUIREMENT #1: Discharge at the Natural Location
The proposed project's stonn water will be discharged to an ephemeral stream (a
tributary of Maplewood Creek) that intennittently flows along the site's west properly
line and along a part of the west portion of the site's south property line. The existing
stream corridor is not located within a Landslide Hazard Drainage Area and is not
adjacent to or within any SAO-defined landslide, steep slope or erosion hazard areas.
1.2.2 Core Requirement #2: Off-site Analysis
This core requirement has been addressed elsewhere in this preliminary report. Please
refer to the Off-Site Analysis Section (Section II).
1.2.3 Core Requirement #3: Flow Control
On-site flow control will be provided by an on-site detention pond designed to Level 2
Flow Control using KCR TS analysis, a design that will match flows and durations,
effectively preventing severe erosion and sedimentation damage caused by development-
induced increases in flow-durations.
1.2.4 Core Requirement #4: Conveyance System
Site runoff will be collected by means of yard drains, catch basins and roof drains.
Collected runoff will be conveyed to the detention facility within pipelines designed to
25-year peak flows and checked for flooding conditions at the 1 ~O-year event.
1.2.5 Core Requirement #5: Erosion and Sediment Control
During construction of the infrastructure for the Elmhurst subdivision, temporary erosion
control methods will be implemented to prevent sedimentation and erosion using those
methods as outlined in Section 1.2.5.1 of the KCSWDM. An NPDES General Pennit for
Construction will be obtained and the conditions specified in that pennit will be
implemented. Sedimentation control of the construction of roads and utilities will be part
of the detention pond function.
1.2.6 Core Requirement #6: Maintenance and Operations
This requirement will be fulfilled by the property owner until bonds have been released
and the and public drainage system(s) have been conveyed to the City of Renton.
11 i i
1.2.7 Core Requirement #7: Financial Guarantees and Liability
Bonds and insurance in accordance with City of Renton requirements will be provided by
or at the behest of the owner during site construction and until the drainage facilities in
public street rights-of-way have been accepted by the City of Renton for ownership.
1.2.8 Core Requirement #8: Water Quality
Water quality for the project will be provided by means of a wet pond associated with the
detention facility designed per Section 6.4.1.2 Basic Wetpond and Section 6.4.4.2
Combined Detention and Wetpond (Basic and Large).
SPECIAL REQUIREMENTS -SECTION 1.3 OF KCSWDM
1.3.1 Special Requirement # 1: Other Adopted Area Specific Requirements
No other area specific requirements are applicable.
1.3.2 Special Requirement #2: Flood Plain / Floodway Delineation
The 100-year flood plain for Maplewood Creek will be determined and shown on the
construction plans and final plat documents.
1.3.3 Special Requirement #3: Flood Protection Facilities
Not applicable to this site.
1.3.4 Special Requirement #4: Source Controls
Not applicable to this project.
1.3.5 Special Requirement#5: Oil Control
Not applicable to this project.
IV. FLOW CONTROL / WATER QUALITY
FACILITY ANALYSIS AND DESIGN
IV.! HYDRAULIC ANALYSIS
The drainage analysis used King County Runoff Time Series (KCRTS) software version
4.2. The on-site soils are (AgC) Alderwood Series KCRTS Soil Group Till. The
proposal is located in Sea-Tac rainfall region with a scale factor of 1.0.
IV.2 EXISTING CONDITIONS
The site of the proposed Elmhurst Subdivision encompasses approximately 9.5 acres.
Using the topography map based on field survey of the site, the existing impervious
surface (pavement, buildings, decks, concrete pads and sidewalks) has been detennined
to be approximately 2.28 acres. A total basin of 10.21 acres has been used for detention
design. (That total basin area includes the area of the Bremerton Avenue NE right-of-
way along the Elmhurst site's easterly property line as far east as the quarter-section line
and all of Tract B as shown on the preliminary plat map). The remaining 10.21 -2.28 =
7.93 acres is assumed to be till lawn (although much of that area is existing, hard-packed
gravel parking / storage areas previously used for construction equipment parking and
storage).
1V.3 DEVELOPED CONDITIONS
The Elmhurst preliminary plat proposes 64 single-family homes on a net site (following
deduction of right-of-way, access easements and critical areas) of7.76 acres, which is
equal to a density of 8.25 DU/GA. From Table 3.2.2.D of the 1998 King County Surface
Water Design Manual, the percent of expected impervious area for a site with this gross
density is 58%. Based on calculations from our preliminary plat map for proposed rights-
of-way, and assuming that each lot will be approximately 50% impervious, we estimate
that the actual impervious area of the site will be about 61 %. Thus, we have used 61 % in
our detention calculations. The remaining 10.21 -6.01 = 4.20 acres is assumed to be till
lawn. These calculations include Tract B which allows for some additional over-sizing of
the pond at this point. Calculations will be adjusted in the construction documents phase
to remove Tract B from the pond sizing calculations.
IV.4 DETENTION ROUTING CALCULATIONS
The City of Renton requires that Level 2 Flow Control Standard be applied to this
project. This standard requires "maintaining the durations of high flows at their pre-
development levels for all flows greater than one-half of the 2-year peak flow up to the
50-year peak flow." Also, the pre-developed peak flow rates for the 2-year and 10-year
runoff events are also maintained when applying the Level 2 flow control standard.
Using the appropriate release rates, the developed time-series were modeled in a pond
with 2: 1 side-slopes, 4 feet of water depth and a pond bottom of 10,580 square feet. A
three-orifice control structure was designed to meet the release rates and frequency
duration standards. These calculations have been included. Based on our calculations,
the volume required to meet the Level 2 Flow Control Standard for the site is 49,285
cubic feet. The detention volume for the preliminary pond as currently shown on the
plans is 75,938 cubic feet (using a 4-foot design depth for live storage). Following the
preliminary plat approval process (as part of the civil construction drawings), the live
storage portion of the pond will be adjusted downward in size from 4-feet deep to 3-feet
deep to more closely match the required volume.
IV.5 WATER QUALITY VOLUME
The basic water quality menu (KCSWDM 6.4.1.1 page 6-68) for a basic wetpond data is
as follows:
Vr =[(0.90)(Ai) + 0.25 (A tg)](R/12)
Ai = impervious surface = 6.01 acres
Atg = area soil covered with grass = 4.20 acres
R= rainfall from mean annual storm 0.47"
Vr=[(0.90)(6.01)(43560) + 0.25 (4.20)(43560)](.47/12) =17,419 c.f.
Vb = (17,419)(3) =52,257 c.f.
Dead Storage Required = 52,257 c.f.
Dead Storage Provided = 52,451 c.f.
During the construction drawings phase of this project, when the pond is adjusted for live
storage, the entire bottom of the pond will be adjusted up by one-foot while leaving the
upper configuration the same as currently shown. By maintaining the same depth of dead
storage as currently shown, this will have the affect of dropping the provided live storage
by roughly 15,000 c.f. while at the same time increasing the amount of dead storage
above the 52,451 c.f. currently proposed.
} m I ~ n;
I
~ ~
8 ~ ~
(,J1 --~ :j 2 0 ~ ""-~
~ ~~~
I ~i ~I c. rr ~(\ ~~ ~~
~ o
S
o o
o
01 o
o o
N o o
N.E. 4TH STREET
r-t
"""
~f<
lJt ,;'-, , ;t, PRELIMINARY PI. AT OF ~ Y , 'Y RIDGEVIEW COURT I ~~M\I\RTlil'S ACRE\TRACTS UNRECO~DED /' t/ ( /' :::.--__ :.. . .:.. I -"..-..... '(.. \ ' \ \ \ /' /' /.; _ "'--;---<"-~ '-~ --I J ,,, \ \ \ \ ./ /'/~' ---,,=::"" --,;;:'-":::-'. ----\\ -. I ' / J ' ! I / .-:.'/' .... :-:-:::::--_.,;;:.,. -::--. --.,--",.., , • ,~:; __ f ~ '~"""~-:--:: ....... _ .......... __ --....
i J ::::. '"/:/ ;--':'-'';;;:;: = ""'" .-" -----' --'--.. J:;:;::::::" <-:-: " ?"'" ( L. C"" ,-~".) \ '---" --./ ---,. s· < : __ ... ~-". . ,~,:,,,,,,-,, ~ -::::/: . , __ -_---::::z~ = .,i 317. CIII!Ir "",
\:, -;"C: .. :"'~' "~:.'":=J.-; "",.,/;::.~~,~~;-ILL'" 'I
I 1-/'n i~/< \ \ \ \ t /,'(1...'-. ~ ,,-;. . ':~~ }," / '/~r ... ~ t: \ (~ "" 4, 'I / "\ I ~ ¢ ~IIII If \\)1 1\,1" ~\ r-'<\,\\ / \ \ J ~tI """' .. ,"""". , U l \ ,1\11\1\\\ " ''>,,~.s::~ // \ I: ~ a ---.,~
!.. ~ HI 11 r '. \ I • r-.--::: ,J \ T I I ~ \
r--
11_III'fi~ """"'"
~
" :0 t1\~11
T'5.I ~~rn ~~ ~
-' ! I 'I II I \ \ \ I\! I \ \ \. -.~ \,/ \.., / ' i I I I ~ "It tJ ~. ~ ii :~'I \ \ I:l;;riil:::::{ li:i';~};~\? \\~~<' ~\~M 2 ~ ~
, -" II 5 \ , \11 '\\\\~\~\t!h \~~\ \\\\\\ \1,\ \~~ '{J)/~II( tj) \) "-~ J l:IDl' : !i \ \<\;t~ ~~. !f~-~\(:~~3': r \ -\'-~z;. 2~-Jl. ~ 2"
~ "::i
~ ~ ~
l> 11 :1 \ " ~ " II ji ~l " .... ", ....,s<! _~. _~,--.",()~",".,,,, '\
J', I }"" '\ '''i!\!!!~~~ w""' .. ""·.w ': ~ .. ~-~-'-' \ J
J :f \ \ ( --
'11,". { \ '_,
\ \ \" ',,-\ \ 'III f
,-~" ........ '""-"'\ \ \ \ \ ~1r'~1"'\ . "-j"'. ( \ \ \ \\, \~ -'·_-rr;!-~J=';;:""'f,-r',...,'~";'~""::.J I ,'~ \ \ "
Q i )4~ ,1 A~J.I \ \ \ '"
!! IL ' ;'f' \ \ \. " ~\ \\ \\\ "" "-. ,.\ '\ \. -. \ " \ ",,-, 'r ,,,1 I, I ~ " __ ---
• 'q' I .;~ ..
t .. ~,,/I\\~~~ ~ "
~
;Z •
r .. rn o •
11 10
I
2 -\1--9
II
8
7
1(.. f \\'
_\. \ "',~ --
'"> V"' ..... :1 \ ~....... \. ll~~ -~ \ "-,.., ~". \ \ 'l>'.I'·"· .. '·.',t",::\ ~~. \ .' . ~ ... " -"~ \ .. ,'" ,:~ ~ ~ ~;1t~~~~~: .,6 ' ___ '_N ~ "S11 -"\ \ s~' fl<' "",~ '·~,..r '\. • ,. -"'-"-____ ,/ " ~ ~ \. ". , r· "\--"'" \ ... , , \ '" '\, " ,,\ . ---. /~ '" ,..... 'I 10 II \ \..... ..~~1>. '---,,;; ..... ~ r ",,~ ~ \ '"',,, \
\ "\ 'v -~"""' ...... ~ ~ -, ~ -\ '\ iIat. ......... ',-~.~-~ =--_ ~ ""'-.~~ ;:~fFlt ___ ~--' '-
y .--~~, ~~~ .... '., •• ---:-."'F~::-.-:, ,.':-. ~,-L~ ---""'~""~'Y':;;; "":\.." > '~~":"r. ----1
\
48 ,'" 'w .. "". ' .' ) ? 317 .. '...:1:._ ..... ..-~ ". ___ "'" Ai I'e&... .. " 4jt"'1.1~t"· " .-.~ "'" ...., 34-7 1% r)'!;.1i·:l"r.f,",~' " "--'..." /'1'1'1'1'.......... ~H
40 4 "". "~"/ .. " ..... 35 ~"r \ \ fn!¥,,-:" <16" \ lRA'
}. \ \ \ I Tn .. r.r I .. 4II Q ...... V//r~ l \.. \ FERNWOOD~~H \ ~' ___ r""---. .\ \ ~~
r~/
;Z~/~ rnm :0
d ~
\ r-, '-. '--"',
.. ~l!,~~ , -, I 611\ II
\ I
\ I VI II \I I\.' \
I 66
~ o
~
JTi
o
~r-1
o o
I\) o o
N.E. 4TH STREET
"~'I--r---
I"
I
III
I I"
I
GEII-J ow.rd<>t;f= fux.uC't~~
~~tU~)
__ ~II:"
-r--t-I
b MARllN'S ACRE
PRELIMINARY PLAT OF RIDGEVIEW COURT
(APPLICATION PENDING AT CITY OF RENTON) I
" IU Y4-~tJ
u,Je
--·.·---.-+l -.---..,.... • I •• '111 I I _ _ __ _
" ..... __ . ...
r-l r-l rj "l '"l[II-rll]'"l ,"l '"l~'"l r-I /1411'311'211 '°119118117116,,5,,4113,,2,,' I
/ II II II I ~t i I II II II II II Ii 1 i I II I EX e..O.W~l L_J L_J ~j t=j tJ:j ~ Lj Lj ~ Lj L:j t? L:j ~ .
i,-ROAD A ~ FUE VUE r-]J" I 15 L __
[f6-TI
[U-D
[ 18 D
,
-'.: .... ~ I _ -,--I r::-=;-.=1
L 42 _ 0
rr40-i I r-"43-~ I~~tl ~== ~
I ~-LI-.h--~-rn
rr--i 145 U_~-.J \ L~ ;2: - --r----m
46 =-'~_
LAURELHUR T PHASE
(UNDER CO STRUCTI( --~ I \~
L__ TtlI! 1--~-1C
2 9
---
D'ElEJ.lTaoJ IWII\~ ~
~I\UT\ ~Q __ .
E~EM~L ~_J ...".
~
nl r o ~ o
8 ~ ~
tTl --~ -.I-~ -J ~ ", Q c:J . ~
~ ,,00
----'
10
4~l-'~
TRACTS
(OPENSPA~.ro......
47
::::--'... . HeAD A e4-
F-~ r:: :::j r:: :::j r:---=! r:---=! r:---=! r" I 23 112411 25 1128 II 27 II 28 1129
I II III II II II II L_JL_JL_JL_JL_JL_JL-
35 33 32
TRACT I
/
:lIOJI r~~ f
;Z~ rn~
0 ~
3 8
-1--
4
4
68
67-
66
.......
N
-l
I
I __ I
ez-t I
I
I
I
0 __ _
o J
.to-I
'8--I ~ 1 I :.. / I I
0. / I I .. / I ~/ I I
~54 I I
o I I
~ I ~ I I
~ I
I
I / /
I /
II ~4
53
II
II
I I
I I
I I \
I
OJ
LiJ n
--
f
I / r-~!
------0 o o
S
Z
0:::
W
lL.
-----
--_2r--r.~
20 40 80
~~~~--!
CELL 1 (DEAD STORAGE)
385
386
388
2,697 SF 5 2,97J CF
3,248 SF 7 855 CF =
4,607 SF '
CELL 2 (DEAD STORAGE)
10,828 CF
385 7,667 SF 5 8010 CF
J
38886 8,352 SF 18 156 CF = 26,166 CF
9,804 SF '
BOTH CELL'S (DEAD STORAGE)
388
389
14,411 SF > 15457 CF 16,502 SF '
BOTH CELL'S (LIVE STORAGE)
389
390
392
.39.3
16,502 SF ~ 17,118 CF
17,733 SF .37954 CF
20,221 SF 20' 866 CF
21.511 SF '
LIVE STORAGE REQUIRED: 49,285 CF
LIVE STORAGE PROVIDED: 75,938 CF
TOP OF BERM ELEVATION = ,394.00
EMERGENCY OVERFLOW ELEV.= 393.00
BOTTOM OF LIVE STORAGE ELEV. = 389.00
DEAD STORAGE REQUIRED; 52,257 CF
DEAD STORAGE PROVIDED: 52,451 CF
BOTTON OF DEAD STORAGE ELEVATION = 385.00
SEDIMENT ELEVATION = 384.00 (1ST CELL ONLY)
PROPOSED DETENTION POND ~ "2, ...".,
02054£X04. 0 we
3.2.2 KCRTSIRUNOFF FILE THOD -GENERATING TIME SERIES
:i!~~.JW~~i~I~_~~~~g~~~~;~~~~~~~~i.If:~Jh~t~l:
SCS Soil Type SCS KCRTS Soil Notes
Hydrologic Group
Soil Group
Alderwood (Ag8, Age, AgO) C Till
Arents, Alderwood Material (AmB, AmC) C Till
Arents, Everett Material (An) 8 Outwash 1
Beausite (BeC, BeD, BeF) C Till 2
Bellingham (Bh) 0 Till 3
Briscot (8r) 0 Till 3
Buckley (Bu) 0 Till 4
Earlmont (Ea) 0 Till 3
Edgewick (Ed) C Till 3
Everett (Ev8, EvC, EvO, EwC) AlB Outwash 1
Indianola (InC, InA, InO) A Outwash 1
Kitsap (KpB, KpC, KpO) C Till
Klaus (KsC) C Outwash 1
Neilton (NeC) A Outwash 1
Newberg (Ng) B Till 3
Nooksack (Nk) C Till 3
Norma (No) D Till 3
Orcas (Or) D Wetland
Oridia (Os) D TIll 3
Ovall (OvC, OvO, OvF) C TIll 2
Pilchuck (Pc) C TIll 3
Puget (Pu) D TIll 3
Puyallup (Py) B Till 3
Ragnar (RaC, RaD, RaC, RaE) B Outwash 1
Renton (Re) D Till 3
Salal (Sa) C Till 3
Sammamish (Sh) D Till 3
Seattle (Sk) D Wetland
Shalcar (Sm) D Till 3
Si (Sn) C Till 3
Snohomish (So, Sr) D Till 3
Sultan (Su) C Till 3
Tukwila (Tu) D Till 3
Woodinville (Wo) D Till 3
Notes:
1. Where outwash soils are saturated or underlain at shallow depth «5 feet) by glacial till, they should
be treated as till soils.
2. These are bedrock soils, but calibration of HSPF by King County DNR shows bedrock soils to have
similar hydrologic response to till soils.
3. These are alluvial soils, some of which are underlain by glacial till or have a seasonally high water
table. In the absence of detailed study, these soils should be treated as till soils.
4. Buckley soils are formed on the low-permeability Osceola mudflow. Hydrologic response is
assumed to be similar to that of till soils.
1998 Surface Water Design Manual 9/1/98
3-25
SECI'lON 3.2 RUNOFF COMPUf) ~ AND ANALYSIS MEIHODS
9/1/98
Dwelling Units/Gross % Impervious(1) Dwelling Units/Gross % Impervious
Acre
1.0 DU/GA
1.5 DU/GA
2.0DU/GA
2.5 DU/GA
3.0 DU/GA
3.5 DU/GA
4.0 DU/GA
Notes:
Acre
15(2) 4.5 DU/GA
20 5.0 DU/GA
25 5.5 DU/GA
30 6.0 DU/GA
34 6.5 DU/GA
38 7.0 DU/GA
42 7.5 DU/GA
For PUDs, condominiums, apartments, commercial businesses, and
industrial areas, percent impervious coverage must be computed.
46
48
50
52
54
56
58
(1) Includes streets and sidewalks.
(2) These figures should be adjusted by the effective impervious fraction given in Table 3.2.2.E, if
applicable. Values from Table 3.2.2.E may be interpolated as necessary.
Land Use Predevelopment Post-Development
Commercial, Industrial, or Roads with Collection System
Multi-Family or High Density Single Family(2) (>4 DU/GA)
Medium Density Single Family(2) (4 DU/GA)
Low Density Single Family(2) (1 DU/GA)
Rural(2) « 1 DU/GA)
GraveVDirt Roads and Parking Lots, Roads without
Collection System
Notes:
0.95 1.00
0.80 1.00(3)
0.66 1.00(3)
0.50 1.00(3)
0.40 1.00(3)
0.50 0.50
(1) The effective impervious fraction is the fraction of actual total impervious area connected to the
drainage system. These figures should be used in the absence of detailed surveys or physical
inspection (e.g., via pipe, channel, or short sheet flowpath).
(2) Figures for residential areas include roadways.
(3) Where downspout infiltration is used, roofs are not counted as impervious area when sizing the flow
control facility. Roofs are considered grass where downspouts are dispersed in rural residential
development, or where dispersed flowpaths exceed 50 feet in urban residential development (see
Section 5.1.2 for limitations on roof downspout dispersion). L-----------_----------___________ ..,...,J. ",.
C~;,.:; .~)
1998 Surface Water Design Manual
3-28
All files will be read/written in the Varking Directory
Vorking Directory:P:~roject Files'02054~CRTS-LEVEL 2
KCRTS Comlland
CREATE a new Time Series
Production of Runoff Time Series
Project Location : Sea-Tac
Computing Series PREDEV.tsf
Regional Scale Factor: 1.00
Data Type : Reduced
Creating Hourly Time Series File
Till Grass
Impervious
Loading Time Series
7.93 acres
Loading Time Series
2.28 acres
Total Area 10.21 acres
File:C:~C_SVDK'KC_DATA'STTG60R.rnf
Scaling Yr: 8
File:C:'KC_SVDK'KC_DATA'STEI60R.rnf
Adding Yr: 8
Peak Discharge: 2.75 CFS at 6:00 on Jan 9 in Year 8
8
8
Storing Time Series File:PREDEV.tsf 8
Time Series Computed
KCRTS Command
CREATE a new Time Series
CANCELLED
KCRTS Colllland
CREATE a new Time Series
Production of Runoff Time Series
Project Location : Sea-Tac
Computing Series DEV.tsf
Regional Scale Factor: 1.00
Data Type : Reduced
Creating Hourly Time Series File
Loading Tille Series File:C:'KC_SVD~KC_DATA'STTG60R.rnf 8
Till Grass 4.20 acres Scaling Yr: 8
Loading Time Series File:C:'KC_SVDK'KC_DATA~EI60R.rnf 8
Impervious 6.01 acres Adding Yr: 8
Total Area 10.21 acres
Peak Discharge: 3.73 CFS at 6:00 on Jan 9 in Year 8
Storing Tille Series File:DEV.tsf 8
Time Series Computed
-
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
1.26 4 2/09/01 2:00 2.75 1 100.00 0.990
0.849 7 1/05/02 16:00 1. 55 2 25.00 0.960
1. 55 2 2/27/03 7:00 1.32 3 10.00 0.900
0.716 8 8/26/04 2:00 1. 26 4 5.00 0.800
0.910 6 10/28/04 16:00 1.22 5 3.00 0.667
1. 32 3 1/18/06 16:00 0.910 6 2.00 0.500
1. 22 5 11/24/06 3:00 0.849 7 1. 30 0.231
2.75 1 1/09/08 6:00 0.716 8 1.10 0.091
Computed Peaks 2.35 50.00 0.980
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
1. 83 6 2/09/01 2:00 3.73 1 100.00 0.990
1. 48 8 1/05/02 16:00 2.29 2 25.00 0.960
2.21 3 2/27/03 7:00 2.21 3 10.00 0.900
1. 58 7 8/26/04 2:00 1. 94 4 5.00 0.800
1. 90 5 10/28/04 16:00 1. 90 5 3.00 0.667
1. 94 4 1/18/06 16:00 1.83 6 2.00 0.500
2.29 2 10/26/06 0:00 1. 58 7 1.30 0.231
3.73 1 1/09/08 6:00 1. 48 8 1.10 0.091
Computed Peaks 3.25 50.00 0.980
Retention/Detention Facility
Type of Facility:
Side Slope:
Pond Bottom Length:
Pond Bottom Width:
Pond Bottom Area:
Top Area at 1 ft. FB:
Effective Storage Depth:
Stage 0 Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Detention Pond
2.00 H:1V
115.00 ft
92.00 ft
10580. sq. ft
15120. sq. ft
0.347 acres
4.00 ft
100.00 ft
49285. cu. ft
1.131 ac-ft
4.00 ft
18.00 inches
3
Orifice # Height
(ft)
Diameter
(in)
2.15
2.90
3.10
Full Head
Discharge
(CFS)
0.251
0.323
0.330
Pipe
Diameter
(in)
1 0.00
2 2.00
3 2.40
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage
(ft) (ft) (cu. ft) (ac-ft)
0.00 100.00 o. 0.000
0.02 100.02 212. 0.005
0.04 100.04 424. 0.010
0.07 100.07 743. 0.017
0.09 100.09 956. 0.022
0.11 100.11 1169. 0.027
0.13 100.13 1382. 0.032
0.16 100.16 1703. 0.039
0.18 100.18 1918. 0.044
0.28 100.28 2995. 0.069
0.38 100.38 4081. 0.094
0.48 100.48 5174. 0.119
0.58 100.58 6277. 0.144
0.68 100.68 7388. 0.170
0.78 100.78 8507. 0.195
0.88 100.88 9635. 0.221
0.98 100.98 10771. 0.247
1.08 101.08 11916. 0.274
1.18 101.18 13070. 0.300
1.28 101. 28 14232. 0.327
1.38 101. 38 15403. 0.354
1.48 101. 48 16583. 0.381
1. 58 101.58 17771. 0.408
1.68 101. 68 18968. 0.435
1. 78 101. 78 20174. 0.463
1. 88 101. 88 21389. 0.491
1. 98 101. 98 22613. 0.519
6.0
6.0
Discharge
(cfs)
0.000
0.019
0.027
0.032
0.038
0.042
0.046
0.050
0.053
0.066
0.077
0.087
0.095
0.103
0.111
0.118
0.124
0.130
0.136
0.142
0.147
0.152
0.158
0.162
0.167
0.172
0.176
Percolation
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Surf Area
(sq. ft)
10580.
10597.
10613.
10638.
10655.
10671.
10688.
10713.
10730.
10813.
10897.
10981.
11066.
11150.
11236.
11321.
11407.
11493.
11579.
11666.
11753.
11840.
11928.
12016.
12105.
12193.
12282.
Hyd
1
2.00
2.03
2.06
2.09
2.12
2.15
2.18
2.21
2.24
2.34
2.40
2.43
2.46
2.50
2.53
2.56
2.59
2.63
2.66
2.76
2.86
2.96
3.06
3.16
3.26
3.36
3.46
3.56
3.66
3.76
3.86
3.96
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00
Inflow
102.00
102.03
102.06
102.09
102.12
102.15
102.18
102.21
102.24
102.34
102.40
102.43
102.46
102.50
102.53
102.56
102.59
102.63
102.66
102.76
102.86
102.96
103.06
103.16
103.26
103.36
103.46
103.56
103.66
103.76
103.86
103.96
104.00
104.10
104.20
104.30
104.40
104.50
104.60
104.70
104.80
104.90
105.00
105.10
105.20
105.30
105.40
105.50
105.60
105.70
105.80
105.90
106.00
Outflow
Target
3.73 *******
Calc
3.27
22859.
23228.
23598.
23969.
24341.
24714.
25087.
25461.
25836.
27092.
27850.
28231.
28612.
29121.
29504.
29887.
30272.
30786.
31172 .
32467.
33770.
35082.
36404.
37735.
39075.
40425.
41784.
43152.
44530.
45917.
47314.
48720.
49285.
50705.
52134.
53573.
55021.
56480.
57947.
59425.
60912.
62410.
63917.
65434.
66960.
68497.
70044.
71601.
73168.
74745.
76332.
77929.
79536.
0.525 0.177
0.533 0.181
0.542 0.188
0.550 0.201
0.559 0.216
0.567 0.236
0.576 0.259
0.585 0.286
0.593 0.300
0.622 0.325
0.639 0.339
0.648 0.348
0.657 0.362
0.669 0.381
0.677 0.404
0.686 0.431
0.695 0.462
0.707 0.495
0.716 0.522
0.745 0.563
0.775 0.600
0.805 0.634
0.836 0.665
0.866 0.695
0.897 0.724
0.928 0.751
0.959 0.777
0.991 0.802
1. 022 0.826
1.054 0.849
1.086 0.872
1.118 0.894
1.131 0.903
1.164 1. 390
1.197 2.250
1.230 3.370
1.263 4.680
1.297 6.170
1.330 7.610
1.364 8.160
1.398 8.670
1.433 9.150
1.467 9.610
1.502 10.040
1. 537 10.450
1. 572 10.850
1.608 11.230
1. 644 11.600
1. 680 11. 960
1. 716 12.310
1. 752 12.640
1. 789 12.970
1.826 13.290
Storage
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Peak
Stage Elev
4.29 104.29
(Cu-Ft) (Ac-Ft)
53447. 1.227
12300.
12327.
12354.
12380.
12407.
12434.
12461.
12488.
12515.
12605.
12659.
12687.
12714.
12750.
12777.
12805.
12832.
12868.
12896.
12987.
13079.
13171.
13263.
13356.
13449.
13543.
13636.
13730.
13825.
13919.
14014.
14110.
14148.
14244.
14340.
14436.
14533.
14630.
14727.
14825.
14923.
15021.
15120.
15219.
15318.
15418.
15518.
15618.
15719.
15819.
15921.
16022.
16124.
2
3
4
5
6
7
8
2.29 1.55
1.83 *******
1.94 *******
2.21 *******
1.90 *******
1.48 *******
1.58 *******
1.47
1.36
1.22
0.77
0.64
0.36
0.30
4.11 104.11
4.09 104.09
4.07 104.07
3.42 103.42
2.99 102.99
2.47 102.47
2.26 102.26
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
50842.
50604.
50216.
41221.
35497.
28679.
26083.
1.167
1.162
1.153
0.946
0.815
0.658
0.599
Inflow/Outflow Analysis
Peak Inflow Discharge:
Peak Outflow Discharge:
Peak Reservoir Stage:
3.73 CFS at 6:00 on Jan 9 in Year 8
3.27 CFS at 8:00 on Jan 9 in Year 8
4.29 Ft
Peak Reservoir Elev: 104.29 Ft
Peak Reservoir Storage: 53447. Cu-Ft
1.227 Ac-Ft
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.021
0.062
0.103
0.144
0.186
0.227
0.268
0.309
0.350
0.391
0.433
0.474
0.515
0.556
0.597
0.639
0.680
0.721
0.762
0.803
0.844
0.886
0.927
0.968
1. 01
1. 05
1. 09
1.13
1.17
1.21
1.26
1.30
42269
7651
5653
3342
1664
192
69
75
121
44
26
16
18
31
27
31
19
11
14
9
5
9
8
3
1
3
1
2
1
o
1
1
68.932
12.477
9.219
5.450
2.714
0.313
0.113
0.122
0.197
0.072
0.042
0.026
0.029
0.051
0.044
0.051
0.031
0.018
0.023
0.015
0.008
0.015
0.013
0.005
0.002
0.005
0.002
0.003
0.002
0.000
0.002
0.002
68.932
81. 409
90.628
96.078
98.792
99.105
99.217
99.340
99.537
99.609
99.651
99.677
99.706
99.757
99.801
99.852
99.883
99.901
99.923
99.938
99.946
99.961
99.974
99.979
99.980
99.985
99.987
99.990
99.992
99.992
99.993
99.995
31. 068
18.591
9.372
3.922
1.208
0.895
0.783
0.660
0.463
0.391
0.349
0.323
0.294
0.243
0.199
0.148
0.117
0.099
0.077
0.062
0.054
0.039
0.026
0.021
0.020
0.015
0.013
0.010
0.008
0.008
0.007
0.005
0.311E+00
0.186E+00
0.937E-01
0.392E-01
0.121E-01
0.895E-02
0.783E-02
0.660E-02
0.463E-02
0.391E-02
0.349E-02
0.323E-02
0.294E-02
0.243E-02
0.199E-02
0.148E-02
0.117E-02
0.995E-03
0.766E-03
0.620E-03
0.538E-03
0.391E-03
0.261E-03
0.212E-03
0.196E-03
0.147E-03
0.130E-03
0.978E-04
0.815E-04
0.815E-04
0.652E-04
0.489E-04
1. 34 1 0.002 99.997 0.003 0.326E-04
1. 38 1 0.002 99.998 0.002 0.163E-04
1.42 0 0.000 99.998 0.002 0.163E-04
1.46 0 0.000 99.998 0.002 0.163E-04
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
Inflow/Outflow Analysis
Peak Inflow Discharge: 3.73 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 3.27 CFS at 8:00 on Jan 9 in Year 8
Peak Reservoir Stage: 4.29 Ft
Peak Reservoir Elev: 104.29 Ft
Peak Reservoir Storage: 53475. Cu-Ft
1.228 Ac-Ft
Flow Duration from Time Series File: rdout. tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.021 42318 69.012 69.012 30.988 0.310E+00
0.063 7709 12.572 81. 583 18.417 0.184E+00
0.105 5669 9.245 90.828 9.172 0.917E-01
0.147 3397 5.540 96.368 3.632 0.363E-01
0.189 1515 2.471 98.839 1.161 0.116E-01
0.231 176 0.287 99.126 0.874 0.874E-02
0.273 58 0.095 99.220 0.780 0.780E-02
0.315 109 0.178 99.398 0.602 0.602E-02
0.357 95 0.155 99.553 0.447 0.447E-02
0.399 40 0.065 99.618 0.382 0.382E-02
0.441 22 0.036 99.654 0.346 0.346E-02
0.483 16 0.026 99.680 0.320 0.320E-02
0.525 23 0.038 99.718 0.282 0.282E-02
0.567 30 0.049 99.767 0.233 0.233E-02
0.609 33 0.054 99.821 0.179 0.179E-02
0.651 26 0.042 99.863 0.137 o .B7E-02
0.693 18 0.029 99.8.92 0.108 0.108E-02
0.735 14 0.023 99.915 0.085 0.848E-03
0.777 10 0.016 99.932 0.068 0.685E-03
0.819 6 0.010 99.941 0.059 0.587E-03
0.861 9 0.015 99.956 0.044 0.440E-03
0.903 10 0.016 99.972 0.028 0.277E-03
0.945 0 0.000 99.972 0.028 0.277E-03
0.987 3 0.005 99.977 0.023 0.228E-03
1. 03 2 0.003 99.980 0.020 0.196E-03
1. 07 4 0.007 99.987 0.013 o .BOE-03
1.11 1 0.002 99.989 0.011 0.114E-03
1.15 1 0.002 99.990 0.010 0.978E-04
1.20 1 0.002 99.992 0.008 0.815E-04
1.24 1 0.002 99.993 0.007 0.652E-04
1.28 1 0.002 99.995 0.005 0.489E-04
1. 32 0 0.000 99.995 0.005 0.489E-04
1.36 2 0.003 99.998 0.002 0.163E-04
1.41 0 0.000 99.998 0.002 0.163E-04
1.45 0 0.000 99.998 0.002 0.163E-04
;; '"'1
•• ~~d~~
1.49 0 0.000 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: rdout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of
Cutoff Base New %Change Probability
0.455 0.34E-02 0.34E-02 -1.4 0.34E-02
0.540 0.24E-02 0.26E-02 8.9 0.24E-02
0.624 0.16E-02 0.16E-02 -4.0 0.16E-02
0.708 0.12E-02 0.99E-03 -18.7 0.12E-02
0.792 0.91E-03 0.65E-03 -28.6 0.91E-03
0.877 0.52E-03 0.39E-03 -25.0 0.52E-03
0.961 0.34E-03 0.24E-03 -28.6 0.34E-03
1. 04 0.28E-03 0.20E-03 -29.4 0.28E-03
1.13 0.15E-03 0.98E-04 -33.3 0.15E-03
1.21 o .11E-03 0.82E-04 -28.6 o . 11E-03
1.30 0.65E-04 0.49E-04 -25.0 0.65E-04
1.38 0.33E-04 0.16E-04 -50.0 0.33E-04
1.47 0.16E-04 0.16E-04 0.0 0.16E-04
1.55 0.16E-04 O.OOE+OO -100.0 0.16E-04
Maximum positive excursion = 0.108 cfs 7.8%)
occurring at 1.39 cfs on the Base Data:predev.tsf
and at 1.50 cfs on the New Data:rdout.tsf
Maximum negative excursion = 0.147 cfs (-14.3%)
occurring at 1.03 cfs on the Base Data:predev.tsf
and at 0.884 cfs on the New Data:rdout.tsf
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
Inflow/Outflow Analysis
Peak Inflow Discharge: 3.73
Peak Outflow Discharge: 3.27
Peak Reservoir Stage: 4.29
Peak Reservoir Elev: 104.29
Peak Reservoir Storage: 53475.
1.228
CFS at 6:00
CFS at 8:00
Ft
Ft
Cu-Ft
Ac-Ft
Flow Duration from Time Series File:rdout.tsf
on
on
Base
0.455
0.540
0.624
0.708
0.792
0.877
0.961
1. 04
1.13
1.21
1.30
1.38
1.47
1.55
Jan
Jan
Tolerance-------
New % Change
0.447 -1.7
0.563 4.4
0.619 -0.8
0.667 -5.8
0.723 -8.7
0.842 -3.9
0.882 -8.2
0.945 -9.6
1. 07 -5.4
1.12 -7.6
1.28 -1. 6
1.35 -2.3
1.50 2.3
1. 50 -3.2
9 in Year 8
9 in Year 8
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.021 42318 69.012 69.012 30.988 0.310E+00
0.063 7709 12.572 81. 583 18.417 0.184E+00
0.105 5669 9.245 90.828 9.172 0.917E-01
0.147 3397 5.540 96.368 3.632 0.363E-01
0.189 1515 2.471 98.839 1.161 o .116E-01
0.231 176 0.287 99.126 0.874 0.874E-02
0.273 58 0.095 99.220 0.780 0.780E-02
0.315 109 0.178 99.398 0.602 0.602E-02
0.357 95 0.155 99.553 0.447 0.447E-02
~<'!
""':
~
0.399
0.441
0.483
0.525
0.567
0.609
0.651
0.693
0.735
0.777
0.819
0.861
0.903
0.945
0.987
1. 03
1. 07
1.11
1.15
1.20
1.24
1.28
1. 32
1. 36
1.41
1.45
1.49
40
22
16
23
30
33
26
18
14
10
6
9
10
o
3
2
4
1
1
1
1
1
o
2
o
o
o
0.065
0.036
0.026
0.038
0.049
0.054
0.042
0.029
0.023
0.016
0.010
0.015
0.016
0.000
0.005
0.003
0.007
0.002
0.002
0.002
0.002
0.002
0.000
0.003
0.000
0.000
0.000
99.618
99.654
99.680
99.718
99.767
99.821
99.863
99.892
99.915
99.932
99.941
99.956
99.972
99.972
99.977
99.980
99.987
99.989
99.990
99.992
99.993
99.995
99.995
99.998
99.998
99.998
99.998
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
0.382
0.346
0.320
0.282
0.233
0.179
0.137
0.108
0.085
0.068
0.059
0.044
0.028
0.028
0.023
0.020
0.013
0.011
0.010
0.008
0.007
0.005
0.005
0.002
0.002
0.002
0.002
0.382E-02
0.346E-02
0.320E-02
0.282E-02
0.233E-02
0.179E-02
0.137E-02
0.108E-02
0.848E-03
0.685E-03
0.587E-03
0.440E-03
0.277E-03
0.277E-03
0.228E-03
0.196E-03
o .l30E-03
o .114E-03
0.978E-04
0.815E-04
0.652E-04
0.489E-04
0.489E-04
0.163E-04
0.163E-04
0.163E-04
0.163E-04
Inflow/Outflow Analysis
Peak Inflow Discharge:
Peak Outflow Discharge:
Peak Reservoir Stage:
3.73 CFS at 6:00 on Jan 9 in Year 8
3.27 CFS at 8:00 on Jan 9 in Year 8
4.29 Ft
Peak Reservoir Elev: 104.29 Ft
Peak Reservoir Storage: 53475. Cu-Ft
1.228 Ac-Ft
Flow Duration from Time Series File:rdout.tsf
cutoff Count Frequency CDF Exceedence Probability
CFS % % %
0.021
0.063
0.105
0.147
0.189
0.231
0.273
0.315
0.357
0.399
0.441
0.483
42318
7709
5669
3397
1515
176
58
109
95
40
22
16
69.012
12.572
9.245
5.540
2.471
0.287
0.095
0.178
0.155
0.065
0.036
0.026
69.012
81.583
90.828
96.368
98.839
99.126
99.220
99.398
99.553
99.618
99.654
99.680
30.988
18.417
9.172
3.632
1.161
0.874
0.780
0.602
0.447
0.382
0.346
0.320
0.310E+OO
0.184E+00
0.917E-01
0.363E-01
o .116E-01
0.874E-02
0.780E-02
0.602E-02
0.447E-02
0.382E-02
0.346E-02
0.320E-02
0.525 23 0.038 99.718 0.282 0.282E-02
0.567 30 0.049 99.767 0.233 0.233E-02
0.609 33 0.054 99.821 0.179 0.179E-02
0.651 26 0.042 99.863 0.137 0.137E-02
0.693 18 0.029 99.892 0.108 0.108E-02
0.735 14 0.023 99.915 0.085 0.848E-03
0.777 10 0.016 99.932 0.068 0.685E-03
0.819 6 0.010 99.941 0.059 0.587E-03
0.861 9 0.015 99.956 0.044 0.440E-03
0.903 10 0.016 99.972 0.028 0.277E-03
0.945 0 0.000 99.972 0.028 0.277E-03
0.987 3 0.005 99.977 0.023 0.228E-03
l. 03 2 0.003 99.980 0.020 0·.196E-03
l. 07 4 0.007 99.987 0.013 0.130E-03
l.11 1 0.002 99.989 0.011 o .114E-03
l.15 1 0.002 99.990 0.010 0.978E-04
l.20 1 0.002 99.992 0.008 0.815E-04
l.24 1 0.002 99.993 0.007 0.652E-04
l. 28 1 0.002 99.995 0.005 0.489E-04
l. 32 0 0.000 99.995 0.005 0.489E-04
l.36 2 0.003 99.998 0.002 0.163E-04
l.41 0 0.000 99.998 0.002 0.163E-04
1.45 0 0.000 99.998 0.002 0.163E-04
l.49 0 0.000 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: rdout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of
Cutoff Base New %Change Probability
0.455 0.34E-02 0.34E-02 -1.4 I 0.34E-02
0.540 0.24E-02 0.26E-02 8.9 I 0.24E-02
0.624 0.16E-02 0.16E-02 -4.0 I 0.16E-02
0.708 0.12E-02 0.99E-03 -18.7 I 0.12E-02
0.792 0.91E-03 0.65E-03 -28.6 I 0.91E-03
0.877 0.52E-03 0.39E-03 -25.0 I 0.52E-03
0.961 0.34E-03 0.24E-03 -28.6 I 0.34E-03
1. 04 0.28E-03 0.20E-03 -29.4 I 0.28E-03
1.13 0.15E-03 0.98E-04 -33.3 I 0.15E-03
1. 21 o . 11E-03 0.82E-04 -28.6 I o . 11E-03
1. 30 0.65E-04 0.49E-04 -25.0 I 0.65E-04
1. 38 0.33E-04 0.16E-04 -50.0 I 0.33E-04
1. 47 0.16E-04 0.16E-04 0.0 I 0.16E-04
1. 55 0.16E-04 O.OOE+OO -100.0 I 0.16E-04
Maximum positive excursion = 0.108 cfs ( 7.8%)
occurring at 1.39 cfs on the Base Data:predev.tsf
and at 1. 50 cfs on the New Data:rdout.tsf
Maximum negative excursion = 0.147 cfs (-14.3%)
occurring at 1.03 cfs on the Base Data:predev.tsf
and at 0.884 cfs on the New Data:rdout.tsf
Base
0.455
0.540
0.624
0.708
0.792
0.877
0.961
1. 04
1.13
1. 21
1. 30
1. 38
1. 47
1. 55
Tolerance-------
New %Change
0.447 -1. 7
0.563 4.4
0.619 -0.8
0.667 -5.8
0.723 -8.7
0.842 -3.9
0.882 -8.2
0.945 -9.6
1. 07 -5.4
1.12 -7.6
1. 28 -1. 6
1. 35 -2.3
1. 50 2.3
1. 50 -3.2
/ .
.... .....
::J ::J "'0"'0 ... .,...: ::J w .gC)
.... 0:::
~
~-.. --~ ;)
~ '\ ---""v
II
// ri¢
~/ /.,,'
~ ... " ./ >v I/ ,'.' , ./
i .. ; /+ ,
I .I
/ , V/
/, ,. a::
V ~ G ~ a ~
::./
/o ~/
,.if7 /<Y' /
(f .* ( /
/ /*' I 1 / ,<>/,~
,::;.'---
j!l'
~/ .. l 'I
~; ,,' /
/ /
:f.
0 0 0
90 90 va
lJ , ,
','
, "
ff
/,,/
/ i !
0 0
GO
r
I-
I-
I-
I-
I-
I-
o o
~
pI-
C
l-
T"' ,
I-
l-
I-
l-
I-
l-
I-
l-
I-
~ I--
l-0
~ I-
I--
l-
l-
I--
I-
I-
'? I--
I-0
~ I--
I-
I-
I--
I-
I--
I--
I--
I--
l-
I-
I--
l-
I--
I-
I-
0' )
Q) u c:: Q)
"'0 Q)
Q) u >< w
>. :t:::
..0 co ..0 0 '-a..
, .
v. Conveyance System Analysis
The conveyance system analysis will be included in this report at construction document
submittal. The system will be designed to convey the 25-year peak flows and checked for
flooding conditions at the 100-year event per the 1998 King County Surface water
Design Manual.
, . ..
VI. Erosion / Sedimentation Control Design
Erosion and sedimentation control will be provided by utilizing BMPs selected from the
1998 King County Surface Water Design manual. These BMP's will likely include, but
are not necessarily limited to, sediment pond(s) and/or trap(s), silt fencing, construction
safety (NGPE) fencing, interceptor v-ditches, rock check dams, plastic sheeting of
stockpiles, straw mulch, and hydro-seeding.
A Temporary Erosion Control Plan will be submitted as part of the construction
documents detailing the means by which sediment and erosion control will be handled
during construction.
Note:
Due to the size of the site, a National Pollution Discharge Elimination System (NPDES)
permit, and a Storm Water Pollution prevention Plan (SWPPP) will be required and
provided prior to the commencement of construction.
HALINEN LAW OFFICES, P.S.
David L Halinen, P.E.
davidhalinen@halinenlaw.com
HAND-DELIVERED
A ProfessIonal Service Corporation
Bellevue Place / Bank of America Bldg.
10500 NE 8th, Suite 1900
Bellevue, Washington 98004
December 27,2004
City of Renton Development Services Division
Department of PlanninglBuildinglPublic Works
1055 S. Grady Way, Sixth Floor
Renton, Washington 98055
Attn: Neil Watts, P.E., Director
DEVELOPMENT P
CITY OF REN!r6~"VING
DEC 2 8 200~
25) 454-8272
Fax (425) 646-3467
Ci1)'OFRENTON
RECEIVED
DEC 2'7 2004
BUILDING DIVISION
Re: Liberty Ridge L.L.c. 's Proposed "Elmhurst" Residential Subdivision
Liberty Ridge L.L.C.'s Request for Approval of (1) a Reduction in the Required
Right-of-Way Widths for the Proposed Residential Access Streets, and (2) Various
Modifications to the Street Standards in Regard to the Proposed Project
Dear Mr. Watts:
I represent Liberty Ridge L.L.C., the preliminary plat applicant for the proposed
"Elmhurst" Residential Subdivision. The preliminary plat application was submitted to your
Division today. I am writing this letter on behalf of Liberty Ridge L.L.C. to request that you
approve:
(1) A reduction in the required right-of-way width for the proposed internal
residential access streets;
(2) A reduction in the required right-of-way width for the west half of the
portion of Bremerton Avenue NE (a residential access street) abutting the
Elmhurst site;
(3) A modification to the Street Standards to permit a reduction in (a) the
required pavement width for the half-street portion of Bremerton Avenue
NE abutting the north half of the Elmhurst site and (b) the required right-
of-way width for that same half-street portion of Bremerton Avenue NE;
and
(4) A modification to the Street Standards to permit reduced-width sidewalks.
The substance of these requests has been previously discussed with your Engineering Plan
Review Supervisor, Kayren Kittrick. Before going into the specifics of these requests, the
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
December 27,2004
Page 2
following list summarizes the various segments of the proposed residential access streets.
Explanation of the Proposed Sections of the Residential Access Streets
Liberty Ridge L.L.C. is proposing residential access streets with the following sections:
(a) Internal Streets: These streets are proposed as a 32-foot wide section from
face-of-curb to face-of-curb with (i) 5-foot sidewalks on both sides (with
the 5-foot dimension taken from the face of curb) and (ii) a 42-foot wide
right-of-way (see the TYPICAL SECTION ROAD A -ROAD B that is set
forth in the middle right portion of Sheet 6 of 8 of the preliminary plat
drawings).
(b) Bremerton Avenue NE (Along the Elmhurst Site's North Half): This
street is proposed as a "half-street improvement" with a 20-foot wide
pavement section from face-of-curb along the west side of the street to
pavement edge along the east side of the street with (i) a 5.5-foot wide
sidewalk along the west side (with the 5.5-foot dimension taken from the
face of curb) and (ii) a 29.5-foot wide right-of-way (with the west 22 feet
of that right-of-way along the west side of the quarter section line) (see the
typical street section that is labeled BREMERTON AVENUE NE STA.
20+ 17 TO STA. 23+50 that is set forth in the middle right portion of Sheet
6 of 8 of the preliminary plat drawings). Note that this 20-foot wide
pavement section was the "half-street" pavement section for
Bremerton Avenue NE that the City approved for the Laurelhurst
Phase 1 residential subdivision abutting roughly the south half of the
Elmhurst site.
(c) Bremerton Avenue NE (Along the Elmhurst Site's South Half North of
Proposed Road A): This street, which is proposed as a completion of the
west half of Bremerton Avenue NE (the developer of the Laurelhurst
Phase 1 residential subdivision currently installing a "half-street
improvement" along the east side of this stretch of Bremerton Avenue
NE), is proposed to consist of 16 feet of pavement west of the quarter
section line to the face-of-curb along the west side of the street to
pavement edge along the east side of the street with (i) a 5.5-foot wide
sidewalk along the west side (with the 5.5-foot dimension taken from the
face of curb) and (ii) a 22-foot wide right-of-way along the west side of
the quarter section line) (see the typical street section that is labeled
BREMERTON AVENUE NE STA. 17+92 TO STA. 20+17 that is set forth
in the lower right portion of Sheet 6 of 8 of the preliminary plat drawings).
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
December 27,2004
Page 3
Ten-foot wide utility easements are planned along the site's frontages of all of these
proposed streets.
Request for Reduction in the Required Right-of-Way Width
for the Proposed Internal Residential Access Streets
Ordinarily-Required Right-of-Way
Widths for the Proposed Streets
RMC 4-6-060F.2.b ordinarily requires a 50-foot wide right-of-way for residential access
streets.
Analysis of the Code Criteria for "Reduced Right-of-Way Dedication"
RMC 4-6-060R.3 states:
3. Reduced Right-or-Way Dedication:
a. When Permitted: The Department may approve a reduction in the required
right-of-way width for residential access streets for new streets within a short plat
or subdivision to forty two feet (42') when the extra area from the reduction is
used for the creation of an additionallot(s) which could not be platted without the
reduction; or when the platting with the required right-of-way width results in the
creation of lots with less than one hundredfeet (100~ in depth.
b. Additional Easements: The Department may require additional easements be
provided for the franchise utilities outside of the dedicated right-of-way when
such a right-of-way reduction is approved. In no case shall a reduction in the
required right-of-way width be approved unless it is shown that there will be no
detrimental effect on the public health, safety or welfare if the right-of-way width
is reduced, and that the full right-of-way width is not needed for current or future
development.
(Italics and underlining added for emphasis.)
In the case of the proposed Elmhurst lots, reduction of the right-of-way width of the
proposed internal streets from 50 feet to 42 feet is used for the creation of additional lots and
results in lots less with a depth of less than 100 feet. Thus, Elmhurst qualifies for the proposed
right-of-way reduction. Note that in relation to RMC 4-6-060R.3.b, Liberty Ridge L.L.C. is
willing to provide easements for franchise utilities as I have explained above.
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
December 27,2004
Page 4
Request for Reduction in the Required Right-of-Way Width for the West HaH
of the Portion of Bremerton Avenue NE Abutting the Elmhurst Site
The same analysis as used in the immediately prior section justifies the proposed
reduction of the required right-of-way width for the west half of the portion of Bremerton
Avenue NE abutting the Elmhurst site (i.e., the proposed right-of-way reduction is used for the
creation of additional lots and results in lots less with a depth of less than 100 feet). Note that a
22-foot half-street width (rather than 21 feet, the bare minimum under the code) has been chosen
to leave enough room for the entirety of the proposed 5-foot wide sidewalk in the right-of-way.
(Note that a 5-foot wide sidewalk is proposed along the west edge of Bremerton Avenue NE to
match the 5-foot wide sidewalk that the Laurelhurst Phase 1 civil construction plans call for
along the east side of Bremerton Avenue NE within the Laurelhurst Phase 1 site.)
Request For a Modification to the Street Standards to Permit a Reduction in (a) the
Required Pavement Width for the Half-Street Portion of Bremerton Avenue NE
Abutting the North HaH of the Elmhurst Site and (b) the Required Right-of-Way
Width for That Same HaH-Street Portion of Bremerton Avenue NE
The north half of the Elmhurst site lies across an existing strip of Bremerton Avenue NE
right-of-way from King County Assessor's Parcel No. 152305-9030 (the "Fue Vue Parcel").
Liberty Ridge L.L.C. has proposed to the Vues that it would install Bremerton Avenue NE
frontage improvements along the east half of the Fue Vue Parcel at no cost to the Vues in
conjunction with development of the Elmhurst parcel if the Vues would dedicate to the City the
balance of the right-of-way that would be necessary for those improvement but the Vues rejected
that proposal. (The Fue Vue Parcel is a parcel with potential for future development and has the
space available for completion of the Bremerton Avenue NE right-of-way.) Because of the
rejection of that proposal, Liberty Ridge L.L.c. proposes to the City a half-street improvement
involving 20 feet of pavement along the west side of Bremerton Avenue NE (16 feet of
pavement west of the quarter section line), which is the same section that the City approved this
year for Conner Homes in regard to the east side of Bremerton Avenue NE where Laurelhurst
Phase 1 is opposite the south half of the Elmhurst site. In regard to that half-street proposal,
Liberty Ridge L.L.C. hereby requests a modification from the pavement width and right-of-way
width provisions of RMC 4-6-060R.2.b1 to (a) reduce the ordinarily-required pavement width
RMC 4-6-060R.2.a and b state:
2. Half Street Improvements:
a. When Permitted: Half street improvements may be allowed for a residential
access street by the Administrator or her/his designee when it is determined that
the adjacent parcel of property has the potential for future development and
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
December 27,2004
Page 5
from 28 feet to 20 feet and reduce the ordinarily-required right-of-way width from 35 feet to 29.5
feet.
Code Criteria for "Modifications"
Subsection 4-6-060R of the Street Standards provides for "Variations from the
Standards". Subsection 1 thereof states:
1. Alternates, Modifications, Waivers, Variances: See RMC 4-9-250.
RMC 4-9-250 sets forth the following purpose statement in subsection A thereof, which explains
the differences between Variances, Waivers, Modifications, and Alternates:
4-9-250 VARIANCES, WAIVERS, MODIFICATIONS, AND
ALTERNATES:
A. PURPOSES:
1. Variances: A grant of relief from the requirements of this Title which
permits construction in a manner that otherwise is prohibited by this Title.
2. Waivers: (Reserved)
3. Modifications: To modify a Code requirement when there are
practical difficulties involved in carrying out the provisions of this Title
when a special individual reason makes the strict letter of this Code
impractical. (Ord. 4346, 3-9-1992)
dedication of the right-of-way necessary for the completion of the street right-of-
way.
b. Minimum Design Standards: The right-or-way for the haZfstreet improvement must
be a minimum ofthirty-five feet (35') with twenty-eight feet paved (28 '). A curb and a six-
foot (6') sidewalk shall be installed on the development side ofthe street. If the street will
require a cul-de-sac, then the right-of-way for the half of the cul-de-sac shall be
dedicated, with installation of a temporary hammerhead turnaround. The property shall
also dedicate easements to the city for street lighting and fire hydrants. Additional
easements shall be provided for the franchise utilities outside of the dedicated right-of-
way.
(Underlining and italics added for emphasis.)
· .
City of Renton Development Services Division
Attn: Neil Watts, P.E., Director
December 27, 2004
Page 6
4. Alternates: To allow the use of any material or method of construction
not specifically prescribed by this Title. (Ord. 4346, 3-9-1992)
(Italics added for emphasis.) In relation to Modifications, "Modification Procedures" are set
forth in RMC 4-9-250D. The relevant portions are subsections 1 and 2 thereof, which are as
follows:
1. Application Time and Decision Authority: Modification from standards,
either in whole or in part, shall be subject to review and decision by the
PlanningIBuildinglPublic Works Department upon submittal in writing of
jurisdiction for such modification. (Amd. Ord. 4777,4-19-1999)
2. Decision Criteria: Whenever there are practical difficulties involved in
carrying out the provisions of this Title, the Department Administrator may
grant modifications for individual cases provided he/she shall first find that a
specific reason makes the strict letter of this Code impractical, and that the
modification is in conformity with the intent and purpose of this Code, and
that such modification:
a. Will meet the objectives and safety, function, appearance,
environmental protection and maintainability intended by the Code
requirements, based upon sound engineering judgment; and
b. Will not be injurious to other property(s) in the vicinity; and
c. Conform to the intent and purpose of the Code; and
d. Can be shown to be justified and required for the use and situation
intended; and
e. Will not create adverse impacts to other property(ies) in the vicinity.
(Ord. 4517, 5-8-1995)
Justification for the Requested Modification to Reduce the Required
Half-Street Pavement Width from 28 Feet to 20 Feet
~, ENVIRONMENTA
QV PAR T N E R SIN C
November 18, 2004
Liberty Ridge L.L.C.
9125 10th Avenue South
Seattle, Washington 98108
Attn: Gary Merlino, Manager
5 NE Gilman BluL, Suite 201 Issaquah, Washington 9802;
Re: Evaluation and Review of Environmental Data
Site of Proposed "Elmhurst" Residential Subdivision
Site Location: 201 Bremerton Avenue NE
Renton, Washington 98059
EPI Project No. 36202.0
Dear Mr. Merlino:
425.395.0010 fax 425.395.0011
Environmental Partners, Inc. (EPI) is pleased to submit this evaluation and review of the available
environmental data for the site of the proposed "Elmhurst" residential subdivision located at 201 Bremerton
Avenue NE in Renton, Washington (the "subject property"). EPI understands that the site, which previously
has been used by Tydico and McCann Construction as a headquarters and construction yard, was acquired
by Liberty Ridge L.L.C. during 2003. You requested this letter in support of an ongoing evaluation of site
conditions in preparation for development of the proposed "Elmhurst" residential subdivision.
Per your request, EPI has prepared this letter to summarize our evaluation of the previously collected
environmental assessment data in the context of the current environmental regulations. The previous site
investigation reports (1991, 1995, and 2000) were prepared at a time prior to the recent revisions to, and
reauthorization of, the Model Toxics Control Act (MTCA; WAC 173-340). The original version of MTCA was
fully implemented in 1990 and was revised and reauthorized in February of 2001. The MTCA revisions, which
included revised cleanup levels, became fully effective in August of 2001 and the reauthorized version of
MTCA is the regulation that currently guides environmental response actions in the State of Washington.
Because the environmental due diligence information provided to Liberty Ridge L.L.C. was collected prior to
February 2001, the findings and conclusions are therefore presented in the context of an earlier version of
MTCA, a version that is no longer in effect. In preparing this letter, EPI has reviewed the prior reports
concerning the subject property and has re-interpreted the previously collected data based upon the currently
applicable MTCA cleanup levels.
Previous Investigative and Remedial Actions
The subject property historically contained two 6,000-galion and one 3,000-galion diesel underground storage
tanks (USTs). The 6,000-galion USTs were removed in 1991 by B&C Equipment Company. Four soil
samples were reportedly collected from beneath the USTs. None of those samples contained petroleum
hydrocarbons at a concentration exceeding the detection limit of the method used, which was 10
milligrams/kilogram (mg/kg).
Liberty Ridge L.L.C.
Evaluation and Review of Envi, unmental Data
Site of Proposed "Elmhurst" Residential Subdivision
November 18, 2004
Page 2
The 3,OOO-galion UST was removed in 1995 by Webster's Inc. An apparent release of diesel-range
petroleum hydrocarbons (DRPH) was noted during the removal of that UST and a total of about 65 cubic
yards of petroleum-contaminated soil (PCS) was removed from the UST removal excavation. PCS removal
was based upon field indications of the potential presence of DRPH (indications in soil such as odor,
discoloration and photoionization detector measurements). The excavated soils were stockpiled on-site for
later ex situ treatment by aeration and biological degradation.
Performance sampling from the final limits of the remedial excavation indicated a maximum detected
concentration of 280 mg/kg of DRPH. Samples from the excavated stockpile contained a maximum
concentration of 1,600 mg/kg of DRPH.
Additional subsurface investigation was performed at the site in 2000 by Environmental Associates, Inc. on
behalf of a potential purchaser of the subject property. That additional investigation involved test pit
excavation and soil sampling from four locations. These locations were in the reported area of landfarm
treatment of the PCS from the 1995 UST removal excavation. Those 2000 samples contained a maximum
concentration of 240 mg/kg of petroleum hydrocarbons.
The current MTCA Method A soil cleanup level for unrestricted land uses (WAC 173-340-740) for DRPH is
2,000 mg/kg. Under the current MTCA regulation, soils containing less then 2,000 mg/kg of DRPH will
support even the most conservative land uses (such as residential land uses) without posing a threat to
human health or the environment. Such soils (Le., soils containing less than 2,000 mg/kg DRPH) may be .
used on a site as backfill or surface material without restrictions.
Therefore, the apparent release observed during the UST removal in 1995 would not require remedial action
under the current MTCA regulation and the excavated material can be re-used on-site. The current MTCA
cleanup levels are based upon newer scientific knowledge and upon the Washington Department of Ecology's
(Ecology's) understanding and interpretation of which conditions are protective of human health and the
environment. There is no reasonable expectation that residual contaminants from the historic diesel fuel
release exceed current soil cleanup levels.
Current Site Conditions
There is no data to suggest that contaminants are present at the subject property at concentrations exceeding
applicable cleanup levels. There are, however, some above ground fuel storage tanks and the potential for
historic releases of contaminants of concern from those tanks. As with all sites, unknown or undiscoverable
conditions may be encountered during construction and redevelopment. It is EPl's current understanding that
the following contingencies will be implemented prior to and during redevelopment activities:
1. All contractors are to be made aware of the potential presence of environmental contaminants and
instructed to notify the property owner immediately if discolored, odiferous, or otherwise suspect soil
is encountered during excavation activities.
ENVIRONMENTAL PARTNERS INC Page 2
Liberty Ridge L.L.C.
Evaluation and Review of Envi, vnmental Data
Site of Proposed "Elmhurst" Residential Subdivision
November 18, 2004
Page 3
2. If such suspect soil is encountered during excavation activities, excavation work in the area(s) with
suspect soils is to be halted until such time as a qualified environmental professional can assess the
observed conditions.
3. If the presence of environmental contaminants is confirmed within the suspect soils at concentrations
exceeding applicable MTCA cleanup levels, then (a) those soils are to be handled and managed in
accordance with MTCA and (b) the work will be managed and overseen by a qualified environmental
professional and properly documented and reported to Ecology in accordance with MTCA.
Based upon EPl's experience, these contingencies represent a standard operating procedure for
redevelopment of a site like the subject property and likely will not pose an undue hardship during the course
of the project.
EPI appreciates the opportunity to be of service on this project. If you have any questions or comments,
please do not hesitate to contact me at (425) 395-0030.
Sincerely,
Thomas Morin, L.G.
Principal Geologist
ENVIRONMENTAL PARTNERS INC Page 3
• DEVELOPMENT SERVICES DIVISIO
WAIV~ OF SUBMITTAL REQUII'(EMENTS
FOR LAND USE APPLICATIONS
Applicant Agreement Statement 2 AND 3
Inventory of Existing Sites 2 AND 3
Lease Agreement, Draft 2 AND 3
Map of Existing Site Conditions 2 AND 3
Map of View Area 2 AND 3
Photosimulations 2 AND 3
This requirement may be waived by:
1. Property Services Section
2. Public Works Plan Review Section
3. Building Section
4. Development Planning Section
PROJECT NAME: 8ZA--~±
DATE: J~/~7 lot{ { ,
Q:\WEB\Pw\DEVSERv\Forms\Planning\waiver.xls
DEVELOPMENT PLANNING
CITY OF RENTON
DEC 282004
RECEIVED
VELOPMENT SERVICES DIVISION
WAIVER "F SUBMITTAL REQUIRE .•. ENTS
FOR LAND USE APPLICATIONS
requirement may be waived by:
1. Property Services Section
" t PROJECT NAME: E ( 141 kvv{ 1-fe...s ,'d~ ~f £. &I,'VI t I b '1
2. Public Works Plan Review Section
3. Building Section
4. Development Planning Section
DATE: /2../27104-
/
Q:\WEB\Pw\DEVSERv\Forms\Planning\waiver.xls
]TY OF RENTON
1055 S. Grady Way
Renton, WA 98055 DEVELOPMENT
CITY OF RE~~~N/NG
Printed: 12-28-2004
Payment Made:
Land Use Actions
RECEIPT
Permit#: LUA04-162
12/28/2004 02:27 PM Receipt Number:
DEC 2 8 200~
RECEIVED
R0406930
Total Payment: 2,500.00 Payee: LIBERTY RIDGE LLC
Current Payment Made to the Following Items:
Trans Account Code Description
5010 000.345.81.00.0007 Environmental Review
5011 000.345.81.00.0008 Prelim/Tentative Plat
Payments made for this receipt
Trans Method Description Amount
Payment Check #5708 2,500.00
Account Balances
Amount
500.00
2,000.00
Trans Account Code Description Balance Due
3021 303.000.00.345.85 Park Mitigation Fee
5006 000.345.81.00.0002 Annexation Fees
5007 000.345.81.00.0003 Appeals/Waivers
5008 000.345.81.00.0004 Binding Site/Short Plat
5009 000.345.81.00.0006 Conditional Use Fees
5010 000.345.81.00.0007 Environmental Review
5011 000.345.81.00.0008 Prelim/Tentative Plat
5012 000.345.81.00.0009 Final Plat
5013 000.345.81.00.0010 PUD
5014 000.345.81.00.0011 Grading & Filling Fees
5015 000.345.81.00.0012 Lot Line Adjustment
5016 000.345.81.00.0013 Mobile Home Parks
5017 000.345.81.00.0014 Rezone
5018 000.345.81.00.0015 Routine Vegetation Mgmt
5019 000.345.81.00.0016 Shoreline Subst Dev
5020 000.345.81.00.0017 Site Plan Approval
5021 000.345.81.00.0018 Temp Use or Fence Review
5022 000.345.81.00.0019 Variance Fees
5024 000.345.81.00.0024 Conditional Approval Fee
5036 000.345.81.00.0005 Comprehensive Plan Amend
5909 000.341.60.00.0024 Booklets/EIS/Copies
5941 000.341.50.00.0000 Maps (Taxable)
5954 604.237.00.00.0000 Special Deposits
5955 000.05.519.90.42.1 Postage
5998 000.231.70.00.0000 Tax
Remaining Balance Due: $0.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
w ~
~ w
n.. <! ~
...J
ffi o
o 8
I a: g
I
" W
Z
REVISIONS
~ 1----------1
LJ " ~
u.z O~
~Z -ill Oa:
~ 1---------1
Q ~ \!! "' iil
.;: w '" x
w
b o N
II • ......
X X X
Q Q
~ w '!I
<5 0 "' <2 w 0. is 0. " ~
0:: Cl. Cl. «
~ « Cl
>-In
Z 0
Vi
5 UJ
0::
00 ® 6.
2 ----3
0)
Z
T Ji!] ;EJ MARTIN S ACRE
0) @ @
68 67 66
2 3 4 5
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
l~ ____________________ ~ __ _
(2)
S.P.1079069 0)
I CD
4
fi !:!
S.P. 882065
(I)
(3)
(2) (I) (2)
(3)
i§
(2) (4) \.50 "'C.
@ @!
,
I ' , , ,-<-
)1J
ttl
4.32 Ac. 4.16 "'c.
@
~------
2.30 Ac. @
2.64Ac. '@32 2.30Ac.
@
CURRENT CITY LIMITS
1.39 Ac.
4.61 Ac.
OJIlB ---------_"'::.
p
U>
'" UJ !::: en
UJ ::IE 0 ::J:
! UJ 0 ~
~4 ... ~ ~
o 100 200 400
.. I I I
GRAPHIC SCALE
SCALE: ,. -200'
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852:
FOUND PUNCH IN J" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE. SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 2.3N., RANGE 5E., W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GA TE.
ELEVATlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00'17658'JO.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARl< IN J" KING COUNTY SURFACE BRASS DISC,
A T THE STREET INTERSECTION OF NE 4TH ST. AND 148TH A vr Sf,
MARKING THE NORTHEAST CORNER OF SECTION IS, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WILL~METTE MERIDIAN. THE NORTH AMERICAN
DATUM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND TO
BE 180903.998//316622.321 AT THAT POINT. THE INVERSE OF BOTH THE
SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID SCALE
FACTOR OF 1.000002187 WAS APPLIED TO THE GRID COORDINA TES FOR
SHOWN GROUND DISTANCES.
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-()1-()4
SHEET REV.:
NEIOHBORHOOO
DETAIL MAP
02054NB01-P04
P04
SHEET 4 OF 8
~ g ~~~~~========================================================~----------------------------------------------------------------------~
Filf:r~.Il,IA!:. XREr: QL01 D~TE.: PLOT SCAlE. PAPER SPAC£> ST.~.: JOB NO CD:
1---+-----------+---+---+----11 ::~,~:E: 1 SCALE ,"=50'
IJERTICA.L: NA VO , 988
HORIZONTAL: NAO 19B3/1(loQl :R CITY OF
RENTON ELMHURST
DATE:
NO.
DRA1hN: xxx
CHECKED:
ONE INCH
AT fULL SCALE
If NOT ONE INCH
SCALE ACCOROINGL Y
Planning/Building/Public Works Dept.
Gregg Zimmerman P.E., Administrator
PAGE:
DRAWING NO.: P05
REVISION BY DATEiAPPR APPROVED:
BREMERTON AVE. N.E. AND
ROAD B PRELIMINARY PROFILE SHEET 5 OF 8
I u I \ ~
lJ
~ 8
Co) + g
o ~ » ..... o g
tIl
~
~
::t! c rn rr.
("j
ri1 ~ ::-2 rn _~
I"""'\. (".:::>
::;;;:..
..... ..,.
~
,
N
~ g ~ ~ .t.-O; ~ o
1m, ..•. m,~rp~::EVc=J~;:~;o -.•.•.• ·.··1·
c,~ • I. avcs: 30+36.09 r-". ! r--C)'V o . \ .. . . . 0 0 '" 1'11.(:> ~i:is . . •.. ~ >' BveE, 39394 1 ..~ ~~t u ~i!
/ : " ~"'r-~ ... ~ :2 t ~ 0
394.2 .j§.{jJ
,3!)E),() • '+
396.00 I rTl
"1l~ ::>;)V!
399.3
398.00
~~
00
(J)() ~rTl Z
Zl~ . ~;o.
~,....
",Z orTl
400.7 . rTl . ................... ....... .. C)'" .
399.91 !;2 ~
:-I> ~::::I
r-0
:2 z
.",
. 499,fl .. · .... · .... · .. PJ . 401.37 ", . . <;:
l>'
:::I
401.4
402.41
402.4
403.41
402.6
~
::n < ,~~.~
·:iO
~ ~,
" ." ~-. ~-(:~~
4~Z
z Gl
.~
~
,-
~
EVCS: ·31+36.09
.. ~" . "-\2, \ .";;\.
EVCE: 395.44
l •
\'
II
o _"-i 0 ", II .", V) ». ::>;)
II "'II);!PJ o~~ ~Ulllt., ~».;;j0
.C) •... , .... O.JL.... . . ··::>JIlJ·· ·00<0 + .. II .. (J) .0t.,00t., ", ~ o>ot., C)
4>0 ot, <0 :::! I.(:>o>~ 0 . 00 ~ 0"" I.(:>
r~~\~,· • -t .. --.; . :
:", BVCS: 32+20.53
~ > ~
aVCE:.398.82
CD
"1l "1l n
:s;:S; ~
_ .. ?>, .~(J) r-" 0, .. , "" ··ro II '.~ l>' .
11"'11 " g: I .• II (". :s:l:
o ~ •. "" t\) .rn.~ .
00'0 + ~ 00" .
\ rvcs:.33+2o.531· ........... ~ ... ~ ... ~ .. ~ .. ~ .• ~§
~. j EVCE: 40U$2;t ~ t, r-2 • . Pl :ti Pl' :;::t I . I Ul r-I.(:>~.~ --.~ r-
............. , . .-~. . ..... ~.~ .. ~ ... ~ :;; . ..::>J"" . :t;: "" 0 :::::::>;)-...
N 0(J) ».~O· <J'I ~
. '" :r:o :0-1 ». . -. o ._,,,, .. !'Tio. 9. ,0 l>::>;)~: ~ _ (J)_ ", , \) I : . ...
.:::1
.... ~
II
~ ~ .t.-~ ~ C$ 0
0 -u , .'(/) lfl ;0 ;0 I lfl » 0 rTl C '-f'l
"ELMHURST"
~ ~ ~
d :z
l>
~ ..
;Z rn
~ 8
<:h 8
~ 8
'1 8
C$ ...... g
~
~
~
~ ......
8
~
398.0
.398·.fl ..
398.78
399.5
39iT28
399.7
~ 8
avcs: 14+00
BveE, 395.57
~ .t.-C$
"1l"1l :S;:s;
"~~(J)
II !=I~~
.. ···1" -lIjjH
....,
<0 ,~
/). ..
-1>0.
EVCS: 16+00
. EveE: 397.86
PVI STA = 16+42.64
PVlELEV':-398,62 .
=-(.,.,.;'!
t., '" ",v. ....... 10 .0> + . 0 00 'J
.t.-O; ~ o
t-... ~
·00 r-
i~ aves, 16+75 ;;: ;;: ~
"1l"1l"1l"1l ::>;)
:S;:S;QQ PJ
I
. \
I
b ,~
\
I
I
I
I
,I
~~I'1(J)f;~ :r: o r-. " , . -:-I C
II • ", l>' (J) 1'1.::>J ...
"'"", (J)
aveE: 398.15
",II II II ~ ", ~
9 '" _ II '" _ ~ ~' •• ,~. I . . '~4>o",'J' I , .... EVCS, 17+25 f "'0>"'6N~ ]j~ .
. til 0 ;I-'" o. ~ ..".. EVCE, 398. 03 ~ "'~c ....::tj"
avcs: 19+00
• '" C). ::>;) ». + 'Jb< -i (J) C') _
:-: -I -I :--J
1
. 0 1lJ_ o C
... ~.
::>;)
-<
. I.(:>C) -.. +.1'100 • I.(:>:<!:+ ................................... I
"':-to c.,~:1--r-'J -00 g~tn
».-::>;) o~",
...... "" .. ;:, ». Sl ~ ....
"1l "1l ~ --I
:s; :s; C) ~
399:78 II avc£: 399.78
401.2
400.78
405.0
402.78
1
-",
\.BVCS: 20+39.83
'\ \ . .. 1JIJ6 ............. ··\IBVCE:404.7Z .. .
• I
407.8
407.06
I
I
~t~(J) 6». II '''');! .~ s
'" . !'l ~!lllf ........... ······iiz
o· • . ;... oD"<'o !". 02+
i-.,Ul
00 0
"1l"1l
:s;:S;
~~",(J) 0,-:::1 . fTl-
11 11 "'11 '" .. . . ~:k!~ ............ ~ .. ~ •. ~
ooo;t t\);;j~
o '" I.(:> :I-::>;) ~
'" '00 Ul r-Ul
I
I
\
I EVCS, 21+.39.83
'J~ Ul:2O>
::>;)"'1lJ 0-::>;) »'~1'1 407.9
407.87
408:4 ·408.j7
408.9
··408:87
EVCL.A07.77 ...
I
. .. O;;j~ ....
».Bl::>J
"'0--1 .C) . :::I ~
0», ~~
;:<:
r'l
I
~
..... 1···········································40M 8 ·409 . .37
/
!
\\i
"1l&i ~r-0;:' c:...:r:
~ ...... g
~ g
~
~
409.5 ..................... (1)
·409:87 0
411.6
410.37
4.09.9
.. nO.8(}
407.3
405.0
404.2
·405.5 .
~
~
" ~~ ~§ ~···2 . ~~
1-<J'I • . -. .
~
g
\
\ -----10
. )
'1
/
)
!
) / : . I / /
. / /
1
1
(
)
/tp. \\ .. 1\ \ ....
.1 \
\ \
/ .
!
~ ~
. . . . . . . .
I"T1c (")::>;)
"-i(J)
"-i
23+49:~~~CT BOUN~Rr. .,.1.1..'_-
"-
\
\
I
I
!
j
I)
?
()"::>;) "1l • o-r-• co». ::>;)~"-i
"-i:S;0
",.., . ..: .. .::;;
Bves: 24+16.92
MCE: 410.54
EVCS, 24+76.92
EVCe, 409.57
25+16.69 =
14+92.94 CENT£-RL-'N'-£~
INTERSECTION ROAD A
.t.-~ 0; (5
~ ~ 3: ~.. • :r: ::>;).. . .. ~ .. ~ ....
-< ."1l:r: '"' "1l:S;1):t
»..:S; 0"1l ~b",(J)~Q .,-);! "-i ~ II ", "-i .U "'II (J)
. .•. II . :--I'" :-·1. ..l>.r-
• '" &i ~!Jl4>o""11'" f\,):-+. 4>0, 9 4>0 t\) II
Oo?>"'" 4>01.(:>+"'" ",t\)-Oo~ . 0>
.~.o ....
~ -U~! m u>1 ~ ~
f'l -I
0 -u~~ ~~ ;0 »
:;: f'l Z (")
CD -I RESIDENTIAL SUBDIVISION Pacific
Engineering
4180 LIND AVE. sw.
RENTON, WA 98055
PHONE: ~O~
u> 0CJ1'o 11 ~.
0) III
f'l -l ~ :< ", ~i~~zm ... 8 I\)
I ~~ID !n~ 9
* -<
) II I
Z
0 ..
0 I\)
~
( )
FOR
LIBERTY RIDGE LLC.
912510TH S
SEATTLE, WA. 98108
PHONE, (425) 226-1000 FAX' (425) 228-4924
RENTON,WA Design, LLC
~
Civil Engineering, Surveying
and Planning Consultants
(425) 251-8811
FAX:
(425) 251-8880
WEB SITE:
PACENG.COM
.. Ol
~ •
~
;2 ...
~
Q
Ot
rn ...
~
~
V! o z V!
w Ii ~ 1/)
~ i..~ Q .. ~
w
~ 0 " ,-
0 0'
w ~ '" §
~
~
'" '" x
,;j
~ II: :::>
I ~ ...J
W
U.Z
O~
~Z -w ()a:
" ~ 11
~ ~, ." -~ ~-,0 z~
..:J,. <~ ~~ ez "0 ~~ 0 I
a If)
II • .-
I ...,
~
W Z 0
x x x
b w z ~ " w a
..
)1 CD
.~ ..,0 <1.+' .,0
0;' ., .,.-...::.::.5 lsE ~"O «
,~ .. 7iLJ :J • a. a. 'c "'0 C ,-E "O~ r=(l) d:E 'E m-"N 'E en
Co> 0.,
a.~
~ wo<3 ~zz ~~§1 zO ~O"" ~ U =>~< wO ..... Z::J .:t:ltoj
0 w " W I ...,
~
ci '!! 0 ~
" Q <
0:: a. a. «
I=! « 0
>-CD
z o
Vl > UJ
0::
REVISIONS
410
405
400
395
390
385
l-a a:
~
@
<:(
~ -:E ~
~
410
405
400
395
385
SEC. 15, TWP. 23 N., RNG. 5 E., W.M .
~. 9+92.81 ROAD A
• CENTERLINE INTERSECTION ='
.. ..18+04.78 BREMERTON AVE. N.E.
I······················ , ............................... I··············································;;:·,,·;·'" ... ; ..........................•....................................•.............. ~'. ..10+00 ... 00 ROAD A . TRAcr BOUNDARY
El-MHURSr .. " .
I
r -
PROJECT. .. . .
00 "" ~ ~ <ti ~ ~
I··················································· . Til ·11
:::.
d
S
0..
.....•...... ~
.:::>
Q:l
---
r-12+B2.14 ROAD A .
..•.•. CENTERI-INE '.NTERSEC 29+96.40 ROAD B
=
. ···1
. .
EXISTING GRADE
=
. ... ... . Lowi"oiNttL£v ;"
. LOW POINT STA = 1 .. -re,,,,.
P VI STA = 14+68.t>6
PVI EI-EV = 391.
A.D. = 3.50 ...... . ..•.. ... ..... . ........•. :;;;j 42.86
FINISHED
I····G .••. R ..... ADE
"-
\
\ ., .-... , -.-, .... "-"..:' ....
... I
j
-'
~ EXISTING TERLINE El;EVA TlON .......•. If ..•............•............................... F: .... '.N .... 1 .. S .... H .... E ... D ....... C •. E .... N .... TE.RLlNE aEVA TION ..........•.
.:.... '" . on :::; a 0; ~:;:: g~ ~ n~ n~ ~
10+00 ff+oo 12+00 13+00 14+00 15+00
ROAD A
'<0
• . «) ........................... ··················,x) . -.+ "
16+00 17+00
EX.
R!W 22' ~ 7.5' R!W °4f·5~~ 16' : i 4' rl
1 ---~----.---"_.-.............................................................................................................. . .... ,..... ................. ,................ j! !~~~Ni1r&t~
/
/
f .
/ .
L_I
('\
/\
/ \
/ \ I . \, ....... .
I
I \
/ .\
I \
.../ .... 1 \f EXISTING GRADE
/ \ I \
\ ...............•....... 1.
\
. \
\ '-~.;;
...................................
\
\
\
1
. ... -.... , ... : .. ".,.-...................... .
FIN/SHGD
GRADE
. 23+24.55 ROAD A
CENTERLINE INTERSECTIONI
. TRACr BOUNDARY =
22+33.56 BREMERTON AVE, N,c.
. ..........•............•......... L£LMHURST. ...
. PROJECT
./
SCALE : HORIZONTAL 1* -50'
VERTICAL I" -5'
410
405
400
395
4" CONC.~
SIDEWALK
\: CONC. CURB
AND GUTTER
BREMERTON AVE N.E.
STA. 20+17 TO STA. 23+50
N.T.S.
LAURELHURST
R!W 22' ~ 25' R/W °41' o~~ 16' 4 ~: 16' ~~; 1 ~'~'I
~~CG~~ --~-~-co~~~:~: 4" CONC,
SIDEWALK
BREMERTON AVE N.E.
AND GUTTER
SAW-CUT AND REMOVE
ASPHALT THICKENED EDGE
(FROM 17+92 TO 20+ 17)
STA. 17+92 TO STA. 20+17
N.T.S.
~ /'
/'
410
~405
...J
~ °400 /' rei III
I.1J ~395
~ ~ 5(390
~
385
18+00
4" CONC .
SIDEWALK
42'
CONC. CURB
AND GUTTER
TYPICAL SECTION ROAD A -ROAD B
N.T.S.
* 1/2" TO TOP OF LIP AT DRIVEWA YS
6"
I 5" ~&GEO~n 1/2
GRO
*1" l :1'. . .' .... ;( 1/2" R AD.
. 'm' EXISnNG CENTERLINE ELEVATION . •• r PROPOSED FINISHED CENTERLINE aEVA TlON
...........•.................................•......................................•......................................•...............................
on · '" ,.... '" CO '" CO : "'. ,.... • '"
385
I ~ 0.05 rTlrT
:~I' RAD '.
12"
18+00
• '" •• '" . '" •• '" "" .'. <\I. . A . 0 . . N . ..,
-0'" 0"" 0" 011) ~~ ~j~ ~.~ ~j~ . ~.~ .
20+00 21+00
ROAD A
22+00 23+00
6" '1, , • . . . •
I. 18" .1
VERTICAL CURB DETAIL
N. T.S.
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01-04
SHEET REV.:
ROAD
CROSS SECl10NS
AND
ROAD A
PREUMINARY
PROALE
02D5~PR01-P05-P06
P06
SHEET 6 OF 8 ~ ci ~U~Cz~====================================================================================~~~~~ ,7
,:j
'~ u.
0'
u '" ,-
4 Q
,.0
~ ~ '-' '" .-<) .. , n.
"' ,.
4 0
~
"' w ,< x
~ a:
::::>
I
~ .J
W
u.. Z
0 ~ ~ Z
W () a:
!K :~ 11
~ ~~ ~gl
~-<~ Zz
~~ u' -" "Z uo ~, ~ "
0
I{)
II • .-
~ .,
" '"
I " ~
w Z 0
x X X
.0 ~ ~ !!! U .,
~ " '" a
j
a..
~ « z
~
...J
W II: a..
.'-~O
a.~ .,0
0;'
IJ)
IJ)'-..:.::,~ BE ~'O «
,2 .. J)w
::l • a.. a..
'c "'0 C .-E ",-1'::Q)
c5E 'E 0>-
.E N c'" COl 0",
a.. 0
~ wIj ~"z ~~~ zO ~O" ~ " ~~., ~a t-ZIj .,~., -u
.0 w
" w I "
'"
ci !!! 0 U <L <L .,
0:: a. a.. «
w t--« 0
>-00
5
Vi
> w
0::
REVISIONS
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
DENSITY CALCULA TIONS :
R/W AREA = 1.72 oc. OR 74,923 sq. ft.
STREAM ACREAGE = 10' WIDE AREA SOUTH
OF NE 2ND PL., AND l' WIDE AREA NORTH
OF NE 2ND PL. = 0.09 oc OR 3,808 sq. ft.
TOTAL AREA = 9.60 oe. OR 418,176 sq. ft.
PROPOSED ACCESS EASEMENT AREA =
0.03 oe. 1,261 sq. ft.
PROPOSED # OF LOTS = 64
ZONING RIO, SUBJECT TO A DEVELOPMENT
AGREEMENT (KING COUNTY RECORDING
#20040908000083)
-------J-l) ,'-."
f---------"c---'
~
f--. - -----_---' ......
\
\
\
47
DENSITY = 64 LOTS
TOTAL AREA (oe) -R/W (oe) -STREAM (oe) -ACCESS (oe)
DENSITY = ____ 6_4_L_O_TS ______ -::-_
9.60 oe -1.720c -0.09 oe -0.03 oe
DENSITY = 64 LOTS
7.76 oc
DENSITY = 8.25 dU/oc
SITE INFORMA nON :
1. E:x. SI TE AREA = 9.49 oe
2. EX. R/W TO BE VACA TED
(BREMERTON AVE.) = 0.11 oe
3. OVERALL SITE AREA
(INCL. VACA TED AREA) = 9.60 oe
4. R/W TO BE DEDICA TED= 1.72 oc
OWNER/APPLICANT: LIBERTY RIDGE L.L.C.
9125 10TH AVE S.
CIVIL ENGINEER :
SEA TTLE, WA 98108
PHONE: (425) 226-1000
FAX: (425) 228-4924
PACIFIC ENGINEERING
DESIGN, LLC
4180 LIND AVE S.W.
RENTON, WA 98055
PHONE: (425) 251-8811
FAX: (425) 251-8880
PA VEMENT AND SIDEWALK
NORTH OF ELMHURST TO
BE INSTALLED IN CONJUNCTION
WITH RIDGEVIEW COURT
11,,_Ji-r--NEW BOUNDARY
JU.--'"-EXISTING BOUNDARY
.}
GEOTECHNICAL
ENGINEER:
EARTH CONSUL TANTS, INC.
1805-136TH PLACE N.E.
SUITE 201
VICINITY MAP
BELLEVUE, WA 98005
PHONE: (425) 643-3780 " 1'~NI
SURVEYOR' CENTRE POINTE SURVEYING
J3701 9TH AVE. S
FEDERAL WA Y, WA 98003
PHONE: (253) 661-1901
SHEET INDEX
POI
P02
P03
P04
P05
P06
P07
P08
PRELIMINARY PLA T
COMPOSITE UTILITY PLAN
TREE CUTTING/LAND CLEARING PLAN
NEIGHBORHOOD DETAIL MAP
BREMERTON AVE N.E. AND ROAD B
PRELIMINARY PROFILE
ROAD CROSS SECTIONS AND
ROAD A PRELIMINARY PROFILE
GRADING AND DRAINAGE PLAN
EXISTING CONDITIONS
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENTt852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC A T THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE. SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N., RANGE 5E., W.M.
ELEVA TION= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GATE.
ELEVA TlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
25 50 100
~~~I~I_ ..... !
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00'17658'30.28" COUNTERCLOCKWISE WAS
APPLIED AT A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WILLA METTE MERIDIAN. THE NORTH AMERICAN
DATUM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND TO
BE 180903.998/1316622.321 AT THA T POINT. THE INVERSE OF BOTH THE
SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID SCALE
FACTOR OF 1.000002187 WAS APPLIED TO THE GRID COORDINATES FOR
SHOWN GROUND DISTANCES.
SCALE: 1" -50'
LEGAL DESCRIPTION
PARCEL A:
THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE FOLLOWING DESCRIBED
PROPERTY: THE NORTH HALF OF THE SOUTHEAST QUARTER OF THE
NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP
23 NORTH, RANGE 5 EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE NORTH
HALF OF TRACT 5, MARTIN ACRE TRACTS, ACCORDING TO THE UNRECORDED
PLA T THEREOF.
S/TUA TE IN THE COUNTY OF KING, STA TE OF WASHINGTON.
PARCEL B:
THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER
OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP 23 NORTH, RANGE 5
EAST, W.M.;
EXCEPT THE EASTERL Y 7.5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTHERL Y HALF OF TRACTS 5 AND 6, MARTIN ACRE
TRACTS, ACCORDING TO THE UNRECORDED PLA T THEREOF.
S/TUA TE IN THE COUNTY OF KING, STA TE OF WASHINGTON
PARCEL C:
THE NORTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER
OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP 23 NORTH, RANGE 5
EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
AND EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE REMAINDER.
(ALSO KNOWN AS THE NORTH HALF OF TRACTS 5 AND 6, MARTIN ACRE
TRACTS, ACCORDING TO THE UNRECORDED PLA T THEREOF; EXCEPT THE
SOUTH 110 FEET OF THE EAST 215 FEET OF SAID TRACT 5);
S/TUA TE IN THE COUNTY OF KING, STA TE OF WASHINGTON
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01--<>4
SHEET REV.:
PREUMINARY
PLAT
DEVElO~"',~,.:::::~,:,. Ui Ii . c.r 'L"., fo.JI'!i~l'-" I·l"~;~-nc.:"'ii--:<;" ."-,,
DEC J F " ~, '-~ ~ .. ~ ;
.. -"!!r w !;; i.J
07l'54HC01-P01
P01
SHEET 1 OF 8
pEVISIONS
o 2
"' q
~
(i < Q
if'
~ '" ~
to a:
~
I
~
...J W
z « ...J on.. Zo I=~ ::::>11: 0« w w...J WO
!!=o Z « ...J
~ 1--------1
"' ~ a
S
u.z
O~
~Z -W Oa:
W :nI
..... .... 0 a. .... .,0 0'::;
II) (1)'-~.~ 5E ~"O ..;
. \1 " 1iw :J • 0.0. '-c "'0 c .-E "0 .... ::0) c5E '-E ""-c N 'c en c", 0., 0. .... o
" 1--------1
~ w
'0
II)
II • .-
x X X
0:: a. 0. ..;
>-Cl
~ I-+H-+--+--+----I
z o
Vl > w
0::
(~
'_oj \
\
,
!
4 !
l
< (' I '-.-)
( --
\' ' -"~' . , I I
\' \21'
ill' ' I , I I
TA
\
\ 6WF 1
\
FERNVVOOD\\~TH
"
\
\
'---
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
. . , .
I
\
\
"
.0
" c I ~
E 32"~ FIR
, il6~. "'. 0
rEi "t -. , ,
I ,--1/"" I
! I I
II-
'i I i
I I
I
I
1 ' I --r-' II .', I I \ I
I " I I ~ 1 --t-'-:_-
! I
I
69
2
4
--_._1
5
9
8
-;
i ' ()
1f
I I i
I I -,-+-
I
I
i
I I
-_L,
I
I
I
i
--1-
i
50 0 100 1--I .-~ I
GRAPHIC SCALE
SCALE: 1" -50'
VERTICAL DATUM
CITY OF RENTON, NAVO 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852.'
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AvE SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N" RANGE 5E" W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GATE .
ELEVA TlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGiE OF 00%%17658'30.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC.
AT THE STREET IN7ERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NOR7HEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WlLLAMETTE MERIDIAN. THE NORTH AMERICAN
DA TUM OF 1983/1991 (NAD 83/91) GRID COORDINA TES WERE FOUND TO
BE 180903.998 / 1316622,321 A T THAT POINT. THE INVERSE OF BOTH
THE SEA LEVEL COFmEC710N FACTOR OF 0.999981824 AND THE GRID
SCALE FACTOR OF 1.000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES.
DEC! B 2004
RECEIVED
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01-04
SHEET REV.:
TREE CUTTING/
LAND CLEARING
PLAN
02,154 TR01-P03
P03
SHEET 3 OF 8 !~LJLJ~~~~~'~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::/::::::::::::::::::~:::::::::/::/::::::~::::::::::::::::::::::~::::::::::::::::::~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~~~~~~~~~~~
D ,~)
o z
m ~
" ~
8 < 0
~ 0 0 m w ~ ;;:
~ ([
::J
I
~
...J
W
W " < ~
'<t a
Cl.
" z
" z • < ~ 0
IL « ~
...J «
til o
o o o I a: g
I ~
W Z
REVISIONS
ro
~ 0
'<t
r w w • ~
i£ 1-____ ---1
'" " u "'
LLZ
O~
~Z -w 00:
? "1-------1
.:: w
" X
" o N
II •
" w z
" '" w 0
X X X
" " ~ ~ w is 0 " < w ~ ~ I ~ 0 " <
cr: Cl.
Cl. «
~ « 0
>-ID
Z 0
(J)
> W cr:
70 68 60
69
[]I ID j~ \
Z 3 4 5
2
MARTIN'S
B
1
68 67
"
6
3
ACR
66
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
8 )
(2)
® 5.111079069 0 o
4
'--------r.::1 ------~
~ 0Iz8J6
@
0
( I )
~~ (3)
(2) (I) (2)
, ------
___ ~_..l...':' . ..c. ----
(3) ~V
~~
(2) (4) 1.50 Ac.
® @
4.76 Ac. 4.32 Ac.
---~------
2.30 Ac.
2.G4Ac.
2.30Ac.
@ ®
CURRENT CITY LIMITS
1.39 Ac.
4.61 Ac.
[jl418
til W t:: <I)
U.J :E 0 :t:
>-4 ~ 4 U.J <:>
:!:.
~ct.
.... t..> .. a: ....
200 a 100 200 400
I __ .t:j I I
GRAPHIC SCALE
SCALE: 1--200'
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE. SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N., RANGE 5E., W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE 19,1' SOUTHWEST OF THE WEST COLUMN OF GA TE.
ELEVA TlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00%%17658'30.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF mE WILLAIIETTE MERIDIAN. THE NORTH AME!'~/CAN
DATUM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND TO
BE 180903,998/1316622.321 AT THAT POINT. THE INVERSE OF BOTH
THE SEA LEVEL CORRECTION FACTOR OF 0,999981824 AND THE GRID
SCALE FACTOR OF /,000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES.
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01-04
SHEET REV.:
NEIat-lBORHOOD
DETAIL MAP
02,'54NBOI-P84
P04
'~LLilllO~' ====================~====:::=~~~~==~============~==================================================================~~~~ ~ z
;;:
SHEET 4 OF 8
" Z
ill
8
u < ~ v,
~ w "-.~ "-
w <' u if>
S "-
w ,-.,
0
(~
0,
" z
" z
00
~ ~ B ~ ~ ~
~ a: :::>
I
~
..J
W
LL Z
0 0 I-~ Z
W 0 a:
~ .~ 11
§ -, .~ ~~
~-.0 2~
:i:!.:J ~~ "2 "0 ~, ~ •
a ll)
II • .-
~ g
I " ~
w z 0
..... .... 0 0.. .... .,0 0;-
V) V).-~.£ 5E
;;:'0 «(
,~ ~
.DW :> • (L(L
'-co 010 e .-E '0 ....
<-<l) ~E '-E 0>-eN 'c en
COl 0., 1[ .... (!)
>-UJI;,3 ~"z M:~ zO ::Jo(:l
~~< ~o I-Z~
<J.:!.!,()
"'
z o
If)
> w a::
f(EVISIONS
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
"ELMHURST" RESIDENTIAL SUBDIVISION
DENSITY CALCULA TIONS :
R/W AREA = 1.72 ae. OR 74,923 sq. ft.
STREAM ACREAGE = 10' WIDE AREA SOUTH
OF NE 2ND PL., AND I' WIDE AREA NORTH
OF NE 2ND PL. = 0.09 ae OR 3,808 sq. ft.
TOTAL AREA = 9.60 ae. OR 418,176 sq. ft.
PROPOSED ACCESS EASEMENT AREA =
0.03 ae. 1,261 sq. ft.
PROPOSED # OF LOTS = 64
ZONING RIO, SUBJECT TO A DEVELOPMENT
AGREEMENT (KING COUNTY RECORDING
#20040908000083)
DENSITY = 64 LOTS
TOTAL AREA (ae) -R/W (ae) -STREAM (ae) -ACCESS (ae)
DENSITY = 64 LOTS
9.60 ae -1.72ae -0.09 ae -0.03 ae
DENSITY = 64 LOTS
7.76 ac
DENSITY = 8.25 du/ae
SITE INFORMA TlON :
1. EX. SITE AREA = 9.49 ae
2. EX. R/W TO BE VACA TED
(BREMERTON AVE.) = 0.11 ae
3. OVERALL SITE AREA
(lNCL. VACA TED AREA) = 9.60 ae
4. R/W TO BE DEDICATED=I.72 ae
OWNER/APPLICANT:
CIVIL ENGINEER
LIBERTY RIDGE L.L. C.
9125 10TH AVES.
SEATTlE, WA 98108
PHONE: (425) 226-1000
FAX: (425) 228-4924
PACIFIC ENGINEERING
DESIGN, LLC
4180 LIND AVE S.W.
RENTON, WA 98055
PHONE: (425) 251-8811
FAX: (425) 251-8880
GEOTECHNICAL
ENGINEER:
SURVEYOR
EARTH CONSULTANTS, INC.
1805-136TH PLACE N.E.
SUITE 201
BELLEVUE, WA 98005
PHONE: (425) 643-3780
CENTRE POINTE SURVEYING
33701 9TH AVE. S
FEDERAL WA Y. WA 98003
PHONE: (253) 661-1901
VICINITY MAP
,: '--"""'''''-+--='''"",""",~~.~~~' '--t I aI' 6"",'00 , +---\ ~ WETlAND "B" (UNREGULA TED CA TEGORY 3 -2,139 SF)
\:~I • \'" 1v1V'~RTI (S ACRE\li~AC1:; UNF<ECO~mED,
Fl R ELi (\;1 : I'~ J\ l~ Y FJ L_ /\ -r () F·-RiD G r_ V! [VV
t,i=) P L! c,Ll, Ii C)N F)ti'~ U iN G ,A, T C! T ()~
\,! '20' PRIVA TE AIl;CESS AND \ ,:.,r /
" 1£ • \ >' UTILITIES EASEMENT '~, ./ / 1)-"'----__ ',-' ) SHARED I /
I... I "-_____ j / ,-'-~::::_
/
N.E.2ND
PL. (PRIV,\ ~
ROAD) "\
--~-----I-
\; 17, I' I •
I 3>852 sq.tt,
: L. - --"-;;-8fft ---:..:;oj ..... JI ,-----------r
: 18i I
VI",.",..m i 3,819 sQ.ft. I I {'-----Wi k -""-.--II!!!
,------7---r
I 19\
I ' , ,,3,907
'---:-----1--
\~ \ 20 L'r"''''
\ \ \ \ 3, ~84 sqdt. \
~i!iI!L-Me;--.l.
---\--,-, 21 \ \ \
, \
4\863 sq. ft.
\--':;;;~,'
WETlAND -"A
(UNR£GUL-AiED
CATEGORY 3
r----r----, ,
, I I , ,
'10 :f: 9 II 8 7 : : 6
I 3,801: : 3;8(11: : 3i801 , : 3,801: : 3,801
I, sq. f.,!;,', " sq:ft. II I ~q. I I Sq.ft. I II sq.ft. . I: I, I \ I
I / I I I I I I I ,I I
L,,_.-J L_'.-J L_~ L_
1/ I I \ I I I I
~-~~-~~~j.~~~~-~~-~
r---------------
I I 55 I I J 5,040 sq. ft. :
~ .... -.-----------~
\53 5,353 sq.ft.
\ .rd----
_-tv~ __ ._
!----,
3,130 SF) , '\ yv.. 'OEllAHD A '\ I 3130 SQ. FT_, --.c--Iv;.-----
, I
/ .___-~<fl ~ , __ . e---"'"
r----
I
I I
'5 1 I I
: 3,801 :
I sq. ft. I
I I
I I I L _.-J
I I I
r----
I ~ I I : 3,9 1 sq.ft.
r---""!"------
: '44
I -'0',921 sq. ft.1 I'
.----45---,'
I 3,921 sq.ft.
• r----------l-
I 47'1 ~~"",,'--="',_;----4,018 54 ft. ", -Jj~iiiIiii ::.i .. ~'~ ...... ~;~-~---____ .... _L.
I sq. ft. :
I I
I I 1--'
9 { " ~ ~ '.' ,~, / TRACT A / '\'0, ~;,,-----1 ___ -;.;: " __ _
PA VEMENT AND SIDEWALK
NORTH OF ELMHURST TO
BE INSTALLED IN CONJUNCTION
WITH RIDGEVIEW COURT
""-'--h;I'-1L - -___________ ,
-ti/-t-'----15.5' EX. R-O-W
',-TO BE VACA TED
\ , , j ,,~I-I!+""-N~J BtJOIOtTAR Y
u--EXISTING BOUNDARY
FU[
.'
IIIIC" v G L_
..:.-tB---fi.:f7~MCzr STRUCTURE S TYP.)
-+1+---20' A TTACHED GARAGE
SETBACK (TYP.)
(TYP.)
SHEET INDEX
POI PRELIMINARY PLA T
P02 COMPOSITE UTILITY PLAN
P03 TREE CUTTING/LAND CLEARING PLAN
P04 NEIGHBORHOOD DETAIL MAP
P05 BREMERTON AVE NE. AND ROAD B
PRELIMINARY PROFILE
P06 ROAD CROSS SECTIONS AND
ROAD A PRELIMINARY PROFILE
P07 GRADING AND DRAINAGE PLAN
P08 EXISTING CONDITIONS
25 50 100
VERTICAL DATUM
CITY OF RENTON, NA VD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT/852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4T1-! STREET AND 148TH AVE. Sf: MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N., RANGE 5E., W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE i9.1' SOUTHWEST OF THE WEST COLUMN OF GATE.
ELEVATION= 407.96 FEF.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
_I~'_~I
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00'17658'30.28" COUNTERCLOCKWISE WAS
APPLIED AT A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE 'rVlLLAMETTE MERIDIAN. THE NORTH AMERICAN
DATUM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND TO
BE 180903.998/1316622.321 AT THAT POINT. THE INVERSE OF BOTH THE
SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID SCALE
FACTOR OF 1.000002187 WAS APPLIED TO THE GRID COORDINATES FOR
SHOWN GROUND DISTANCES.
ii·
SCALE: 1" -SO'
NOTE:
FOR LOCA TlON OF SEWER, WA TER AND
STORM DRAINAGE SEE SHEET P02
32,922 sq. ft. J' ',-i, ... "
(DETENTION) 10' UTI!.ITY ", '-...... mt:.~;;=;;=!;it;;iii1i .. ~ ~~;~~~~
EASEMEJq (TYP.) 00,,,, ,,_ ,
b __ -UNDER CONS~UCTION
, (DEPICTED AS PER LAURELHURST -------J l'
1--------~"'-
10
1--..,. -----_
/
/
I '-
~WF FLAGGING AL'oNG EAST
EDGE OF MAPLEWOO[}_
CREEK=100 YEAR FLOOD
PLAIN ,--',
/
\
/ 46
I L=1 I I ,~-n7:-_-
J ! "'--23 ·rrl
; 24. ~ 4861 II 4,750 I I ' I sq. ft. I I sq. ft.
I I I
I I I ----L ______ J L ____ _
--,
1\---1
I \ I I
l-"2s--_'~' :26
I 4,750"'" I 4,750
sq.ft. : 7--sq.ft.
I I I ".
I I L ____ _
/"
\ CONSTRUCTION lORA WINGS)
\----\ ---.~-------~,~ -----------
"-~ ------/
UNDERNEDjBLANKET
EASEMENT
RIGHT TO MAKE NECESSARY
SLOPES FOR CUTS OR FILLS
UPON SAID PREMISES FOR 136 TH
AVE S.E. AS GRANTED BY DEED
RECORDED APRIL 3, 1962 UNDER
RECORDING No. 5407391.
1 l!l "". i ~
r-I-=::c-" :
I 1>') It 1
PROJECT NO,: 02054
DRAWN BY: ..JGC
ISSUE DATE: 12-01-04
SHEET REV,:
PREUMINARY
PLAT
DEllE' ') ..... , P,\~t-~",. en\' ''''~-ii P;j~i'r(\'IN{" ,·'r -:t-),j {.:,.;;: 'i. .:;
DfC 2!J 21Ja~
f:Jr:,"'1"
' ... ...,
0, '054HC01-P01
P01
SHEET 1 OF 8
,
" z
en <0 -,
w
U " o
(/)
::5
a.. «
::?;
..J
~ o
o o o I a: g
I
CJ
W Z
REVISIONS
" " 0.1-______ --1
U.Z a ~ w ., ~ « Z U 'n
o' W '3 () ~ (t:
I ~ 11
"' ~ • C>
• ::;
Cc
~ ~, .e -~
~-.0 z~
..J--.~ 'd~ ~z "0 '$~
0 I
'0 0 N
II I " , • w ..-z 0
~ < 0\
X X X
" 0 \" w
'" z " <r '" " W ~ "
" w '" x
.... ... 0 a. ...
0>0 o!::
I/) 1/)'-..x:.E 5E 3='0 «
.~ ~ :Ow :> ' 0.0. 'c 010 e ,-E '0 ... '-Q) .i:E 'E m-eN
'c~ eo> Eo> 0. ... (!)
~
w I (3 ~"z ~:~ zO ~oo ~ 0 o~< ~o
f-Z':::l <~< -0
" w 8 I "
~
" '" 0 <r ~ ~ «
~ 0. 0. «
~ « 0
>-CD
z o
iii
5
UJ ~
::'r=N E "'~"''''''TH''' .. , ...... S ...................... ~ r·"M"'C"""""" .~
, ,I '~
2 3
MARTIN'S
S.E,
68 67
I
I' 8-50
Z 3 4 5
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
8
4
19
-------GJ ______ "" 0'<)
~ ~
(3)
(2)
)
(I)
~~ ___ .L.':'--"-~ ___ . __
(3)
(2) (4)
~~
4.76 Ac.
2.64Ac.
1'/---
'/.,39 Ac.
" , I
'~:89
" ''.::-=-= =
\~--------------------~--c ~
®
0Iz816
S.P. 882065
(I)
'. (3)
1.50 Ac.
~ ttl
4.32 Ac.
~------
2.30 Ac .
~ .. 2,30Ac.
®
CURRENT CITY LIMITS
4.61 Ac.
[J)IIB ® -I-~-------
200 400
I I
VERTICAL DATUM
CITY OF RENTON, NA VD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE, SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N., RANGE 5E" W.M.
ELEVA TlON= 454,78 FEET.
SITE:
SET COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GATE.
ELEVATlON= 407,96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GL9BAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES, A
CONVERGENCE ANGLE OF 00%':17658'30.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WlLLAMETTE MER!DIAN, THE NORTH AME"?ICAN
DA Tl.JM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND TO
BE 180903.998 / 1316622,321 A T THAT POINT. THE INVERSE OF 80TH
THE SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID
SCALE FACTOR OF 1.000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES .
PROJECT NO,: 02054
DRAWN BY: .JQC
ISSUE DA TE: 12-01-04
SHEET REV.:
P04 , £I,.,.,.,jj-pp
"LLlllLO~' ====================~~===~~~~======::============~=======::::::::=========================================================~~~~ ~ z
;;:
SHEET 4 OF 8
REVISIONS
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
o z
~ z ~ ~ B ~ is u; "ELMHURST" RESIDENTIAL SUBDIVISION
w ~ ifl
~ ," o
31------1
u.z 00 ~~ -w Oa:
'::; "1------;
" "'
"0 to
II •
HI-t--+-+-+----l
>-(D
x HH-+-+-+--t
5
Ul > w a::
DENSITY CALCULA TlONS :
R/W AREA = 1. 72 ae. OR 74,923 sq. ft.
STREAM ACREAGE = 10' WIDE AREA SOUTH
OF NE 2ND PL., AND 7' WIDE AREA NORTH
OF NE 2ND PL. = 0.09 ae OR 3,808 sq. ft.
TOTAL AREA = 9.60 ae. OR 478, I 76 sq. ft.
PROPOSED ACCESS EASEMENT AREA =
0.03 ae. 1,261 sq. ft.
PROPOSED # OF LOTS = 64
ZONING RIO, SUBJECT TO A DEVELOPMENT
AGREEMENT (KING COUNTY RECORDING
#20040908000083)
- ----~~.::;:
-----~...-J
I ; ,
:/ ,
N.E.2NO-1{
PL. (PRlVA, 7t: i
ROAD) "', \
--.-----+-->,-,i/
t--.-------" -Tn
,I
.-~
I , ' ;
l~
I
I
f-----------r+-i'
\./
f---------,,"-,~
'! ('I i 'oj
--------1+
\
\
47
I
DENSITY = 64 LOTS
TOTAL AREA (ae) -R/W (ae) -STREAM (ae) -ACCESS (ae)
64 LOTS DENSITY =
~~----~----~----~~-9.60 ae -1. 72ae -0.09 ac -0.03 ae
DENSITY = 64 LOTS --------------------7.76 ae
DENSITY = 8.25 du/ae
I ~~,\
L_ --Y-oe---
I " / 46
SITE INFORMA TlON :
1. EX. SITE AREA = 9.49 ae
2. EX. R/W TO BE VACA TED
(BREMERTON AVE.) = 0.11 ae
3. OVERALL SITE AREA
(INCL. VACA TED AREA) = 9.60 ae
4. R/W TO BE DEDICA TED= 1.72 ac
OWNER/APPLICANT: LIBERTY RIDGE L.L.C.
9125 10TH AVE S.
GEOTECHNICAL
ENGINEER:
EARTH CONSULTANTS, INC,
1805-736TH PLACE N.E.
SUITE 201
VICINITY MAP SEA TTLE, WA 98108
PHONE: (425) 226-1000
FAX: (425) 228-4924
BELLEVUE, WA 98005
PHONE: (425) 643-3780
CIVIL ENGINEER: PACIFIC ENGINEERING
DESIGN, LLC SURVEYOR CENTRE POINTE SURVEYING
33701 9TH AVE. S
FEDERAL WA 1. WA 98003
PHONE: (253) 661-1901
4180 LIND AVE S.W.
RENTON, WA 98055
PHONE: (425) 257-8817
FAX: (425) 251-8880
PAVEMENT AND SIDEWALK
NORTH OF ELMHURST TO
BE INSTALLED IN CONJUNCTION
WITH RIDGEVIEW COURT
SHEET INDEX
POI PRELIMINARY PLA T
P02 COMPOSITE UTILITY PLAN
P03 TREE CUTTING/LAND CLEARING PLAN
P04 NEIGHBORHOOD DETAIL MAP
P05 BREMERTON AVE N.E. AND ROAD B
PRELIMINARY PROFILE
P06 ROAD CROSS SECTIONS AND
ROAD A PRELIMINARY PROFILE
P07 GRADING AND DRAINAGE PLAN
P08 EXISTING CONDITIONS
......... --NEW BOUNDARY
',U .. ~' .u----EXISTING BOUNDARY
I
I I
50 0 25 50 100
I I ! I • .... •
GRAPHIC SCALE
SCALE: 1" -50'
I~o----------
3
t--~-'i'r~'-.-. ---
',' I :
4
'I I
\.\J..-:r--EXISTING \T _B9U_CND_AR!_
\. ...J
NOTE:
FOR LOCA TlON OF SEWER, WA TER AND
STORM DRAINAGE SEE SHEET P02
.--UNDER CONS~UCTION b
(DEPICTED AS fER LAURELHURST
CONSTRUCTION I ORA WINGS)
~,----- ---_.,----------
UNDERNEDjBLANKET
EASEMENT
RIGHT TO MAKE NECESSARY
SLOPES FOR CUTS OR FILLS
UPON SAID PREMISES FOR 136 TH
AVE S.E. AS GRANTED BY DEED
RECORDED APRIL 3, 1962 UNDER
RECORDING No. 5407391.
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT/852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 748TH AVE. SE MARKING THE
NORTHWEST CORNER Of ':ECTION 14, TOWNSHIP 23N., RANGE 5E., W.M.
ELEVA TlON= 454.78 FEfT,
SITE:
SET COTTON GIN SPIKE 19.7' SOUTHWEST OF THE WEST COLUMN OF GATE.
ELEVA TlON= 407,96 FL r.
BASIS OF BEAf<7fNG
TRUE NORTH, BASED Uf'CN GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINCTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00'17658'30,28" COUNTERCLOCKWISE WAS
APPLIED AT A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WILLA METTE MERIDIAN. THE NORTH AMERICAN
DA TUM OF 7983//991 (NAD 83/91) GRID COORDINA TES WERE FOUND TO
BE 180903.998/1316622,321 AT THA T POINT. THE INVERSE OF BOTH THE
SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID SCALE
FACTOR OF 1.000002187 WAS APPLIED TO THE GRID COORDINATES FOR
SHOWN GROUND DISTANCES,
LEGAL DESCRIPTION
PARCEL A:
THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE FOLLOWING DESCRIBED
PROPERTY: THE NORTH HALF OF THE SOUTHEAST QUARTER OF THE
NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP
23 NORTH, RANGE 5 EAST, W,M.;
EXCEPT THE EAST 37,5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE NORTH
HALF OF TRACT 5, MARTIN ACRE TRACTS, ACCORDING TO THE UNRECORDED
PLA T THEREOF.
SITUA TE IN THE COUNTY OF KING, STA TE OF WASHINGTON,
PARCEL B:
THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER
OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP 23 NORTH, RANGE 5
EAST, W.M,;
EXCEPT THE EASTERLY 7,5 FEET THEREOF FOR ROAD;
(ALSO KNOWN AS THE SOUTHERLY HALF OF TRACTS 5 AND 6, MARTIN ACRE
TRACTS, ACCORDING TO THE UNRECORDED PLA T THEREOF.
SITUA TE IN THE COUNTY OF KING, STA TE OF WASHINGTON
PARCEL C:
THE NORTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER
OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP 23 NORTH, RANGE 5
EAST, W.M.;
EXCEPT THE EAST 37.5 FEET THEREOF FOR ROAD;
AND EXCEPT THE SOUTH 110 FEET OF THE EAST 215 FEET OF THE "".~" ..
PROJECT NO.: 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01-04
SHEET REV.:
PREUMINARY
PLAT
O:J54HC01-POl
01
1 OF 8
REVISIONS
l.J o it '" ~ w
tl a: :::>
I
~ ...J
W
z « ...J
Il...
~
...J
5
~
CJ)
~ ~ 8
~I------I
~ " c
u.z o~
~z -w Oa:
:~ ~I------I
"' w x
"0
L()
II • .-
x x x
>-ID
x 1-1--+-+--+-+---1
z o
Vi :> w
C<:
-. "-,
.
/1:
ORIFICE
CONTROL
STRUCTURE
/
PROPOSED -__ ,
EMERGENCY
OVERFLOW
PROPOSED
CB (TYPE I)
(TYP.)
/\CRE,lR
\
\
PROPOSED --i;l\-~~+-~~:::;~ ENERGY .
l
/
/
/
PROPOSED
2 -CELL
DETENTION POND
tl't£T POND")
PRO SED
IS' A CESS
ROAD
ROPOSED
12" ST
\
\
\
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
" 'f I . T/""l fjji. 1 ,. -u4 1
/1 I
L
I
f
\
PROPOSED
CB (TYPE I)
\(TYP.)
\ -/'
C:OURT
RE['Hm~)
~ I
I
I
i \ ~
-~ "j
,-,' L
)
TF~/\CT
HI/ •. ' TER wETER
FUE VUE
PROPOSED
12" ST
LLi 2:
~
PROPOSED <t
CB (TYPE I) ~
(TYP.) 0
" ~
F-'-''tM-Ir--. i
1 '
4
ffi
m ~
o ,.J
1 --.--~-----.. ~ ~
Ii
I I
8
1
1r-
t 1
1
I 1
.~~"1-"
-'-~"-j
I
i
i
I
_ 1...-_-=_="-_=~_ = -=_--_=-=~_ "_
\
\
\ I
\ -.~ J 1_ --.----. "-
f-
\
\
_'-_-j--
I _"~._l__O _ I
'[ , ~+"I
1 !
'-....... '"
'-" --. I " ... ,,---~ ~''-":::-:~l
'. ", 4,3 ; :
50 0
_~~~~'_. n--~
GRAPHIC SCALE
SCALE: 1--50'
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT/852:
FOUND PUNCH IN J" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE, SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N" RANGE 5E., W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SET COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GATE,
ELEVA TlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00%%17658'30.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARK IN J" KING COUNTY SURFACE BRASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST, AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WlLLAMETTE MERIDIAN. THE NORTH AMERICAN
DATUM OF 1983/1991 (NAD 8J/91) GRID COORDINATES WERE FOUND TO
BE 180903.998 / 1316622.321 AT THAT POINT. THE INVERSE OF BOTH
THE SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID
SCALE FACTOR OF 1.000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES.
LEGEND
-•
IIIl
III!J
T.
--I
~"------' I I
I
SANITARY SEWER CLEANOUT
SANITARY SEI't£R MANHOLE
FIRE HYDRANT ASSEMBLY
CAP, WA TER MAIN
W/TEMPORARY 2" BLOWOFF ASSEMBLY
WATER METER
ELBOW
CB TYPE I
CB TYPE I W/SOLID LOCKING LID
CB TYPE 1/
CB TYPE 1/ W/SOLID LOCKING LID
PROPOSED EASEMENT
PROPOSED 8" DOWNSPOUT MANIFOLD
PROPOSED 6" DRIVEWAY DRAIN CONNECTION
EXISTING PAVEMENT
PROPOSED PAVEMENT
PROPOSED SDEWALK
~
Z ~ W II:
PROJECT NO, 02054
DRAWN BY: .JQC
ISSUE DATE: 12-01-04
SHEET REV,:
GRADING
AND DRAINAGE
DEVF:f<~l ::'L., ~)~:\NG eny ,:/-! -,~-.• ~,:
OE.(' ., i ,,, -'.' t . ~ ._ < I
02154GR01 ~P07
P07 \ 111-
~LJ~~~L~!'lJ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::~::::~::::::::~~~~~~~~~~~~::::~::::::~I~I~I ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~S~H~E~ET~~7~O~F~8~~
REVISIONS
<0 z
'" ~
z « ...J n..
~
...J
§
~
(/)
~ ~ 8
~I-----""
.
u.z O~
~Z -w Oa:
In'-~
~~ 01------1
-o
Lf}
II • .-
a::
Cl.
Cl. ..:
~ ..:
Cl
z o
Vi > "-' a::
ENERGY
I
I 'IS' 1./ (
I; ~
/
PROPOSED
CB (TYPE I)
(TYP.)
~ I / \
2-CELL , \
/
PROPOSED PR SED
_________ ~ DETENTION POND 15~CESS
-~ ("WET POND") ROAD
---.... ~ ------------ROPOSED
12" ST
E3
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
, " Ii
1,1 8 I,'
I I i II I
I I I i I I I
I z ~ I I w.~
-.,..",~ I--~~ II '. ""I -'I
I I II I \ I .11'''-2S--1 IT-24 11 L ~5 '_ II 1,1 I ----~_.J
I I I I '
\
\
/
/
\
PROPOSED
CB (TYPE I)
'\TYP.)
/
46
'ii') \ I'i I, ! f\. Iu", .... _, I
./
~
I
\ ~ , ,
! ! , ,
J
./
./
,
FUE VU[
PROPOSED
12-ST ~
PROPOSED <:(
CB (TYPE I) :z
(TYP.) 0
~
ffi ~ i
i
I
8
~r-
I I
I
I I
----l--
I
I
I
I I
.--_I·"i I
I
1
__ L-_-::-_ =-'=-..0="---=-" """=' -=--_-=-_.".1. '""'"
, ! I
i ' I
\
! \
69
I \
I ----.---1
1
__
I ---______ L
'-.
'--.. ,
-7 \ . \
( .
I'
,
-i--J
I
, "
" ", I
\
\
'-. "
'--', ,,'~\: I
Lk3
I I I
11-
50 a 25 50 100 I.-a-t t t
GRAPHIC SCALE
SCALE: 1" -SO'
VERTICAL DATUM
CITY OF RENTON, NA VD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852:
FOUND PUNCH IN J" KING COUNTY SURFACE BRASS DISC AT THE STREET
INTERSECTION OF NE 4TH STREET AND 148TH AVE. SE MARKING THE
NORTHWEST CORNER OF SECTION 14, TOWNSHIP 23N" RANGE 5E" W,M,
ELEVA nON= 454,78 FEET.
SITE:
SET COTTON GIN SPIKE 19,1' SOUTHWEST OF THE WEST COLUMN OF GATE.
ELEVA nON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES, A
CONVERGENCE ANGLE OF 00%%17658'30,28" COUNTERCLOCKWiSE WAS
APPLIED AT A PUNCH MARK IN 3" KING COUNTY SURFACE 8RASS DISC,
AT THE STREET INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NOR''HEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WlLLAMETTE MERIOIAN. THE NORTH AMERICAN
DATUM OF 1983/U191 (NAD 83/91) GRID COORDINATES WERE FOUND TO
8E 180903.998 / 1316622.321 A T THAT POINT. THE INVERSE OF 80TH
THE SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID
SCALE FACTOR OF 1.000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES.
LEGEND
-SANITARY SEWER CLEANOUT
• SANITARY SEWER MANHOLE
FIRE HYDRANT ASSEMBLY
CAP, WA TER MAIN
W!TEMPORARY 2· BLOWOFF ASSEMBL Y
WATER METER
ELBOW
IIIIl CB TYPE I
L
I
CB TYPE I W/SOUD LOCKING UD
CB TYPE /I
CB TYPE /I W/SOUD LOCKING UD
PROPOSED EASEMENT
PROPOSED 8-DOWNSPOUT MANIFOLD
PROPOSED 6-DR/~WA Y DRAIN CONNECTION
EXISTING PA ~MENT
PROPOSED PA~MENT
I i PROPOSED SIDEWALK
PROJECT NO,: 02054
DRAWN BY: .JGC
ISSUE DATE: 12-01-04
SHEET REV,:
GRADING
AND DRAINAGE
DE" " . "', L ,~ " ~.~ -J 1
RECE.IVED
02C54GR01-P07
P07
iii SHEET 7 OF 8 "l~~LJLJ~lJ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::~~::::~::::::::::~::::::::::::~~~~~::::~::::::::~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~~~~~~~~~~~ ~ 0 ~ z
"
I~EVISIONS
o z
w u
'" ,,'
« " ~
tl a: :::>
I ~
...J
W
N a i5 Q.
z « ...J a..
~ ...J
~
~
~ ~
8
i!:t-------t
w ~ c
u.z O~
~Z -w Oa:
~ :J;
b ,,1------1
a
10
II • ..-
a::: Q.
Q. «
z o
(I)
> w a:::
PROPOSED
CB (TYPE I)
(TYP.)
/
I ! j .i I
iii , '
! I ! I , !
PROPOSED71n~:-~~~~~~~~~1r= 8" W
/
PROPOSED T1'i~-.j. ....
12" ST
\ -----.,,---H+t----
~~~~sED~iryilt,~\Br--Ji~8~.--1~1l[j
.,. "Aj k ~ t![p--~-~---I~--lL.ft-ti~
N.E. 2ND W[ ,t ! I'
, \ PL. (PRIVA~'I' \
ROAD) \ \
PROPOs£Q ll'-::-~iW\~
_BEND (TYP.r \ '-.
I--P-R-OPOSED" , I, \ '.. \lrrl-r-
CB (TYPE I)
(TYP.)
PROPOSED --.;
ORIFICE
CONTROL
STRUCTURE
PROPOSED
EMERGENCY
OVERflOW
PROPOSED----~1f~~~~~::~~~~ ENERGY .
EMERGENCyg
SPILLWAY
\
\
47
/
i /
\
/
PROPOSED
DETENTION ~~ 1 POND
--~~
PR SED
IS' A CESS
ROAD
ROPOSED
12" ST
SEC. 15, TWP. 23 N., RNG. 5 E., W.M.
PROPOSED
8" SS
PROPOSED
8" W
D
I
:...;.;.;.. --
f--l
" If, I I
f8: 1\:, 7 :
:1 I I ", I
" I I • I --,Z...l 1-"
r-----
I 61
, I
"7, {;.-,
'-..j ',,..J
,--l
I I
161
I I
I I
I I
I----l
I .., r T/"'""l
/ Ji.... I ''-''flt/","-.:J4 I . 1/ I
w..II' i I I
LJ
PROPOSED \
GA 1"£ VAL VE PROPOSED \ TEE R[\JWOOD\~nH \
\ -~ ~ \ ~-~ ~~
I
(
~ I
I
i ~
, , , ,
, -'-j
317.02' <31&.83' >
I ./
I}
1 J
.. r·· .
PAVEMENT AND SIDEWALK
NORTH OF ELMHURST TO
BE INSTALLED IN CONJUNCTION
WITH RIDGEVIEW COURT
--~ T-.~~~tT~YL--
\
PROPOSED
8-W
PROPOSED \ fB (TYPE I)
(TYP.)
/--
r--l
I '.. I
11121
I I I Tt I' ---. i
I I I
I----l PROPOSED
8" W
PROPOSED
1"£E
CII[~ \_/il~ -~, __ '~'!J1~ff01'f ,..-'"j c_
TF? /', C' T \ ,'." ..... -' I
\
/'
I~_-PROPOSED
SSMH (TYP.)
PROPOSED
8" W
"-'-.. ....
8
. ,
!
c-O
~r-
i I
!
I I
I I
.. __ 1-1
I
I
-+-1
I I
I
I
I
I
.... '. .... , I
....... '-",
'-"" 4~~"~~
,/ /' \ 1'1 1-
50 a 25 50 100
~I _~-~_"~~I ~I~_I
GRAPHIC SCALE
SCALE: r -50'
VERTICAL DATUM
CITY OF RENTON, NAVD 88 CONTOUR INTERVAL = 2'
BENCHMARK
BASE:
KING COUNTY POINT # RENT1852:
FOUND PUNCH IN 3" KING COUNTY SURFACE BRASS DISC AT THE STREE:T
INTERSECTION OF NE 4TH STREE:T AND 148TH AVE. SE MARKING THE
NORTHWEST CORNER OF SECT/ON 14, TOWNSHIP 23N., RANGE 5E., W.M.
ELEVA TlON= 454.78 FEET.
SITE:
SE:T COTTON GIN SPIKE 19.1' SOUTHWEST OF THE WEST COLUMN OF GA TE.
£LEVA TlON= 407.96 FEET.
BASIS OF BEARING
TRUE NORTH. BASED UPON GLOBAL POSITIONING SYSTEM (GPS)
LAMBERT GRID WASHINGTON STA TE NORTH ZONE COORDINA TES. A
CONVERGENCE ANGLE OF 00%%17658'30.28" COUNTERCLOCKWISE WAS
APPLIED A T A PUNCH MARK IN 3" KING COUNTY SURFACE BRASS DISC,
A T THE STREE:T INTERSECTION OF NE 4TH ST. AND 148TH AVE. SE,
MARKING THE NORTHEAST CORNER OF SECTION 15, TOWNSHIP 23 NORTH,
RANGE 5 EAST OF THE WlLLAMETTE MERIDIAN. THE NORTH AMERICAN
DATUM OF 1983/1991 (NAD 83/91) GRID COORDINATES WERE FOUND ro
BE 180903.998 / 1316622.321 AT THA T POINT. THE INVERSE OF BOTH
THE SEA LEVEL CORRECTION FACTOR OF 0.999981824 AND THE GRID
SCALE FACTOR OF 1.000002187 WAS APPLIED TO THE GRID
COORDINA TES FOR SHOWN GROUND DISTANCES.
LEGEND
-•
II1II
II
L
T
SANITARY SEWER CLEANOUT
SANITARY SEI\£R MANHOLE
FIRE HYDRANT ASSEMBLY
CAP, WA TER MAIN
W!TEMPORARY 2-BLOWOFF' ASSEMBLY
WATER METER
ELBOW
CB TYPE I
CB TYPE I W/SOLID LOCKING UD
CB TYP£ /I
CB TYPE /I W/SOUD LOCKING UD
PROPOSED EASEMENT
PROPOSED 8-DOWNSPOUT MANIFOLD
PROPOSED 6-DRIVEWAY DRAIN CONNECTION
EXISTING PA IIEMENT
PROPOSED PAVEMENT
PROPOSED gDEWALK
PROJECT NO,: 02054
DRAWN BY: .Joe
ISSUE DATE: 12-Q1-<>4
SHEET REV.:
COMPOSITE
UTIL111Y PLAN
DEC 282004
02,154CIJ01-P02
P02 ~ ','-'" I'
\ I I I SHEET 2 OF 8 ~l~LJ~JLO~'lJ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::~~~::~::::::::~~~~~::::~~~~!::::::!~::::::~I~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~~~~~~~~~ ~ z c, ~ c:
•
,
•
/'
( (
\
,
•
\..
~
" ~ !''''1 .. ~ ....
..J Q. \ -Guy wire anchor
,,,,_,, __ ,,iJ.. \.'t:1 ~ ~ ~;~t~e 4 .. -_~.,,"_.Hi;W'2r'c.
-U ,
CATCH BASIN ! t i:l. \ DRAIN MANHOLE
RIM 408.49 • ~ ~ cu I W \ RIM .!Ii 1. 53 12" CMP IE 406.34 E en ,. ~ 12~ CONe IE 402.61 \II
...J cn 6" pvc IE 402.56 N
I.L. 36~ CMP IE 400.57 E , .. \'!"'~,_CC ---\ ATCH BASIN f'1"tf"~--,~-"" ~ 40e 47 " ~ -------._.-.# -.. -.-----12H4~p' IE 406. 12 W
.'" .. ~,<I ~1 )J"" ~<:)".~r-: ~<$>:1'0 12" CMP IE 406.09 E
Fence pos ~ e.... I : ~oe,.ffJ .,p!>.E> ~. J'.'t.-4. .. ~ _ .;,..... _,'.
Match Line
0.... tTfo' • )t_ r. ' il'6' , J....0-'"
o'e>·<i'.> /)"
Fence IIpO 7'
.<!>.J
/
•
B
! • <:)
pdwer '7'91' pale '
-\--.' jfl"J'\ "J
: ,/., ~<:)"J' ... ~ 8 ~. .•
: . ,-\ ~/,.J
I ;n'11iQht
3.. "'0.,. i . ,
I ~~'~f
,\ ~<:J~' , ;!",.":>'
~
I
I
r!i:''''' • I
i
\
• •
, ;----
'Cl. I (!)
-0 '0 ,I-,I-
BOUNDARY/TOPOGRAPHIC SURVEY
A portion of the
City of Renton,
NW 1/4
Legend:
s
•
III
o ..
lOll
t·)
'* o ..
= Monument found, Visited August 1. 200.
= #4 Rebar with yellow plastic cap stamped
"22338/38965" to be set.
"" Sdnitary sewer manf101e
= S~nitary sewer clean out
= Storm manhole
= Catch basin
-Water mete,
= Telephone box
:: Sign
= Power pole
= Light standard
of the NW 1/4 of Section 15,
King County,
Township 23 N. , Range
, Surveyor s Notes:
1)
2)
3)
4)
5)
6)
The monument control shown for this site was accomplished
by field traverse utilizing a one (1) second theodolite
with integral electronic dIstance measuring meter
(Geodimeter 600) and Real Time Kinematic (RTK) / StatiC
Glob_I Positioning System (GPS). Linear and angular closure of the traverses meet the standards af WAC
332-130-090,
UtilIties other than those shown may exist on this site.
Only those which are visible or having visible evidence of their installation are shown hereon.
This survey represents physical improvement
they existed July 1. 2004. the date of this survey.
conditions as
field
Full reliance for legal descriptions and recorded
easements have been placed on the title report from
Stewart Title Guaranty Company Commitment order No.
204100352. dated November 12. 2004. No additional research has been attempted.
Offset dimensions shown hereon are measured perpendicular to property lines.
This site is subject to
for cuts and fills upon
Southeast as granted by Recording No. 5407391".
"right to make necessary slopes said premises for 136th Avenus
deed recorded April 3. 1962 under
5 E., W. M.
Washington
•
Match Line
Description:
Parcel A:
The South 110 feet Of the East 215 feet of the following
described property:
The North half of the Southeast quarter of the Northwest
quarter of the Northwest quarter of Section 15. Township 23 North. Range 5 East. Wi11amette Meridian;
EXCEPT the East 37.5 feet thereof for road;
(ALSO KNOWN AS the South 110 feet of the East 215
feet of the North half of Tract 5. Martins Acre Tracts. according to the unrecorded plat thereof);
Situate in the County of King, State of Washington.
Parcel B:
The South half of the Southeast quarter of the Northwest
quarter of the Northwest quarter of Section 15, TownshIp
23 North. Range 5 East. Wi 11amette Meridian;
EXCEPT the Easterly 7.5 feet for road;
B
, .~. 1
• ;fo'
• Top
(ALSO KNOWN AS the Southerly half of Tracts 5 and 6.
.... 0
" Martins Acre Tracts. according to the unrecorded plat thereof);
Situate in the County of King. State of Washington.
Parcel c:
The North half of the Southeast quarter of the Northwest
quarter of the Northwest quarter of Section 15, Township
23 North, Range 5 East. Willamette Merid,an;
EXCEPT the East 37.5 feet thereof for road;
AND EXCEPT the South 110 feet of the East 215 feet of the remainder;
(ALSO KNOWN AS the North half of Tracts 5 and 6. Martins Acre Tracts, according to the unrecorded plat
thereof; EXCEPT the South 110 feet of the East 215 feet
of said Tract 5);
1fJ~·1
~.f;> •• Top
Situate in the County of King. State of Washington.
•
//
~ ~.
• --
t Centre 33639 9th Avenue South
! /. Federal Way, WA 98003
V P . t (253) 681-1901 --orne
t Sun \;1/ lil
UAA"."J Kieswetter ,." S Woods
DArn December 23, 2004 lOB.... 2257
i """" 1" = 20' ro. 'U., 2257
,
I
~"fC ,~. '_ :
-," _0 ,
,~.15 ,
;----
I
J
! I , ,
'c. 'Q) '0 '0 ,I-,,...
Gravel
~ ... "".Q
• Top
o
!
I
.N'
20
I
40
I
Scale:
1" --20'
•
•
•
DE" ). -t.. ,82f:D-',
lNDEXDATk NW_NW 15, T23N., R5E., W.M.
SURVEY FO~
Liberty Ridge. LLC
9125 10th Avenue South
Seattle. WA 98108
KING COUNTY, WASHINGTON
SHEET 1 OF 2
:WF
, . ..," I ~ TOPj
\ \
\
..,A
...\"
~c:.."'::.."~.
x
-:~-,
•
#" •
1.8'
on S
!
\
\
, .
,,-',-
~
\ . ~~"
\
top
\
\
-I
\
'-. "
\
\ \
• u o • ~
,
""" ",¢\
~ Top
14" I
,
'J , , r
I
I
\
\
I
I
I
I
\\"" \
V.' ,\
\
:'.-lITt--L
\
\
\
\
\
\
",,,\
• JoP
l-I
•
,
~w&.C ."",,·0,;; i\
\
I'
'),\I!(WF \ 1 f,.
\ \ \:¢.
\ f"P \ "
\
\
i " ' i TO.~.
~.,. ,
I
\
\
\
\
\ ,
\\
\
\
\ ,
\ I
'I"---Thl west li~e of the\
E1;2 of the ~w 1/4 \ Sec 15. Twp 3N, (:,
Rn g!\ 5E, WM #>~' '-\ \
6'
•
Legend:
\
\
SOLID LID
384.82 S
384.76 E
"
\
= Monument found. Visited August 1, 200.
\
•
&
• = #4 Rebar with yellow plastic cap stamped
"22338/38965" to be set.
Q = Storm manhole
~ ~ Catch basin
o ~ Si gn
~ ~ Power pole
)8( ~ Light standaro
\
\
\
\
\
\
•
• -
\
\
\
•
....
•
•
•
• .Jfo.'
WF dP4X
--
\ ""').+
\4., '"
\5_1'8
BOUNDARY/TOPOGRAPHIC SURVEY
A portion of the
City of Renton,
NW 1/4 of the NW 1/4 of Section 15,
King County,
Township 23 N. , Range
\
\
\ •
",..,1 .\ Toe",· -.. - -•• - . ---••
, --~1~-' /"
Day 1 ight· : .• - -.. --- - --- - - - - . -
ight
" .. "
\ "'~"!IIRetaining wall
• //
\
\
(
\
Match
11'Ret;3ining wall with cyclone fence
• ".' ,
Line A
) . '
/
CATCH BASIN RIM 399.72
4" ADS IE 39B ... ~S~O,.::p.
\
Asphalt
---L
\
--
•
I
I
f •
-
\
\
\
\
\
.' ~F dp5
•
•
•
\
\
\
•
,
. Fil ter
/'
/'
•
4 ",p,~:" --~
~-.-------
Benchmark:
Base:
--
The East-Wes Section line
Twp 23N, Rng
•
KING COUNTY POINT # RENT1852:
'." -',
•
1
Found punch in 3" King County surface brass disc at the street intersection of NE 4th Street and 148th Ave. SE marklng the Northwest corner of Section 14, Township 23N., Range 5E., W.M.
Elevation~ ~54.78 feet.
Site:
/
/
\
\
\ ¢' ,. ,
\
•
--
\
)
Set cotton gin spike 19. l' Southwest of the west column of gate,
Elevation~ 407.96 feet.
Vertical Datum:
City of Renton, NAVD 88
\
\
•
-, --.....
•
\.
\
\
\ •
-
¢'
hag wire fence
•
\
~,
•
/
/
1
/
/
-
/
,
I
I
, w
TO~. ¢.
•
" ¢.
•
",ncrete
\
\
¢"'--,,.,.-, retaining wall
r _.-/
•
Basis
/
./
¢' ". \
•
----'--
/
of
•
. . . . . , .. .. , .. '
S89 "14' 38"E 641. 39'
7"
,,"" '/'
.6' wood fence
Bearing:
. -fa'p' ~
~//':; ------
•
True North. Based upon Global PositIoning System (GPS)
Lambert Grid Washington State North Zone coordInates. A
convergence angle of 00°58'30.28" counterclockwise was
applied at a punch mark in 3" King county surface brass
disc, at the street intersection of NE 4th St. and 148th Ave. SE, marking the Northeast corner of Section 15.
Township 23 North, Range 5 East of the Willamette Meridian. The North American Datum of 1983/1991 (NAD 83/91) grid
coordinates were found to be 180903.998 / 1316622.321 at
that point. The inverse of both the sea level correction
factor of 0.999981824 and the grid scale factor of
1.000002187 was applied to the grid coordinates for shown
ground dlstances.
•
•
•
5 E., W.M.
Washington
.-,-
\
~ .. '.' Power w/ ~1'. power .. ,.,r... ..... J.>
l' E •
tP1'~
QPower
.'
pole
'i2'--,'_i,:;-:,,,.
.... _------
, l ,,' ,-
Building 6' wood
Edge of aspha
\
\
6'
;/
~
\ !;'.
\ u
Asphalt
Iron post for tennis net
Gal
_c .r I$J'/,.' i:J'/,.' ,p?>' "---><I'",-_}9~ ____ ~ ._ .. ______ . \""0'" q, ~'
<) ~ -----"
Asphalt
"-<:,'" .~
•
fence x
•
\
I
•
12-15-2005
---,
•
wall
•
Basketball
",.'
\
\
\
t
\
\ \
\
, ;
00
.J
fence gat.",~
•
•
¢' •
•
•
\
\ /
\
1
\
.,"'~ ,&; ,-'
/
~ u • OJ
Asphalt
./
a a z
/
7.5'
7.
--to· t. .... ,,~ Ili" ~ t:. " . ,ti'
---,. E
•
,/
~f.~ ___ Th~arth-South Center
S€ction line Sec 15,
Twp 23N, Rng 5E, WM --
• u o
r
~X
• C
'M ,
" • " fu "X
,-,;
•
'. ".
, ~,t : ,-,,--
;~ -'
--. ' ..
• u o • -
x
/
/
/
•
•
•
,
.K
o 20 40
•
¢.,
Sign
•
!~~I--~I
Scale:
1" -20'
line of ical curb
&. gutter
~ Centre 33639 9th Avenue South
•
Federal Way, WAc 98003
P . te (253) 661-1901 ---om
t Surveying
DRAWN BY:,J Kieswetter CHECKED BY: S Woods
DArE: December 23, 2004 JOB NAllE: 2257
sc"'" 1" ~ 20' JOB NO.: 2257
INDEX DATA:
SURVEY FOR
DEC) ,
R"C" " "" t;; r:. a ~:' i.,}
NW-NW 15, T23N., R5E., W.M.
Liberty Ridge, LLC
9125 10th Avenue South
Seatt lei WA 98108
KING COUNTY, WASHINGTON
SHEET 2 OF 2