HomeMy WebLinkAboutContract iT CAG-01-155 AGREEMENT GCA 2798 SR 169 Maple Valley Highway HOV/Queue Jump THIS AGREEMENT, made and entered into this '15 day of 0 — 20 d l , between the STATE OF WASHINGTON, Department of Transportation, acting by and through the Secretary of Transportation, hereinafter called the "STATE", and the City of Renton, 1055 South Grady Way, Renton, WA., hereinafter called the "CITY", WHEREAS, the CITY is planning construction or improvements under a project entitled "SR 169 Maple Valley Highway HOV/Queue Jump," hereinafter called the "PROJECT", and in connection therewith, the CITY has requested that the STATE participate in the PROJECT as herein described, and WHEREAS, the STATE is willing to commit matching funds to the CITY for the preliminary engineering phase of the PROJECT, and WHEREAS, it is the intent of this AGREEMENT to be supplemented in the future to provide for the construction of the PROJECT, and NOW, THEREFORE, by virtue of RCW 47.28.140, and in consideration of the terms, conditions, covenants, and performances, contained herein, or attached hereto and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: I GENERAL The CITY, shall act as lead agency in developing the preliminary engineering and environmental documentation for the PROJECT, as outlined in Exhibit "B", Scope of Work, attached hereto and by this reference made a part of this AGREEMENT. The CITY, through it's Consultant Perteet Engineering Inc., shall prepare environmental documentation which will meet the requirements of the National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA), all required permits, an approved design file, plans, specifications and estimate (PS&E), and the right-of-way plans for the PROJECT. 2798.02.agr.doc 1 1 Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction, and amendments thereto, and adopted design standards, unless otherwise noted. I I PAYMENT The STATE, in consideration of the faithful performance of the work to be done by the CITY, agrees to reimburse the CITY for the actual direct and related indirect costs, up to but not to exceed $300,000, or 50% of total costs, whichever is less as shown in Exhibit "A," Estimate of Cost, attached hereto and by this reference made a part of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the CITY, to cover costs incurred. These.payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of final audit, all required adjustments will be made and reflected in a final payment The CITY agrees to submit a final bill to the STATE within forty-five (45) days after the CITY has completed the work. III EXTRA WORK In the event unforeseen conditions require an increase in the cost from that agreed to on Exhibit "A", this AGREEMENT will be modified by supplemental AGREEMENT covering said increase. In the event it is determined that any change from the description of work contained in this AGREEMENT is required, approval must be secured from the STATE prior to beginning such work. Where the change is substantial, written approval must be secured. Reimbursement for increased work and/or a substantial change in the description of work shall be limited to costs covered by a written modification, change order or extra work order approved by the STATE. 2798.02.agr.doc 2 GCA 2798 f ' r IV RIGHT OF ENTRY The STATE hereby grants and conveys to the CITY the right of entry upon all land which the STATE has interest, within or adjacent to the right of way of the highway, for the purpose of performing the preliminary engineering under this AGREEMENT. V LEGAL RELATIONS Each of the PARTIES to this AGREEMENT shall protect, defend, indemnify, and save harmless the other PARTY, its officers, officials, employees, and agents, while acting within the scope of their employment as such, from any and all costs, claims, judgment, and/or awards of damages, arising out of, or in any way resulting from, each of the PARTY's negligent acts or omissions. No PARTY will be required to indemnify, defend, or save harmless the other PARTY if the claim, suit, or action for injuries, death, or damages is caused by the sole negligence of the PARTY. Where such claims, suits, or actions result from concurrent negligence of the PARTIES, the indemnity provisions provided herein shall be valid and enforceable only to the extent of the PARTY's own negligence. Each of the PARTIES agrees that its obligations under this subparagraph extend to any claim, demand, and/or cause of action brought by, or on behalf of, any of its employees or agents. For this purpose, each of the PARTIES, by mutual negotiation, hereby waives, with respect to each of the other PARTY only, any immunity that would otherwise be available against such claims under the Industrial Insurance provisions of Title 51 RCW. In the event that any of the PARTIES or combination of the PARTIES incurs any judgment, award, and/or cost arising there from, including attorneys' fees, to enforce the provisions of this Section, all such fees, expenses, and costs shall be recoverable from the responsible PARTY or combination of the PARTIES to the extent of that PARTY's/those PARTIES' culpability. This indemnification shall survive the termination of this AGREEMENT. 2798.02.agr.doc 3 GCA 2798 V1 VENUE In the event that any party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this AGREEMENT, the PARTIES hereto agree that any such action or proceedings shall be brought in a court of competent jurisdiction situated in Thurston County, Washington. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT as of the day and year first above written. CITY OF RENTON WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Jest/ Tanner By By Mayor (q"r7 I L,4u►n_. �, Title Title p14 '-)"Z APPROVED AS TO FORM: Date APPROVED AS TO FORM: '. Assistant Attorney General cz� l� ©4 CCity torney Date a&?ff� Or/, Date ATTEST: Marilyn P rsen, City Clerk 2798.02.agr.doc 4 GCA 2798 EXHIBIT "A" Summary Estimate of Funding Shares SR169 Maple Valley Highway HOV/Queue Jump Design Funding A. City of Renton $300,000 B. State $300,000' Total $600,000 STATE Funds Preliminary Engineering $300,000 Environmental Documentation; Design and PS&E Total $300,000 Notes: 1. The STATE agrees to participate in the PROJECT up to a maximum amount of $300,000 or 50% of the total costs, whichever is less. 2798.02.ExhbtA.doc GCA 2798 i 00 — F D o m Q Q bo �o b b ry b m o0 o a v i� m b b b Q Q b b Q ry F F- o S T \ b a o 0 _ Q U w N N Q N O O 0 V � a u co d T p a d _ T N p b9 h O ° O m b C O F p W o H 'o W C3. E e � W•� N 3 a 9 C Q Q G O C 6 G C O w W Q 2' F N m b o0 N N Q Q b b b 0 C v •;� b C p .o 6 O Q Q o0 b 00 00 O 00 Q O b b �O N N N �O O O C � W h O V1 p Uo o e ti n A .`v' o L5 E `" o °a " = Oa' A °c n.o O ¢ c 2 c = c ai v U € S c a r 00 U Y Al aU F- ��G � UU00 U '�(n FOOOarn¢ <n ¢ r-'vo — o aka` N d Q - x O. M N V M Q N 2+Q1 N.• H H „O:`^^N?HQ O H O O��D H H b N VOl Q H m H�^pH H H H H 00 F F� H H H H H V1 H H H H H H H H H H 01 Vl N N -• h < Q �1 N r O O V O h `O Q N N N N N �x b V O O Y 'p V H u N OC V O H Y T O Q Z v a� H 3 V^ e 0 y� � L � e h N � O G O H � p �N b b Q 00 N b b N O N o00 b m O N N m Q Q b m Q.b O0 S p ° » w � .5a. A e w O N b O L h VJ a H O O Q Q m L E � W m i F W H e c'9 9 e F Q Q Q N Q N Q N Q o0 Q m Q Q Q Q N Q Q N Q N m — S m C N O Y m Y W m r q Spq t � gg �, � 3 `� �; g � c� `� y v F w w' •c Q.q � 3 s W v] w �� 'S.0 � �. � � chi � `��1° � e � Hw p G � �•� .1 c g N v $ sue ` g°y �L—�u'- ?vii 3�v 5 •a u C u � o shy u ��— G�:._ O� p' ... G O 5 C C C G O C 0 06 O 2 FM H O H O d V h N w VI b b 0 b b h V C N 4 d .di n� y Y O U O a. rn'�Ux � F 00 N O � N u O O v h H N r b O 00 p d O V1 _O ry H L O N O b b b C Y c O eN�f C� 00 0 C W O � 0 W C W C7 C7FgOQ 0a > �U F . C o d a C p q 4 W H a F RQ m b O b b H H H H H b p N � L Qn N N oo b N oo d b r r � m � p� 00 N d A N e e V h 'O ed � Q � X o W� cS Pia�W az 93dwa1 x 8 Q EXHIBIT "A" CONSULTANT FEE DETERMINATION-SUMMARY SHEET SR 169 Maple Valley Highway HOV/Queue Jump Classification Hours Rate Cost Project Manager 476 x $52.88 = $25,171 Project Engineer 841 x $36.06 = $30,326 Transportation Planner 24 x $43.28 = $1,039 Traffic Engineer 176 x $27.88 = $4,907 Senior Planner 288 x $41.35 = $11,909 Drainage Engineer/PLS 281 x $27.00 = $7,587 Design Engineer 1016 x $21.00 = $21,336 Biologist 160 x $25.00 = $4,000 Survey Crew(2) 130 x $37.00 = $4,810 Project Surveyor 118 x $24.00 = $2,832 CADD Operator 956 x $18.50 = $17,686 Clerical 168 x $14.00 = $2,352 Total TOTAL DSC = $133,955 OVERHEAD(OH COST-including Salary Additives): OH Rate x DSC 168.8% x $133,955 = $226,116 FIXED FEE(FF): FF Rate X DSC 35% x $133,955 = $46,884 REIMBURSABLE& GPS Receiver $1,800 Geodometer $800 Total Station $800 Digital Level $100 Degross Aerial Mapping $11,300 APS Locate $1,500 Macualey Appraisals $5,000 Prints @.20 s.f. $4,500 VSSIM/SYNCRO @$15/hr $720 Mileage @.325 $1,073 CADD @$10/hr $9,560 Misc. $480 TOTAL = $37,633 SUBCONSULTANT COSTS(See Exhibit G): _ $155,730 GRAND TOTAL: _ $600,318 DATE 02-Aug-01 2798.02.ExhbtA.xls GCA 2798 EXHIBIT "A" ESTIMATE OF COST Project Hour Estimate CONSULTANT FEE DETERMINATION - SUMMARY SHEET MAPLE VALLEY HIGHWAY AT I-405 I DIRECT SALARY COST(DSC): Classification Personhours x Rate = Cost Vice President/Principal 35 $59.48 $2,081.80 Principal Engineer 191 $30.50 $5,825.50 Senior Engineer 75 $23.22 $1,741.50 Drafting 20 $23.90 Typist/Repro/Accounting 16 $478.00 $18.67 $298.72 TOTAL-DSC: $10,426 OVERHEAD (OH COST- including Salary Additives): OH Rate x DSC of 190.4% x $10,425.52 = $19,850 FIXED FEE (FF) FF Rate x DSC of 30.0% x $10,425.52 _ $3,128 REIMBURSABLES: Automobile Mileage $0.35 /mile 800 miles $280 Subcontract(drilling, FWD,traffic control) $28,000 An 1 ea $28,000 Laboratory testing $2,225 lea 1 ea $2,225 PtD rental $2.1 /day 6 days $13 TOTAL-REIMBURSABLES: _ $30,518 GRAND TOTAL: $63,921 PREPARED BY: Susan Chang DATE: 22-May-01 SHANNON & WILSON,INC. GCA 2798 EXHIBIT "A„ ESTIMATE OF COST Project Hour Estimate SUMMARY OF PROJECT COSTS CIVILTECH CORPORATION Project: Maple Valley Highway-CAG-01-071 (City of Renton) Direct Salary Direct Salary Classification Cost Total Hours Total Cost Project Manager $ 46.95 110 $ Senior Engineer 5,165 Engineer $ 34.44 168 $ _ 5,786 $ 25.00 152 $ 3,800 Technical Support $ 21.32 208 $ 4,435 Administrative Assistant $ 16.50 22 $ 363 Firm Total Hours/Salary Costs: 660 $ 19,548 Total Direct Salary $ 19,548 Overhead @ 163.37%: $ 31,936 Fixed Fee @ 30%: $ 5,864 Total CTC Labor Cost: $ 57,348 Direct Reimbursables: Reproduction: $ 300 Mileage $ 65 Tele/Fax/Postage/Courier $ 50 Reimbursables Subtotal: (Rounded) $ 415 Firm Total: (Rounded) $ 57,763 GCA 2798 EXHIBIT «k ESTIMATE OF COST Project Hour Estimate SR-169 ! SR-169 & 1-405 INTERCHANGE (Approx. 1,200 L.F.) May 23, 2001 Renton,Washington Page 1 of 1 Hough Beck & Baird SUBCONSULTANT FEE DETERMINATION Personnel Classification Hours x Rate = Cost Principal 16 x $ 49.00 = $ 784.00 Project Manager 20 x $ 34.50 = $ 690.00 Designer 79 x $ 26.50 = $ 2,093.50 Computer Tech Staff 132 x $ 22.00 = $ 2,904 00 Technical Staff 32 x $ 19.50 = $ 624.00 Admin/Clerical Staff 13 x $ 15.50 = $ 201.50 TOTAL DSC: $ 7,297.00 OVERHEAD COST(OH Cost-Including Salary Additives): OH Rate x DSC: 1.8537 x $ 7,297.00 = $ 13,526.45 FIXED FEE(FF): FF Rate x DSC: 0.30 x $ 7,297.00 = $ 2,189.10 SUBTOTAL $ 23,012.55 REIMBURSABLE EXPENSES: Mileage 60 mi. x 0.345 = $ 20.70 Reproduction/Copies = $ 775.00 Courier= $ 200.00 Film/Photo Developing = $ 38.00 $ 1,033.70 $ 1,033.70 GRANT TOTAL $ 24,046.25 PROJECT COST OR $ 24,046.00 GCA 2798 EXHIBIT "A" ESTIMATE OF COST Project Hour Estimate Subconsultant Fee Determination McCulley, Frick & Gilman, Inc. Project: SR 169 at I405 HOV Lanes Anticipated Personnel Classification Hours x Rate = Cost Senior Environmental Scientist 40 x $40.89 = $1,635.60 Staff Environmental Scientist(Noise) 52 x $18.52 = $963.04 Staff Environmental Scientist(Air) 42 x $17.31 = $727.02 Project Secretary 6 x $13.75 = $82.50 Total Direct Salary Costs (DSC) $3,408.16 Overhead Cost(OH Cost-inlcuding salary additives) OH Rate X DSC 138.59% x $3,408.16 = $4,723.37 Fixed Fee FF(percent of DSC) FF X DSC 35% x $3,408.16 = $1,192.86 Subtotal $9,324:38 Estimated Reimbursible Expenses Sound Level Meter $500.00 Travel ($0.345/mile) $75.62 Reproduction/Computers/Postage/Etc. $100.00 Subtotal: $675.62 $675.62 Grand Total $1.0,000.00 MFG Inc. May 22, 2001 GCA 2798 EXHIBIT "B" SCOPE OF WORK SR169-Maple Valley Highway HOV/Queue Jump PURPOSE AND BACKGROUND Purpose This Scope of Work outlines the city-state partnership entered into by and between the Washington State Department of Transportation (STATE), the City of Renton (CITY) for work through 100% design. Background The Arterial HOV project was initiated in support of Renton's Comprehensive Plan. The Comprehensive Plan includes an HOV element that identifies several corridors and interchange locations as candidates for HOV treatments. Maple Valley Highway was one of the corridors chosen. This study evaluated a corridor between Sunset Boulevard North on the west and 140th Way S.E. on the east. SCOPE OF WORK The work includes preparation of construction documents and right-of-way plans for the project, in addition to required environmental documentation. Prior to receiving authorization to proceed with the final design the consultant will perform preliminary studies to examine alternatives and determine the preferred configuration for the project. These will include alternatives for the location of signals and provision of access to adjoining properties east of the 1-405 northbound ramps; alignment of the widened highway; and, consideration of potential impacts upon park/recreational facilities. The scope of the construction includes the following: transit priority for all intersections; HOV lanes; a west bound right turn lane and transient queue jump at the 1-405 north bound on ramp; east bound right turn lane; and transit-only queue jumps at the 140th Way S.E. connection. Involvement/Participation Project Management The City of Renton will take the lead and manage the project through the design stage and construction at such time as funding becomes available. Design Responsibility A consultant firm will be hired to perform the preliminary design, and to develop contract plans, specifications and estimate (PS&E). 2798.02.ExhbtB.rtf 1 GCA 2798 Project Review City of Renton, Washington State Department of Transportation (WSDOT) staff, King County staff, and private utilities will be able to review the plans at the 30%, 60% and 90% completion stages. Private and Public Utilities will be given the opportunity to coordinate their upgrades to existing facilities. Project Schedule Design Item Estimated Completion • Consultant Selection April 2001, NTP May 2001 • Initial Studies, Definition Report June 2001, August 2001 • ROW Mapping PSE September 2001, December 2001 • ROW Acquisition January 2002, June 2002 • Construction June 2002, June 2003 Whether this schedule can be maintained will depend primarily upon the City's identifying grant funds within the stated time. ' 2798.02.ExhbtB.rtf 2 GCA 2798 EXHIBIT "B" Detailed Scope of Work City of Renton SR 169 Maple Valley Highway HOV/Queue Jump INTRODUCTION III The objective of the project is to design and construct high occupancy vehicle (HOV) queue dumps and bypass lanes and provide transit priority traffic signal improvements on the Maple Valley Highway (SR 169) at 140th Way S.E. and east of the 1-405 northbound freeway ramps. The project involves roadway widening at intersection approaches and modifications to channelization and traffic signals and also includes widening to improve the northbound on- and off-ramp movement at the 1-405/SR 169 interchange. The project will further develop alternatives recommended in the "Arterial HOV Project Pre-Design Report" prepared by PBQD in February, 1997. Specifically, the concepts shown on Figure 12b as Alternative 6 on will be developed in the 1-405/SR 169 interchange area. At the present time, it is unknown if the widening for HOV lanes at 1- 405 will be uniformly about the existing road centerline, or if widening will occur all on the south or north side of SR-169. This will be determined during using results of the traffic study and the technical design charrette process. The concepts shown on Figure 10a as Alternative 4 & 6 will be developed at the SR 169 / 140th Way SE intersection. Transit signal priority will be installed along SR 169 at the following six intersections: Houser, Sunset Boulevard, 1-405 ramps, Park Place, SE 131St, and 140th Way SE. The project will be developed in a format suitable for City advertisement and award. WSDOT must approve the channelization plans and traffic signals. It is anticipated that King County will also have some approval authority over the improvements at 140th Way SE. The services under this agreement will be accomplished under three phases: Phase 1 - Design and Environmental Studies, and Preparation of PS&E Phase 2 - Right-of-way plan preparation & acquisition (requires supplement) Phase 3 - Services during construction (requires supplement) The fee for services during right-of-way acquisition and acquisition, and for services during construction will be negotiated during or following the completion of the project design when these elements of the work can be more accurately identified, and will be included as a supplement to this agreement. 2798.02detai1.ExhbtB.doc 3 GCA 2798 SCOPE OF SERVICES PHASE 1 — DESIGN STUDIES AND PREPARATION OF PS&E General 1. PROJECT MANAGEMENT 1.1 Schedule and coordinate with consultant and subconsultant personnel and equipment. 1.2 Coordinate and attend monthly Technical Advisory Committee meetings during the design studies portion of the project, and prepare meeting minutes. 1.3 Prepare, monitor, and update project schedule. Monitor project budget. 1.4 Prepare monthly billings, progress reports, and updated monthly project schedule. 1,5 Attend bi-weekly coordination/discussion meetings and other meetings as needed, and prepare meeting minutes. 1.6 Other management activities as needed to fulfill the requirements of this agreement. 2. PROJECT COORDINATION/PLANNING This element of the work includes efforts to coordinate the project development with all known project stakeholders. Known stakeholders include City Public Works, Parks, and Planning Departments, WSDOT, King County, Shari's Restaurant, Silver Cloud Inn, Stoneway and various public and private utilities. 2.1 Facilitate a project kickoff meeting with the consultant team, city staff, and representatives from WSDOT and King County. The purpose of this meeting is to determine issues, procedures, and processes to be followed in development of the project. 2.2 Arrange and facilitate a technical design charrette that will focus on development of alternative solutions to the design and environmental issues on the SR 169 / 1- 405 project. 2.3 Coordinate with City Parks Department to minimize impacts and maximize benefits to Cedar River Park. 2.2 Assist the City in coordination with WSDOT, King County, and King County Transit. 2.3 Assist the City in organizing, staffing, and conducting a community information program to include one open house meeting with interested citizens. Provide presentation graphics for this public presentation. The City will provide all advertisements, mailings and will arrange for meeting rooms and refreshments as necessary. 2.6 Meet individually with representatives with Shari's Restaurant, Silver Cloud Inn, and Stoneway to keep them informed of the project progress. (9 meetings assumed) 2798.02detai1.ExhbtB.doc 4 GCA 2798 2.7 Present the project to the City Council or appropriate Council committee at least two times during the project development. 2.8 Coordinate with various public and private utilities along the route. Prepare and maintain utility coordination checklist. Coordinate and attend utility meetings. Review utility records and identify utility conflicts. 2.9 Provide, through subcontract, geotechnical studies, landscape architecture services, and preliminary costs for acquisition of right-of-way. 2.10 Other coordination and lannin activities p g a es as needed to fulfill the requirements of this agreement 3. TRAFFIC STUDY This work includes an analysis to evaluate the existing and future traffic conditions (year 2020) along the project corridor and recommend roadway alternatives for evaluation by the design charrette process. 3.1 Gather and review existing studies and reports prepared for the project site and vicinity. 3.2 Obtain existing traffic count information from City, WSDOT, and County files. The City will provide any required additional traffic counts. 3.3 Obtain future traffic volumes from the City's EMME/2 model. 3.4 Perform manual adjustment of the model output as necessary to correct for location of zone centroids, link connectors, etc. 3.5 Perform SYNCHRO analysis and VISSIM simulation for existing and future conditions. 3.6 Review three-year accident history for the two project sites, and propose improvements that could enhance safety at any high accident locations. 3.7 Prepare signal warrant analysis as required by WSDOT for modifications to existing signals. 3.8 Analyze the impacts of the proposed improvements on transit and HOV operations. Recommend solutions that will enhance those operations. 3.9 Identify traffic impacts to existing and planned non-motorized facilities. 3.10 Suggest channelization and widening alternatives that should be considered for more detailed study for use at the design charrette. 3.11 Upon selection of a construction alternative by the City, prepare a traffic analysis report that summarizes the results of the above work. 3.12 Other traffic study efforts as required to culminate in a traffic analysis report summarizing the study and identifying a successful solution. 2798.02detai1.ExhbtB.doc 5 GCA 2798 4. SURVEYING Perteet Engineering will provide control surveys and limited ground based topographic mapping completion surveys. Aerial photogrammetry will be provided by DeGross Aerial Mapping, and will include digital orthophotography and digital aerial mapping. Surveying will be sufficient to complete the project design, and will as a minimum include the following. 4.1 Control Surveys: Control surveys for the project will include datum control surveys, pre-marks for aerial photogrammetry, ground control for topographic completion surveys and control surveys for road right-of-ways. Datum control surveys will be to provide the project in Washington State Plane Coordinate System (WSPCS), North Zone (NAD 83/91) horizontal datum.; and North American Vertical Datum (NAVD 88). We will identify or establish approximately 10 horizontal control points and 7 vertical benchmarks for the project. Aerial photogrammetry `pre-mark' control spacing will be coordinated with our subconsultant as needed for 1" = 400' photo scale and 1" = 20' mapping scale. Control surveys for right-of-way will be limited to WSDOT monumentation for SR 169 and SR 405, and local monumentation for 140th Way SE. 4.2 Topographic Mapping Completion Surveys: In areas where the ground is obscured on the aerial photography, ground based topographic surveys may be required. These surveys will be provided with the same level of detail and to the same map accuracy standards as the aerial photogrammetric mapping. In addition, ground based topographic surveys will be included to supplement the aerial photogrammetric mapping for key vertical elements. These include storm drainage & sanitary ewer structures limited ry , paving edge profiles, limited road crown P rofles, limited curb line profiles and limited drainage corridor profiles. 4.3 Aerial Photogrammetry: 4.3.1 Digital Orthophotography SR 169 / Bronson Way Project Orthophoto Limits 2798.02detai1.ExhbtB.doc 6 GCA 2798 Digital orthophotography will be provided from the confluence point of Cedar River and SR 169 at the 'south end' of the project to 500' west of Hauser Way on the `north end' of the project. This digital orthophotography will be approximately 1000' wide. In addition, this orthophotography will include an approximately 1000' wide strip centered on the easterly margin of 1-405 extending from the SR 169 limits to approximately 100' north of NE 3rd Street. SR 169 / 140th Way SE Project Orthophoto Limits Digital orthophotography will be provided from 1000' south of 140th Way SE on the 'south end' of the project to the north end of the bridge crossing the Cedar River at the 'north end' of the project. This digital orthophotography will be approximately 1 000' wide. This digital orthophotography will be provided at the following specifications: Color imagery @ 0.4'pixel resolution. 4.4 Digital Aerial Mapping Aerial mapping will be provided for a 200' strip of the digital orthophotography, 100 feet on either side of the road surface centerline. This digital aerial mapping will be at a scale of 1" = 20' and include DTM generated 1'contours. All topographic features, which are clearly visible and identifiable to the stereo plotter operator, will be shown on the mapping. Topographic features will include but not be limited to the following: Edge of Pavement/Curb & Gutter Trees Pavement Striping Shrubs Driveways (paved & unpaved) Gravel Shoulders Sidewalks and Walkways Gravel Parking Areas Utility Poles Fire Hydrants Fences Rockeries Houses, Garages, Sheds Walls Survey Monuments (Pre-marks) Utility Structures All aerial & supplemental ground topographic survey mapping will be delivered in digital AutoCAD format, with standard WSDOT layering, symbology and attribute conventions. All mapping will be two dimensional with individual line segments connecting points. Final digital files are to be contiguous at a 1 to 1 scale in model space. Point data blocks will include number identifier, elevation and description fields will also be included. Mapping is to be planimetric with digital terrain modeling. Mapping to comply with the National Map Accuracy Standards for 1" = 20' scale mapping. 2798.02detail.ExhbtB.doc 7 GCA 2798 SR 169 / Bronson Proiect Mapping Limits Digital aerial mapping will be provided from 1000' south of 1-405 on SR 169 to the intersection of Bronson Way & Hauser Way. Coverage will also include 300' of Sunset Blvd north and south of Bronson, and 300' of Hauser Way & Bronson Way north, south, & west of the intersection. SR 169 / 140th Way SE Project Mapping Limits Digital aerial mapping will be provided from 700' south of 140th Way SE to the south end of the bridge crossing Cedar River immediately north of the project. Coverage will also include 500' of 140th Way SE. 4.5 Deliverables • Digital orthophoto files as specified above • Copies of the aerial photo contact prints • Digital aerial mapping files as specified above 4.6 Specific Exclusions • Engineering grade parcel surveying & mapping SR 16911-405 5. ALTERNATIVES DEVELOPMENT (SR 169/1-405) 5.1 Perform alternatives analysis. Develop and refine approximately three distinct alternatives as required for alternative analysis and to identify a successful solution, coordinate design charrette and refine alternatives. 5.2 Prepare design memo summarizing alternatives analysis and recommendation of selected alternative. The design memo will include results of the traffic analysis and hydraulic summary as attachments. 6. PRELIMINARY ENGINEERING (30%) (SR 169/1-405) 6.1 Prepare typical sections and plan and profile drawings for selected alternative. 6.2 Prepare channelization plan for approval per WSDOT Design Manual. 6.3 Prepare design deviation requests as applicable for WSDOT approval 6.4 Prepare preliminary right of way analysis based on available right-of-way mapping. The analysis will identify the location of existing public right-of-way, the approximate location of parcel boundaries, and the approximate amount of take required to construct the alternative. 6.5 Provide an estimate of costs for right-of-way acquisition. 6.6 Develop traffic control strategy including construction staging. 6.8 Prepare preliminary signal plans per WSDOT requirements. 6.9 Prepare traffic signal priority preliminary details. 6.10 Perform signing inventory. 2798.02detai1.ExhbtB.doc 8 GCA 2798 6.11 Prepare geotechnical report for walls, fill slopes, surfacing depths, sign bridge and signal pole foundations. 6.12 Prepare hydraulics summary report. In addition to drainage analysis and conveyance needs, the report will address water quality, detention and aquifer protection needs. 6.13 Prepare preliminary wall plan. 6.14 Prepare preliminary opinion of cost, including cost for right-of-way acquisition. 7. ENVIRONMENTAL ANALYSIS AND PERMITTING (SR 169/1-405) 7.1 Conduct a one-day biological reconnaissance of the project vicinity to identify biological features or conditions that may affect project permitting. 7.2 Prepare a programmatic Section 4(f) analysis addressing the use of Cedar River Park land for roadway development and assist with planning and coordination of park mitigation and economic development considerations at the Stoneway site. ■ It is assumed that only a minor amount of parkland will be taken and that both the land area and park functions can be mitigated by acquisition of additional land and design changes to the park. 7.3 Prepare a Biological Assessment for the project, focusing on use of the nearby Cedar River by listed salmonids. 7.4 Prepare a SEPA Checklist for the project using the City of Renton format. 7.5 Identify permits needed for construction of the project improvements, and assist the City in applying for those permits. Assistance will include preparation of forms and exhibits. 7.6 Prepare a Local Agency Environmental Classification Summary for NEPA compliance. The documentation will be expanded beyond the typical analysis to address issues associated with the decision making process for use of parklands. It is assumed that the addition of lanes will qualify as a Categorical Exclusion under the Department of Transportation Act (23 CFR 771.117) (d) (1) "Modernization of a highway by resurfacing, restoration, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing)."7.7 Prepare an review of air quality impacts that may be caused by the project. This work does not include a detailed analysis in accordance with the requirements of the state and federal air quality conformity requirements. 7.8 Prepare a review of noise impacts that may be caused by the project. This work does not include a detailed noise impact and mitigation analysis in accord with WSDOT policies and procedures. 8. FINAL DESIGN (SR 16911-405) 8.1 Prepare 60% complete contract plans and updated preliminary cost estimate for the proposed improvements. Submit the plans to City staff for review and comment. 2798.02detai1.ExhbtB.doc 9 GCA 2798 8.2 Prepare 90% plans, specifications, and cost estimates for the construction contract. Plans shall include complete details for the roadway widening, sidewalk, retaining walls, storm drainage, signals, street lighting, channelization, signing, and landscaping details. Plans shall show all existing physical features; surface and subsurface utilities, as determined by field survey or indicated on City or utility company records for the area included in the right-of-way, or greater if necessary, outside the right-of-way to include pertinent details adjacent to the right-of-way. Plans will be at a scale of 1"=20'. Submit the plans to the City for review and comment. 8.3 Submit final review plans, specifications, and cost estimates for the construction contract. Minor adjustments to the final plan set will be made if required prior to printing of the PS&E package and advertisement for bids. P 9 P 9 8.4 All required work necessary to prepare a complete set of contract plans and specifications for the project. List of plans to be prepared is anticipated to include the following (some elements may be combined): • Index sheet • Vicinity Map • Summary of Quantities • Roadway sections • Construction sequence plans • Plan and Profile sheets • Drainage plans • TESC plans • Channelization plans • Wall plans • Utility plans • Traffic signal plans • Transit signal priority plans • Illumination plans • Signing plans • Traffic control plans • Landscaping plans SR 1691140TH WAY SE 9. ALTERNATIVES DEVELOPMENT (SR 169/140TH WAY SE) 9.1 Perform alternatives analysis. Develop and refine approximately three distinct alternatives as required for alternative analysis and to identify a successful solution. 9.2 Prepare design memo summarizing alternatives analysis and recommendation of selected alternative. The design memo will include results of the traffic analysis and hydraulic summary as attachments. 2798.02detai1.ExhbtB.doc 10 GCA 2798 10. PRELIMINARY ENGINEERING (30 %) (SR 169/140TH WAY SE) 10.1 Prepare typical sections and plan and profile drawings for selected alternative. 10.2 Prepare channelization plan for approval per WSDOT Design Manual. 10.3 Prepare design deviation requests as applicable for WSDOT approval 10.4 Prepare preliminary right of way analysis 10.5 Develop traffic control strategy including construction staging. 10.6 Prepare preliminary signal plans per WSDOT requirements. 10.7 Prepare traffic signal priority preliminary details. 10.8 Perform signing inventory. 10.9 Prepare geotechnical report for walls, fill slopes, surfacing depths, sign cantilever and signal pole foundations. 10.10 Prepare hydraulics summary report.. In addition to drainage analysis and conveyance needs, the report will address water quality, detention and aquifer protection needs. 10.11 Prepare preliminary wall plan. 10.12 Prepare preliminary opinion of cost. 11. ENVIRONMENTAL ANALYSIS AND PERMITTING (SR 169/140TH WAY SE) 11.1. Conduct a one-day biological reconnaissance of the project vicinity to identify biological features or conditions that may affect project permitting. 11.2. Prepare an analysis of impacts to parkland (King County Trail) similar to a programmatic Section 4(f) analysis that can be incorporated into the SEPA checklist. 11.3. It is assumed that only a minor amount of parkland (trail) will be taken and that both the land area and trail functions can be mitigated by acquisition of additional land and design changes to the trail. 11.4. Prepare a SEPA Checklist for the project using the City of Renton format 11.5. Prepare a Biological Assessment for the project, focusing on use of the nearby Cedar River by listed salmonids. 11.6. Identify permits needed for construction of the project improvements, and assist the City in applying for those permits. Assistance will include preparation of forms and exhibits. 11.7. It is assumed that the project will terminate outside the jurisdictional shoreline zone for the Cedar River (at least 200 feet beyond the ordinary high water mark) and will not affect any associated wetlands that would be considered part of the jurisdictional shoreline. 12. FINAL DESIGN (SR 169/140TH WAY SE) 12.1 Prepare 60% complete contract plans and updated preliminary cost estimate for the proposed improvements. Submit the plans to City staff for review and comment. 2798.02detai1.ExhbtB.doc 11 GCA 2798 12.2 Prepare 90% plans, specifications, and cost estimates for the construction contract. Plans shall include complete details for the roadway widening, sidewalk, retaining walls, storm drainage, signals, street lighting, channelization, signing, and landscaping details. Plans shall show all existing physical features; surface and subsurface utilities, as determined by field survey or indicated on City or utility company records for the area included in the right-of-way, or greater if necessary, outside the right-of-way to include pertinent details adjacent to the right-of-way. Plans will be at a scale of 1"=20'. Submit the plans to the City for review and comment. 12.3 Submit final review plans, specifications, and cost estimates for the construction contract. Minor adjustments to the final plan set will be made if required prior to printing of the PS&E package and advertisement for bids. 12.4 Provide one camera-ready copy of the contract specifications and special provisions. The City will be responsible for the printing of the contract documents for bidding purposes. 12.5 Assist City staff during the advertisement for bids. Attend bid opening, prepare bid tab, provide background check for bid award, and prepare a letter of recommendation to award. 12.5 All required work necessary to prepare a complete set of contract plans and specifications for the project. List of plans to be prepared is anticipated to include the following (some elements may be combined): • Index sheet • Vicinity Map • Summary of Quantities • Roadway sections • Construction sequence plans • Alignment/Right-of-way plans • Plan and Profile sheets • Drainage plans • TESC plans • Channelization plans • Wall plans • Utility plans • Traffic signal plans • Transit signal priority plans • Illumination plans • Signing plans • Traffic control plans OPTIONAL SERVICES Optional services which may be performed include: • Landscaping plans for the 140th Way SE intersection. 2798.02detai1.ExhbtB.doc 12 GCA 2798 Provision of optional services shall be considered as extra work.. PHASE 2 - RIGHT-OF-WAY PLAN PREPARATION (REQUIRES SUPPLEMENT) The fee for services during right-of-way acquisition and acquisition will be negotiated during completion of the project design when this element of the work can be more accurately identified, and will be included as a supplement to this agreement. The City will be responsible for supplying title reports and for acquisition of new right-of-way. The following describes a typical scope of services for this phase of the work. 1. Order and provide copies of title reports for each parcel along the corridor where right-of-way is to be obtained. Invoices for the title reports shall be sent directly to the City for payment. 2. Prepare final right-of-way plans in accordance with WSDOT standards. 3. Prepare parcel maps for use in the negotiation process. 4. Provide marking or staking of the right-of-way to be acquired to assist the appraisal and negotiation process. 5. Prepare legal descriptions of required takes. 6. Attend bi-weekly meetings with the City during the negotiation process. 7. By qualified subconsultant, prepare appraisals of the right-of-way acquisitions required to construct the project. Consultant will assist the right-of-way appraisers and negotiators as may be necessary to define the extent of takings and to prepare possible mitigation measures. Services to acquire property through condemnation shall be considered as extra work. PHASE 3 - SERVICES DURING CONSTRUCTION (REQUIRES SUPPLEMENT) Phase 3 of this project will authorize construction engineering. The fee portion of this phase of services will be negotiated as a supplement to previous phases of services P 9 PP P P following the completion of the design phase. The following describes a typical scope of services for this phase of the work. 1. Provide the services of a full-time resident project representative who will observe the technical conduct of the construction. The Consultant will endeavor to protect the Agency against defects and deficiencies in the work of the Contractor, but he cannot guarantee the Contractor's performance and he shall not be responsible for construction means, methods, techniques, sequences, procedures or for safety precautions and programs in connection with the work. 2. Spot check the construction staking and construction layouts as performed by the construction contractor. 3. Recommend actions on questions which may arise as to the quality and acceptability of materials furnished, work performed, and rate of progress of work. 2798.02detai1.ExhbtB.doc 13 GCA 2798 4. Measure the quantities of materials for pay items and record and report on the construction operation. 5. Prepare and recommend for approval periodic requests for payment submitted by the Construction Contractor. 6. Review shop drawings, samples, traffic control plans, test reports and other data submitted by the Contractor for compliance with the information given in the contract documents. 7. Assist the City in providing documents and records for general compliance with State and Federal requirements. 8. Prepare record drawings of the completed project. TIME FOR COMPLETION All work under Phase 1 of this contract shall be completed within 360 calendar days of notice to proceed. SUBCON LTAN SU TS The following subconsultants will be used to assist in accomplishment of the work: • Shannon &Wilson — Geotechnical studies • CivilTech —Walls and structural engineering • Hough, Beck & Baird — Landscape architecture • McCulley, Frick and Gilman —Air/ noise analysis MINIMUM NOTICE OF MEETING REQUIRING CONSULTANT PARTICIPATION Consultant will normally be given a minimum of 24-hour notice of required meeting attendance. ITEMS TO BE PREPARED AND/OR FURNISHED BY THE CONSULTANT 1. Sufficient copies of half-size plans and reports to meet the requirements of the permitting agencies. 2. One set of all sheets comprising the set of contract plans on disk in AutoCAD format. Professional Engineer Stamps and logos will be removed prior to furnishing CAD files. 3. Copy of all survey information. 4. Ten copies of the draft design memo for both projects, and ten copies and one camera ready copy of the design memo for both projects. 5. Five copies of half-size drawings and estimate for 60% and 90% review. 2798.02detaiLExhbtB.doc 14 GCA 2798 6. Furnish final plans on original mylar 22" x 34" plan sheets. 7. Furnish one original half-size plan set and one photo-ready copy of the contract specifications for use by the City in printing the bid package. ITEMS TO BE FURNISHED BY THE CITY 1. City will provide copies of all previous studies and environmental documentation of the ro'ect. p 1 2. Copies of plans, profiles, cross sections, field topographic survey notes or documents available to City that will aid in the preparation of the plans and studies within the limits of the project. 3. Additional traffic counts as needed. 4. Output from the City's EMME/2 model for the base and forecast years. 5. As-built information of existing plans. 6. Printing of final contract package 7. Copies of the City's standard contract boilerplate.. DESIGN CRITERIA III Reports and plans, to the extent feasible, shall be developed in accordance with the latest edition and amendments of the following: Reports and plans, to the extent feasible, shall be developed in accordance with the latest edition and amendments of the following: 1. Washington State Department of Transportation, "Standard Specifications for Road and Bridge Construction." 2. Washington State Department of Transportation, "Design Manual." 3. Washington State Department of Transportation, "Materials Laboratory Outline." 4. Washington State Department of Transportation, Construction Manual. 5. Washington State Department of Transportation, "Local Agency Guidelines." 6. Highway Research Board's Manual entitled "Highway Capacity." 7. FHWA and Washington State Department of Transportation, "Manual on Uniform Traffic Control Devices for Streets and Highways." 8. Standard drawings prepared by City of Renton and furnished to the Consultant shall be used as a guide in all cases where they fit design conditions. 9. AASHTO 1994, "A Policy of Geometric Design of Highways and Streets." 10. AASHTO "Guide for the Development of Bicycle Facilities." 11. WSDOT Highway Runoff Manual 12. WSDOT Hydraulics Manual 13. King County Surface Water Design Manual 2798.02detail.ExhbtB.doc 15 GCA 2798 dMk . •♦ N A-N.30th St. In, :s '�,�, .ZH .9. ' t { i f y Y"r NE 12th Sheet Boeing 101 PLMW _LU L N 4th Street NE 4th Sheet 128th s K Shd 901 � .. 7th sheet a N 7 3 r N s t Maple Valley Highway(SR-169)at 140`h Way SE and at and east of the I405 Southbound and Northbound Freeway Ramps GCA 2798 Exhibit "B" Sheet 16 of 16