PRELIMINARY PLANNED URBAN DEVELOPMENT - 1
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
RE: Avana Ridge PUD
Preliminary Planned Urban
Development
LUA15-000894, PP, PPUD
)
)
)
)
)
)
)
)
)
FINAL DECISION
SUMMARY
The applicant proposes a preliminary planned urban development for the construction of two multi-
family buildings on a 3.8 acre parcel for a total of 74 dwelling units. The applicant seeks PUD
approval in order to vary from a number of zoning code standards, including an increase in allowed
building and retaining wall height, a reduction in required roof pitch, a decrease in required parking
and a decrease in required private open space. The PUD is approved subject to conditions.
TESTIMONY
Note: The following is a summary of testimony provided for the convenience of the reader only and
should not be construed as containing any findings of fact or conclusions of law. The focus upon or
exclusion of any particular testimony or hearing evidence in this summary is not reflective of the
priority or probative content of any particular hearing evidence and no assurance is made as to
accuracy.
Rocale Timmons, senior City of Renton planner, summarized the proposal. She noted that
recommended Conditions 14 and 15 of the staff report, requiring dedications for light fixtures, was in
error as there is sufficient space proposed for the lights. The two conditions should be stricken. In
response to examiner questions, Ms. Timmons noted that property to the east is zoned Residential 8.
She also noted that there has been no indication that the proposal would impair any views. Traffic
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 2
calming features were considered for access roads and in staff’s opinion the proposed speed radar
signs were sufficient to control speeds. There is no public trail system close by. Sidewalk
improvements are required for the intersection of 172nd and Benson Rd. S. in order to assure safe
walking conditions to school bus stops and continuous sidewalk connections to the surrounding
sidewalk network.
Rohini Nair, City of Renton traffic engineer, noted that queuing issues on Benson Road South and
Benson Drive South was a major neighborhood concern. The City had the applicant’s traffic engineer
model queuing and from this it was found that new turning restrictions proposed for the project would
reduce current queuing off of Benson Road South. A new condition of approval will be submitted by
staff to require the new turn restrictions. Regarding speeding on 104 and106, it is staff’s opinion that
the radar speed signs will adequately address the problem.
Brian Paldar, project architect, noted that as a result of project modifications necessitated by permit
review the applicant needs to request a minor increase in the proposed height from 8’ 3” floor to
ceiling to an 8’ 6” floor to ceiling to accommodate ventilation systems. The east building will still be
under the 40 foot limit. The west building will need to be increased in height 1.6 feet for a total of
41.6 feet. No changes are proposed to the roof line. The PUD process enables the applicant to
preserve a lot of on-site vegetation and other natural features. There will be no view impacts since
existing trees are up to 60 feet high, taller than the proposed buildings. Any existing territorial views
would be to the west and would be unaffected by the proposal. In response to examiner questions,
there currently is no on-street parking on SE 172nd St. Mr. Paldar also noted that the “eyes on the
street” caused by dwellings overlooking 172nd, as well as more pedestrians using the proposed
pedestrian facilities, would probably serve to reduce crime.
Larry Hobbs, applicant’s traffic engineer, noted that the channelization changes that would improve
queuing from the Benson Road S. access would be composed of a left turn lane and a shared left and
right turn lane and a change out in a traffic signal face. With the channelization changes the queue
lengths are reduced from 372 feet to 212 feet and will be shorter than pre-development conditions.
The channelization changes double vehicle storage space.
Doug Goods, neighbor, doesn’t support or oppose the project, he just wants to make sure his concerns
are addressed. He has seen a significant increase in traffic in the vicinity over the years. Traffic
backs up all the way from Puget Drive. He wanted to know why the applicant’s proposal to put in a
median on 172nd wasn’t recommended by staff. He doesn’t believe that the applicant’s solution to the
queuing problem will be solved by the rechanneling, given the amount of new development in the
area. He felt that more traffic calming measures should be implemented for 104 and 106th avenues,
such as speed bumps, however he’s not as concerned as much about speed as he is about increased
traffic.
Molly Moss, neighbor, is against the proposal. She feels that the access to 172nd street will increase
traffic on her street (104th) as well as 105th and 106th avenues. Currently the neighborhood has a low
level of traffic. This will be a safety hazard as the streets are currently used by children. None of the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 3
roads have uninterrupted sidewalks to Nelson Middle School.
Jerry Miller, neighbor, noted that the streets impacted by the proposal haven’t been adequately
described. There’s a new development at the northeastern corner of intersection of Benson and 172nd
with several dozen units and this will add to the traffic problem. If the right in/right out 172nd
solution proposed by the applicant for 172nd were to be implemented, people would be doing u-turns
on their driveway so he and Anna Miller are opposed to that solution.
Anna Miller, neighbor, noted that parking from the project will spill onto adjoining streets making
traffic circulation difficult. 172nd is very narrow and traffic is already very poor in the area. In the
next 5-10 years traffic will be a nightmare.
Paul Skulstad, neighbor, felt that access to the proposal should be from SR 515 instead of 172nd. The
surrounding community doesn’t have sidewalks for students walking to and from school. Electronic
radar signs aren’t needed. 172nd has a portion that’s like a washboard, which slows down vehicles.
The traffic analysis for the project doesn’t take into account traffic that will be generated by other
projects in the pipeline, including a large apartment complex directly across the street and a medical
dental complex. People are having trouble finding parking already in the apartment complex and it
hasn’t been completed yet. There’s also another 21 lot subdivision and another complex on Benson
being constructed. The Benson and Benson intersection needs to be redone. The two left turn lane
solution was obvious. There should be a third left turn lane.
Karen and Polo Cantu, neighbors, noted that the roads of her neighborhood do not have sidewalks or
shoulders. Her and her husband purchased their home because of the uncommonly spacious lots and
quiet neighborhood. She still feels safe walking the streets. The proposed access onto 172nd St. is too
close to the 106th Ave. Residents of the proposed apartments will quickly realize that driving throu gh
the neighborhood will be much quicker than driving through the Benson/Benson intersection. A
radar speed sign will not reduce the volume of traffic. The traffic study doesn’t account for new
development or the impact on 106th street and other neighborhood roads. Based upon 1.8 cars per
dwelling unit and round up to two cars to account for visitors, the proposed parking is insufficient.
The access should be moved from 172nd to SR 515. 172nd St. is inaccurately classified as a
commercial street in the ERC report. It currently primarily serves residential use.
Nancy Stanley, neighbor, noted that the 162 unit Trails apartment complex across the street is still
under construction and its traffic impacts haven’t been fully evaluated.
Danny Kumono, neighbor from Kelsey Court condominiums, affirmed that the traffic impacts of the
Trails complex hasn’t yet been realized as its still under construction. Crime has increased as a result
of the Trails. Cars turning right onto
Benson from 172nd aren’t slowing down. Visibility is poor because of the road curvature, so there are
a lot of close calls in making a left turn. In the evening the Benson/Benson intersection is fully
congested and it’s not possible to make a left turn. A larger area should be considered when doing a
traffic analysis.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 4
Dan Palmer, neighbor, noted that 104th, 105th and 106th has been an oasis of a neighborhood with big
yards and quiet streets. There’s currently no through traffic. There’s no vehicle pollution. There are
people with respiratory problems in the neighborhood who will be adversely affected by the pollution
from increased traffic. He noted there are no sidewalks, stormwater systems or lights on the roads.
The neighborhood is full of wildlife and trees and is an important watershed area. High impact
buildings are not compatible with this environmentally fragile area. Transfer of development rights
would work well here. The building design is not compatible with the surrounding 60 year and turn
of the century homes. Even the new CVC store is more aesthetically pleasing.
In rebuttal, Ms. Timmons noted that the area was annexed into the City from King County in 2008,
which is why the streets don’t have sidewalks or street lighting. The site was zoned commercial
arterial when it was annexed into the city. That zoning designation allowed 60 du per acre. A
subsequent rezone reduced the density to the currently applicable 20 du per acre. The site serves as a
transition zone from the commercial development to the south to the residential use to the north.
172nd is classified as a commercial use street because of the transportation needs to the south. The
proposed development will create many of the improvements necessary to upgrade 172nd to
commercial use. The City currently has no transfer of development rights program. The design of the
project is set by the City’s design standards. SR 515 would not be a suitable access point because of
significant change in grade at the southern portion of the site. Several retaining walls are necessary to
stabilize this portion of the project. SR 515 is a commercial arterial street and the City limits access
points. WSDOT would also restrict access from the state road. There are also critical areas that
would prevent access from the south. Parking is set by city code based upon the number of
bedrooms, which in this case is 96 stalls. The applicant has requested a two stall reduction. The
project site has a significant amount of open space to accommodate wildlife. The applicant’s request
for an additional 1.5 feet in building height has been reviewed by City staff. Given the extensive
number of PUD benefits and large amount of open space, staff supports the request for additional
height. As to safe routes to schools, it’s expected that students will not use 106/104/105 roads to get
to Nelson Middle School. They would use Benson Road to walk safely to Nelson. Molly Moss noted
that while student from the proposal may use Benson Road, students residing on 106/104/105 would
still be walking their neighborhood roads.
In response to examiner questions, Ms. Nair noted that the traffic study included traffic from all
approved land use applications, including the Trails project across the street. The lane configuration
will result in improved queuing lengths even with the traffic of the Trails project taken into
consideration. Staff is not opposed to having south bound traffic subject to a radar speed sign as well
on 104th and 106th streets. WSDOT may not approve a direct access onto SR 515 because of the
availability of other access routes.
Larry Hobbs, applicant’s traffic engineer, testified that the traffic report was prepared pursuant to City
guidelines and trip generation estimates from the latest edition of the ITE Trip Generation Manual.
The report was subjected to peer review, which concurred with the traffic analysis. The Trails project
was included in the background traffic along with a percentage traffic growth rate required by the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 5
City. The traffic analysis concluded that 10% of the AM peak hour traffic would be heading west
(using 106/104/105), which is 4 trips and five trips for PM peak hour. This is only one additional
vehicle every 12 or 15 minutes on the three streets. The radar speed limit sign isn’t necessary.
WSDOT would not allow access onto SR 515 since other reasonable access is available.
Brent Carson, applicant’s attorney, noted that the land use designations of the site could not be
questioned at this point. Many of the concerns of the neighbors concern SEPA issues that haven’t
been appealed. Given the minor number of trips generated on 106/104/105 and verification from peer
review on the applicant’s analysis of this issue, the City has no nexus and proportionality to require
mitigation such as the radar controlled sign.
EXHIBITS
The May 10, 2016 Staff report in addition to Exhibits 1-23 identified in pages 2 of the Staff
Report were admitted into the record at the May 10, 2016 hearing. The staff power point
presentation was admitted as Ex. 24. Revised elevations were submitted by the application and
admitted as Ex. 25. Ex. 26 was submitted by the applicant and admitted as a color site plan. Ex.
27 were admitted as west building elevations and Ex. 28 as east building elevations. Google
maps was admitted as Ex. 29.
FINDINGS OF FACT
Procedural:
1. Applicant. Avana Ridge LLC.
2. Hearing. A hearing on the application was held on May 10, 2016.
Substantive:
3. Project Description. The applicant proposes a preliminary planned urban development for the
construction of two multi-family buildings on a 3.8 acre parcel for a total of 74 dwelling units. The
requested modifications are summarized as follows:
RMC Code Citation Required Standard Requested Modification
RMC 4-2-110A
Development
Standards for
Commercial Zoning
Designations- Roof
Pitch
Roof pitches are required to be equal
to or greater than 4:12 and may
project an additional six (6) vertical
feet from the maximum wall plate
height.
This proposal includes a roof pitch
of 2:12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 6
RMC 4-2-110A
Development
Standards for
Commercial Zoning
Designations- Roof
Pitch
A maximum building height of 3
stories with a wall plate height of 30
feet is permitted.
The proposal includes a height of
46-feet and 5-inches as measured
from average grade plane to the
tallest point of the shed roof
elements.
RMC 4-6-060F Street
Standards
Various: See discussion in Table C:
PUD Criteria - Circulation
Various: See discussion under FOF
xx: PUD Criteria - Circulation
RMC 4-3-100 Urban
Design Standards
Various: See discussion in Table E:
Design District ‘D’ Standards
Various: See discussion under FOF
xx: Design District ‘B’ Standards
RMC 4-4-080F,
Parking, Loading, and
Driveway Regulations
Based on the proposed use, a
minimum and maximum of 96 parking
spaces would be allowed in order to
meet code.
The applicant proposed a total of
94 spaces within surface parking
areas. The proposal does not
comply with the minimum parking
stall requirements.
RMC 4-4-090, Refuse
and Recyclables
Standards
There shall be at least one deposit
area/collection point for every thirty
(30) dwelling units.
The proposal includes a single
refuse/recycle storage location
centrally located, between both
buildings at the center of the site.
RMC 4-4-040,
Retaining Wall Height
Heights are limited to 48 inches for
retaining walls located within front
yard/side yard along-a-street
setbacks, and 72 inches for walls
elsewhere on site.
A section of the keystone-type wall
located near the monument sign at
the Benson Road/Benson Drive
intersection is proposed at a height
of 5.5 feet. A section of the
keystone-type wall located near the
monument sign at the Benson
Road/Benson Drive intersection is 5
feet and 6-inches tall.
RMC 4-9-150.E.2,
Private Open Space
Each residential unit in a PUD shall
have usable private open space for
the exclusive use of the occupants of
that unit in compliance with
dimensional standards.
The current proposal provides
4,156 SF of private, attached open
space through the use of private
balconies for some of the units
which does not comply with the
dimensional standards.
The project site is currently vacant and bisected by a stream. Access to the site is proposed via SE
172nd St, between the east and west buildings, and another ingress/egress point via Benson Rd S.
The two access points create a through road for emergency vehicle ingress/egress across the property.
4. Adequacy of Infrastructure/Public Services. The project will be served by adequate
infrastructure and public services as follows:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 7
A. Water and Sewer Service. Water and sanitary sewer service for the development would be
provided by the Soos Creek Water and Sewer District. A water and sewer availability
certificate from the Soos Creek utility district was submitted to the City with the land use
application. Approved water and sewer plans from Soos Creek are required to be
provided during utility construction permit approval.
B. Fire Protection. Fire protection would be provided by the City of Renton Fire Department.
C. Drainage. In conjunction with the City’s stormwater regulations, the proposal mitigates
all significant drainage impacts. New impervious surfaces would result in surface water
runoff increases. The Applicants submitted a Technical Information Report (“Drainage
Report”) with the project application (Exhibit 9). The stormwater detention and water
quality treatment would be provided within a combined detention/water quality vault
under the parking area located in the western portion of the site. The combined
detention/water quality vault would be followed by a media filtration system to
accommodate the Enhanced Water Quality Treatment requirements for multi-family
development. Further staff review will be conducted for final PUD approval.
D. Parks/Open Space. The project provides for adequate parks and open space. For parks
impacts, the applicant will be paying a park impact fee, which is currently assessed at
$975.50 per multi-family dwelling unit.
The proposed development is designed specifically to increase the access and opportunity
for open space and in sheer numbers harbors a significant amount of open space as well.
The project includes 19,795 square feet of community open space in the southern portion
of the site in addition to 49,918 square feet of critical area space. Beyond the space
required for critical areas, Renton has no public open space requirements for multi-family
developments except for some nonspecific standards in its design regulations. A small
fenced off-leash dog run is provided at the east side of the site between a landscape buffer
and the parking lot among a grove of existing trees to be preserved. The multiple open
spaces throughout the site are well designed and provide a variety of recreational
opportunities both passive and active. Due to the presence of a stream along the lower
area of the site, a natural border exists. A pedestrian bridge crosses the stream to link the
open space and the residential developments.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 8
A central path and complementing pedestrian bridge crossing will be constructed to create
an access point to the southern community open space from the surface parking lot. The
large area would be ample usable space for passive recreation and special events such as
picnics, parties, weddings, movie night in the park, concerts, etc.; thereby promoting
community involvement. Additionally, the space would take advantage of and display the
attractive territorial views to the West. Finally, the space would serve to preserve and
enhance existing vegetation and natural character through tree preservation, removal of
extensive invasive Blackberries, and replacement with native understory vegetation to be
maintained through the life of the development.
The space features a large, central, gently sloping lawn for casual seating and recreation.
The lawn is oriented to slope down towards an open pavilion whose intended use includes
performances, and community gatherings. The pavilion is also sited to capture and frame
the attractive territorial views to the West.
The applicant has indicated that there is an opportunity to include interpretive
signage/information regarding differentiating elements (trees, landscaping, drainage,
architecture, etc.) of the proposed development at strategic place(s) on site. The use of
interpretive signage would result in an increase in public benefit for the overall project.
Therefore, a condition of approval requires the applicant to provide interpretive
signage/information regarding differentiating elements (trees, landscaping, drainage,
architecture, etc.) of the proposed development at a strategic place(s) on site.
A resident amenity lounge located on Level 1 of the West building takes advantage of
outdoor space and integrates an outdoor plaza intended for gathering spaces, barbecues,
and lounge areas for a variety of opportunities for the residents. The area opens up the
western portion of the site and provides a softer building edge and brings visual interest to
what would normally be considered the “side” elevation of the project.
E. Pedestrian Circulation. The proposal provides for an appropriate pedestrian circulation
system. The applicant has proposed a series of pedestrian connections throughout the site
however it is unclear if there is a differentiation of materials across the drive aisles
(Exhibit 2). Therefore, as recommended by staff, a condition of approval requires the
applicant to revise the site plan to depict a differentiation in materials for all pedestrian
connections within parking areas and/or drive aisles on site.
F. Off-Site Traffic Improvements. The proposal is served by adequate and appropriate off-
site street infrastructure.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT - 9
Based upon the applicant’s traffic impact analysis (“TIA”), Ex. 15, staff have determined
that the project will comply with the City’s level of service standards. It is anticipated that
the proposed development would generate approximately 492 average daily trips with 38
AM peak-hour trips and 46 PM peak-hour trips. The TIA assessed traffic impacts on three
affected intersections as required by City standards. The TIA concluded that all
intersections will operate at an acceptable level of service with the proposed development.
Staff have also determined that the proposal passes City concurrency standards as outlined
in Ex. 23. Analysis of future conditions address cumulative impacts of the proposed
project and traffic growth in the study area. Traffic signal warranty analysis was also
provided at the intersection of SE 172nd St and Benson Rd S. The report states there is no
need for a signal at the intersection as a result of the project. The TIA concludes that sight
distance requirements are met at the site access driveway onto SE 172nd St and with
vegetation trimming, within the right of way, at the site access driveway to Benson Rd S
(Exhibit 15). ct. The conclusions of the report were accepted by staff and not disputed by
a qualified traffic expert, therefore they are taken as verities. Staff also concluded in the
staff report that the proposed circulation system is adequate to accommodate emergency
vehicles and there is no evidence in the record to the contrary. Payment of traffic impact
fees as required by the Renton Municipal Code will assure that the applicant pays its
proportionate share of system-wide traffic improvements.
A major concern of the neighbors was traffic impacts to 106 Ave SE, 104 Ave SE and 105
Ave SE. In uncontested testimony, several neighbors testified that these roads are
isolated, currently accommodate a minimal amount of traffic and are not developed with
sidewalks or shoulders that can be used for pedestrian traffic. By contrast, the project’s
access to SR 515, the most likely thoroughfare to be used by project residents, can only be
directly accessed by passing through the Benson Road S./SR 515 intersection, which is
subject to severe congestion during the AM and PM peak hour. Neighbors are concerned
that this congestion will cause vehicles going to and leaving the project site to drive
through the 105/104/106 Ave SE roads. A SEPA mitigation measure requires the
installation of speed radar signs for southbound traffic on 104th and 106th to slow down
some of this new traffic. Although a review of the surrounding road network shows that
persons may very well choose to drive through 105/104/106 to avoid the Benson/SR 515
intersection a well as other traffic problems in the area, the applicant’s traffic analysis
reveals that the project will only add five PM peak hour trips and four AM peak hour trips
into the 105/104/106 roads. The applicant’s traffic analysis was verified by peer review.
Given the expert traffic analysis prepared by the applicant and the independent expert
verification conducted under the peer review, the applicant’s traffic analysis is taken as a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
10
verity given the absence of any expert testimony to the contrary. With only a maximum of
five additional trips per hour generated by the proposal, there is no basis to require more
than the speed radar signs required by the SEPA mitigation measures. Neighborhood
residents are certainly correct to assert that the cumulative impacts of all projects must be
considered when assessing traffic impacts, but there is nothing in the record to suggest that
the speed radar sign required of the applicant is less than the applicant’s fair share of
mitigating these cumulative impacts. Case law is very clear in the State of Washington
that the City has the burden of proof in establishing that any required road improvements
are proportional and attributable to impacts created by development. See Burton v. Clark
County, 91 Wn. App. 505, 516-17 (1998). For this application, there is no evidence to
suggest that more than the speed radar signs required by SEPA is necessary to off-set the
traffic impacts caused by the proposal on the 105/104/106 roads.
Another issue frequently cited by neighbors was the queuing length at the Benson Road
S./SR 515 intersection. Uncontested traffic analysis conducted by the applicant
establishes that with re-channelization measures required by this decision, queue lengths
will be reduced from 372 feet to 212 feet and will be shorter than pre-development
conditions, even when added traffic from recently approved development projects is
incorporated into the analysis. Since the proposal will be improving upon existing
queuing conditions at the Benson Road S./SR 515 intersection, no further mitigation can
be required.
A few neighbors also suggested that project access directly connect to SR 515 instead of
SE 172nd St. As testified by City staff, direct access onto a limited access thoroughfare
such as SR 515 is avoided by both the City and the state (which also regulates SR 515
access) when reasonable alternate project access is available. Further, direct access would
be highly challenging given the critical areas (stream and coal mine hazard) and steep
grade on the south portion of the project site. Direct access to SR 515 is not warranted or
feasible for this project.
Several people also testified about walking conditions to and from school. Students may
very well be walking to Nelson Middle School, located to the north of the project site.
Nelson Middle School can be accessed via Benson Road S. which has sidewalks between
the school and the project site. As part of the proposed project, sidewalks would be
constructed along the frontage of the site and would connect to the existing sidewalk
system. However, the frontage along the daycare center at the southwest corner of the
intersection of Benson Road S. and SE 172nd Ave is missing some sidewalk linkage. For
this reason, the conditions of approval require improvements to be made along the day
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
11
care frontage to fill in the missing sidewalk connections. As noted by Ms. Moss, there are
still no sidewalks along the 105/104/106 streets. As previously discussed, the proposal
will add a minor amount of traffic to these roads, and for the reasons previously discussed,
the speed radar sign required of the applicant adequately mitigates against the applicant’s
proportionate share of impacts to these roads.
A few neighbors testified that they believed that the applicant’s traffic analysis did not
include traffic generated by other projects. However, as testified by both staff and the
applicant, the applicant’s traffic analysis did in fact factor in the traffic of currently
approved projects as well as a general background traffic increase factor required by City
standards.
5. Adverse Impacts. Since the project provides for adequate infrastructure and public services,
the only remaining impacts to be considered are to critical areas. There are two critical areas at the
project site – a Type Ns stream bisects the project site and a high coal mine hazard is located in the
southern portion of the site.
A. High Coal Mine Hazard. As conditioned, the proposal has been adequately mitigated to
address any significant adverse impacts to coal mine hazards. High Coal Mine Hazards are
considered areas with abandoned and improperly sealed mine openings and areas underlain
by mine workings shallower than 200 feet in depth for steeply dipping seams, or shallower
than 15 times the thickness of the seam or workings for gently dipping seams. These areas
may be affected by collapse or other subsidence. A Coal Mine Hazard Assessment was
performed by Icicle Creek Engineers, Inc. on March 22, 2004 and January 20, 2009
(Exhibits 7 and 8). The studies found that the southern portion of the project site overlays
a historic coal mine known as the Springbrook Mine, along with the opening to the mine.
The study further found that the Springbrook Mine meets the City’s criteria for a high coal
mine hazard.
Several recommendations to mitigate potential risk of the coal mine hazard/former entry
were included in the Icicle Creek Engineer report, including the excavation of the fill at the
mine entry and backfilling with controlled density fill (Exhibit 8). However, these
recommendations were based on a former development proposal which included structures
in the southern portion of the site. The proposed development is setback approximately 125
feet from the coal mine hazard and would likely not have the same impacts as the former
development. However, there are some grading activities and smaller recreational
improvements in the proximity of the coal mine hazard which may potentially be affected
by mining related subsidence.
A SEPA mitigation measure was issued requiring an updated Coal Mine Hazard Report
demonstrating the proposal would not increase the threat of the geological hazard to
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
12
adjacent or abutting properties beyond pre-development conditions and the development
can be safely accommodated on the site (Exhibit 20).
B. Type Ns Stream. As conditioned, the proposal has been adequately mitigated to address
any impacts to the on-site stream. The applicant submitted a Wetland and Supplemental
Stream Study, prepared by Ed Sewell Consulting Inc., dated December 22, 2015 (Exhibit
10). The report identifies an unnamed seasonal stream (Stream A) that bisects the northern
and southern portions of the site and runs from east to west. As defined by RMC 4-3-
050.G the stream best meets the criteria of a Type Ns stream due to its intermittent flow
and lack of fish use. Class Ns streams have a standard buffer of 50 feet as measured from
the Ordinary High Water Mark (OHWM) as well as a 15-foot setback from the edge of the
buffer to any structure. The applicant is proposing buffer averaging for portions of the
stream buffer. Additionally, the applicant is proposing an alteration within the stream and
its associated buffer for a pedestrian crossing. With the conditions recommended in the
staff report (and adopted by this decision), the proposed buffer averaging and stream
alteration conforms to the City’s critical areas regulations for the reasons identified at page
14 of the staff report.
C. Wildlife/Vegetation. As noted in the applicant’s habitat assessment, there are no state or
federally listed species on or near the site and there are no rare or unique plant
communities on the site. The only wildlife/vegetation subject to protection at the project
site are trees. The City’s adopted Tree Retention and Land Clearing Regulations require
the retention of 20 percent of trees in a residential development. As noted at p. 10 of the
staff report, the City’s tree retention standards specifically require the retention of 42 trees
and the applicant is retaining 46 trees. As further noted at p. 10, City tree density
requirements require a total of at least 132 trees at the project site. A condition of approval
requires that the applicant demonstrate compliance with this standard as the application
materials are unclear as to the total amount of trees that will be planted at the project site.
Beyond trees, since there are no wildlife species specifically protected by City of Renton
regulations, there is no basis to regulate or restrict the project based upon wildlife or
vegetation impacts.
D. Compatibility. The project is compatible with surrounding development as it is within the
range of densities authorized by applicable zoning standards and is heavily regulated by
the City’s “Design District B” design standards. As testified by staff, the intermediate
densities authorized for the site are intended to serve as a transition between the
commercial uses to the south and the residential uses to the north. The higher densities of
the project site, compared to the northern residential uses, is mitigated by the perimeter
landscaping and emphasis upon aesthetic design imposed by the City’s design standards.
On the north perimeter of the project, where compatibility issues would be most
pronounced, the adjacent residential dwellings would be screened from the surface parking
lot through the use of landscape buffers, building modulation and new proposed street
trees. The design may not bear any similarity to the design of the turn of century homes in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
13
the vicinity, but the applicant was required to comply with Design District B standards and
no one has suggested that staff’s finding of compliance with these standards was in error.
E. Respiratory Problems. One neighbor testified that he was concerned that pollution caused
by increased project traffic would exacerbate the respiratory problems of some neighbors
living close to the project site. Without any scientific evidence to substantiate this
assertion, there is insufficient evidence to reasonably conclude that the relatively modest
traffic generated by the proposal would exacerbate respiratory problems.
6. Superiority in Design. The development of this site as a PUD results in a superior design than
what would result by the strict application of the Development Standards for the following reasons:
natural features, overall design, and building and site design. The proposed design provides for the
retention of the natural grade on site, significant trees and a noteworthy amount of landscaping and
re-vegetation. Additionally, the plan provides for both active and passive recreation spaces
significantly beyond the standard code requirements. The proposed design can provide for the
aforementioned amenities because of the modifications requested for the PUD as outlined in Finding
of Fact No. 3. The modifications approved by this decision contribute to and enable the superior
design proposed for this project by increasing available space for open space and natural site features.
7. Public Benefit. The proposal provides several public benefits as detailed in pages 17-20 of
the Staff Report, adopted and incorporated by this reference as if set forth in full.
CONCLUSIONS OF LAW
Procedural:
1. Authority. RMC 4-9-150(F)(8) authorizes the Examiner to conduct hearings and make final
decisions on planned urban development applications.
Substantive:
2. Zoning/Comprehensive Plan Designations. The project site is zoned Residential Multi-Family
(RMF) and has a comprehensive plan land use designation of Residential High Density.
3. Review Criteria. A PUD may be pursued by “any applicant” as authorized by RMC 4-9-
150(B), which is interpreted to authorize the application of PUD regulations to multi-family
development projects. RMC 4-9-150(D) governs PUD criteria. Those criteria are quoted below in
italics and applied through corresponding conclusions of law.
RMC 4-9-150(B)(2): Code Provisions That May Be Modified:
a. In approving a planned urban development, the City may modify any of the standards of chapter 4-
2 RMC, chapter 4-4 RMC, RMC 4-6-060 and chapter 4-7 RMC, except as listed in subsection B3 of
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
14
this Section. All modifications shall be considered simultaneously as part of the planned urban
development…
4. As shown in Finding of Fact No. 3, the requested revisions are limited to the regulations
identified in the regulation quoted above with the exception of the Private Open Space modification
to RMC 4-9-150.E.2. As such, the conditions of approval require that the applicant provide a revised
site plan demonstrating compliance with the private open space standards of RMC 4-9-150.E.2.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
1. Demonstration of Compliance and Superiority Required: Applicants must demonstrate that a
proposed development is in compliance with the purposes of this Section and with the Comprehensive
Plan, that the proposed development will be superior to that which would result without a planned
urban development, and that the development will not be unduly detrimental to surrounding
properties.
5. The criterion is met. The purposes of the PUD regulations, as outlined in RMC 4-9-150(A),
are to preserve and protect the natural features of the land and to encourage innovation and creativity
in development of residential uses. As outlined in Finding of Fact No. 4 and 5 the natural features of
the site are protected by open space, buffers and mitigation that significantly exceeds minimum code
standards. The proposal involves innovation and creativity via the integration of critical area open
space into the recreational open space of the project site. The project is consistent with the
comprehensive plan as determined in Finding of Fact No. 22 of the staff report. As determined in
Finding of Fact No. 6, the proposal is superior in design to what which would occur without a PUD.
As determined in Finding of Fact No. 4 and 5 the project will not create any significant adverse
impacts and so would not be unduly detrimental to surrounding properties.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
2. Public Benefit Required: In addition, Applicants shall demonstrate that a proposed development
will provide specifically identified benefits that clearly outweigh any adverse impacts or undesirable
effects of the proposed planned urban development, particularly those adverse and undesirable
impacts to surrounding properties, and that the proposed development will provide one or more of
the following benefits than would result from the development of the subject site without the proposed
planned urban development:
…
b. Natural Features: Preserves, enhances, or rehabilitates natural features of the subject
property, such as significant woodlands, native vegetation, topography, or noncritical area
wildlife habitats, not otherwise required by other City regulations; or…
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
15
e. Overall Design: Provides a planned urban development design that is superior to the
design that would result from development of the subject property without a planned urban
development. A superior design may include the following: ...
6. The proposal provides for public benefit by providing amenities related to natural features and
overall design that significantly exceed code standards as determined in Finding of Fact No. 7. These
benefits clearly outweigh any adverse impacts since there are no significant adverse impacts
associated with the proposal as determined in Finding of Fact No. 4 and 5. The integration of the
natural features of the site with the recreational/open spaces of the site is particularly well done and
will succeed in providing significant aesthetic and recreational benefits to project residents as well as
retaining a significant amount of green space and vegetation for the surrounding community.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria:
a. Building and Site Design:
i. Perimeter: Size, scale, mass, character and architectural design along the planned urban
development perimeter provide a suitable transition to adjacent or abutting lower density/intensity
zones. Materials shall reduce the potential for light and glare.
7. The criterion is met for the reasons identified at page 21 of the staff report.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria:
a. Building and Site Design:
…
ii. Interior Design: Promotes a coordinated site and building design. Buildings in groups should be
related by coordinated materials and roof styles, but contrast should be provided throughout a site by
the use of varied materials, architectural detailing, building orientation or housing type; e.g., single
family, townhouses, flats, etc.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
16
8. The criterion is met for the reasons identified at pages 21-22 of the staff report.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
b. Circulation:
i. Provides sufficient streets and pedestrian facilities. The planned urban development shall have
sufficient pedestrian and vehicle access commensurate with the location, size and density of the
proposed development. All public and private streets shall accommodate emergency vehicle access
and the traffic demand created by the development as documented in a traffic and circulation report
approved by the City. Vehicle access shall not be unduly detrimental to adjacent areas.
9. The proposal provides for adequate streets and pedestrian facilities as determined in Finding
of Fact No. 4.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
b. Circulation:
…
ii. Promotes safety through sufficient sight distance, separation of vehicles from pedestrians, limited
driveways on busy streets, avoidance of difficult turning patterns, and minimization of steep
gradients.
10. The criterion is met for the reasons identified at p. 22-26 of the staff report.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
17
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
b. Circulation:
…
iii. Provision of a system of walkways which tie residential areas to recreational areas, transit, public
walkways, schools, and commercial activities.
11. The criterion is met for the reasons identified at p. 22-26 of the staff report.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
b. Circulation:
…
iv. Provides safe, efficient access for emergency vehicles.
12. The proposal provides for safe and efficient access for emergency vehicles as determined in
Finding of Fact No. 4.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
c. Infrastructure and Services: Provides utility services, emergency services, and other improvements,
existing and proposed, which are sufficient to serve the development.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
18
13. As determined in Finding of Fact No. 4, the proposal is served by sufficient public
infrastructure and services to serve the development.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
d. Clusters or Building Groups and Open Space: An appearance of openness created by clustering,
separation of building groups, and through the use of well-designed open space and landscaping, or
a reduction in amount of impervious surfaces not otherwise required.
14. The project’s principal PUD characteristic is its integration of clustered buildings strategically
located adjacent to combined and well-designed open space and critical areas as outlined in Finding
of Fact No. 4(D).
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
e. Privacy and Building Separation: Provides internal privacy between dwelling units, and external
privacy for adjacent dwelling units. Each residential or mixed use development shall provide visual
and acoustical privacy for dwelling units and surrounding properties. Fences, insulation, walks,
barriers, and landscaping are used, as appropriate, for the protection and aesthetic enhancement of
the property, the privacy of site occupants and surrounding properties, and for screening of storage,
mechanical or other appropriate areas, and for the reduction of noise. Windows are placed at such a
height or location or screened to provide sufficient privacy. Sufficient light and air are provided to
each dwelling unit.
15. The criterion is met for the reasons outlined at p. 28 of the staff report.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
19
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
f. Building Orientation: Provides buildings oriented to enhance views from within the site by taking
advantage of topography, building location and style.
16. The buildings are orientated toward the open spaces or toward the offsite view vistas afforded
in the naturally elevated site location. There is minimal orientation toward off site non view areas.
RMC 4-9-150(D): The City may approve a planned urban development only if it finds that the
following requirements are met.
…
3. Additional Review Criteria: A proposed planned urban development shall also be reviewed for
consistency with all of the following criteria
…
g. Parking Area Design: Provides parking areas that are complemented by landscaping and not
designed in long rows. The size of parking areas is minimized in comparison to typical designs, and
each area related to the group of buildings served. The design provides for efficient use of parking,
and shared parking facilities where appropriate.
17. Parking across the site would be handled in way as to not have large surface parking areas.
Instead the applicant is proposing the use of parallel parking stalls along the perimeter of the
proposed drive aisle. The surface parking design is comprised of 90-degree stalls to make maximum
use of parking area and provide clear, safe vehicular circulation that promotes visibility. The use of
compact stalls is minimal and is well under the code-required maximums for compact stall counts.
RMC 4-9-150(D)(4): Each planned urban development shall demonstrate compliance with the
development standards contained in subsection E of this Section, the underlying zone, and any
overlay districts; unless a modification for a specific development standard has been requested
pursuant to subsection B2 of this Section.
18. As discussed below, the proposal complies with all development standards imposed by RMC
4-9-150(E). The proposal is compliant with the standards of the underlying RMF zone for the
reasons identified in Finding of Fact No. 23 of the staff report. As a project located in the RMF zone,
the project is in the District B design district as regulated by RMC 4-3-100. For the reasons identified
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
20
in Finding of Fact No. 29 of the staff report, the proposal is consistent with all District B design
standards.
RMC 4-9-150(E)(1): Common Open Space Standard: Open space shall be concentrated in large
usable areas and may be designed to provide either active or passive recreation. Requirements for
residential, mixed use, commercial, and industrial developments are described below.
a. Residential: For residential developments open space must equal at least ten percent (10%) of the
development site’s gross land area.
i. Open space may include, but is not limited to, the following:
(a) A trail that allows opportunity for passive recreation within a critical area buffer (only the square
footage of the trail shall be included in the open space area calculation), or
(b) A sidewalk and its associated landscape strip, when abutting the edge of a critical area buffer and
when a part of a new public or private road, or
(c) A similar proposal as approved by the reviewing official.
ii. Additionally, a minimum area equal to fifty (50) square feet per unit of common space or
recreation area shall be provided in a concentrated space as illustrated in Figure 1.
19. The 19,795 square feet of community space alone exceeds ten percent of the total 164,827
square feet of the project area. This space, along with other open spaces provided in the project site,
also satisfies the requirement of 50 square feet per dwelling unit, for a total of 3,700 additional square
feet of open space.
RMC 4-9-150(E)(2): Private Open Space: Each residential unit in a planned urban development
shall have usable private open space (in addition to parking, storage space, lobbies, and corridors)
for the exclusive use of the occupants of that unit. Each ground floor unit, whether attached or
detached, shall have private open space which is contiguous to the unit. The private open space shall
be well demarcated and at least fifteen feet (15') in every dimension (decks on upper floors can
substitute for the required private open space). For dwelling units which are exclusively upper story
units, there shall be deck areas totaling at least sixty (60) square feet in size with no dimension less
than five feet (5').
20. Ground related units do not have their own private open space. A condition of approval
requires that the applicant provide a revised site plan demonstrating compliance with the private open
space standard of at least 15-feet in every dimension for all ground related units. Not all upper story
residential units have private open space dimensioned at 60 feet. A condition of approval requires
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
21
that the applicant provide revised elevations for upper floor units demonstrating compliance with the
private open space standard of at least 60 square feet in size with no dimension less than 5 feet.
RMC 4-9-150(E)(3): Installation and Maintenance of Common Open Space:
a. Installation: All common area and open space shall be landscaped in accordance with the
landscaping plan submitted by the Applicants and approved by the City; provided, that common open
space containing natural features worthy of preservation may be left unimproved. Prior to the
issuance of any occupancy permit, the developer shall furnish a security device to the City in an
amount equal to the provisions of RMC 4-9-060. Landscaping shall be planted within one year of the
date of final approval of the planned urban development, and maintained for a period of two (2)
years thereafter prior to the release of the security device. A security device for providing
maintenance of landscaping may be waived if a landscaping maintenance contract with a reputable
landscaping firm licensed to do business in the City of Renton is executed and kept active for a two
(2) year period. A copy of such contract shall be kept on file with the Development Services Division.
b. Maintenance: Landscaping shall be maintained pursuant to requirements of RMC 4-4-070.
21. As Conditioned.
RMC 4-9-150(E)(4): Installation and Maintenance of Common Facilities:
a. Installation: Prior to the issuance of any occupancy permits, all common facilities, including but
not limited to utilities, storm drainage, streets, recreation facilities, etc., shall be completed by the
developer or, if deferred by the Planning/Building/Public Works Administrator or his/her designee,
assured through a security device to the City equal to the provisions of RMC 4-9-060…
22. As Conditioned.
RMC 4-9-150(E)(4): Installation and Maintenance of Common Facilities:
…
b. Maintenance: All common facilities not dedicated to the City shall be permanently maintained by
the planned urban development owner, if there is only one owner, or by the property owners’
association, or the agent(s) thereof. In the event that such facilities are not maintained in a
responsible manner, as determined by the City, the City shall have the right to provide for the
maintenance thereof and bill the owner or property owners’ association accordingly. Such bill, if
unpaid, shall become a lien against each individual property.
23. As conditioned.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
22
DECISION
The proposed preliminary PUD meets all applicable criteria quoted in this decision and for that
reason is APPROVED. Requested revisions to development standards identified in Finding of Fact
No. 3 are all approved except for revisions to RMC 4-9-150.E.2. The applicant’s request for an
additional 1.5 feet in building height for the west building as proposed in Ex. 27 is also approved.
The proposal is subject to the following Conditions of Approval:
1. The applicant shall comply with the mitigation measures issued as part of the
Determination of Non-Significance Mitigated ERC Addendum, dated April 7, 2016.
2. The applicant shall be required to record formal Lot Combination or Binding Site Plan in
order to ensure the proposed buildings are not built across property lines. The instrument
shall be recorded prior to building permit approval.
3. The applicant shall be required to submit a detailed landscape plan to the Current
Planning Project Manager prior to construction permit approval complying with RMC 4-
4-070.
4. The applicant shall be required to submit a detailed landscape plan depicting at least 132,
two-inch caliper, trees (or the gross equivalent inches) on site; not including the those
trees located within the Native Growth Protection Easement. The detailed landscape plan
shall be submitted to, and approved by, the Current Planning Project Manager prior to
construction permit approval.
5. The applicant shall submit a revised landscaping plan depicting a minimum three-foot
landscaped setback from the sidewalk at the base of retaining walls abutting, or within,
public rights-of-way. Landscaping shall include a mixture of shrubs and groundcover
(trees are optional) in conformance with the standards of RMC 4-4-070H4, Perimeter
Parking Lot Landscaping. The revised landscaping plan shall be submitted to, and
approved by, the Current Planning Project Manager prior to engineering permit approval.
6. The applicant shall submit a revised Mitigation plan which addresses the criteria found in
RMC 4-3-050.H.2 demonstrating the reduced buffer wouldn’t negatively impact the
function of the stream. The revised mitigation plan shall be submitted to, and approved
by, the Current Planning Project Manager prior to engineering permit approval.
7. The applicant shall submit a revised Mitigation plan which addresses the criteria found in
RMC 4-3-050.H.2 demonstrating the bridged crossing wouldn’t negatively impact the
function of the stream. The revised mitigation plan shall be submitted to, and approved
by, the Current Planning Project Manager prior to engineering permit approval.
8. The applicant shall establish a Native Growth Protection Easement over that part of the
site encompassing the stream and buffer area and place split rail fencing and signage
along the outer edge of the buffer. The Final Mitigation plan shall include all
specifications for fencing and signage and shall be submitted to, and approved by, the
Current Planning Project Manager prior to engineering permit approval.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
23
9. The applicant shall be required to provide, to the Current Planning Project Manager, tree
retention inspection/monitoring reports after initial clearing, final grading, and annually
for two years by a qualified professional forester. The inspection/monitoring reports shall
identify any retained trees that develop problems due to changing site conditions and
prescribe mitigation.
10. The applicant shall provide interpretive signage/information regarding differentiating
elements (trees, landscaping, drainage, architecture, etc.) of the proposed development at
a strategic place(s) on site. The site plan depicting the signage shall be submitted to, and
approved by, the Current Planning Project Manager prior to building permit/Final Plat
approval whichever comes first.
11. A detailed fencing plan shall be provided identifying the location and specifications for
all fencing on site. All fencing shall be made of quality materials in keeping with the
architectural aesthetic of the proposed structures. The fencing plan shall be submitted to,
and approved by, the Current Planning Project Manager prior to building permit approval.
12. The applicant shall provide a lighting plan that adequately provides for public safety
without casting excessive glare on adjacent properties; at the time of engineering permit
review. Pedestrian scale and down lighting shall be used in all cases to assure safe
pedestrian and vehicular movement, unless alternative pedestrian scale lighting has been
approved administratively or is specifically listed as exempt from provisions located in
RMC 4-4-075 Lighting, Exterior On-Site.
13. The applicant shall eliminate the proposed access restrictions along SE 172nd St in order
to provide full access along SE 172nd St. A revised site plan shall be submitted to, and
approved by, the Plan Reviewer prior to engineering permit approval.
14. Prior to the issuance of any occupancy permits, all common facilities, including but not
limited to utilities, storm drainage, streets, recreation facilities, etc., shall be completed by
the developer or, if deferred by the Planning/Building/Public Works Administrator or
his/her designee, assured through a security device to the City equal to the provisions of
RMC 4-9-060.
15. All common facilities not dedicated to the City shall be permanently maintained by the
planned urban development owner, if there is only one owner, or by the property owners’
association, or the agent(s) thereof. In the event that such facilities are not maintained in a
responsible manner, as determined by the City, the City shall have the right to provide for
the maintenance thereof and bill the owner or property owners’ association accordingly.
Such bill, if unpaid, shall become a lien against each individual property.
16. The applicant shall create a public outreach sign in coordination with City of Renton to
communicate with road users, the general public, area residences and businesses, and
appropriate public entities about project information; road conditions in the work zone
area; and the safety and mobility effects of the work zone. The sign shall be placed on site
prior to construction commencement.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
24
17. The applicant shall provide a revised site plan demonstrating compliance with the private
open space standard of at least 15-feet in every dimension for all ground related units.
The revised site plan shall be submitted to, and approved by, the Current Planning Project
Manager prior to building permit approval whichever comes first.
18. The applicant shall provide revised elevations demonstrating compliance with the private
open space standard of at least 60 square feet in size with no dimension less than 5 feet
for all upper story units. The revised elevations shall be submitted to, and approved by,
the Current Planning Project Manager prior to building permit approval whichever comes
first.
19. Prior to the issuance of any occupancy permit, the developer shall furnish a security
device to the City in an amount equal to the provisions of RMC 4-9-060. Landscaping
shall be planted within one year of the date of final approval of the planned urban
development, and maintained for a period of 2 years thereafter prior to the release of the
security device. A security device for providing maintenance of landscaping may be
waived if a landscaping maintenance contract with a reputable landscaping firm licensed
to do business in the City of Renton is executed and kept active for a 2 year period. A
copy of such contract shall be kept on file with the Planning Division.
20. The building entries from a street shall be clearly marked with canopies, architectural
elements, ornamental lighting, and/or landscaping and include weather protection at least
four and one-half feet (4-1/2') wide. The revised elevations shall be submitted to, and
approved by, the Current Planning Project Manager prior to building permit approval.
21. The applicant shall be required to submit a revised site and landscaping plan depicting
entrances and pedestrian connections from ground related residential units, along SE
172nd St, to the public sidewalk. The revised landscape and site plan shall be submitted
to and approved by the Current Planning Project Manager prior to building permit
approval. Staff is aware there may be topographic challenges with entrances along SE
172nd St and the applicant is encouraged to provide stairs to the units or demonstrate
separate entrances are not feasible prior to building permit approval.
22. The applicant shall submit revised refuse and recycle enclosure elevations which include
a roof. The revised elevations shall be submitted to, and approved by, the Current
Planning Project Manager prior to building permit approval.
23. The applicant shall revise the site plan to depict a differentiation in materials for all
pedestrian connections within parking areas and/or drive aisles on site. The revised site
plan shall be submitted to and approved by the Current Planning Project Manager prior to
building/engineering permit approval. If this condition of approval is met the proposal
would satisfy this standard.
24. The applicant shall provide detailed specifications for all site furniture, and art, in order to
ensure durable, vandal- and weather-resistant materials are used. The specifications shall
be submitted to, and approved by, the Current Planning Project Manager prior building
permit approval.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PRELIMINARY PLANNED URBAN DEVELOPMENT -
25
25. The applicant shall submit revised elevations depicting entrance detailing/weather
protection for ground related units, fencing, pedestrian connectivity, lighting fixtures,
contrasting materials, and/or special detailing along SE 172nd St. The revised elevations
shall be submitted to and approved by the Current Planning Project Manager prior to
building permit approval whichever comes first.
26. The applicant shall submit a materials board subject to the approval of the Current
Planning Project Manager prior to building permit approval. The board shall include
color and materials for the following: guardrails, façade treatments, retaining walls, raised
planters, siding, windows/frames, and canopies. Acceptable materials include a
combination of brick, integrally colored concrete masonry, pre-finished metal, stone,
steel, glass, cast-in-place concrete, or other superior materials approved at the discretion
of the Administrator.
27. The current left turn and right turn southbound lanes from Benson Road South to SR 515
shall be rechanneled by the applicant to one left turn lane and one combined left turn/right
turn lane and the applicant shall also modify the light signal at the Benson Road
South/SR 515 to accommodate the re-channelization.
DATED this 24th day of May, 2016.
City of Renton Hearing Examiner
Appeal Right and Valuation Notices
RMC 4-8-080 provides that the final decision of the hearing examiner is subject to appeal to the
Renton City Council. RMC 4-8-110(E)(14) requires appeals of the hearing examiner’s decision
to be filed within fourteen (14) calendar days from the date of the hearing examiner’s decision.
A request for reconsideration to the hearing examiner may also be filed within this 14 day appeal
period as identified in RMC 4-8-110(E)(13) and RMC 4-8-100(G)(9). A new fourteen (14) day
appeal period shall commence upon the issuance of the reconsideration. Additional information
regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall –
7th floor, (425) 430-6510.
Affected property owners may request a change in valuation for property tax purposes
notwithstanding any program of revaluation.