Loading...
HomeMy WebLinkAbout400-06pF RF y z POLICY & PROCEDURE 09 e. P TE SEP E Subject: Index: PUBLIC WORKS/BUILDING WATER MAIN, FIRE HYDRANT, AND FIRE SERYICE MAINS PLANS REVIEW Numbe r: AND APPROVAL 400-06 Effective Date: Supersedes: Page Of Prepared by: Approved by: Sept. 1985 1 2 Jim Matthew Go Bob Bergstrom 1.0 PURPOSE: To establish a policy/procedure for the review and approval of water main, fire hydrants, and fire service main plans prior to installation. 2.0 ORGANIZATIONS AFFECTED: Public Works Department Building/Zoning Department Fire Department King County Fire Marshal King County Fire Districts King County Water Districts 3.0 REFERENCES: xMC 4-6 RMC 4-5-070 4.0 POLICY: The City of Renton desires to coordinate the approval of all water main, fire hydrant, and fire service main installation plans in accordance with adopted City ordinances. 5.0 DEFINITIONS: Not applicable. 40Q-06 WATER MAIN, FIRE HYDRANT AND FIRE SERVICE MAINS PLANS REVIEW AWD APPROVAL PAGE 2 6.Q PRQCEQURE: 6.1 Water Main, Fire Hydrant, and Fire Service Main Plan Review Process 6.1 .1 Appiication is filed with the appropriate Pubiic Warks Department or Water Dzstrict. 6.1 .2 Plans shall be prepared according ta City of Rentan Public Works Department specifications. 6.1 .3 Two (2) capies of plans shall be rauted ta the Renton Fire Prevention Bureau or King County Fire Marshal for review within two (2) days of submissian, or as expeditiousiy as passibie. 6,1 .4 Normal turn-around time for Fire Prevention review is seven (7} days. 6.1 .5 Tf plans are approved as submitted, final drawings may be signed off by the Fire Marshal and water utility installation permit issued. 6.1 .b If plans are not appraved ar correcti ns are required, apprava] sha7l be withheld until needed corrections are made. 6.1 .7 Copies of appraved drawings shall be kept on file with the Public Works Department and King County Water District, where applicable.