1.0 PURPOSE:
To establish a policy/procedure for the review and approval of water
main, fire hydrants, and fire service main plans prior to installation.
2.0 ORGANIZATIONS AFFECTED:
Public Works Department
Building/Zoning Department
Fire Department
King County Fire Marshal
King County Fire Districts
King County Water Districts
3.0 REFERENCES:
xMC 4-6
RMC 4-5-070
4.0 POLICY:
The City of Renton desires to coordinate the approval of all water main,
fire hydrant, and fire service main installation plans in accordance
with adopted City ordinances.
5.0 DEFINITIONS:
Not applicable.
40Q-06
WATER MAIN, FIRE HYDRANT AND FIRE SERVICE MAINS
PLANS REVIEW AWD APPROVAL
PAGE 2
6.Q PRQCEQURE:
6.1 Water Main, Fire Hydrant, and Fire Service Main Plan Review
Process
6.1 .1 Appiication is filed with the appropriate Pubiic Warks
Department or Water Dzstrict.
6.1 .2 Plans shall be prepared according ta City of Rentan Public
Works Department specifications.
6.1 .3 Two (2) capies of plans shall be rauted ta the Renton Fire
Prevention Bureau or King County Fire Marshal for review
within two (2) days of submissian, or as expeditiousiy as
passibie.
6,1 .4 Normal turn-around time for Fire Prevention review is
seven (7} days.
6.1 .5 Tf plans are approved as submitted, final drawings may be
signed off by the Fire Marshal and water utility
installation permit issued.
6.1 .b If plans are not appraved ar correcti ns are required,
apprava] sha7l be withheld until needed corrections are
made.
6.1 .7 Copies of appraved drawings shall be kept on file with the
Public Works Department and King County Water District,
where applicable.