Loading...
HomeMy WebLinkAboutP 9806030147 Return Address: AFTER RECORDING RETURN TO: CITY OF RENTON CITY CLERK'S OFFICE 200 MILL AVENUE SOUTH RENTON,WA 98055-2189 Please print or type information WASHINGTON STATE RECORDER'S Cover Sheet(RCW 65.04) Document Title(s) (or transactions contained therein): (all areas applicable to your document must be filled in). 1. DEPARTMENT OF THE ARMY PERMIT Grantor(s) (Last name first,then first name and initials) 1. UNITED STATES ARMY CORPS OF ENGINEERS sr1 Grantee(s) (Last name first,then first name and initials) 1. CITY OF RENTON Legal description(abbreviated: i.e.lot,block,plat or section,township,range) Portions of the Cedar River Commercial Waterway through the City of Renton in Section 17, 0.3 Township 23 North,Range 5 East,W.M.,in King County,Washington. W 1-- Assessor's Property Tax Parcel/Account Number: Commercial Waterway Parcel Number Not Assigned, Prop.Mgmt Initials g g8-Aa3 q H:\FORMS\KCRECORD\KC_COVER.DOC 0 • DEPARTMENT OF THE ARMY PERMIT Permittee: Renton, City of City of Renton 200 Mill Avenue South Permit No: 97-4-01329 Renton, Washington 98055 Issuing Office: Seattle District Note: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. Project Description: Place fill in 0.31 of an acre of wetlands in accordance with the plans and drawings attached hereto which are incorporated in and made a part of this permit. (Complete the disjunct portions of Oakesdale Avenue S.W. and provide access to abutting property) . Project Location: In wetlands adjacent to Springbrook Creek, Duwamish River at Renton, Washington. Permit Conditions: General Conditions: MiR - 6 2001 1. The time limit for completing the work authorized ends on If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least 1 month before the above date is reached. tot 2. You must maintain the activity authorized by this permit in good condition and in accordance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should • you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification to this permit from this office, which may require restoration of the area. On 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. r • Renton, City of 97-4-01329 7. After a detailed and careful review of all of the conditions contained in this permit, the permittee acknowledges that, although said conditions were required by the Corps of Engineers, nonetheless the permittee agreed to those conditions voluntarily to facilitate issuance of the permit; the permittee will comply fully with all the terms of the permit conditions. Special Conditions: a. You must provide a copy of the permit transmittal letter, the permit form, and drawings to all contractors performing any of the authorized work. b. You must comply with the provisions of the attached Water Quality Certification. c. The wetland area created as mitigation for work authorized by this permit shall not be made the subject of a future individual or general Department of the Army permit application for fill or other development, except for the purposes of .enhancing or restoring the mitigation associated with this project. d. A new permit application shall be submitted for review and evaluation for Phase 2 work if funding is obtained. The Phase 2 work shall be subject of a new public notice. e. You shall establish a permanent conservation easement to protect created and avoided wetlands within the proposed project and mitigation areas and record them with the County. f. The wetland seed mix shall only include native species in the mitigation areas. g. A status report on the mitigation construction, including as-built drawings, shall be submitted to the Regulatory Branch, Corps of Engineers, 13 months from the date of permit issuance. Annual status reports are required until mitigation construction is complete. h. The revised February 1998 Mitigation Plan shall be implemented. The first annual mitigation monitoring report will be due no later than one year after the • Corp's written acceptance of the as-built drawings and thereafter as scheduled in the 0 mitigation report. All reports must be submitted to the Seattle District, Regulatory CID Branch. Q i. A description of the mitigation area identified in the final mitigation plan as approved, and any subsequent permit mitigation area revisions, will be recorded with the Registrar of Deeds or other appropriate official charged with the responsibility for maintaining records to or interest in real property. Proof of this documentation must be provided to the Corps of Engineers, Seattle District within 60 days of issuance of this permit. Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: ( ) Section 10 of the Rivers and Harbor Act of 1899 (33 U.S.C. 403) . (X) Section 404 of the Clean Water Act (33 U.S.C. 1344) . 2 Renton, City of 97-4-01329 ( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.0 1413) . 2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorization required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit doesnot authorize any iniury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal project. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. lip Ird e. Damage claims associated with any future modification, suspension, or 0, revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of VP this permit is not contrary to the public interest was made in reliance on the information you provided. 20 5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require include, but are not limited to, the following: a. You fail to comply with the terms and conditions of the permit. b. The information provided by you in support of your application proves to have been false, incomplete, or inaccurate (See 4 above) . c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such 3 e r ' Renton, City of 97-4-01329 directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions. General condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit. Your signature below, -as permittee, indicates that you accept and agree to comply with the terms and conditions of this permit. x /16il1i�'%�� X 3/6/ 9'$ City of on ( ATE) This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below. >181-1-4--"----- 3/aN.S AMES RIGSBY (DATE) Colone. Corps of Engineers District Engineer 1111 When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will 4111 continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. CD (TRANSFEREE) (DATE) CO 4 4