Minor Franchise Permit: MFP19003690
IVR Number: 19003690
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :06/26/2019Application Date:1423059095Parcel Number:12923 156TH AVE SE
Permit Type:08/30/2019Issue Date:Franchise
Permit Work Class:08/29/2020Expiration Date:Minor Utility
Job Number:N.556168Franchise Type:Telephone
Description:Century Link to access HH12809 and overlash on 3 poles
CONDITIONS OF OH APPROVAL: 1. Any existing height violations within the Project Reach must be resolved at the
time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2.
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the
City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to
underground facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case Century Link shall participate in the joint use trench installation for the purpose of
undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the
aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from
the first event triggering the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19003690
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Qwest Corp d/b/a CenturyLink
N.556168
Austin Sweeney
253-766-7549
austin.sweeney@centurylink.com
12923 156th Ave SE
CenturyLink to access HH12809 and overlash on 3 poles.
North Sky Communications 503.582.1263
NORTHSC857Q4 BL.028638
6/20/19Austin Sweeney
MFP19003690
RESTORATION PER CITY OF RENTON STANDARDS
Scott Warlick 7/9/2019
Holly Powers 8/30/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.556168
North Sky Communications 503.582.1263
Austin Sweeney 253.766.7549
23315 66th Ave S Kent, WA 98032
austin.sweeney@centurylink.com
12923 156th Ave SE
Reset FormPrint Form
Austin Sweeney
Austin Sweeney 06/20/19
MFP19003690
Scott Warlick
7/9/2019Monday - Friday
8:00AM - 3:00PM
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
TRAFFIC CONTROL PLAN
JOB # N. 556168.C.45
PERMIT #
Designed For: CENTURYLINK
Project # N.556168.C.45
Kathy HubbardTraffic Control Supervisor
TCS # 011905
Approved 6/19/19Phone 253-737-5198
tcpnd@comcast.net
_______________________Kathy Hubbard
Date:6/19/19 Author:Kathy Hubbard, Traffic Control Supervisor Project:N.556168.C.45
CERT:TCS # 011905 Designed for CenturyLink:By Kathy Hubbard (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:KATHY HUBBARD, TCS# 011905, tcpnd@comcast.net
Legend
Work Area
CONES
WORK TRUCK
FLAGGERN
NOT TO
SCALE
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
P1 P2 P3HH12809
156TH AVE SESE 128TH ST156TH AVE SE @ SE 128TH ST
HH12809 / AERIAL OVERLASH
ONE LANE TWO WAY TRAFFIC OPERATION
SPEEDLIMIT
25
ROADWORKAHEAD
W20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1BE PREPAREDTO STOP
W20-7bBE PREPAREDTO STOPW20-7bBE PREPAREDTO STOPW20-7bW20-7aW20-7a12923
WORK AREA
12' X 375'
Comments:
THIS IS TO ACCESS THE HH-12809 LOCATED BEHIND
THE SHOULDER AND OVERLASH AERIAL.
THIS WILL BE A ONE LANE TWO WAY TRAFFIC
OPERATION WITH FLAGGERS.
FLAGGERS WILL ASSIST WITH DRIVEWAYS.
FLAGGERS WILL ASSIST ANY PEDESTRIANS AT WORK AREA.
Designed For: CENTURYLINK
Project # N. 556168.C.45
Kathy HubbardTraffic Control SupervisorTCS # 011905
Approved 6/18/2019
Phone 253-737-5198tcpnd@comcast.net
_______________________Kathy Hubbard
www.invarion.com
MFP19003690
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.140004670000”NVICINITY MAP%7561/'40#/'RENTON REGIONAL FIRE AUTHORITY.%102#7.&7002*10'
ÄEMAIL RCWN"FWPPEQPGV241,'%6+&5#4/1414&54&545%12'1(914-21("*#0&*1.'52.+%'%1706.4'Ä610'9(+$'42.#%'0'9(+$'46*47':+56+0)%10&7+6 4+5'47221.'#%106+07'0'9(+$'4#.10)#'4+#.4176'#2241:6121.'#6*'0%106+07'(+$'4#.10)':+56+0)#'4+#.&412#2241:61%7561/'45$7+.&+0) 2.#%'0'9'37+2/'06DRAFTED BY: MOUNTAIN LTD/SL 06/03/1923N5E14N.556168W26226RNTNWA0112923 156TH AVE SERENTON, WA 9805913/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO(+$'4'0)+0''456'2*'0567#462*10'01
Ä'/#+.UVGRJGPUVWCTV"%GPVWT[.KPMEQOMFP19003690
TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L
B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONHT-CL-YRPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSDRAFTED BY: MOUNTAIN LTD/SL 06/03/1923N5E14N.556168W26226RNTNWA0112923 156TH AVE SERENTON, WA 9805923/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO(+$'4'0)+0''456'2*'0567#462*10'01
Ä'/#+.UVGRJGPUVWCTV"%GPVWT[.KPMEQOMFP19003690
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSGEO CODE:WC CLLI:RNGE:SECT:TOWN:016'(1470&'4)4170&#%6+8+6;6'56#0&8'06+.#6'/#0*1.'76+.+6;8#7.624+1461'064;2.#%'9#40+0)&'8+%'5#0&914-#4'#2416'%6+10#54'37+4'�&75'';'#0&*'#&5#('6;2416'%6+102'4('&'4#.56#6'#0&.1%#.4')7.#6+105DRAFTED BY: MOUNTAIN LTD/SL 06/03/1923N5E14N.556168W26226RNTNWA0112923 156TH AVE SERENTON, WA 9805933/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO(+$'4'0)+0''456'2*'0567#462*10'01
Ä'/#+.UVGRJGPUVWCTV"%GPVWT[.KPMEQO EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP C/L C/L C/L C/L C/L C/L
C
/L C/L C/L C/L C/L EOP EOP EOP
EOP
EOP EOP EOP EOP EOP EOP
EO
P
EOP EOP EOP EOP VJ#8'5'5*17.&'45*17.&'4T5'VJ56
5+&'9#.-
5*17.&'4
VJ#8'5'STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER10+40318058/16791318'-4"A0604047RISER UP/OVERLASH26'-8" NEUTRAL HOA19'-8" CATV HOA18'-4" FIBER & CTL HOASTATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER21+70318049/16791221'A3221774OVERLASH28'-9" NEUTRAL HOA22' CATV & FIBER HOA21' CTL HOASTATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER33+90318025/16791220'-1"A0604034OVERLASH THEN DROP TO BUILDING (NO OVERLASH)25'-5" NEUTRAL HOA21'-9" FIBER HOA21'-6" CATV HOA20'-1" CTL HOA4'06104')+10#.(+4'#76*14+6;VJ#8'5'220'130'40'016'21("*#0&*1.'52.+%'%1706.4'Ä610'9(+$'42.#%'0'9(+$'46*47':+56+0)%10&7+6 4+5'47221.'#016'"%7561/'45/2122.#%'0'9'37+2/'06016'"%7561/'45$7+.&+0)2.#%'1(0'9(+$'461'064#0%'+061$7+.&+0)
21(
%6.**
/212
140'016'"%7561/'45$7+.&+0)'064#0%'2.#%'1(0'9(+$'4+0':+56+0)%10&7+661/212016'"21.'#2.#%'1(0'9(+$'4#.10)':+56+0)#'4+#.&41261%7561/'45$7+.&+0)67'10'&4+8'9#;&4+8'9#;&4+8'9#;&4+8'9#; R/W R/W R/W R/W R/W R/W R/W R/W R/W R
/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R
/W R/W R/W R/W R/W R
/W R/W R/W R/W R/W 5'48'24'37'30'25'37'20'125'016'6*'4+)*6Ä1(Ä9#;5*190*#5016$''05748';'&146+'&4+)*6Ä1(Ä9#;.1%#6+10+5#557/'&9+6*4'('4'0%'6110.+0'#5174%'/#6'4+#.5%1064#%614618'4+(;#..4+)*651(9#;#0&14'#5'/'06524+1461%105647%6+10MFP19003690
City of Renton
Dept. of Community & Economic Development
Phone: 425-430-7266 / franchise@rentonwa.gov
This letter is in response to an Aerial Variance request for explanation regarding CenturyLink permit
request to place fiber on job N.556168 to provide fiber to CenturyLink customer order.
This customer is currently being fed by an overhead copper service wire which comes from the existing
aerial copper cable attached to the current the pole line on 156th Ave SE. The most efficient and cost-
effective way to upgrade the customer to fiber is to place overhead fiber along the pole line, as
requested, and then from the pole, follow the copper service wire to the existing utility room. This costs
us approximately, $8,000. If we were to change the design to an underground path, this would cost us at
least $30-40,000. Plus, we would have to disturb the driveway to the customer, which is Fire station #16.
Extra work to never block the ability for the Response team to be delayed in any way would also drive
up the cost. Also, the aerial path allows for less ground disturbance, concrete disturbance, restoration,
and traffic impact. If this is acceptable to the City of Renton we will proceed as planned, otherwise we
will not be able to provide this service to the customer as requested.
Thank You,
Stephen Stuart
CenturyLink Engineering - CDFS Fiber Engineer
23315 66th Ave S
Kent, WA 98032
206-379-6516
stephen.stuart@centurylink.com
MFP19003690
August 30, 2019
Stephen Stuart
Qwest Corp d/b/a CenturyLink
23315 66th Ave S
Kent, WA 98032
Via Email: stephen.stuart@centurylink.com
SUBJECT: Request for Undergrounding Exemption (N.556168, MFP19003690, 12923 156th Ave SE)
Dear Mr. Stuart:
The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
CenturyLink proposes to have North Sky Communications overlash approximately 427 lineal feet of new
24-count aerial fiber to existing Puget Sound Energy (PSE) power poles beginning on the west side of 156th
Ave, proceeding south to 12923 156th Ave SE.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii. City
of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any
telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate
telecommunications facilities in, under, over or across any public way of the City, and to also provide
telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use
of such public ways from the City pursuant to Section 5-19-3 of this Chapter.”
CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a
blanket grant of authority, dating back to territorial times, and therefore has unique status as compared
to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink,
RCW Section 35.99.030 states that a city or town may not require a “master permit” from service
providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link
has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct
and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per
the RCW and Washington State Constitution, cable service is not a right granted without a franchise.
Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not
the provision of future cable.
In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties;
when costs outweigh the general welfare consideration implicit in underground installation; or, if the
CenturyLink N.556168
Page 2 of 2
August 30, 2019
growth pattern of the area has not been sufficiently established to determine the ultimate service routes.
In this instance, the portion of the route proposed for aerial installation is in an area where cost to
underground one utility service will be cost prohibitive.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant for the Project Reach is approved with conditions subject to the conditions
below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1)
any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case Century Link shall participate
in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines.
The new aerial lines must be undergrounded within one year, or approved otherwise by the
City, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, September 13, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Stephen Stuart, CenturyLink stephen.stuart@centurylink.com
Amy Silbaugh, CenturyLink amy.silbaugh@centurylink.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19003690
Engineering
1 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within
the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Century Link shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines,
or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
3 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
4 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
Page 1 of 1