Loading...
HomeMy WebLinkAboutMt Olivet Fiber One line_Page_2Mt Olivet Fiber Optic cabling, Termination & Splicing Scope narrative: Fber Optic Cable Installation Scope Task 1- I nstall ow ner provided 144 cou nt fiber o ptic cable in exist ing cond uit fro or the TA-25 at 3 rd & Monterey (S. W. Corner of intersection, in grass, at entry nce to M onterey Terrace apa rime nt comp lex) to the ex isting TA-25, next to the Rento n Technical Co liege. (Slack Detail -100 feet of slack will be insta lied at a bove mentioned TA-25's... in add ition, 175 feet of express slack will be installed in the 25-TA's adjacent to traffic signal controllers "Signalized intersections" and 50 feet of slack in any other TA-2 5's) Task 2 - Provide & Install 12 count fiber cable from the generator house to the pump house (leaving 30 feet of slack at each end for terminations) Task 3" - Provide & Install 12 cou nt fiber cab le from the TA-25 at 3 rd & M onterey to the generator bu ild ing, leaving 100 foot slack in TA-25, for splicing and 30 foot slack in generator b uild ing, for terminations. »» Per Ron Hanson- CRy Transportation will provide & Install... Please confirm Fber Splicing /Termination Scope Location 1: Pump House Provide & Install 1x 1RU Corning CCH Panel Terminate 1 x 12 strand with LC/UPC Single -mode fiber connectors Location 2: Generator House Provide & Install 1x 1RU Corning CCH Panel Terminate 2 x 12 strand with LC/UPC Single -mode fiber connectors Location 3 -Transportation Change Order: TA-25 / NE 3rd & Monterey Provide & Install 1x Fiber Splice Closure Install 3 x cables into new splice closure (12 -12 -144) Fusion Splice to Cities direction (total 18 fusion splices) (12 strand to signal controller and 12 strand to generator building, provided & installed by City transportation dept.) Location 4 -Transportation Change Order: TA-25 / NE 3rd & Ed monds Provide & Install 1x Fiber Splice Closure Mid -sheath 144 fiber cable and install (City Transportation dept. provided) signal controller fiber cable, into new splice closure. Fusion Splice to Cities direction (total 12 fusion splices) Location 5 -Transportation Change Order: TA-25 / NE 3rd & Jefferson Provide & Install 1x Fiber Splice Closure Mid -sheath 144 fiber cable and install (City Transportation dept. provided) signal controller fiber cable, into new splice closure. Fusion Splice to Cities direction (total 12 fusion splices) Location 6"": TA-25 / NE 4th & Renton Tec College Install 1 x cable into Existing (Coyote PIT) splice closure (new 144 count) Provide & Install 1x new PLP endplate Fusion Splice to existing fiber, per Cities direction (total ""36 fusion splices- 18, in each existing closure) »» Per Ron Hansen- Prep new 144 into existing PLP Coyote splice closure, that hasjumper cable installed to another PLP Coyote closure, with the City'stie in cables(Endplate isfull).