HomeMy WebLinkAboutWeatherly Inn 8.19.pdfEa,111, olution NWLLc Earth Solutions NWLLc 1805— 136111 Place N.E., Suite 201, Bellevue, WA 98005 Phone (425) 449-4704 FAX (425) 449-4711 Field Rep. Project No. Page 1 of 2 Report No. AK 0895.06 13a Time On Site Time Off Site Date Day of Week 11:00 AM 11:30 AM 8/19/19 Monday CONSTRUCTION STORMWATER NPDES Permit No GENERAL PERMIT — FIELD REPORT Project Name Job Location Client / Owner I Weatherly Inn 1 4500 Talbot Rd. S., Renton RJ Development, LLC Erosion Control BMPs Overall Condition Need Repair (13 Elements) G= Good F=Fair Y= Yes N=No Comments _ P=Poor _ _ 1. Preserve Vegetation/Mark Clearing Limits • Buffer Zones Around Sensitive Areas G N Silt fence working as intended • Silt Fence 2. Establish Construction Access • Fabric/Quarry Spalls WAR- • Wheel Wash G N Sweep roadway when soil is seen on surface I • Sweeper Truck 3. Control Flow Rates • Stormwater Vault/Facility F N • Straw Wattles • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation G N • Straw • Sediment Ponds/Traps/Filters • Chemical Treatment 5. Stabilize Soils -- --- - - - • Nets and Blankets • Mulch / Bark / Rock • Hydroseeding / Grass • Plastic Sheeting G N • Stabilize Stockpiles • Stockpiles • PAM • Water Truck 6. Protect Slopes G N • Benching / Track Walking • Pipe Slope Drains • Plastic Sheeting /Anchors (1) .Protect Drain Inlets • Catch Basin Inserts G N CB inserts working as intended • Gutter / Road 8. Stabilize Channels and Outlets N/A N/A N/A • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants N/A N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control De -Watering N/A N/A N/A 11. Maintain BMPs G N See recommended notes U. Manage the Project G N Available upon request • Maintain SWPPP /Site Loa Book 13. Protect Low Impact Development (LID BMPs) N/A N/A N/A • Bioretention Rain Garden Facilities • Permeable Pavement Field Rep NPDES Permit No. Date Project No. Page 2 of 2 Report No. AK WAR- 8/19/19 0895.06 13a Monitoring and Records / Recommendations? Will existing BMPs need to be modified or removed, or other BMPs installed? If YES, list the action items to be completed on the following table: ❑ YES ® NO Actions / Recommendations To Be Completed Completed Y or N Initials / Date If Complete) Sweep site entrance when soil is seen on roadway Ongoing Ongoing Describe Current Weather Conditions: 70so F, Clear Approximate amount of precipitation since last inspection: 0.00 inches Approximate amount of precipitation in the last 24 hours: 0.00 inches Was water quality sampling part of this inspection? ❑ YES ® NO If YES, record results in the table below: Describe below the discharging stormwater, if present Note the presence of suspended sediment, "cloudiness", discoloration. or oil sheen N/A Turbidity Meter Used: Hanna Meter # 15 Monitor Location Turbidity (NTUs) pH Notes • Is the site in compliance with the SWPPP and the permit requirements? • If NO, indicate tasks necessary to bring site into compliance on the "Actions To Be Completed" table above, and include dates each job will be completed • If NO, has the non-compliance been report to Dept. of Ecology? • If NO, should the SWPPP be modified? Sign the following certificate: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief." By: (Print/Sign) Andrew Kimn CESCL Certification Number: CESCL-EF8182309 MV4 Inspection completed on: (Date) 8/19/19 ® YES ❑ NO ❑ YES ❑NO ❑ YES ❑ NO