Loading...
HomeMy WebLinkAboutP_Lot_Analysis_FFCC_190905_v1Refer to: Date: Project: Job No.: CS No.: Scale: The Contractor shall execute the work in accordance with these instructions issued in accordance with the contract documents. Proceeding with the work in accordance with these instructions confirms your acknowledgement that there will be no change in the Contract Sum or Contract Time. 1/64" = 1'-0"FAMILY FIRST COMMUNITY CENTER 16-0996 09/05/19 P1.09 1/64" = 1'-0" LANDSCAPE ANALYSIS, LOT COVERAGE, AND PARKING ANALYSIS TOTAL SF OF THE SITE: 129,000 SF PROPOSED BUILDING FOOTPRINT: 21,165 SF TOTAL EXISTING IMPERVIOUS AREA: 5,500 SF TOTAL PROPOSED IMPERVIOUS AREA: 71,320 SF LOT COVERAGE BY STRUCTURES: 17% TOTAL PROPOSED PARKING STALLS : 90 ON-SITE, 29 SHARED TOTAL PARKING REQUIRED: 92 TOTAL INT. PARKING LANDSCAPE AREA: 4,023 SQFT FAMILY FIRST COMMUNITY CENTER PERVIOUS AREA IMPERVIOUS AREA