HomeMy WebLinkAboutCO 2 CITY OF RENTON CAG-19-152 , CO #2-19
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT .
CONTRACT: Lake Youngs Ct SE Storm&Water Improvement Project CAG-19-152 C.O.# 2
CONTRACTOR: Oceanside Construction, Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment,subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below and shown in the contractor's proposal:
ITEM Alteration Under This Change Order Unit Qty. Unit Price Total Price
Field Work NEW ITEM: LS 1 $14,279.77 $14,279.77
Directive#9 See attached for Field Work Directive#9 and associated Force Account-11.
10%Sales Washington State Sales Tax LS 1 $1,427.98 $1,427.98
Tax
Total $15,707.75
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THIS ORDER TOTAL AFTER CHANGE
$501,986.60 $506,035.03 $15,707.75 $521,742.78
SIGNATURES: '` ---
Contractor: ,f r`'" '' Date: '5
17
Project Engineer: y:G��"-� ��A''^ — Date: 9/b/24)I'
Date:
Approved By: fff���
t.
Ron S k Utility System ector
Approved By: .4er i� ���� Date:
Gre Zimmerm n finis rat r
Approved Date:
Shanelo
ane Moloney,/ Renton City Attor y /
Attest: P) Date: / -
lasort Seth,City Clerk
H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-4017 2617 Lake Youngs CT SE\1600
Construction\1606a-Change Orders\CO#2\CO#2-Oceanside Construction.doc\MMIp
Cityof Renton
Field Work Directive
Public Works Department FWD# 09
Lake Youngs Ct SE Storm &Water
Project Name: Improvement Project CAG- 19- 152
Contractor: Oceanside Construction, Inc.
Water Pipe Bends for Minimum
Subject: Utility Clearance Date: 8/14/2019
Scope:
To accommodate existing site conditions,the location of the water main cut-in tee no longer allows for
pipe deflection to achieve minimum clearance from the existing and proposed storm drain system. The
City of Renton is directing Oceanside Construction, Inc.,to include additional 45° bends with thrust
blocking to ensure minimum clearances are met.
See the Exhibit 1 for schematic drawings of the plan and profile of changes to the proposed water
alignment.
vla Change Order
Please note that this work shall be charged ". Please provide the cost for
this Work for the City's review and approval.
Attachment(s):
Exhibit 1
Contractor Acknowledgement:
By:
Contr tor Signature Date
Title J
By: l/j ,/e/4- ,4-/,f 8/13/2019
Signature Date
City of Renton Project Manager
THIS FIELD WORK DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT
PRICE. LABOR, EQUIPMENT,AND/OR MATERIAL OUTLINED IN THIS FIELD WORK DIRECTIVE SHALL BE PAID BY BID
ITEM(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACT PRICE INCREASES. ANY
PROTEST TO THE FIELD WORK DIRECTIVE SHALL FOLLOW 1-04.5 OF THE WSDOT STANDARD SPECIFICATIONS.
a
MAXIMIZE THIS DISTANCE 45° HORIZONTAL BENDS
WITH WATER PIPE CENTEREDr
WITH THRUST BLOCKING
AT SD CROSSING PER SHEET C-502
2' ± F 5'MIN.
L J - - 10111P
TESTING CONNECTION
&FINAL CONNECTION
( -- PER DETAIL 1/C-501-
PROPOSED / \
DEFLECTPIPE AS I 8" SD 2' +/
NECESSARY
TO
MAINTAIN ACCEPTABLE ,
COVER AND CLEARANCE
FROM OTHER UTILITIES
FROM THIS POINT ON
VEX. 12"X8" TEE AND 8" GV
EX.
MH#1
PLAN
PROFILE MECHANICAL JOINT FITTINGS EX. 8" GV
WITH JOINT RESTRAINT SYSTEM
PROPOSED ROMAC 600 SERIES OR EQUAL
8" SD
6" MIN. in
CLEARANCE 2' ± _----
S 1\_ , 111110. -
45°VERTICAL BENDS
WITH THRUST BLOCKING
PER SHEET C-502 EX. 12"X8"TEE AND 8" GV
EXHIBIT 1 FWD-09 8/14/2019
Oceanside Construction Inc.
, 1511 Mt. Baker Hwy Bellingham,WA.98226
Phone 360-933-1728 Fax 360-933-4152
Force Account
201903 — Lake Youngs Ct. SE Storm Et Water Subject: Water Pipe Bends for Minimum Utility
Improvements Clearance (FWD #9)
To Michael Mitchell Number: FA-11
City of Renton Revision No. : 2
1055 South Grady Way, 5th Floor Date: 8/15/2019
Renton, Washington 98057 Field Work Order /
Work Type: T£tM
(425)-430-7265
Days Valid: 5
Return To Auden Schilder
Oceanside Construction Inc
(360) 933-1728
asatosc@yahoo.corn
Scope Of Work / Time Extension Request
Dig in four 45 degree bends to make the connection to the existing main per FWD#9.
Details
Cost Qty
Line No Code Description Type /Rate / Hrs Workers Ext
Shovel , Excavator,
Backhoe, Tractors Labor 10.00
$73.25 Hrs 2.00 $1,465.00
001 Under 15 TN
Cory / Steve (Standard Time)
Loader, Overhead 10.00
002
Under6 Yards Labor $73.81 Hrs 1.00 $738.10
Jon (Standard Time)
TCS Labor $51.55 1 Hr0 1.00 $515.50
003
Kris (Standard Time)
004 Flagger Labor 10.00
gg � $48.33 Hrs 1.00 $483.30
Cost Qty
Line No Code Description Type /Rate / Hrs Workers Ext
Daryl (Standard Time)
DumpTruck Solo Labor 10.00
� $66.51 Hrs 1.00 $665.10
005
John W (Standard Time)
Pipe Layer Labor 10.00
� $57.67 Hrs 1.00 $576.70
006
Drew (Standard Time)
Shovel , Excavator, 1.00
Backhoe, Tractors Labor ti $108.87 Hrs 2.00 $217.74
007 Under 15 TN
Cory / Steve (OT)
Loader, Overhead 1.00
008
Under6 Yards Labor $109.70 Hrs 1.00 $109.70
Jon (OT)
1.00
TCS Labor $76.31 1.00 $76.31
009 Hrs
Kris (OT)
1.00
Flagger Labor $71.48 Hrs 1.00 $71.48
010
Daryl (OT)
DumpTruck Solo Labor 1.00
� $98.75 Hrs 1.00 $98.75
011
John W
1.00
Pipe Layer Labor $85.49 Hrs 1.00 $85.49
012
Drew (OT)
5.00
Dump Truck Solo Labor $66.51 Hrs 1.00 $332.55
013
Tom (Standard Time)
1990 Peterbuilt 12 CY
014 Dump Truck Equipment $76.54 5.00 - $382.70
Working
015 John Deere 544J Equipment $38.36 6.00 - $230.16
Loader
Cost Qty
Line No Code Description Type /Rate / Hrs Workers Ext
Standby
John Deere 544J
016
Loader Equipment �$47.95 5.00 - $239.75
Working
2007 Chev 3500 with
017
tools Equipment �$36.25 11.00 - $398.75
Working
1982 Volvo Water
018
Truck Equipment �$60.00 11.00 - $660.00
Standby
2006 Chev Silverado Equipment ✓ $25.00 11.00 - $275.00
019
Working
Allied hoe pack Equipment ✓ $20.00 11.00 - $220.00
020 -
Standby
2015 Chev 3500 with
021
tools Equipment $36.25 11.00 - $398.75
Working
Willi Dump Trailer Equipment � $12.00 6.00 - $72.00
022
Standby
30 TN Equipment
Equipment l$24.00 11.00 - $264.00
023 Trailer
Standby
JD 085 Excavator Equipment si$43.75 11.00 - $481.25
024
Working
040 Excavator Equipment $35.00 11.00 - $385.00
025
Standby
45 Degree bends with 1.00
026 Material �$1,368.44 - $1,368.44
accessories EACH
3.00
Steel Plate Rental Material $245.30 EACH - $735.90
027
Including WSST 10%
1.00
028 4'x 8' Shoring Box Material /$822.80 - $822.80
EACH
.�. . -y.
•
•
•
. , ,
' • s
i•
T.
\: k'
. t
. ' •• !M • • .
•
k _ a.
•-f
... it ..., "S
., - ..
1
•
/ -
. S r
•
- _ • {�
.. ` J ..
1
ti
•
/ -
-. ..
t ,
•
•
•
.I .
- n
1,
i.I. f
... . '
Cost Qty
Line No Code Description Type /Rate / Hrs Workers Ext
Including WSST 10%
Concrete for Reverse 70.00
029
Thrust Block Material $3.60 EACH - $252.00
Per Bag of Concrete
Breakout
Labor : $5,435.72
Gross Margin Percent @ 29%: $1,576.36
Equipment : $4,007.36
Gross Margin Percent @ 21%: $841.55 ti
Material : $3,179.14 ✓
Gross Margin Percent @ 21%: $667.62
Total: $15,707.7514
Signed By: Dated: 8/15/2019
Auden Schilder
Project Manager
8/30/2019
NO EXCEPTIONS TAKEN
MICHAEL MITCHELL
WATER UTILITY
CITY OF RENTON
Corporate Office
3633 136th PI SE, Ste 100, Bellevue, WA 98006
01 H.D. FOWLER PO Box 160, Bellevue, WA 98009-0160
Phone 425-654-8800' Fax 425-641-8885
COMPANY
REMIT: PO Box 84368, Seattle, WA 98124 Bellevue Branch
13440 SE 30th St
— Invoice Bellevue,WA 98005
1 5246230 BEWH
Number (425)746-8400 Fax(425)641-8885
# 151155
HD Fowler Company- Bellevue 1/2
"III'iIII'1111111"111II0IIII111111IIIIIIIIIIII'IIIIIIIIPIIii
T-1 OCEANSIDE CONSTRUCTION INC Bellevue WA 98005
1511 Mt Baker Hwy Order# Inv Date: Order Writer:
Bellingham WA 98226-8722
06398516 08/14/19 Todd Lewis
Terms: NET 10TH PROX Due: 09/10/19 PO/JOB:
FOB: H. D. FOWLER Ship Via: WILL CALL LAKE YOUNGS CT SE
Qty Qty Part# Unit Extended T
Line Ship'd BO'd UoM Description Price Price X
Please note: our Corporate phone number
has changed. If you have any questions
regarding payables or receivables call
Corporate at 425-654-8800.
10 2 0 EA 2" X 24' SCH 40 GALVANIZED Nh-PLE A53 ERW 23.370 46.74
11 2 0 CA 2" SCH 40 GALVANIZED 90 STREET ELBOW IMPORT 15.090 30.18
12 2 0 CA 2" BRASS GATE VALVE,TI tREADED NRS 200 WO® 20.270 56.54
13 4 0 EA 8" MJ 45 ELL DI,AWWA C153,C/L,LESS ACCESS (59 94.910 379.64
LBS)
14 2 0 CA 8" 45 ELL,MJ X FL,DI,AWWA C153,C/L,LEO ACCE 177.070 351.11
(83 LBS)
15 8 0 EA 8" WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 58.660 469.28
WEDGE ACTION GLAND& GASKET (BOXED WITH
BLACK LETTERING)
16 1 0 EA 8" BLACK BOLT& NUT KIT 8 PER 3/4" X 3 1/2", A 10.170 10.17
307,GRADE A,IMPORT
18 1 0 EA 8" 1/8" FULL FACE GASKET, NEOPRENE, 150# 5.050 5.05
I
��
r,� '>,
Sub total 1,351.74
"* Remittance Address** EFT Routing: 121000248 Freight 0.00
PO Box 84368, Seattle, WA 98124-5668 EFT Bank No: 418 545 3362 Tax 0.00
Grand Total 1,351.74
COREY Serving the Pacific Northwest since 1911
www.hdfowler.com
Corporate Office
3633 136th PI SE, Ste 100, Bellevue, WA 98006
01 H.D. FOWLER PO Box 160, Bellevue, WA 98009-0160
Phone 425-654-8800' Fax 425-641-8885
COMPANY- Bellevue Branch
REMIT: PO Box 84368, Seattle, WA 98124 13440 SE 30th St
— Invoice Bellevue,WA 98005
Number 15247256 BEWH (425)746-8400 Fax(425)641-8885
# 151155
HD Fowler Company-Bellevue 2/2'
"I1I'llII'11111111 I11II1IIIIIIIIIuIIIIhh1IIIIII1I.IIIl"1111I1I
T-1 OCEANSIDE CONSTRUCTION INC Bellevue WA 98005
1511 Mt Baker Hwy Order# Inv Date: Order Writer:
Bellingham WA 98226-8722
06403126 08/15/19 Todd Lewis
Terms: NET 10TH PROX Due: 09/10/19 PO/JOB:
FOB: H. D. FOWLER Ship Via: WILL CALL LAKE YOUNGS CT SE
Qty Qty Part# Unit Extended +
Line Ship'd BO'd UoM Description Price Price X
Please note: our Corporate phone number
has changed. If you have any questions
regarding payables or receivables call
Corporate at 425-654-8800.
1 2 0 EA 8" SHACKLE CLAMP FOR DIP GRINNELL FIG. 595, 186.250 372.50
BLACK
2 20 0 FT 3/4" CORTEN, ALL THREAD ROD,10 FT 5.270 105.40
3 16 0 EA 3/4" CORTEN NUT 0.930 14.88
4 16 0 EA 3/4" CORTEN WASHER 0.720 11.52
c
rS>
i
1
POSTED
Sub total 504.30
** Remittance Address '* EFT Routing: 121000248 Freight 0.00
PO Box 84368, Seattle, WA 98124-5668 EFT Bank No: 418 545 3362 Tax 0.00
Grand Total 504.30
COREY C Serving the Pacific Northwest since 1911
www.hdfowler.com
()United Rentals- RENTAL RETURN
TRENCH SAFETY INVOICE ''
�'
715CA 552 # 172737557-001 7133 5 8TH AVE SOUTH
SEATTLE WA 98108 - --
206-767-3121 Customer # 915583
206-767-0265 PA3 Invoice Date : 08/19/19
Rental Out : 08/15/19 11:38 AM
+;.1 M LAKE YOUNG COURT WATER SOL Rental In : 08/19/19 01:21 PM
"4 E° 2701 LAKE YOUNGS CT SEEn w UR Job Loc : 2701 LAKE YOUNGS CT
RENTON WA 98058-3847 customer Job ID; 74
A 75 P.O. # : WATER
1-3 4 Cell: 2 5 3-2 6 6-6 8 6 3 Ordered By : CORY CHRISTIANSON
Office: Reserved By : RICARDO LEMUS
Salesperson : JOHN CURTIS
5.3.1836 1 MB 0.425 51122S21.p01 389140 1-1 0
Ihillluiiiluillillui'lltllIniiitlllldiiilililllidiililitu Invoice Amount: $1,822.70
OCEANSIDE CONSTRUCTION INC Terms: Due Upon Receipt
1511 MT BAKER HWY Payment options: Contact our credit office 212-333-6600 Ext.84727 1
REMIT TO:
HIGHWAY 7135 8TH AVE SOUTH h
BELLINGHAM WA 98226-8722 SEATTLE WA 98108
7
RENTAL ITEMS:
Qty Equipment Description Minimum Day Week 4 Week Amount _
' 944/9946 ROAD PLATE 8' X 20' 75.00 75.00 223.00 460.00 669.00
10.i3t+38 SHIELD ALGNINJM 1' X 8' i ?., 556.00 I t ,..77 596.00
Make: SPEEDSHORE Model: 4X8 AS
4Pria1 , 15-1311AS
4 942/8352 ADJUSTABLE SPREADER 32"-48" 3.00 3.00 7.00 20.00 28.00
1 330/6903 SLING 4 LEG 3/8" X 5' 47.00 47.00 124.00 325.00 124.00
Rental Subtotal: 1,417.00
SALES/MISCELLANEOUS ITEMS:
Qty Item Price Unit of Measure Extended Amt.
6 NON-SKID PAINT ORANGE [X-7102-5/FRWST] 40.000 GALLON 240.00
Sales/Misc Subtotal: 240.00
Agreement Subtotal: 1,657.00
Tax: 165.70
Total: 1,822.70
COMMENTS/NOTES:
CONTACT: CORY CHRISTIANSON
CELL#: 253-266-6863
CPU
NO DELIVERY
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM
TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA.
0� '0?
7/'
2 �
f
4ii7
THIS INVOICE IS ISSUED SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT,WHICH ARE INCORPORATED HEREIN BY REFERENCE.
A COPY OF THE RENTAL AGREEMENT IS AVAILABLE UPON REQUEST.
You Can Now Access Invoice History and Update Purchase Orders Online Page: 1