Loading...
HomeMy WebLinkAbout3006_001.pdfGrading Contractor Grading Foreman Checked By Rino Construction ((0 0\\e> Are approved Plans/Permits onsite YES NO Project No. Permit No. As requested, ESNW representative was on-site to review and recommend SWPPP with client. ESNW representative and client discussed King County Sewer Discharge permit application and regulations. Based on our observations, ESNW representative recommends the following: • Site is eligible for KC sewer discharge permit. • ESNW representative recommends water be directed to on site vault or baker tank via swales and pumps. • If authorized, per permit requirements, ESNW representative or client representative must test turbid water with IMHOFF cone every batch release (21,000 gal) to determine settable solids in water. If acceptable, client may discharge into sewer system. • ESNW representative recommends installing baker tank for ease of testing, settling solids and measuring flow rate. • Continue to cover steep slopes of vault excavation with plastic. • Monitor track out on main road. ESNW representati\ scheduled. ESNW will return when requested. Marley T Kirkham Assistant Erosion Control Manager (206)235-3250 COPY TO: CONTINUED ON NEXT PAGE ❑ Earth Solutions NWILLC Field Rep. Project No. Page 1 of 1 Report No. MTK 5.O(p o a. r = 1805 136'h Place NE, FAX: Time On Site Time Off Site Date Day of Week Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 9:30 10:00 9/12/19 Thursday (425) 449-4704 (866) 366-8710 DAILY FIELD REPORT Travel Time Weather 1.25 RT 70°F, Sun Project Name Job Location Client / Owner Weatherly Inn 4500 Talbot Road South RJ Development General Contractor General Contractor's Superintendent Received Onsite By Grading Contractor Grading Foreman Checked By Rino Construction ((0 0\\e> Are approved Plans/Permits onsite YES NO Project No. Permit No. As requested, ESNW representative was on-site to review and recommend SWPPP with client. ESNW representative and client discussed King County Sewer Discharge permit application and regulations. Based on our observations, ESNW representative recommends the following: • Site is eligible for KC sewer discharge permit. • ESNW representative recommends water be directed to on site vault or baker tank via swales and pumps. • If authorized, per permit requirements, ESNW representative or client representative must test turbid water with IMHOFF cone every batch release (21,000 gal) to determine settable solids in water. If acceptable, client may discharge into sewer system. • ESNW representative recommends installing baker tank for ease of testing, settling solids and measuring flow rate. • Continue to cover steep slopes of vault excavation with plastic. • Monitor track out on main road. ESNW representati\ scheduled. ESNW will return when requested. Marley T Kirkham Assistant Erosion Control Manager (206)235-3250 COPY TO: CONTINUED ON NEXT PAGE ❑