Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia '
l m ia, WA 98501
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
Date: September 16, 2019
ESNW No.: ES- 895.06
Project: Weatherly inn
Copies Date Description
1 9/9-9/13/19 Daily Field Report(s) # 27-31
Comments:
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
CC:
1:
2:
3:
4:
5:
John Wilson
Mark Richardson
Jeff Brain
Jennifer Vogele
Jonathan Chavez
ATTN:
ATTN:
ATTN:
ATTN.
ATTN-jchavez@rentonwa.gov
johnw aarinocon.com
rnarkgaccrete-build
ieff@accrete.build
jennifer2accrete.build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
El YES f-] NO Project No.
Project No.
Earth Solutious NWLLC
eld
AKd Rep.
0895.06
1/1
27
' 71 =
1805 136" Place NE, FAX:
Time On Site
11:00 AM
Suite 201 (425) 449-4711
Monday
Bellevue, WA 98005 TOLL FREE:
10:15 AM
(425) 449-4704 (866) 366-8710
Travel Time
DAILY FIELD REPORT
_
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractors Superintendent
General Contractor
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
El YES f-] NO Project No.
Project No.
Page of
Report No.
0895.06
1/1
27
Time Off Site
Date
Day of Week
11:00 AM
9/9/19
Monday
Weather
60s°F, Rain
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By (,q%)5
Permit No.
At the client's request, ESNW rep was onsite to observe vault excavation and earthwork activities.
Vault Excavation
While onsite, rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep
observed the south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the
west slope to be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and
federal regulation.
Earthwork Activities
Rep observed contractor receiving sewer pipe and manhole deliveries. Rep met with pipe contractor onsite.
Contractor expressed plans to begin pipe work tomorrow. Rep will return onsite to observe and test compaction of
pipe backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client.
4-13 �_
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE F1
Earth Solutions NW«C Field Rep
Project No. Page of Report No.
0895.06 1/2 28
_AK
Sol t 1805 136th Place NE, FAX: Time On Site
Time Off Site Date Day of Week
Suite 201 (425) 449-4711
6iiiL
Bellevue, WA 98005 TOLL FREE:
12:00 PM
1:45 PM 9/10/19 Tuesday
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT Travel Time
Weather
1.25 Hr. RT
70s°F, Clear
Project Name Job Location
Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor General Contractor's Superintendent
Received Onsite By
Grading Contractor Grading Foreman
Checked By ✓4 9 JIy
Rino Construction Rod
fi
Are approved Plans/Permits onsite 1-1 YES F-1 NO Project No.
I
Permit No
Test Reference
Maximum Fill Test Dry % of
Number Test Location (Sewer Backfill) Elevation Compaction
Dry Density Moisture Density Maximum
Curve
lbs./cu ft % lbs./cu.ft. Dry Density
15 See map for approximate location 4 1
130.7 12.1 125.5 96
16 See map for approximate location -2' 1 1 1
130.7 12.4 124.3 1 95
17 See map for approximate location SG 1 1 1
130.7 10.8 123.9 1 95 71
At the client's request, ESNW rep was onsite to observe and test sewer line backfill, vault excavation and earthwork
activities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W5'xD7'). Rep observed
contractor place an 8" PVC pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with
a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1.1 (H.V) Lu a near 7' vertical Lue, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
Rep recommended contractor place plastic sheeting on all exposed slopes.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
bArM Earth Solutions NWLLC Field Rep.
AK
1805136 1h Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 12:00 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractors Superintendent
Grading Contractor Grading Foreman w
f Rino Construction Rod
Are approved Plans/Permits onsite n YES ❑ NO Project No
1 46
Project No.
Page of
Report No.
0895.06
2/2
28
Time Off Site
Date
Day of Week
1:45 PM
9/10/19
Monday
Weather
70s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
fr
COPY TO: CONTINUED ON NEXT PAGE F]
Earth Solutions NW«C Field Rep. Project No- Page of Report No.
AK 0895.06 1/2 29
I I 1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 9/11/19 Wed
(425) 449-4704 (866) 366-8710 1:30 PM 3:30 PM
DAILY FIELD REPORT Travel Time Weather
_ 1.25 Hr. RT 70s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
YES F-1 NO Project No.
Test Test Location (Sewer Backfill)
Number
Checked By * 9%15
Permit No
Reference Maximum Fill Test Dry % of
Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs /cu.ft. % lbs./cu ft Dry Density
18
See map for approximate location
4
1
130.7
11.5
123.6
95
19
See map for approximate location
-2'
1
130.7
12.2
124.2
95
20
See map for approximate location
SG
1
130.7
11.3
123.5
95
At the client's request, ESNW rep was onsite to observe and test sewer line
backfill, vault excavation and earthwork activities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a
sewer line (W5'xD7'). Rep observed contractor place an 8" PVC pipe at the
toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of
pea gravel. Rep observed contractor place brown silty sand with gravel
material in loose 12"-18" lifts and compacting with a hoe pack. Rep took
compaction tests on backfill and observed material to be adequate of at least
95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation
with a large excavator. Rep observed the south slope to be near vertical, the
east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west
slope to be (H:V) to a near 3' vertical toe. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor " W t:
is responsible for providing all safety measures in accordance with state and
federal regulation. -
Rep recommended contractor place plastic sheeting on all exposed slopes.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
%F
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO
Project No.
Earth Solutions N'W«r
eld Rep.
AKdk
0895.06
2/2
29
60111 ions
1805 136" Place NE, FAX:
Time On Site
NWLLC
Suite 201 (425) 449-4711
Wed
Bellevue, WA 98005 TOLL FREE:
1:30 PM
70s°F, Clear
(425) 449-4704 (866) 366-8710
Client / Owner
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractors Superintendent
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO
Project No.
Page of
Report No
0895.06
2/2
29
Time Off Site
Date
Day of Week
3:30 PM
9/11/19
Wed
Weather
70s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Project No. Permit No
COPY TO: CONTINUED ON NEXT PAGE ❑
Earth Solutions NW«C Field Rep
AK
Solutions 1805 136" Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 9:30 AM
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES
❑ NO Project No.
Project No
Page of
Report No.
0895.06
1/2
30
Time Off Site
Date
Day of Week
11:15 AM
9/12/19
Thursday
Weather
70s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
j Checked By
Permit No.
Test Reference Maximum Fill Test Dry % of
Number Test Location (Sewer Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve I lbs./cu.ft. I % lbs./cu.ft. Dry Density
21 See map for approximate location 4 1 130.7 12.1 123.9 95
22 See map for approximate location .2' 1 130.7 11.4 124.0 95
23 See map for approximate location SG 1 130.7 11.7 124.3 95
F
he client's request, ESNW rep was onsite to observe and test sewer line backfill, vault excavation and earthwork
ivities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W5'xD7'). Rep observed
contractor place an 8" PVC pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with
a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. Rep used a '/" steel t -probe and observed that the vault excavation subgrade was very dense, firm,
unyielding, and suitable for support of the proposed vault slab. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation.
Rep recommended contractor place plastic sheeting on all exposed slopes.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
21522 23
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«�
Field Rep.
Project No. Page of
Report No.
AK
0895.06 2/2
30
I
1805136 1h Place NE, FAX:
Time On Site
Time Off Site I Date
Day of Week
6L
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
9:30 AM
11:15 AM 9/12/19
Thursday
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
70s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC_
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
I
Are approved Plans/Permits
onsite ❑ YES F-1 NO Project No.
Permit No.
21522 23
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«�
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1/2
31
Solutions 1805 136t1 Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
12:15 PM
2:00 PM
9/13/19
Friday
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
60s°F, Overcast
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor's Superintendent
Grading Foreman
General Contractor
Received Onsite By
Grading Contractor
Checked By L* OV, s
Rino Construction
Rod
Are approved Plans/Permits onsite YES ❑ NO Project No. Permit No,
Test
Reference Maximum Fill Test Dry % of
Number Test Location (Sewer Backfill)
Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.ft. % lbs./cu.ft. Dry Density
24 See map for approximate location
4 1 130.7 11.4 124.2 95
25 See map for approximate location
-2' 1 130.7 12.8 124.7 95
26 See map for approximate location
SG 1 130.7 11.5 123.8 95
At the client's request, ESNW rep was onsite to observe and test sewer line backfill, vault excavation and earthwork
activities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W5'xD7'). Rep observed
contractor place an 8" PVC pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with
a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW repwill return to observe earthwork activities when requested by client.
1
Andrew Kimn, Field Technician, 206-430-9183
L
COPY TO: CONTINUED ON NEXT PAGE
RC: Eam-111 Earth SolutiouS NW«C AK
Rep
I F 1805 136"' Place NE, FAX: Time On Site
NWLLc Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710 12:15 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractors Superintendent
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite
F1 YES ❑ NO Project No.
Project No. Page of
Report No.
0895.06 2/2
31 _
Day of Week
Time Off Site Date
2:00 PM 9/13/19
Friday
Weather
60s°F, Overcast
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
COPY TO:
CONTINUED ON NEXT PAGE ❑