HomeMy WebLinkAboutMFP19004921DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004921 IVR Number: 19004921 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :09/09/2019Application Date:4202401081Parcel Number:652 LIND AVE NW Permit Type:09/18/2019Issue Date:Franchise Permit Work Class:09/17/2020Expiration Date:Minor Utility Job Number:104318962Franchise Type:Electric Description:Crew to park in ROW to connect customer service. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 104318962 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 652 Lind AVE NW CREW NEEDS TO PARK IN ROW TO CONNECT CUSTOMER SERVICE. NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED. ✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.09.09 22:21:53 -07'00'9/9/19 MFP19004921 Scott Warlick 9/11/2019 RESTORATION PER CITY OF RENTON STANDARDS Nathan Janders 9/18/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 104318962 Potelco, Inc JESSE DOUCET (206) 573-3576 6905 S 228th St, Kent, WA 98032 JESSE.DOUCET@PSE.COM 652 Lind AVE NW TBD TBD CORRIE RYDBERG 9/9/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.09.09 22:21:37 -07'00' MFP19004921 8:00AM - 3:00PM Monday - Friday Scott Warlick 9/11/2019 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 8692122408685869185502173013056516704118698317660654313309654664660658666650869785568553620616854712327LIND AVE NW S 123RD ST87TH AVE S Sheet: 1File: J:\Electric_South King\Jesse Doucet\508097569 - Sri Muralidharan\Site Plan\Site Plan.pdfMissing or invalid reference652318315-165697318306-16567525 kVA 120/240V (A)SLAG7738#4ACSR A318298-16569625 kVA 120/240V (A)ROW30'90°R=48"PSE PROVIDED & INST350MCM TRIPLEX CABLE INCUSTOMER PROVIDED & INST3" SCH'L 80 CONDUIT±40'±20'CUSTOMER PROVIDED4' X 4' WORK PITCUSTOMER PROVIDED4' X 4' WORK PITSITE PLANPOWER GENERAL NOTES - RESIDENTIAL PROJECTNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:BENJAMIN WULFE9303 156TH PL NEREDMOND, WA 98052SRI MURALIDHARAN631-232-1208SITE SPECIFIC NOTESOVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILESCALE: NONECIRCUIT ONE-LINE DIAGRAMARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.HP Svc/MSADistributionSuperiorORDER#NOTIF#PWRPROJECT PHASECABLE TVPHONEGASFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.PRIMARY UNDERGROUND10.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.9.E-Mail:Cell Phone:Project Manager Contact Information:Manager:JESSE DOUCET206-573-6813JESSE.DOUCET@PSE.COMSCALE: 1" = 50'104318962Service Stubs104318962508097569AT HH1: EXISTING-EXISTING HH TO REMAINAT M01: NEW-INSTALL NEW 200AMP METERSPAN SPECIFIC NOTESHH1 TO M01:-INSTALL 1-RUN OF 1/0 UG TRIPLEX CABLE ±60' ____'ACTUALCUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:VAULTS & WORK PITS.-PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT HH1.-PROVIDE A 4' X 4' WORK PIT & 1 YARD OF SAND AT M01.TRENCHING & CONDUIT.-INSTALL ±60' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM HH1 TO M01.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200kWh MtrElec. Mtr Base12" Min 36" Typical24" to 36" MaxConduit DepthPower Cable ConduitCustomer Provided3" Schedule 40 Grey PVCRegulator VentUtility-ProvidedGas Meter AssemblyMin36"Customer ProvidedConduit Stakes48"48"Top View4'2 1/2" Conduit Service Riserfrom Gas Service Lines12" Minimum ClearanceCustomer ProvidedDrainage PipeWork Pit DimensionsElectric & joint Utility4'MTR BASE DETAILSCALE: NONETV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverBackfill for ConduitFree of rockslarger than 8"in diameterSeparation12" Minin ConduitSchedule 40 Yellow PVCGas Service Line32" Typical(Power, Gas,Phone & Cable)Separation12" Min12" MinSeparation36" MINIMUM COVERIN RIGHT OF WAY JOINT TRENCH DETAILJoint Service Line in Conduit (NTS)To Excavated Dirt PileBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"XXXXUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJESSE DOUCET206-573-68138/23/2019JESSE DOUCET206-573-68138/23/2019N/AN/AN/ATAYLOR PAULSEN253-318-68978/23/2019RW-114915RENTONSRI MURALIDHARANNEW UG RES SVC652 LIND AVE NW, RENTON, WA 98507N/AN/AN/A104318962AS NOTED1 OF 1KINGN/AN/ACSPSKEPMSW 7-23N-05EN/AN/A2305E0272305E0282305E027PCR-13N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AJOBSITEJOBSITECIRCUIT FEET ADDED: 0'LRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:1897SQ.200AMPSGAS7.7KW80A2.7%3.1%001"2"0050'100'MFP19004921 #652 1010 10101010 1010101010101010 NW 7TH ST LIND AVE NW1010 HH1 8BXB10-PLATE STEEL PLATEROADNARROWSW5-1UTILITYWORKAHEADW21-7100'100'N PSE PUGETSOUNDENERGY -O%#104318962 652 Lind Ave NW 5th September, 2019 prachi.joshi@pse.com 425-424-6425 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. LEGEND TRENCH SIGN LOCATION TRAFFIC FLOW 28" TRAFFIC CONE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP19004921