Loading...
HomeMy WebLinkAboutAdden E SUNSET NEIGHBORHOOD PARK, PHASE 2 BID ADDENDUM E 23 SEPTEMBER 2019 ADDENDUM — E TO THE CONTRACT DOCUMENTS FOR City of Renton SUNSET NEIGHBORHOOD PARK, PHASE 2 Project Issued: August 28, 2019 Addendum E Issued: September 23, 2019 Bid Opening Date: September 24, 2019 To: All Holders of Bid/Contract Documents: This addendum forms part of the Contract Documents and modifies the original Plans and Specifications, for which proposals are due on the date and time above. Acknowledge receipt of this addendum on "Addenda Received" of the Bid Documents in the Contract Documents. Failure to do so might subject the bidder to disqualification. This addendum shall clarify the Contract Documents as follows: Item No. 1 — Drawing C-18 1. Reissue Drawing C-18 with revised scale changed from 1" = 20' to 1" = 5' Addendum E-Page 1 of 1