Loading...
HomeMy WebLinkAboutD 5642513 QUIT CLAIM DEED THE GRANTOR PUGET SOUND POWER & LIGHT COMPANY, a Washington corporation for and in consideration of ONE DOLLAR ($1.00) and other valuable considerations conveys and quit claims to the City of Renton, the following described real rte. ,,>: estate, situated in the County of King, State of Washington: A strip of land fifty (50) feet wide known as the Renton • Snoqualmie Transmission right of way described as follows: Twenty-five (25) feet on each side of the following center line beginning at a quarter corner between Sections 9 and 16, Township 23 North, Range 5 East, W.M. ; thence S 72°15' West 2,772 feet and leaving said Section 16 at a point 858 feet south from the northwest corner of said Section 16; thence S 72°15' West 300 feet; thence S 65°15' West 325 feet; thence S 72° West 545 feet; thence S 61°50' West 260 feet; thence S 82°30' West to a terminus on Mt. Olivet Way in Section 17, Township 23 North, Range 5 East, W.M. , or as said center line may be determined in the field by actual use. It is understood that the parcel of land above described is a portion of the right of way for certain transmission and/or distribution lines of the Grantor, which right of way and electric lines are used by the Grantor in its business as an electric public service company, and said parcel of land is hereby conveyed to the Grantee solely for the establishment and maintenance of a public highway and the installation and maintenance of utility lines other than electric utility lines. As part of the consideration of this trans- action, it is understood that the facilities of the Grantor shall be permitted to remain along and across the right of way of said highway but not to interfere with ordinary highway traffic. Should it become necessary in the future to. alter or relocate any of said facilities from within the right of way herein conveyed, by order of the City of Renton, all costs for such alterations or relocations shall be borne by the City of Renton. IN WITNE$S.W1f OF, said corporation has caused this instrument to be executed,1a0W,0454r, officers and its corporate seal to be hereunto affixed this `:: c7 ,y, day of ofe1 c (/S 7" , 1963. -•— a.,.::; ."':,.., PUGET SO JD POWER & LIGHT COMPANY ,� 10 r - lice President By t.secremary STATE OF WASHINGTON) ) ss COUNTY OF KING ) On this s30 ?y day of /64).17-77‘s3 , before me, the undersigned, a Notary Public in and for the Sof Washington, duly commissioned and sworn, personally appeared JOIll F. WALLIN and J. H. KING to me known to be the Vice President and Asst. Secretary, respectively, of Pinot Sound Power & Light Comraniy, the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that they arruthorized to execute the said instrument and that the seal affixed is the corporate seal of said corporation. °..Wtness my hand and official seal hereto affixed the day and year first above "W t'i`e 1, } f. V ,„' Notary Public in and for the State of Washington „ `cA . ; 'I-J -' ,:' residing at Seattle • , ,r«! tor IZecor 1 � / 1� !M, ."Guest of l •--'c r G- -Ltet -rC�, A-:-;-) RORPOT "Z'- "4ORRIS, County ifAitor V ,i.. ,.' I ...- 1 • . . , - - .#11742.--774:2 :r. " ''''''' .....--....... .- _ ..1,-•,•,-Z.2174:-.)--A-1:1-') All :d :ca"..."' Ps. A,!..1.) ....,. . . •:4',! 're r! :y3 '-i ...P..;' C..< -I - t.) 1 t ' - +;....i -; -----$1„.-- vi --.-..--...d.........„ .• (1) . • V) a> t 1,........ .., a) # , ....., . ,• ._ t. , ...... I . ...,,, Q.. . . .- . tN: . .. -. ..-1- I , C N ..-,-- ... -, \, .4 I '' • , --- , e 4 a s p- cony RESOLUTION NO. /2 Q X WHEREAS the City of Renton is presently engaged in the improvement of its street system, including the acquisition of new rights-of-way for the purpose, among others, of alleviating traffic congestion and to facilitate the flow of traffic, and WHEREAS such overall plan includes the establishment, improvement and construction of the so-called Third Avenue North Extension, the establishment of which is in the public interest and for the public benefit, and WHEREAS Puget Sound Power & Light Company, a Washington Corporation, is willing to deed unto the City a right-of-way for said Third Avenue North Extension, and WHEREAS the construction of said right-of-way includes the removal of certain electric transmission lines owned and controlled by said Company, NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF RFJTON AS FOLLOWS: Section 1: The aforestated facts and recitals are hereby found to be true and correct in every respect. The City Council further finds that the relocation of certain electrical transmission lines owned and controlled by Puget Sound Power & Light Company is necessary and vital to the construction and establishment of said Third Avenue North Extension and that it is further recognized that such work shall be done by said Company in compliance with its rules and regulations which require said work to be done by its own labor forces. Section 2: That certain Quit Claim Deed dated Augpst the 30th , 1963 executed by Puget Sound Power & Light Company, as Grantor, and conveying unto the City of Renton, as Grantee, a certain strip of land 50 feet in width, and as further described in that certain Deed, which is attached hereto labeled Exhibit "A", and made a part hereof as if fully set forth, is hereby accepted by the City; the City Clerk is hereby directed to place said Deed on record with the office of the King County Auditor. Section 3: As further consideration for the execution and delivery of said Deed unto the City of Renton, the City agrees to pay unto Puget Sound Power & Light Company, the sum of Seventeen Thousand Five Hundred Dollars ( $17,500.00) on account c the cost of removal and relocation of said Company's electric transmission lines and facilities within said right-of-way hereinabove described, and such payment to be made upon full completion of said removal and relocation and upon certification thereof by the City Engineer of the City of Renton. This payment of $17,500.00 shall be the total consideration to be paid by the City unto said Company for all of the costs and expense involved in said relocation and that all additional costs therefor shall be borne by -1- Puget Sound Power & Light Company. The City Engineer of the City of Renton has hereto- fore approved and verified the costs and expenses of said relocation and the removal of said obstructions from the right-of-way hereinabove deeded unto the City of Renton, all of which plans and specifications therefor are hereby attached, labeled Exhibit "B" and made a part hereof as if fully set forth herein. If the total cost of said relocation, as set forth in Exhibit "B", should be less than the sum of $17,500.00, then in any such event the City's obligation to pay therefor shall be said lesser sum. PASSED BY THE CITY COUNCIL this 23rd day of September, 1963. Helmie Nelson, City Clerk APPROVED BY THE MAYOR this 23rd day of September 3. Frank Aliment, Mayor APPROVED AS TO FORM: Gerard M. Shellan, City Attorney -2-