HomeMy WebLinkAboutCity Case File - KousoumRENTON CODE COMPLIANCE CODE18-000542 NARRATIVE September 24, 2019 Address: 8031 South 130th Street Seattle, WA 98178 Violator: Sonya Kousoum PO Box 33161 Seattle WA 98133 RMC Violation: 4-5-060 Construction Administrative Code No Building Permit: The City of Renton Municipal Code requires building permits to be applied for and obtained by any person, firm, or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish, use, occupy or maintain any building or structure in the city. October 1, 2018: Building Inspector Phil Hudgens wrote correction notice to obtain a building permit for work being done that has not been permitted by the city. Property owner & contractor came to city hall to discuss what needs to be done. She has already talked to Adriann Alexander, Permit Technician & Dave Christenson, Wastewater Utility Engineer and is going to take steps to hook up to sewer & abandoned the septic. The contractor will contact Phil and he wrote the original correction notice. October 9, 2018: Per Kevin Louder, Code Compliance Inspector, Rich Melchior with Rich Design is working on the drawings to submit permits. He was in city hall speaking with Steve Triplett about permit submittal. He wanted to let code compliance know that work is stopped on the house until permit is issued. November 29, 2018: Septic or Sewer has not been submitted for approval so a building permit may not be submitted for review and approval. December 21, 2018: No activity on this property. Sent a Finding of Violation for $250.00. This Finding of Violation was dismissed as the mailing came back "Return to Sender No Such Number Unable to Forward". February 5, 2019: Sent letter thanking Ms. Kousoum for submitting a King County Operation/Performance Monitoring Report for her septic system. The compliance date to submit health department approval and a building permit application was February 20, 2019. February 17, 2019: Email received from Ms. Kousoum. February 18, 2019: 1 sent email in response to the February 17, 2019, email. I asked to be updated on the progress. March 27, 2019: Email sent to Ms. Kousoum asking the status of the sewer connection. April 24, 2019: Email sent to Ms. Kousoum asking the status of the case and asking that the building permit plans be submitted by May 9, 2019. Email response from Rich Melchiour, designer with update. Email reply to Mr. Melchiour with information regarding a pre -application meeting. May 8, 2019: Email from Mr. Melchiour stating they are waiting on engineering and that he's loaded the pre -application information into MyBuilingPermit.com. The pre -application meeting was applied for and was completed on July 30, 2019. September 4, 2019: A Finding of Violation Second Notice was issued for $250.00. There is no application for sewer or building permit. The compliance date or appeal date is September 19, 2019. September 16, 2019: An appeal of the Finding of Violation Second Notice was received by the city clerk's office. September 24, 2019: To date there an application for sewer hook-up or building permit review have not been received by the city. In one week the process thus far will have taken a year. I certify under penalty of perjury under the laws of the state of Washington that the foregoing is true and correct. G� signed on (.D9 -Z — in Renton, Washington Denis Law Mayor Community & Economic Development C. E. "Chip" Vincent, Administrator February 5, 2019 Sonya Kousoum 8031 South 130"1 Street Seattle, WA 98178 RE: Health Department Approval Dear Ms. Kousoum: Thank you for submitting the King County Health Operation/Performance Monitoring Report for the septic system on your property. There is no indication on the Report that the health department is approving additional bedrooms for the septic system. This code case has been on -going for over five months with no progress being made. Obtain health department approval and submit along with a building permit application and plans for the work that has been done without permits. The compliance date is February 20, 2019. If you have any questions please let me know. Respectfully, 7b Y1tA Donna Locher Lead Code Compliance Inspector Development Services Division 425-430-7438 dlocher@rwenwtonwa.gov 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov I Public HealthMONITORING Seattle & King County Environmental Health Division, 14350 SE Eastgate Way, Bellevue, WA 98007, Tel. (206) 477-8050 Inspection Type: INTERMITTENT - Correction Status: No corrections needed Tax ID: 2144800311 Inspection Date: 01/22/2019 GENERAL SYSTEM TYPE: Gravity Site Address: 8031 S 130TH ST City: RENTON Mail Address: City: Zip: OSM Company: McNel Septic Service, Inc. OSM Name: Shawn Carlton OSM Tel#: 425-432-2270 Submitted 01/22/2019 by: COMMENTS & GENERAL INSPECTION NOTES No Def9ciencles Noted -STRESS TEST 200 GALS = 25 MIN OK -SYSTEM OPERATING PROPERLY AT TIME OF INSPECTION GENERAL SITE & SYSTEM CONDITIONS All Components accessible for maintenance, secure and in good condition: YES - - If a dye test was performed, did the dye surface? (N_/A if no dye test) NIA Effluent---- Effluent Making onto the surface of the ground from arty component? (If yes, explain in comments) NO Improper encroachment (roads, buildings, etc.) onto component(s): _ - NO Component settling problems observed: - - - - •_- ..._ _ _ . .._ __ _..� NO - Subsurface components adequately covered Period average daily flow (gallons per day) --� --- - --- - ---� --- - Site malMenance required (e.g. Landscape maintenance) If yes, describe in rommenb: N/A Occupant compliance problem (occupant not operating the system property), if YES, describe in notes: -- _ _ NO _ Structures connected to onsite sewage system occupied. If NO explain in comments: — _ - YES Alterations made to the OSS (valves adjusted, timer settings modified, ports Installed, etc.) (If YES, - NO describe to notes): Risers and ids secured: YES YES Pre -failing Signs ~_ NO Record Drawing Modified NO Record Drawing New -� --�— NO - ONSITE SEWAGE SYSTEM INSPECTION DETAIL This component was: Fully Inspected Effluent level within operational limb (if NO explain in comments): YES All required baffles In place (N/A = No baffles required): YES Effluent Filter Cleaned (N/A - Not Present): YES Compartment 1 Scum accumulation (Inches. If other specify): 1 Compartment 1 Sludge accumulation (Inches, if other specify): 7 Pumping needed: NO A modificadontrepair was completed on the component (If yea, provide detail in comments): NO This component was-. Fully Inspec ed Component appears to be functioning as intended: YES A modificationlrepair was completed on the component (If yes, provido detail in comments): NO ReportlD: 739442 View inspection reports online at www.onlinerme.com Page 1 of 2 This component was: Futy kapeded Component settling problems observed: NO Surface water, downspouts diverted away from drainfield: YES Load test performed with satisfactory results (N/A = Not Performed). YES Evidence of vehicular traffic or livestock over drainfiekt: NO Observation ports present and axessible: YES A method, such as aeration, was used to reduce clogging of the biomat in this component (if yes, provide detail in comments): Ha A modificatlon/repalr was completed on the component (if yes, provide detail in comments): NO fiis report indkafaa wrtain dienchrisfia orMa onsW aawapa system M Ma limo o/vhif In noway h M mpod a puanmUs o/opmabon arNMe pnibananee. RaportJD: 739442 View inspection reports online at www.onlinemre com Page 2 of 2 Donna Locher From: Sonya Kousoum <skousoum@hotmail.com> Sent: Sunday, February 17, 2019 5:28 PM To: Donna Locher Subject: RE: Health Department Approval Donna, Since the beginning I have NOT added any bedrooms. I did not intend to make add any bedrooms. In your latest threatening letter dated February 5th, 2019, you wrote "no progress being made." Now actually I have a contractor trying to work on the sewer connection. As you know I have an architect working on designing a dwelling family unit instead of a toilet in a shop. He spoke to you many times in the last couple of months. I provided all information to the architect and the contractor per your request. You requested a report of the septic system. I obtained the report you requested on the septic system. Who was telling you the septic was failing? I would like to know who told you the septic tank was failing. I would like to get things resolved as soon as possible. However it's not in my hands. I have been doing the right things since the start. I pulled permit as required. I have stopped everything until this matter is resolved. I want to do things correctly. No, I would not like to provide approval from the Health department when you know I have been attempting to connect to sewer line. I have been working with the architect and engineer to get this matter resolved. I have not made additional bedrooms. Your inspectors were at the site many times. We passed the first plumbing and electrical inspections. Why your first and second inspectors did not ask for building permit? They know very well what was done. Can you tell me clearly and not with lies how do you come up me adding bedrooms? I really want to get this matter resolved. If you are going to send me a letter, please tell me the next step I need to do, not to threaten me to spend money unnecessarily? I hope you understand what I am doing and what I attempt to accomplish. Thank you for your understanding. Best regards, Sonya To: Donna Locher <DLocher@Rentonwa.gov> Subject: RE: Health Department Approval Donna, Since the beginning I have NOT added any bedrooms. I did not intend to make add any bedrooms. In your latest threatening letter dated February 5th, 2019, you wrote "no progress being made." Now actually I have a contractor trying to work on the sewer connection. As you know I have an architect working on designing a dwelling family unit instead of a toilet in a shop. He spoke to you many times in the last couple of months. I provided all information to the architect and the contractor per your request. You requested a report of the septic system. I obtained the report you requested on the septic system. Who was telling you the septic was failing? I would like to know who told you the septic tank was failing. I would like to get things resolved as soon as possible. However it's not in my hands. I have been doing the right things since the start. I pulled permit as required. I have stopped everything until this matter is resolved. I want to do things correctly. No, I would not like to provide approval from the Health department when you know I have been attempting to connect to sewer line. I have been working with the architect and engineer to get this matter resolved. I have not made additional bedrooms. Your inspectors were at the site many times. We passed the first plumbing and electrical inspections. Why your first and second inspectors did not ask for building permit? They know very well what was done. Can you tell me clearly and not with lies how do you come up me adding bedrooms? really want to get this matter resolved. If you are going to send me a letter, please tell me the next step I need to do, not to threaten me to spend money unnecessarily? I hope you understand what I am doing and what I attempt to accomplish. Thank you for your understanding. Best regards, Sonya Donna Locher From: Donna Locher Sent: Monday, February 18, 2019 8:34 AM To: 'Sonya Kousoum' Subject: RE: Health Department Approval Good Morning, It sounds like there may be some misinformation happening in regards to your property. The only reason it would be suggested that you hook up to sewer is if your septic is failing and/or the county would not approve new construction in regards to your septic system (usually new bedrooms). The city has no reason to ask you to hook up to sewer if your septic is fully functioning. We have talked with your architect. As far as the sewer hookup to date we have not received any information. If you have on -going information please keep us updated. Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory: Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter 42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records. As such, the information you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. a 9. CODE COMPLIANCE oroaram information PARKING ENFORCEMENT information BUILDING & SIGN PERMITS information From: Sonya Kousoum (mailto:skousoum@hotmail.com] Sent: Sunday, February 17, 2019 5:28 PM Donna Locher From: Donna Locher Sent: Wednesday, March 27, 2019 2.16 PM To: 'Sonya Kousoum' Subject: Work without Permits Good Afternoon, To date we have not received any paperwork regarding your sewer connection. What is the status? The sewer connection must be approved prior to building permit issuance. To date we have not received a building permit application and plans for the work that has already been started and any additional work you'd like to do. What is the status? These items must be taken care of without delay. Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory.' Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter 42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records. As such, the'nformation you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. Owtbk ff IL W, CODE COMPLIANCE Program information PARKING ENFORCEMENT information BUILDING & SIGN PERMITS information From: Donna Locher Sent: Monday, February 18, 2019 8:34 AM To:'Sonya Kousoum' <skousoum@hotmail.com> Subject: RE: Health Department Approval Good Morning, The Current septic system is in good working order. Upon preliminary approval of the ADU we will apply for sewer conversion. The plans are done for the ADU addition and with the structural engineer right now. We are waiting for the engineer to complete and then we will be ready to submit. We want to schedule a preliminary review meeting with one of your departments. I believe that is the next part of the process. Can you please advise us as to how to go about setting that up? Thanks Rich Rich Melchior CPBD Founder/Professional Designer Rich Design Group llc 253-951-8049 www.richdesigngroup.com From: Sonya Kousoum <skousoum@hotmail.com9 Sent: Wednesday, April 24, 2019 11:28 AM To: Rich <richdesign1@comcast.net> Subject: Fwd: Sewer Hook Up From: Donna Locher <DLocher@Rentonwa.sov> Sent: Wednesday, April 24, 2019 9:35:47 AM To:'Sonya Kousoum' Subject: Sewer Hook Up Good Morning, It has been two months since our last correspondence. I checked with our engineering division and they have not received any information in regards to your hooking up to the city's sewer system. If this is still your intention please provide an update. If you are choosing to stay on septic please provide that information as well. A check of permit records indicates we have not received any building plans for review. The building permit plans must be submitted to the city by May 9, 2019. Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Donna Locher From: Donna Locher Sent: Wednesday, April 24, 2019 1:39 PM To: 'Rich'; 'Sonya Kousoum' Subject: RE: Sewer Hook Up Thank you for the update Rich. Go online to My6uildingPermit.com, choose land use, set up an account and choose pre - application meeting. You can upload the documents and send the information to the city. Once the city receives the documents they will schedule the meeting. If you need assistance please contact Planning Customer Service PlanningCustomerService@rentonwa.sov Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory: Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter 42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records. As such, the information you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. 9. CODE COMPLIANCE program information PARKING ENFORCEMENT information BUILDING & SIGN PERMITS information From: Rich [mailto:richdesign1@comcast.net] Sent: Wednesday, April 24, 2019 1:29 PM To:'Sonya Kousoum' <skousoum@hotmail.com> Cc: Donna Locher <DLocher@Rentonwa.gov> Subject: RE: Sewer Hook Up Hello Donna, This is Rich connecting for Sonya. Donna Locher all From: From: Donna Locher Sent: Monday, May 13, 2019 6AS AM To: 'Rich' Subject: RE: Up date Thank you very much Rich. Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory: Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter 42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records. As such, the information you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. d � 9 CODE COMPLIANCE aroaram information PARKING ENFORCEMENT information BUILDING & SIGN PERMITS information From: Rich [mailto:richdesignl@comcast.net] Sent: Wednesday, May 08, 2019 2:32 PM To: Donna Locher <DLocher@Rentonwa.gov>; 'Sonya Kousoum' <skousoum@hotmail.com> Subject: Up date Donna, Sonya Kousoum project is still waiting for engineering. The project pre -application process has been uploaded on My Building permit. I will receive a meeting time in the near future from the City I assume. Thanks Rich From: Donna Locher <DLocher@Rentonwa.gov> Sent: Wednesday, April 24, 2019 1:39 PM To: 'Rich' <richdesign1@comcast.net>;'Sonya Kousoum' <skousoum@hotmail.com> Subject: RE: Sewer Hook Up Thank you for the update Rich. Go online to MyBuildingPermit.com, choose land use, set up an account and choose pre - application meeting. You can upload the documents and send the information to the city. Once the city receives the documents they will schedule the meeting. If you need assistance please contact Planning Customer Service PlanninRCustomerService@rentonwa.eov Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory: Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records. As such, the information you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. CODE COMPLIANCE program information PARKING ENFORCEMENT Information BUILDING & SIGN PERMITS information From: Rich[mailto:richdesienl@comcast.netl Sent: Wednesday, April 24, 2019 1:29 PM To:'Sonya Kousoum' <skousoum@hotmail.com> Cc: Donna Locher <DLocher@Rentonwa.eov> Subject: RE: Sewer Hook Up Hello Donna, This is Rich connecting for Sonya. The current septic system is in good working order. Upon preliminary approval of the ADU we will apply for sewer conversion. The plans are done for the ADU addition and with the structural engineer right now We are waiting for the engineer to complete and then we will be ready to submit. We want to schedule a preliminary review meeting with one of your departments. I believe that is the next part of the process. Can you please advise us as to how to go about setting that up? Thanks Rich Rich Melchior CPBD Founder/Professional Designer Rich Design Group llc 253-951-8049 www.richdesigngroup.com From: Sonya Kousoum <skousoum@hotmail.com> Sent: Wednesday, April 24, 2019 11:28 AM To: Rich <richdesisn1@comcast.net> Subject: Fwd: Sewer Hook Up From: Donna Locher <DLocher@Rentonwa.eov> Sent: Wednesday, April 24, 2019 9:35:47 AM To:'Sonya Kousoum' Subject: Sewer Hook Up Good Morning, It has been two months since our last correspondence. I checked with our engineering division and they have not received any information in regards to your hooking up to the city's sewer system. If this is still your intention please provide an update. If you are choosing to stay on septic please provide that information as well. A check of permit records indicates we have not received any building plans for review. The building permit plans must be submitted to the city by May 9, 2019. Respectfully, Donna Locher Lead Code Compliance Inspector 425-430-7438 Advisory: Please be advised the City of Renton is required to comply with the Public Disclosure Act Chapter42.56 RCW. This act establishes a strong state mandate in favor of disclosure of public records As such, the information you submit to the City via email, including personal information, may ultimately be subject to disclosure as a public record. 9L CODE COMPLIANCE arortram information PARKING ENFORCEMENT information ® ■ ■ ■ lu � N • qqy�� Q II ill a ' v E n V a. ZQI j F Go Go v o z o CL CL Q w 0 0 •a v w E o -a Lb , .i � l7 O a a N aL - �z x � VO > a y w a z � - = t a N , X f b � � � V e ro u i L to to � t a a Q G G © q y tri c o 10 v = 2 O co v i 5 N to , c m u t E a N ~ c � m Lo �� • w 2 � N Z • I y O C � m ; 0 A N 0 a N L F � W V m F VI C C � 3 D E Y u° as ce s N EL EL N S L) L] n E yR Y V) LLLiii111 L 402 L � C L O •, v N 7 L O O t v�X E L Ii 3 v v a CD�o o rn rn }' 'x � v � v c E f0 c v - o M I C � � � M Q O v 1C0 C N O ? L y v O N N L a m �s N �� 'E �U_ Vi CO fU0 7 i &�W O J ()e r Finding of Violation Second Notice Mayor Denis Law Ma Community & Economic Development C.E. "Chip" Vincent, Administrator Issued To: Date: September 04, 2019 Code Case No: CODE18-000542 Sonya Kousoum Owner (Tax -Payer): Sonya Kousoum PO Box 33161 Violation Address: Seattle, WA 981330161 8031 S 130th St Seattle, WA 98178-4942 The undersigned City of Renton Code Compliance Inspector hereby certifies and states that a Warning of Violation has been provided to the named violator and the violation was not eliminated. The Violator has created, permitted to exist, maintained or failed to eliminate the following violation(s): VIOLATION 1: No Building Permit Investigation Date 09/04/2019 Code Text: No Building Permit: The City of Renton Municipal Code requires building permits to be applied for and obtained by any person, firm, or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish, use, occupy or maintain any building or structure in the city. Corrective Action: Approval from the King County Health Department has not been obtained for the septic system. A permit to connect to the city sewer system has not been submitted for review and approval. Submit approval for the septic system or a permit application to connect to the city sewer system within 15 day of the date of this notice. The additional permits you have obtained may not receive inspections until a building permit is reviewed, approved and issued. Fees: Description Amount CODE - Violation Fine $250.00 Violation 1 Subtotal: $250.00 Payment of $250.00 must be made within fifteen (15) days of the date of this Finding of Violation. All city codes listed on this Finding of Violation must be brought into compliance within fifteen (15) days of the date of this Finding of Violation. Invoice to follow. I certify under penalty of perjury under the laws of the State of Washington that I have issued this Finding of Violation on this date and at the location stated above. I certify that I believe by a preponderance of the evidence that the violator committed the above violation(s). Signed: Date CDO�`dq ��r1 r Issued By: Do Locher Lead Code Compliance Inspector 425-430-7438 diocher@rentonwa.gov Page 1 of 2 Code Case No: CODE18-000542 Date: September 04, 2019 Violation Address: Total Amount Due: $250.00 8031 S 130th St Seattle, WA 981784942 NOTICE OF RENTON MUNICIPAL CODE VIOLATION The City has elected to establish a non judicial hearing and determination system to enforce Renton Municipal Codes (RMC) civil code violations. Therefore a code violation penalty, consistent with RMC 1-3-2.P is imposed, not including any costs, fees or assessments. You may respond in the following manner: I deny creating, permitting to exist, maintaining or failing to eliminate the violation(s) and I am requesting a hearing to contest this Finding of Violation. Appeal requests must be received by the Renton City Clerk's office within 15 days of the date of this Finding of Violation. Please send me a hearing date. I promise to appear on that date. The administrator must prove by a preponderance of the evidence that I committed the violation. I understand that under RMC 1-3-2.G that the administrator shall decide whether the opportunity to be heard will be only in writing or in person, or both. The city is not required to call witnesses to testify at the hearing Pursuant to RMC 1-3-2.K, failure to attend the scheduled hearing makes the Finding of Violation final, and I may be subject to additional costs if I fail to withdraw or resolve my appeal prior to the hearing date. I also understand that the city has not waived any rights or remedies under the law. Appeals should be mailed to: City of Renton Attention: City Clerk 1055 S Grady Way Renton, WA 98057 I admit that I have created, permitted to exist, maintained or failed to eliminate the violation(s) and do not need or want any kind of hearing. As a result, I have enclosed a check or money order (do not send cash) in the amount of $ . I understand I am required to bring the property into compliance with City of Renton Municipal Code. I also understand that if compliance is not achieved I may be issued additional Findings of Violation with increasing penalties, and or criminally prosecuted. NSF checks will be treated as failure to respond. Payment should be made to: City of Renton Attention: 1st Floor Finance 1055 S Grady Way Renton, WA 98057 Complete information below: (PLEASE PRINT Name: Street or P.O. Box: City: State: Zip: Telephone: Home: Signature of Violator: Work: Date: Page 2 of 2 61OZ/91/6 -tO-603Z° o098t£6LdZ%aopa—aig�xdsu•zamQTAJPd/-)ut-lgaM noS-Lmuoluaa•saopSo,;:sduy 13o I ;)Bud �annain sC•,�Qd RI Nil ill 1111 �el&iQwd SPS Permit No10 �Iaza, 9590 9402 4890 9032 1582 65 • Send=• Plaa�P nrint vour name, address, an�zbpi�{[e ON -vial S�raior� City of Renton CODE COMpU KE Donna Locher 1055 5 Grady Way-6th Floor Renton, WA 98057 I-r bsg2- „ � rr►rlrllrrrlr I rrrll ,,, Z— li I Inl Illli I I i l l IIIII final I I III i ■ Complete items 1, 2, and 3. " "''" " a Agentx ■ Print your name and address on the reverse Addressee so that we can return the card to you. ■ Attach this card to the back of the mallpiece, B. y nri ted fv�e) n � — C. Date of Deilvery or on the front if space permits. 1. Ardcie Addressed to: D. ddress different from item 1? ❑ Yes 7tdedMw ,yam ��sou� If YES, enter delivery address below �'NO q.,�_ ,I' aP eon 36161 a ���v t�� G4sl33 3 'L°,g 3. Service Type ❑ Prtatry Man II I II1I'I Jill III I IIIII�II'II III) I I I �I I III I I lli aidit o �Ce tl ed "MaW t Deflrary ❑ R t t)eihr��� ❑ pt for 9590 9402 4890 9032 1582 85 ❑ Cerafled Man RasMoted ❑ Weed on De ftw CG endue n Wivery ResMoted `� Qnswmsipatm Cor ftffn& on 7019 0140 0000 6611 9542 eeu ❑iadie0anfl""°"°" W1 Restricted Odyery Reratd td UK" PS Form 3811, July 2015 PSN 7530-02-000-9053 Domestic Return Receipt Code Case No: CODE18-000542 • Date: September 04, 2019 Violation Address: Total Amount Due: $250.00 8031 S 130th St Seattle WA 98178-4942 NOTICE OF RENTON MUNICIPAL CODE VIOLATION The City has elected to establish a non -judicial hearing and determination system to enforce Renton Municipal Codes (RMC) civil code violations. Therefore a code violation penalty, consistent with RMC 1-3-2.P is imposed, not including any costs, fees or assessments. You may respond in the following manner 1 deny creating, permitting to exist, maintaining or failing to eliminate the violation(s) and I am requesting a hearing to contest this Finding of Violation. Appeal requests must be received by the Renton City Clerk's office within 15 days of the date of this Finding of Violation. Please send me a hearing date. I promise to appear on that date. The administrator must prove by a preponderance of the evidence that I committed the violation. I understand that under RMC 1-3-2.G that the administrator shall decide whether the opportunity to be heard will be only in writing or in person, or both. The city is not required to call witnesses to testify at the hearing. Pursuant to RMC 1-3-24 failure to attend the scheduled hearing makes the Finding of Violation final, and I may be subject to additional costs if I fail to withdraw or resolve my appeal prior to the hearing date. I also understand that the city has not waived any rights or remedies under the law. Appeals should be mailed to: City of Renton Attention: City Clerk 1055 S Grady Way Renton, WA 98057 I admit that I have created, permitted to exist, maintained or failed to eliminate the violation(s) and do not need or want any kind of hearing. As a result, I have enclosed a check or money order (do not send cash) in the amount of $ 1 understand 1 am required to bring the property into compliance with City of Renton Municipal Code. I also understand that if compliance is not achieved I may be issued additional Findings of Violation with increasing penalties, and or criminally prosecuted. NSF checks will be treated as failure to respond. Payment should be made to: City of Renton Attention: 1st Floor Finance 1055 S Grady Way Renton, WA 98057 Complete information below, (PLEASE PRINT; Name: Sb [\� q�\ rI OmaAyN/-- Street or P 0. Box: 1•�• W7< City. �& C\AA 61- State: VGA Zip: I �b Telephone: Home: Ck �� I - `� 1-41orkk Signature of Violator Date: 9 - IL-4- I t Page 2 of 2 i i x o � f r vJ f �J ttt O j O r,i ry L •, O o aVA w � � Ln 0�0 _ m' - -n �� rn N m o v CZ) 9 >Wgi nc to D-"+ m O N m Ul A D 0 Finding of Violation Second Notice CITY OF RENTONCIN OF RENTON SEP 16 2019 SEP EIVED CITY CLERIK'S OFF(CEIn D(-E%NS F P E Community & Economic Development C.E. "Chip" Vincent, Administrator Issued To: Date: September 04, 2019 Code Case No: CODE18-000542 Sonya Kousoum Owner (Tax -Payer): Sonya Kousoum PO Box 33161 Violation Address: Seattle, WA 981330161 8031 S 130th St Seattle, WA 98178-4942 The undersigned City of Renton Code Compliance Inspector hereby certifies and states that a Warning of Violation has been provided to the named violator and the violation was not eliminated. The Violator has created, permitted to exist, maintained or failed to eliminate the following violation(s): `VIOLATION 1: No Building Permit 'T^ Investigation Date; 09/04/2019 1 Code Text: No Building Permit: The City of Renton Municipal Code requires building permits to be applied for and obtained by any person, firm, or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish, use, occupy or maintain any building or structure in the city Corrective Action: Approval from the King County Health Department has not been obtained for the septic system. A permit to connect to the city sewer system has not been submitted for review and approval. Submit approval for the septic system or a permit application to connect to the city sewer system within 15 day of the date of this notice. The additional permits you have obtained may not receive inspections until a building permit is reviewed, approved and issued. Fees: Description Amount CODE -Violation Fine $250.00 Violation I Subtotal: $250.00 Payment of $250.00 must be made within fifteen (15) days of the date of this Finding of Violation. All city codes listed on this Finding of Violation must be brought into compliance within fifteen (15) days of the date of this Finding of Violation. Invoice to follow I certify under penalty of perjury under the laws of the State of Washington that I have issued this Finding of Violation on this date and at the location stated above. I certify that I believe by a preponderance of the evidence that the violator committed the above violation(s). Signed: Date: b9(N Issued By Do Locher Lead Code Compliance Inspector 425-430-7438 ii dlocher@rentonwa.gov � I — rw Page 1 of 2