HomeMy WebLinkAboutSR_ERC_Report_K-12 Public Charter School_190918_v2_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_K-12 Public Charter School_190918_v2_FINAL
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: September 23, 2019
Project File Number: PR19-000287
Project Name: K-12 Public Charter School
Land Use File Number: LUA19-000035, ECF, CU-H, SH
Project Manager: Alex Morganroth, Associate Planner
Owner: MBA Cascade Plaza LLC, 7420 SW 24th St, Ste 4, Mercer Island, WA 98040
Contact/Contact: Anna Johnson, Washington Charter School Development, 107 Spring St, Suite 4025,
Seattle, WA 98104
Project Location: 17060 116th Ave SE
Project Summary: The applicant, Washington Charter School Development (WCSD), is requesting a
Hearing Examiner Conditional Use Permit, Site Plan Review, and Environmental (SEPA)
Review to convert a vacant grocery store (former QFC) within the Cascade Village
Shopping Center to a K – 12th grade public charter school. The 40,664 square foot
building is located at 17060 116th Ave SE. The parcel is approximately 13.6 acres (APN
2823059009). The site is zoned Commercial Arterial (CA) and is located in the Urban
District D Overlay. The applicant proposes to provide 60 parking spaces in the existing
parking lot and convert several existing parking spaces (and some landscape areas) to
bus loading and outdoor sport courts. The school would serve approximately 525
students. The school day would start at 8:00 am (Monday – Friday) and end at 3:30
pm. Afterschool clubs and tutoring may start as early as 7:00 am and end as late as
5:00pm (Monday – Thursday). The school seeks to occupy the existing structure by fall
of 2020. Renovations would include interior tenant improvements, seismic upgrades,
new mechanical and electrical systems, envelope improvements, landscaping and
overall site improvements. The size of the building would not increase as a result of
the project. Approximately 2,300 sq. ft. of new or replaced impervious surface is
proposed. No critical areas are present on the project site. The applicant submitted a
Drainage Report, Geotechnical Report, Traffic Study, and SEPA Checklist.
Exist. Bldg. Area SF: 40,664 Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
N/A
N/A
Site Area: 13.6 ac Total Building Area GSF: 40,664
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a Determination
of Non-Significance - Mitigated.
Building
Location
City of Renton Department of Community & Economic Development
K-12 Public Charter School
Staff Report to the Environmental Review Committee
LUA19-000035, ECF, CU-H, SH
Report of September 18, 2019 Page 2 of 4
SR_K-12 Public Charter School_190918_v2_FINAL
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS-M with a 14-day Appeal Period.
B. Mitigation Measures
1. The applicant shall conduct a security survey of the site with a Renton Police Crime Prevention
Representative prior to the issuance of the Certificate of Occupancy.
2. The applicant shall submit a traffic management plan with the Civil Construction Permit application for
review and approval by the Public Works Plan Reviewer.
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Neighborhood Detail Map
Exhibit 3: Site Plan
Exhibit 4: Floor Plans
Exhibit 5: Landscape Plan
Exhibit 6: Traffic Study (dated July 15, 2019 and prepared by Heffron Transportation Inc)
Exhibit 7: Drainage Report (dated February 15, 2018 and prepared by Sitewise Design PLLC)
Exhibit 8: Geotechnical Report (dated February 12, 2019 and prepared by GeoResources)
Exhibit 9: Architectural Elevations
Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Water
a. Storm Water
Impacts: A 12-inch stormwater main is located in 116th Ave SE. No private stormwater conveyance
system is located on the project site. The existing roof drainage is collected via roof downspouts and
sheet flows through the parking lot into the public conveyance system in the street. The applicant
has indicated that the project would result in approximately 2,198 square feet of new or replaced
impervious surface. Therefore, a full drainage review pursuant to the 2017 Renton Surface Water
Design Manual is required to be submitted at the time of Construction Permit application submittal.
A Surface Water System Development (SDC) fee would be assessed at a rate of $0.641 per square
foot of new impervious surface, to be no less than $1,508.00, at the time of construction permit
issuance. Staff anticipates that existing stormwater requirements and impact fees would adequately
City of Renton Department of Community & Economic Development
K-12 Public Charter School
Staff Report to the Environmental Review Committee
LUA19-000035, ECF, CU-H, SH
Report of September 18, 2019 Page 3 of 4
SR_K-12 Public Charter School_190918_v2_FINAL
mitigate any impacts created by the increase or replacement of impervious surface, therefore no
further mitigation is recommended.
Mitigation Measures: None
Nexus: N/A
2. Fire & Police
Impacts: The City of Renton Police Department provided a comprehensive set of comments and
suggestions related to safety and security for the new school, applicable during both the construction
and school operation phases (see Exhibit 10). Recommendations are primarily related to physical
improvements such as the provision of adequate exterior lighting, installation of reinforced doors and
windows, monitoring security alarms, and installation of territorial landscaping designed to create a
clear boundary between public and private space. In addition, specifications for staff and pedestrian
access control and lockdown procedures are also included in the recommendations. In addition to
creating a safe environment in the school for teachers and students, adhering to the recommendations
helps ensure the safety of City of Renton police officers should they need to respond to the school for
any reason. Therefore, staff recommends as a mitigation measure that the applicant conduct a security
survey of the site with a Renton Police Crime Prevention Representative of the premises prior to the
issuance of the Certificate of Occupancy.
Mitigation Measures: The applicant shall conduct a security survey of the site with a Renton Police
Crime Prevention Representative of the premises once construction is complete.
Nexus: SEPA Environmental Review
3. Transportation
Impacts: The applicant submitted a Transportation Technical Report prepared by Heffron Transportation
Inc. (Exhibit 6). The report included analysis related to site access and circulation, trip generation,
parking needs and impact fees for the proposed new school. The consultant utilized recent traffic counts
to evaluate the potential impact of the proposed project on the Level of Service (LOS) of multiple
intersections near the project site. The report concluded that while the proposal would generate
additional vehicle trips and delays at all studied intersections, the increase would be small relative to
existing traffic volumes and would not result in any LOS decreases in the surrounding area. The
consultant estimates that the school would generate approximately 1,300 new daily trips, the majority
of which would occur outside of the commuter AM and PM peak hours. In comparison to the previous
use on the site, a large supermarket, the proposal would generate a significantly lower number of trips
(1,200 vs. 5,183 trips).
The project site currently has five points of ingress/egress including three driveways off of 116th Ave SE,
one driveway off of SE 168th St, and one driveway off of SE 170th St. The report recommends that the
applicant create a traffic management plan that requires vehicular traffic at the proposed school to
utilize the northern and southern most access points off of 116th Ave SE. This would be achieved by
blocking certain entrances via a gate, utilizing pavement striping that directs the school traffic to a
specific driveway, and providing education to bus drivers, parents, and students on the preferred way to
enter and exit the site. The report concludes that utilization of the two preferred entrances of 116th Ave
SE would be safest due to fewer opportunities for vehicular and pedestrian movement conflicts.
Therefore, staff recommends as a mitigation measure that the applicant submit a traffic management
plan with the Civil Construction Permit application for review and approval by the Public Works Plan
Reviewer.
Staff has reviewed the report and concurs with the analysis and recommendations made regarding
access, circulation, and trip generation. Payment of the required impact fees would adequately mitigate
the expected traffic impacts of the project and therefore no further mitigation is recommended.
City of Renton Department of Community & Economic Development
K-12 Public Charter School
Staff Report to the Environmental Review Committee
LUA19-000035, ECF, CU-H, SH
Report of September 18, 2019 Page 4 of 4
SR_K-12 Public Charter School_190918_v2_FINAL
Mitigation Measures: None
Nexus: N/A
D. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in
writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA
98057, on or before 5:00 p.m. on October 11, 2019. RMC 4-8-110 governs appeals to the Hearing Examiner and
additional information regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall –
7th Floor, (425) 430-6510.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
K-12 Public Charter School
Land Use File Number:
LUA19-000035, ECF, CU-H, SH
Date of Meeting
September 23, 2019
Staff Contact
Alex Morganroth
Associate Planner
Project Contact/Applicant
Anna Johnson
Washington Charter School
Development
107 Spring St, Suite 4025,
Seattle, WA 98104
Project Location
17060 116th Ave SE
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Neighborhood Detail Map
Exhibit 3: Site Plan
Exhibit 4: Floor Plans
Exhibit 5: Landscape Plan
Exhibit 6: Traffic Study (dated July 15, 2019 and prepared by Heffron Transportation Inc)
Exhibit 7: Drainage Report (dated February 15, 2018 and prepared by Sitewise Design PLLC)
Exhibit 8: Geotechnical Report (dated February 12, 2019 and prepared by GeoResources)
Exhibit 9: Architectural Elevations
Exhibit 10: Advisory Notes
STATE OF WASHINGTON
ARCHITECT
REGISTERED5087
BRADLEY S. MILLER
Miller HayashiArchitects
118 North 35th St. Suite 200
Seattle, Washington 98103
Tel: 206 634 0177
Fax: 206 634 0167
PRELIMINARY COORD SETNOT FOR CONSTRUCTIONARCHITECT'S STAMP
CONSULTANT'S STAMP
CONSULTANT
DATE
PHASE
REVISIONS
7/12/2019
K-12 Public Charter
School
16950 116th Ave SE
Renton, WA 98058
CUP
Description Date
K-12 Public Charter
School
7/12/2019
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
168 SF
SPRINKLER/ UTILITY
758 SF
CLASSROOM MS
793 SF
CLASSROOM MS
793 SF
CLASSROOM MS
793 SF
CLASSROOM MS
874 SF
CLASSROOM HS 767 SF
CLASSROOM HS
772 SF
CLASSROOM HS
772 SF
CLASSROOM HS
772 SF
CLASSROOM HS
772 SF
CLASSROOM HS
498 SF
MECHANICAL
109
403 SF
FLEX CR
777 SF
CLASSROOM HS
764 SF
CLASSROOM HS
2346 SF
COMMONS A
454 SF
SERVERY
3317 SF
MULTIPURPOSE (300 SEATS)
455 SF
TEACHER SUPPORT
750 SF
CLASSROOM MS
753 SF
CLASSROOM MS
833 SF
ADMIN
463 SF
FLEX CR
814 SF
MS LAB
814 SF
JOINT LAB 949 SF
JOINT MUSIC
782 SF
CLASSROOM MS
776 SF
CLASSROOM HS
771 SF
CLASSROOM HS
771 SF
CLASSROOM HS
769 SF
CLASSROOM HS
H
57 SF
TOILET
28 SF
IDF
130 SF
OFFICE
124 SF
OFFICE
124 SF
OFFICE
225 SF
CONF ROOM
376 SF
STORAGE
120 SF
OFFICE
(E) 20' - 11 5/8" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 0" +/-(E) 20' - 11 5/8" +/-28' - 0 3/4"
49 SF
JANITOR
57 SF
TOILET
1
A4.10
2
A4.10
1020 SF
HS LAB
76 SF
STOR
436 SF
W/C
PROJECTOR
SCREEN
TEACHING WALL
TEACHING WALL
134 SF
ED FLEX
REF
EXISTING CMU WALL, TYPEXISTING FRAMED WALL,
TYP
CMU WALL, TYP1
A4.11
71 SF
WELLNESS
2
A4.11
117 SF
CHANGING
138 SF
STORAGE112 SF
CHANGING
123 SF
ED FLEX
127 SF
ED FLEX
145 SF
ED FLEX
157 SF
ED FLEX
436 SF
W/C
772 SF
CLASSROOM MS
473 SF
W/C
1
A3.20
1
A3.20
3
A3.20
3
A3.20
91 SF
STORAGECL STEELF.O. FDNCL STEELCL STEELCL STEELCL STEELCL STEELCL STEELCL STEELCL STEELCL STEELF.O. FDNF.O. FDNF.O. FDN
(E) 32' - 5 1/8" +/-(E) 18' - 1" +/-(E) 17' - 8" +/-(E) 31' - 9" +/-(E) 42' - 1 1/2" +/-(E) 28' - 11 3/8" +/-40' - 0"CL STL
CL STL
CL STL
CL STL
CL STL
F.O. FDN
F.O. FDN
4
A3.20
4
A3.20
2
A3.20
2
A3.20
2
A3.10A
4A3.10A3 P-173 P-166
A3.10A
TEACHING WALL, TYP
OVERHEAD
DOOR
188 SF
ELECTRICAL
Floor Plan Legend
FRAMED WALL/ PARTITION,
TYPICAL
TYPE 1A IF NO TAG IS PRESENT
EXISTING FRAMED
WALL/PARTITION
DOOR, TYPICAL
SEE SCHEDULE
RELITE TYPE
SEE SCHEDULE1012
RE2
EXISTING CMU
WALL/PARTITION
STATE OF WASHINGTON
ARCHITECT
REGISTERED5087
BRADLEY S. MILLER
Miller HayashiArchitects
118 North 35th St. Suite 200
Seattle, Washington 98103
Tel: 206 634 0177
Fax: 206 634 0167
PRELIMINARY COORD SETNOT FOR CONSTRUCTIONARCHITECT'S STAMP
CONSULTANT'S STAMP
CONSULTANT
C MILLER HAYASHI ARCHITECTS
DATE
PHASE
SHEET TITLE
SHEET NO.
REVISIONS
A2.00
First Floor Plan
2/15/2019
Excel Public Charter
School
16950 116th Ave SE
Renton, WA 98058
CUP
1808
1/8" = 1'-0"1 Floor Plan - Level 1
N
Description Date
K-12 Public Charter
School
7/12/2019
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
H
EXISTING RIDGE
SKYLIGHT MONITOR, TYP
EXISTING STRUCTURE SLOPES 1/8" : 12"; PROVIDE INSULATION TO ACHIEVE 1/4" : 12" SLOPE, TYPEXISTING STRUCTURE SLOPES 1/8" : 12"; PROVIDE INSULATION TO ACHIEVE 1/4" : 12" SLOPE, TYPROOF DIVIDER EXISTING STRUCTURE SLOPES 1/8" : 12"; PROVIDE INSULATION TO ACHIEVE 1/4" : 12" SLOPE, TYPMECHANICAL UNIT
DS DS DS DS DS
DS
ROOF MONITOR
ROOF MONITOR
MECHANICAL UNIT
MECHANICAL UNIT
STATE OF WASHINGTON
ARCHITECT
REGISTERED5087
BRADLEY S. MILLER
Miller HayashiArchitects
118 North 35th St. Suite 200
Seattle, Washington 98103
Tel: 206 634 0177
Fax: 206 634 0167
PRELIMINARY COORD SETNOT FOR CONSTRUCTIONARCHITECT'S STAMP
CONSULTANT'S STAMP
CONSULTANT
C MILLER HAYASHI ARCHITECTS
DATE
PHASE
SHEET TITLE
SHEET NO.
REVISIONS
A2.01
Roof Plan
2/15/2019
Excel Public Charter
School
16950 116th Ave SE
Renton, WA 98058
CUP
1808
1/8" = 1'-0"1 Roof PlanN
Description Date
STATE OF WASHINGTON
ARCHITECT
REGISTERED5087
BRADLEY S. MILLER
Miller HayashiArchitects
118 North 35th St. Suite 200
Seattle, Washington 98103
Tel: 206 634 0177
Fax: 206 634 0167
PRELIMINARY COORD SETNOT FOR CONSTRUCTIONARCHITECT'S STAMP
CONSULTANT'S STAMP
CONSULTANT
DATE
PHASE
REVISIONS
2/15/2019
Excel Public Charter
School
16950 116th Ave SE
Renton, WA 98058
CUP
Description Date
K-12 Public Charter
School
7/12/2019
MATERIALS AND FINISHES
SYMBOL DESCRIPTION
PEDESTRIAN C.I.P. CONC. PAVING
BROOM FINISH, SAND-COATED EXP. JOINTS, SAWCUT JOINTS,
SCORING AS INDICATED ON PLAN
PAINTED LINES ON EXISTING ASPHALT PAVING
BIKE RACK, INVERTED U, HOT-DIPPED GALVANIZED STEEL, POWDER COATED.
MODEL BR-3 AVAILABLE FROM FAIRWEATHER SITE FURNISHINGS. GALVANIZED
STEEL FINISH. COLOR: SEMI-GLOSS BLACK.
STONE SLAB: 24" W, 18" HT, 5' LONG, BLACK OR DARK GREY, GRANITE, SAWN
TOP ROUGH CUT SIDES, SEE SPECS
4' HT. CHAINLINK FENCE, REF: ARCH.
NOTES
1.ALL PLANTING AREAS TO RECEIVE 2" OF MULCH.
2.AT GRADE LANDSCAPING AREAS SHALL CONTAIN AT LEAST TWELVE INCHES OF TOPSOIL AT FINISH
GRADE. PLANTING SOIL TO BE AMENDED PER COS 2011 STANDARD PLAN #142
3.ALL LANDSCAPE AREAS TO BE WATERED WITH A PERMANENT AUTOMATIC IRRIGATION SYSTEM.
PLANTING
SYMBOL BOTANICAL NAME/ COMMON NAME SIZE/COND./SPACING
CARPINUS JAPONICA/ JAPANESE HORNBEAM 2" CAL./ B&B/PER PLAN
BETULA POPULIFOLIA 'WHITESPIRE SENIOR'/ WHITESPIRE
SENIOR GRAY BIRCH
2" CAL./ B&B/PER PLAN
PARROTIA PERSICA 'VANESSA'/ PERSIAN IRONWOOD 2" CAL./ B&B/PER PLANDDPOWER LINETOWER BASETOWER BASE
L2.00
1
FENCE/GATE,
REF: ARCH.
15' PARTIALLY SIGHT-OBSCURING
LANDSCAPED VISUAL BARRIER
INTERIOR PARKING
LANDSCAPING, TYP.
2' TYP.
5'
TYP.
2' TYP.PARENT DROP-OFFBUS LOADINGOUTDOOR
PLAY COURTS
PARKING
SWALE, TYP,
POLE MOUNTED
LIGHT FIXTURE,
REF: ARCH
POLE MOUNTED
LIGHT FIXTURE,
REF: ARCH
EX.
POWER
LINE BASE
4' HT. CHAIN
LINK FENCE
4' HT. CHAIN
LINK FENCE
SOD LAWN
5' MULCH RING
@ TREE BASE,
TYP.149'149'149'4'-8"151'-2"398'-9"
83'-9"136'EX.
VEGETATION
TO REMAIN
EX.
VEGETATION
TO REMAIN
4' HT. CHAIN
LINK FENCE
398'-9"217'151'STAT EO F W ASHINGTONNO
.8
.
K A R E N S KIES
T
50 E X PLICENSE
D
LANDS CA P E A RC H ITECT.
1 2 1020/19/111 west john street suite 306
seattle washington 98119
206 323 6032
www.kk-la.com
Karen Kiest
Landscape Architects
STAT EO F W ASHINGTONNO
.8
.
K A R E N S KIES
T
50 E X PLICENSE
D
LANDS CA P E A RC H ITECT.
1 2 1020/19/111 west john street suite 306
seattle washington 98119
206 323 6032
www.kk-la.com
Karen Kiest
Landscape Architects
Miller Hayashi Architects
118 North 35th St.Suite 200
Seattle, Washington 98103
Tel: 206 634 0177
Fax: 206 634 0167
ARCHITECT'S STAMP
CONSULTANT'S STAMP
CONSULTANT
WCSD
Cascade Village
School
17060 116th Ave SE
Renton, WA 98058
PARROTIA PERSICA 'VANESSA'/ PERSIAN IRONWOOD 2" CAL./ B&B/PER PLAN
ACER CIRCINATUM / VINE MAPLE 2" CAL./ B&B/PER PLAN
QUERCUS GARRYANA / GARY OAK 2" CAL./ B&B/PER PLAN
CORYLUS COLURNA/ TURKISH FILBERT 2" CAL./ B&B/PER PLAN
ZELKOVA SERRATA/ JAPANESE ZELKOVA 2" CAL./ B&B/PER PLAN
SHRUBS & GROUNDCOVER
SYMBOL BOTANICAL NAME/ COMMON NAME SIZE/SPACING/ MATURE
HEIGHT
ANDROMEDA POLIFOLIA 'NANA' / NANA BOG ROSEMARY 1 GAL./ 30" O.C./2'
CORNUS STOLONIFERA 'KELSEYII'/ KELSEY'S DOGWOOD 1 GAL./24" O.C./2.5'
JUNCUS EFFUSUS/ COMMON RUSH (50%)1 GAL./ /24" O.C./ 2'
CAREX OBNUPTA/ SLOUGH SEDGE (50%)1 GAL./ /24" O.C./ 2'
ROSA X 'NOASCHNEE' / FLOWER CARPET WHITE
GROUNDCOVER ROSE 1 GAL./ 24" O.C./ 2'
ILEX CRENATA 'CONVEXA' / JAPANESE HOLLY 1 GAL./ 24" O.C./ 4'
VIBURNUM DAVIDII / DAVID'S VIBURNUM 2 GAL./ 36" O.C./ 3'
SPIRAEA X BUMALDA 'DENISTAR' / SUPERSTAR SPIREA 1 GAL./ 24" O.C./ 2'
LONICERA PILEATA / BOXLEAF HONEYSUCKLE 1 GAL./ 30" O.C./ 2'
LIRIOPE SPICATA/ CREEPING LIRIOPE 1 GAL./ 24" O.C./ 2'
MAHONIA AQUIFOLIUM / TALL OREGON GRAPE (25%)1 GAL./ 48" O.C./ 6'
VACCINIUM OVATUM/ EVERGREEN HUCKLBERRY (25%)1 GAL./ 48" O.C. / 6'
VACCINIUM CORYMBOSUM/ HIGHBUSH BLUEBERRY
(25%)5 GAL./ 48" O.C./6'
MORELLA CALIFORNICA/ CALIFORNIA WAX MYRTLE
(25%)5 GAL./ 48" O.C./10'
FRAGARIA CHILOENSIS/ COASTAL STRAWBERRY 1 GAL./ 24" O.C.
FRAGARIA CHILOENSIS/ COASTAL STRAWBERRY 1 GAL./ 24" O.C.
ALL SHRUBS AND GROUNDCOVER SHALL BE CONTAINER
HYDHYDWV
WV
WV WVWV
CTOWER BASEL2.00
3
L2.00
2
BLDG
CANOPY, TYP.
REF: ARCH PARENT DROP-OFFPARENT DROP-OFF
STONE SLAB,
TYP
ENTRY
PLANTING
AREA, TYP..
POLE MOUNTED
LIGHT FIXTURE,
REF: ARCH POLE MOUNTED
LIGHT FIXTURE,
REF: ARCH
EX. POWER LINE
BASEPROPERTY LINE
LEASE
AGREEMENT
SITE
BOUNDARY
GATE,
REF: ARCH.
EX. FENCE
STONE SLAB,
TYP.
MOUNDED
PLANTING
AREA, TYP.1'-9"39'-10"1'-11"42'-2"1'-9"39'-10"37'-3"5' TYP.8' TYP.
13'-11"20'20'18'-6"18'-10"20'39'-5"27'-1"23'-10"19'-1"25'-9"17'18'-10"26'-4"
CONC. PED
PAVING
EX.
VEGETATION
TO REMAIN
EX.
BUILDING
PROPOSED PROJECT
BUILDING216'-6"293'-5"4
1
'
-
8
"
30'-6"PRELIMINARY COORD SETNOT FOR CONSTRUCTIONMIN. 5' PLANTING STRIP IS REQUIRED AROUND THE PERIMETER OF ALL PARKING
FRAGARIA CHILOENSIS/ COASTAL STRAWBERRY 1 GAL./ 24" O.C.
SOD LAWN
CITY OF RENTON 4-4-070 LANDSCAPING
F.4. PROJECTS ABUTTING LESS INTENSIVE ZONES OR USES
c.COMMERCIAL ZONE ABUTTING RESIDENTIAL ZONE: 15' WIDE PARTIALLY SIGHT-OBSCURING
LANDSCAPE VISUAL BARRIER ALONG COMMON PROPERTY LINE
F.6 PARKING LOTS
b.INTERIOR PARKING LOT LANDSCAPING: 25 SF/PARKING STALL
60 STALLS X 25 SF = 1,500 SF REQUIRED
4230 SF PROVIDED, SEE PLAN FOR DIMENSIONS.
H.2 PARTIALLY SIGHT-OBSCURING LANDSCAPED VISUAL BUFFER
MINIMUM 6' HIGH AT MATURITY AT LEAST 50% SIGHT OBSCURING
H.5 INTERIOR PARKING LOT LANDSCAPING
a.TREES SHALL BE 2" DBH. AT LEAST ONE TREE FOR EVERY (6) PARKING STALLS
60 STALLS/6 = (10) TREES REQUIRED
(12) TREES PROVIDED
B.AT MINIMUM (1) SHRUB/20 SF LF LANDSCAPED AREA (50% MAY BE DECIDUOUS)
4230 SF/20 = (212) SHRUBS REQUIRED
(350) SHRUBS PROVIDED
REF: ARCHTECTURAL SITE PLAN FOR PARKING STALL COUNTS AND DIMENSIONSWVWVHYDWVCCGV
G.M.
BIKE RACKS
(TYP. OF 4)
LEASE
AGREEMENT SITE
BOUNDARY
EX.
BUILDING
BUILDING
40'49'-8"23'-5"65'-8"132'-2"2
0
'
-
2
"
C MILLER HAYASHI ARCHITECTS
DATE
PHASE
SHEET TITLE
SHEET NO.
REVISIONS
2/15/19
CUP
1808
Description Date
L1.00A
Landscape
Plan
COLOR
0
scale 1" = 20' - 0"
20 40Landscape Plan1
Excel Public Charter
School
16950 116th Ave SE
Renton, WA 98058
K-12 Public Charter
School
7/12/2019
CONDITIONAL USE PERMIT
TECHNICAL INFORMATION REPORT
Project:WCSD Cascade Village
17060 116th Ave SE
Renton, WA 98057
Prepared For:Miller Hayashi Architects
118 N. 35th St. Suite 200
Seattle, WA 98103
Prepared By:Ryan Yokum, EIT
Reviewed By:Marc Errichetti, PE
Date:February 15, 2018
TRANSPORTATION TECHNICAL REPORT
for
Renton K-12 Charter School
PREPARED FOR:
Washington Charter School Development
PREPARED BY:
6544 NE 61st Street, Seattle, WA 98115
ph: (206) 523-3939 fx: (206) 523-4949
July 15, 2019
February 12, 2019
WCSD 16950 116th Ave SE LLC
107 Spring Street, Suite 4025
Seattle, WA 98104
Attn: Ms. Anna Johnson
(503) 970-7487
Geotechnical Engineering Report
Proposed Building Improvements
17060 – 116th Avenue Southeast
Renton, Washington
PN: 2823059009
Doc ID: WCSD.CascadeVillage.RG
INTRODUCTION
This geotechnical engineering report summarizes our site observations, subsurface
explorations, and engineering analyses and provides geotechnical recommendations and design
criteria for the proposed improvements for the existing building located at 17060 – 116th Avenue
Southeast in Renton, Washington. The site location is shown on the Site Location Map, included as
Figure 1.
Our understanding of the project is based on our conversations with Ms. Anna Johnson with
Washington Charter School Development, our review of the conceptual Site Plan by Miller Hayashi
Architects, LLC dated April 30, 2018, our review of the Survey Plan by Puget Sound Surveying, Inc.
dated October 31, 2017, our December 14, 2018 site visit and subsurface explorations, and our
experience in the City of Renton area.
We understand that the development will consist of a structural retrofit of the existing
building and improvements to the parking area. You are proposing to convert the old grocery store
into a new school building that will include a new awning area in the front and a playground area in
the existing parking area. You are currently planning to keep the existing building and its
foundations. Portions of the current parking area that is impervious will be converted to landscape
areas. We anticipate that any new additions or structures will be a one or two-story, steel framed
structure likely founded on conventional shallow foundations, similar to the existing building. The
site is currently developed with a storm system and all other typical utilities and you are not
proposing to increase the impervious area at the site and are actually decreasing it.
C H A R T E R S C H O O LK-1 2 P U B L I C
C H A R T E R S C H O O LK-1 2 P U B L I C
K-12 Public Charter
School
7/12/2019