July 3, 2019
Hand Delivery
Ms. Angelea Weihs
City of Renton
Department of Community
and Economic Development
1055 South Grady Way
Renton, WA 98057
RE:Site Plan Review
Brown Bear Carwash - Auto Sentry Addition
77 RainierAvenue, Renton, Washington 98057
OurJob No.20696
Dear Ms. Weihs:
On behalf of our client Car Wash Enterprises, lnc., Barghausen Consulting Engineers, lnc. is submitting
the required application forms, plans, and supporting documentation for a Site Plan Review to allow for
the expansion of the addition of the Auto Sentry. The project includes the addition of a 27- by 20-foot
Auto Sentry canopy structure for unattended, point-of-sale transactions. Additional site improvements
include the addition of a trash enclosure, asphalt paving and striping, new curbing, and perimeter and
interior landscaping. The existing automotive service station will be demolished and replaced with new
paving and landscaping.
The following items are enclosed for your review:
1. One (1) PDF copy of the Pre-Application Meeting Summary prepared by the City of Renton
dated February 22,2018
2. One (1) PDF copy of the Waiver Form prepared by the City of Renton dated April 4,2018
3. One (1) PDF copy of the Land Use Permit Master Application
4. One (1) PDF copy of the Project Narrative prepared by Barghausen Consulting Engineers,
lnc. dated July 2,2019, including:
a. Construction Mitigation Description
b. Urban Center Design Report
5. One (1) PDF copy of the Environmental Checklist prepared by Carwash Enterprises, lnc.
dated March 01,2018
6. One (1) PDF copy of the Title Report prepared by Chicago Title lnsurance Company dated
May 14,2A19
7. One (1) PDF copy of the Affidavit of lnstallation of Public lnformation Sign
8. One (1) PDF copy of the photo depicting the location of the Public lnformation Sign
BARGHAUSEN CONSULTING ENGINEERS, INC.
18215 72ND AVENUE SOUTH KENT, WA 98032 Pl 425-251-6222 F\ O5-29-A7A2
BRANCH OFFICES: TUMWATER, WA KLAMATH FALLS, OR LONC BEACH, CA ROSEVILLE, CA SAN DIECO, CA
barghausen.com
Ms. Angelea Weihs
City of Renton
Department of Community
and Economic Development July 3, 2019
L One (l ) PDF copy of the Neighborhood Detail Map
10. One (1) PDF copy of the Preliminary Site Plan prepared by Barghausen Consulting
Engineers, lnc. dated June 14, 2019
11. One (1) PDF copy of the Preliminary Grading Plan with Demo Exhibit prepared by
Barghausen Consulting Engineers, lnc. dated July 2,2019
12. One (1) PDF copy of the Architectural Elevations, including Screening Details for Refuse,
prepared by Barghausen Consulting Engineers, lnc. dated May 3l ,2019
13. One (1) PDF copy of the Landscape Plan, including the Landscape Analysis prepared by
Bradley Design Group, lnc. dated April 16,2018
14. One (1) PDF copy of the ALTA/NSPS Land Title Survey prepared by Barghausen Consulting
Engineers, lnc. dated May 6, 2019
'15. One (1) PDF copy of the Geologic Hazard Report prepared by Zipper Geo Associates dated
July 27,2018
16. One (1) PDF copy of the Letter of Geologic Risk dated June 28, 2019
17. One (1) PDF copy of the Drainage Report (TlR) prepared by Barghausen Consulting
Engineers, lnc. July 2,2019
18. One (1 ) PDF copy of the Colored Maps for Display, including
a. Colored Preliminary Site Plan
b. Colored Landscape Plan
We believe that the enclosed plans and technical documents make up complete applications. Should you
have any questions or require additional documentation, please contact me al (425) 251-6222 or by email
at m brasel@barghausen.com.
Sincerely,
fb¿ a/.-*
Nick A. Wecker
Senior Planner
NAW/lb [20696c.001 .doc]enc: As Notedcc: Mr. Joe Guiseffi, CarWash Enterprises, lnc.
Mr. Jay S. Grubb, Barghausen Consulting Engineers, lnc.
Mr. Chris S. Ferko, Barghausen Consulting Engineers, lnc.
Ms. Mettie Brasel, Barghausen Consulting Engineers, lnc.
Anthony E. Merlino, Barghausen Consulting Engineers, lnc.
-2-