Loading...
HomeMy WebLinkAboutCA_Stormwater Assessment_5626 NE 2nd Street_190716_v3.pdfSURFACE WATER UTILITY jfarah 09/10/2019 DEVELOPMENT ENGINEERING jchavez 09/24/2019 Table of Contents · Section 1: Project Overview · Section 2: Conditions and Requirements Summary · Section 3: Special Studies and Reports TIR Section 1: Project Overview This proposed project is to build a new single-family residence on the subject property located at the northwest corner of the intersection of NE 2nd Street and Nile Avenue NE. The construction of this new residence requires frontage improvements to be installed along a portion of Nile Avenue NE and NE 2nd Street. The frontage improvements together with the proposed new residence and driveway creates the need for this Report. The frontage improvements consist of a 5’ sidewalk and 8’ landscape strip along Nile Avenue NE and vertical curb, gutter, pavement widening, 5’ sidewalk, 8’ landscape strip and storm drainage installation on NE 2nd Street . The property is a vacant parcel covered with heavy under story and several trees. The proposed developed property with the frontage improvement area breaks down as follows: Area of Frontage = 3,874 square feet Proposed Improvements: vertical curb, gutter and approach 305 sq. ft. 5’ sidewalk 1,019 sq. ft. new pavement 702 sq. ft. new ADA ramps 165 sq. ft. Area Impervious = 2,191 square feet Area Pervious = 1,783 square feet Total proposed Impervious = 2,191 square feet Project will install a new type 1 catch basin and 12” storm pipe. Determine type of Drainage Review Required using Figure 1.1.2.A. from the Renton Surface Water Design Manual (RSWDM). From Figure 1.1.2.A, Targeted Drainage Review Category #2 is required. YESYESYES5626 NE 2nd StreetYESYES TIR Section 2: Conditions and Requirement Summary Section 1.2 Core Requirements Core Requirement #1: Discharge at Natural Location The subject property has a two separate Threshold Discharge Areas (TDA). TDA #1 is the west side of Nile Avenue NE which flows into the existing gutter on the west side of Nile and is collected within the City catch basins on the west flow line of the street and then flows to the east into a neighboring development. The basin break is created at half-delta of the curb return on the northwest corner of Nile Avenue NE and NE 2nd Street. The developed contributing area within TDA #1 is: 545 square feet of new 5’ sidewalk, 140 square feet for two new ADA ramps, and 117 square feet of new vertical curb, gutter, and paving. The proposed impervious area within TDA #1 is 802 square feet. The developed impervious surfaces within this TDA #1 is below the threshold for review (2,000 square feet), therefore no further review is required in this Threshold Discharge Area. Threshold Discharge Area TDA #2 is the north side of NE 2nd Street. This TDA flows into a broad ditch on the north side of NE 2nd Street then flow through culverts and ditches towards the west. This system consists of open ditches and driveway culverts before flowing into the City storm system near Lyon Avenue NE. This TDA will collect the runoff form the new residence, driveway, and frontage improvements on NE 2nd Street. The proposed development and frontage improvements will discharge into the existing ditch system on the north side of NE 2nd Street; which is the natural discharge area for this TDA. The proposed basin breakdown of this TDA #2 is: 25 square feet ADA temp. ramp, 474 square feet of new 5’ sidewalk, 890 square feet of new vertical curb, gutter, approach and paving. The proposed new impervious surfaces on the lot are proposed to discharge into this TDA. The on-site proposed hard surfaces total 3,040 square feet. Therefore, the total proposed impervious surfaces within this TDA is 4,429 square feet. Core Requirement #2: Offsite Analysis TDA #2: The upper grade break of this Threshold Discharge Area is at half-delta on the northwest corner of the intersection of Nile Avenue NE and NE 2nd Street. From this point, the TDA boundary is created by the centerline of NE 2nd Street; the flow is collected within the “broad” ditch area on the north side of NE 2nd Street and flows to the west. At the west end of the subject property is an existing 12” concrete culvert cross 42 feet to the west. This culvert allows the driveway area of the neighboring property to cross over the ditch. The flow continues on the north side of NE 2nd Street within an open ditch and another 12” CMP pipe used as a driveway culvert for the neighbor to the west. There were no signs of overtopping or erosion within this open ditch section at the time of a field visit in April 2019. The flow continues west and enters the City storm conveyance system at the intersection of NE 2nd Street and Lyons avenue NE. Core Requirement #5: Erosion and Sediment Control A Temporary Erosion and Sediment Control Plan has been designed and provided as part of building permit application for the new residence. A copy of the submitted plan and details are herein. Core Requirement #6: Maintenance and Operations The frontage improvements consisting of vertical curb and gutter, sidewalks, ADA ramps, landscaping, storm drainage pipe and catch basins are located within existing public right- of-way. the City of Renton is responsible for maintenance and operations of these new facilities once accepted by the City. Core Requirement # 7: Financial Guarantees and Liability Financial Guarantees and Liabilities will be provided to the City of Renton as part of the issuance of the utility construction permit to construct the frontage improvements. A Bond Quantity worksheet has been attached to this Section for review and approval. CED Permit #:UnitReference #PriceUnitQuantity CostBackfill & compaction-embankmentESC-16.50$ CY75487.50Check dams, 4" minus rockESC-2SWDM 5.4.6.380.00$ Each Catch Basin ProtectionESC-335.50$ EachCrushed surfacing 1 1/4" minusESC-4WSDOT 9-03.9(3)95.00$ CY DitchingESC-59.00$ CY Excavation-bulkESC-62.00$ CY Fence, siltESC-7SWDM 5.4.3.11.50$ LFFence, Temporary (NGPE)ESC-81.50$ LF Geotextile FabricESC-92.50$ SY Hay Bale Silt TrapESC-100.50$ Each HydroseedingESC-11SWDM 5.4.2.40.80$ SYInterceptor Swale / DikeESC-121.00$ LF Jute MeshESC-13SWDM 5.4.2.23.50$ SY Level SpreaderESC-141.75$ LF Mulch, by hand, straw, 3" deepESC-15SWDM 5.4.2.12.50$ SY4201,050.00Mulch, by machine, straw, 2" deepESC-16SWDM 5.4.2.12.00$ SY Piping, temporary, CPP, 6"ESC-1712.00$ LF Piping, temporary, CPP, 8"ESC-1814.00$ LF Piping, temporary, CPP, 12"ESC-1918.00$ LF Plastic covering, 6mm thick, sandbaggedESC-20SWDM 5.4.2.34.00$ SY Rip Rap, machine placed; slopesESC-21WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22SWDM 5.4.4.11,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23SWDM 5.4.4.13,200.00$ Each Sediment pond riser assemblyESC-24SWDM 5.4.5.22,200.00$ Each Sediment trap, 5' high berm ESC-25SWDM 5.4.5.119.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26SWDM 5.4.5.170.00$ LF Seeding, by handESC-27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC-28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC-29SWDM 5.4.2.510.00$ SY TESC SupervisorESC-30110.00$ HR2220.00Water truck, dust controlESC-31SWDM 5.4.7140.00$ HR UnitReference #PriceUnitQuantity Cost30.00$ Lin. Feet EROSION/SEDIMENT SUBTOTAL:1,757.50SALES TAX @ 10%175.75EROSION/SEDIMENT TOTAL:1,933.25(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)Tree Protection Fencing WRITE-IN-ITEMS Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostGENERAL ITEMS Backfill & Compaction- embankmentGI-16.00$ CYBackfill & Compaction- trenchGI-29.00$ CYClear/Remove Brush, by hand (SY)GI-31.00$ SYBollards - fixedGI-4240.74$ EachBollards - removableGI-5452.34$ EachClearing/Grubbing/Tree RemovalGI-610,000.00$ Acre0.11,000.00Excavation - bulkGI-72.00$ CYExcavation - TrenchGI-85.00$ CYFencing, cedar, 6' highGI-920.00$ LFFencing, chain link, 4'GI-1038.31$ LFFencing, chain link, vinyl coated, 6' highGI-1120.00$ LFFencing, chain link, gate, vinyl coated, 20' GI-121,400.00$ EachFill & compact - common barrowGI-1325.00$ CYFill & compact - gravel baseGI-1427.00$ CYFill & compact - screened topsoilGI-1539.00$ CYGabion, 12" deep, stone filled mesh GI-1665.00$ SYGabion, 18" deep, stone filled mesh GI-1790.00$ SYGabion, 36" deep, stone filled meshGI-18150.00$ SYGrading, fine, by handGI-192.50$ SY5201,300.00Grading, fine, with graderGI-202.00$ SYMonuments, 3' LongGI-21250.00$ EachSensitive Areas SignGI-227.00$ EachSodding, 1" deep, sloped groundGI-238.00$ SYSurveying, line & gradeGI-24850.00$ Day1.51,275.00Surveying, lot location/linesGI-251,800.00$ AcreTopsoil Type A (imported)GI-2628.50$ CY601,710.00Traffic control crew ( 2 flaggers )GI-27120.00$ HRTrail, 4" chipped woodGI-288.00$ SYTrail, 4" crushed cinderGI-299.00$ SYTrail, 4" top courseGI-3012.00$ SYConduit, 2"GI-315.00$ LFWall, retaining, concreteGI-3255.00$ SFWall, rockeryGI-3315.00$ SFSUBTOTAL THIS PAGE:5,285.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI-130.00$ SYAC Grinding, 4' wide machine 1000-2000syRI-216.00$ SYAC Grinding, 4' wide machine > 2000syRI-310.00$ SYAC Removal/DisposalRI-435.00$ SY321,120.00Barricade, Type III ( Permanent )RI-556.00$ LFGuard RailRI-630.00$ LFCurb & Gutter, rolledRI-717.00$ LFCurb & Gutter, verticalRI-812.50$ LFCurb and Gutter, demolition and disposalRI-918.00$ LFCurb, extruded asphaltRI-105.50$ LFCurb, extruded concreteRI-117.00$ LFSawcut, asphalt, 3" depthRI-121.85$ LF144266.40Sawcut, concrete, per 1" depthRI-133.00$ LFSealant, asphaltRI-142.00$ LF144288.00Shoulder, gravel, 4" thickRI-1515.00$ SYSidewalk, 4" thickRI-1638.00$ SY1144,332.00Sidewalk, 4" thick, demolition and disposalRI-1732.00$ SYSidewalk, 5" thickRI-1841.00$ SY9369.00Sidewalk, 5" thick, demolition and disposalRI-1940.00$ SYSign, Handicap RI-2085.00$ EachStriping, per stallRI-217.00$ EachStriping, thermoplastic, ( for crosswalk )RI-223.00$ SFStriping, 4" reflectorized lineRI-230.50$ LFAdditional 2.5" Crushed SurfacingRI-243.60$ SYHMA 1/2" Overlay 1.5" RI-2514.00$ SYHMA 1/2" Overlay 2"RI-2618.00$ SYHMA Road, 2", 4" rock, First 2500 SYRI-2728.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SYRI-2821.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI-2945.00$ SY783,510.00HMA Road, 4", 6" rock, Qty. over 2500 SYRI-3037.00$ SYHMA Road, 4", 4.5" ATBRI-3138.00$ SYGravel Road, 4" rock, First 2500 SYRI-3215.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI-3310.00$ SYThickened EdgeRI-348.60$ LFSUBTOTAL THIS PAGE:9,885.40(B)(C)(D)(E)Page 2 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)PARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrowPL-121.00$ SY2" AC, 1.5" top course & 2.5" base coursePL-228.00$ SY4" select borrowPL-35.00$ SY1.5" top course rock & 2.5" base coursePL-414.00$ SYSUBTOTAL PARKING LOT SURFACING:(B)(C)(D)(E)LANDSCAPING & VEGETATIONNo.Street TreesLA-1250.00$ each61,500.00Median LandscapingLA-2Right-of-Way LandscapingLA-312.00$ SY3203,840.00Wetland LandscapingLA-4SUBTOTAL LANDSCAPING & VEGETATION:5,340.00(B)(C)(D)(E)TRAFFIC & LIGHTINGNo.SignsTR-1650.00$ eachStreet Light System ( # of Poles)TR-24,800.00$ eachTraffic SignalTR-3Traffic Signal ModificationTR-4SUBTOTAL TRAFFIC & LIGHTING:(B)(C)(D)(E)WRITE-IN-ITEMSConcrete removal50.00$ SY11550.00ADA ramps550.00$ each31,650.00SUBTOTAL WRITE-IN ITEMS:2,200.00STREET AND SITE IMPROVEMENTS SUBTOTAL:22,710.40SALES TAX @ 10%2,271.04STREET AND SITE IMPROVEMENTS TOTAL:24,981.44(B)(C)(D)(E)Page 3 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/DD-126.00$ SY* (CBs include frame and lid)BeehiveD-290.00$ EachThrough-curb Inlet FrameworkD-3400.00$ EachCB Type ID-41,500.00$ Each23,000.00CB Type ILD-51,750.00$ EachCB Type II, 48" diameterD-62,300.00$ Each for additional depth over 4' D-7480.00$ FTCB Type II, 54" diameterD-82,500.00$ Each for additional depth over 4'D-9495.00$ FTCB Type II, 60" diameterD-102,800.00$ Each for additional depth over 4'D-11600.00$ FTCB Type II, 72" diameterD-126,000.00$ Each for additional depth over 4'D-13850.00$ FTCB Type II, 96" diameterD-1414,000.00$ Each for additional depth over 4'D-15925.00$ FTTrash Rack, 12"D-16350.00$ EachTrash Rack, 15"D-17410.00$ EachTrash Rack, 18"D-18480.00$ EachTrash Rack, 21"D-19550.00$ EachCleanout, PVC, 4"D-20150.00$ EachCleanout, PVC, 6"D-21170.00$ Each193,230.00Cleanout, PVC, 8"D-22200.00$ EachCulvert, PVC, 4" D-2310.00$ LFCulvert, PVC, 6" D-2413.00$ LFCulvert, PVC, 8" D-2515.00$ LFCulvert, PVC, 12" D-2623.00$ LFCulvert, PVC, 15" D-2735.00$ LFCulvert, PVC, 18" D-2841.00$ LFCulvert, PVC, 24"D-2956.00$ LFCulvert, PVC, 30" D-3078.00$ LFCulvert, PVC, 36" D-31130.00$ LFCulvert, CMP, 8"D-3219.00$ LFCulvert, CMP, 12"D-3329.00$ LFSUBTOTAL THIS PAGE:6,230.00(B)(C)(D)(E)Quantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESPage 1 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, CMP, 15"D-3435.00$ LFCulvert, CMP, 18"D-3541.00$ LFCulvert, CMP, 24"D-3656.00$ LFCulvert, CMP, 30"D-3778.00$ LFCulvert, CMP, 36"D-38130.00$ LFCulvert, CMP, 48"D-39190.00$ LFCulvert, CMP, 60"D-40270.00$ LFCulvert, CMP, 72"D-41350.00$ LFCulvert, Concrete, 8"D-4242.00$ LFCulvert, Concrete, 12"D-4348.00$ LFCulvert, Concrete, 15"D-4478.00$ LFCulvert, Concrete, 18"D-4548.00$ LFCulvert, Concrete, 24"D-4678.00$ LFCulvert, Concrete, 30"D-47125.00$ LFCulvert, Concrete, 36"D-48150.00$ LFCulvert, Concrete, 42"D-49175.00$ LFCulvert, Concrete, 48"D-50205.00$ LFCulvert, CPE Triple Wall, 6" D-5114.00$ LFCulvert, CPE Triple Wall, 8" D-5216.00$ LFCulvert, CPE Triple Wall, 12" D-5324.00$ LFCulvert, CPE Triple Wall, 15" D-5435.00$ LFCulvert, CPE Triple Wall, 18" D-5541.00$ LFCulvert, CPE Triple Wall, 24" D-5656.00$ LFCulvert, CPE Triple Wall, 30" D-5778.00$ LFCulvert, CPE Triple Wall, 36" D-58130.00$ LFCulvert, LCPE, 6"D-5960.00$ LFCulvert, LCPE, 8"D-6072.00$ LFCulvert, LCPE, 12"D-6184.00$ LFCulvert, LCPE, 15"D-6296.00$ LFCulvert, LCPE, 18"D-63108.00$ LFCulvert, LCPE, 24"D-64120.00$ LFCulvert, LCPE, 30"D-65132.00$ LFCulvert, LCPE, 36"D-66144.00$ LFCulvert, LCPE, 48"D-67156.00$ LFCulvert, LCPE, 54"D-68168.00$ LFSUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 2 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, LCPE, 60"D-69180.00$ LFCulvert, LCPE, 72"D-70192.00$ LFCulvert, HDPE, 6"D-7142.00$ LFCulvert, HDPE, 8"D-7242.00$ LFCulvert, HDPE, 12"D-7374.00$ LFCulvert, HDPE, 15"D-74106.00$ LFCulvert, HDPE, 18"D-75138.00$ LFCulvert, HDPE, 24"D-76221.00$ LFCulvert, HDPE, 30"D-77276.00$ LFCulvert, HDPE, 36"D-78331.00$ LFCulvert, HDPE, 48"D-79386.00$ LFCulvert, HDPE, 54"D-80441.00$ LFCulvert, HDPE, 60"D-81496.00$ LFCulvert, HDPE, 72"D-82551.00$ LFPipe, Polypropylene, 6"D-8384.00$ LFPipe, Polypropylene, 8"D-8489.00$ LFPipe, Polypropylene, 12"D-8595.00$ LFPipe, Polypropylene, 15"D-86100.00$ LFPipe, Polypropylene, 18"D-87106.00$ LFPipe, Polypropylene, 24"D-88111.00$ LFPipe, Polypropylene, 30"D-89119.00$ LFPipe, Polypropylene, 36"D-90154.00$ LFPipe, Polypropylene, 48"D-91226.00$ LFPipe, Polypropylene, 54"D-92332.00$ LFPipe, Polypropylene, 60"D-93439.00$ LFPipe, Polypropylene, 72"D-94545.00$ LFCulvert, DI, 6"D-9561.00$ LFCulvert, DI, 8"D-9684.00$ LFCulvert, DI, 12"D-97106.00$ LF141,484.00Culvert, DI, 15"D-98129.00$ LFCulvert, DI, 18"D-99152.00$ LFCulvert, DI, 24"D-100175.00$ LFCulvert, DI, 30"D-101198.00$ LFCulvert, DI, 36"D-102220.00$ LFCulvert, DI, 48"D-103243.00$ LFCulvert, DI, 54"D-104266.00$ LFCulvert, DI, 60"D-105289.00$ LFCulvert, DI, 72"D-106311.00$ LFSUBTOTAL THIS PAGE:1,484.00(B)(C)(D)(E)Page 3 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESSpecialty Drainage ItemsDitching SD-19.50$ CYFlow Dispersal Trench (1,436 base+)SD-328.00$ LF French Drain (3' depth)SD-426.00$ LFGeotextile, laid in trench, polypropyleneSD-53.00$ SYMid-tank Access Riser, 48" dia, 6' deepSD-62,000.00$ EachPond Overflow SpillwaySD-716.00$ SYRestrictor/Oil Separator, 12"SD-81,150.00$ EachRestrictor/Oil Separator, 15"SD-91,350.00$ EachRestrictor/Oil Separator, 18"SD-101,700.00$ EachRiprap, placedSD-1142.00$ CYTank End Reducer (36" diameter)SD-121,200.00$ EachInfiltration pond testingSD-13125.00$ HRPermeable PavementSD-14Permeable Concrete SidewalkSD-15Culvert, Box __ ft x __ ftSD-16SUBTOTAL SPECIALTY DRAINAGE ITEMS:(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention PondSF-1Each Detention TankSF-2Each Detention VaultSF-3Each Infiltration PondSF-4Each Infiltration TankSF-5Each Infiltration VaultSF-6Each Infiltration TrenchesSF-7Each Basic Biofiltration SwaleSF-8Each Wet Biofiltration SwaleSF-9Each WetpondSF-10Each WetvaultSF-11Each Sand FilterSF-12Each Sand Filter VaultSF-13Each Linear Sand FilterSF-14Each Proprietary FacilitySF-15Each Bioretention FacilitySF-16Each SUBTOTAL STORMWATER FACILITIES:(B)(C)(D)(E)Page 4 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESWRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)WI-1WI-2WI-3WI-4WI-5WI-6WI-7WI-8WI-9WI-10WI-11WI-12WI-13WI-14WI-15SUBTOTAL WRITE-IN ITEMS:DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:6,230.00SALES TAX @ 10%623.00DRAINAGE AND STORMWATER FACILITIES TOTAL:6,853.00(B) (C) (D) (E)Page 5 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostConnection to Existing WatermainW-12,000.00$ EachDuctile Iron Watermain, CL 52, 4 Inch DiameterW-250.00$ LFDuctile Iron Watermain, CL 52, 6 Inch DiameterW-356.00$ LFDuctile Iron Watermain, CL 52, 8 Inch DiameterW-460.00$ LFDuctile Iron Watermain, CL 52, 10 Inch DiameterW-570.00$ LFDuctile Iron Watermain, CL 52, 12 Inch DiameterW-680.00$ LFGate Valve, 4 inch DiameterW-7500.00$ EachGate Valve, 6 inch DiameterW-8700.00$ EachGate Valve, 8 Inch DiameterW-9800.00$ EachGate Valve, 10 Inch DiameterW-101,000.00$ EachGate Valve, 12 Inch DiameterW-111,200.00$ EachFire Hydrant AssemblyW-124,000.00$ EachPermanent Blow-Off AssemblyW-131,800.00$ EachAir-Vac Assembly, 2-Inch DiameterW-142,000.00$ EachAir-Vac Assembly, 1-Inch DiameterW-151,500.00$ EachCompound Meter Assembly 3-inch DiameterW-168,000.00$ EachCompound Meter Assembly 4-inch DiameterW-179,000.00$ EachCompound Meter Assembly 6-inch DiameterW-1810,000.00$ EachPressure Reducing Valve Station 8-inch to 10-inchW-1920,000.00$ EachWATER SUBTOTAL:SALES TAX @ 10%WATER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostClean OutsSS-11,000.00$ EachGrease Interceptor, 500 gallonSS-28,000.00$ EachGrease Interceptor, 1000 gallonSS-310,000.00$ EachGrease Interceptor, 1500 gallonSS-415,000.00$ EachSide Sewer Pipe, PVC. 4 Inch DiameterSS-580.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS-695.00$ LFSewer Pipe, PVC, 8 inch DiameterSS-7105.00$ LFSewer Pipe, PVC, 12 Inch DiameterSS-8120.00$ LFSewer Pipe, DI, 8 inch DiameterSS-9115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS-10130.00$ LFManhole, 48 Inch DiameterSS-116,000.00$ EachManhole, 54 Inch DiameterSS-136,500.00$ EachManhole, 60 Inch DiameterSS-157,500.00$ EachManhole, 72 Inch DiameterSS-178,500.00$ EachManhole, 96 Inch DiameterSS-1914,000.00$ EachPipe, C-900, 12 Inch DiameterSS-21180.00$ LFOutside DropSS-241,500.00$ LSInside DropSS-251,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS-26Lift Station (Entire System)SS-27LSSANITARY SEWER SUBTOTAL:SALES TAX @ 10%SANITARY SEWER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right-of-Way Improvements Subtotal (b)(b)24,981.44$ Future Public Improvements Subtotal(c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d)(d)6,853.00$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond6,366.89$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. EST1((b) + (c) + (d)) x 20%-$ MAINTENANCE BOND */**(after final acceptance of construction)1,933.25$ 24,981.44$ 44,325.16$ 1,933.25$ -$ 6,853.00$ -$ 46,258.41$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS7/16/2019Darrell L. Offe, Jr.#27460Offe Engineers, PLLCR((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R - S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)425-260-3412darrell.offe@comcast.net5626 NE 2nd Frontage Improvements 5626 NE 2nd Street144450-0070FOR APPROVAL 13932 SE 159th PlacePage 1 of 1Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/16/2019 Section 1.3 Special Requirements Special Requirement #4: Source Control The proposed project does not require a commercial building or commercial site development permit. TIR Section 3: Special Studies and Reports Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 www.cobaltgeo.com (206) 331-1097 February 4, 2019 Mr. Bob Wenzl bob@tuscanywa.com RE: Stormwater Feasibility Evaluation Proposed Single-Family Residence 56xx NE 2nd Street Parcel No. 1444500070 Renton, Washington Dear Mr. Wenzl, In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our stormwater feasibility evaluation at the referenced site. The purpose of our evaluation was to determine the feasibility of utilizing infiltration devices for stormwater runoff management from new impervious surfaces. Site and Project Description The site is located at the northwest corner of the intersection between NE 2 nd Street and 148th Avenue SE in Renton, Washington. The site consists of one rectangular parcel with a total area of 9,591 square feet. The site area is currently undeveloped and vegetated with grasses, ferns, ivy, blackberry vines, various herbs/shrubs, along with Fir, Alder, Cedar, Maple, and other trees. The site area generally slopes downward toward the east at magnitudes of less than 10 percent and relief of about 6 feet . The site is bordered to the north and west by residences, to the east by 148th Avenue SE and to the south by NE 2nd Street. The project includes construction of a single-family residence with access driveway. Stormwater will be managed through dispersion, infiltration, or other shallow devices depending on feasibility. Area Geology The Geologic Map of King County indicates that the site is underlain by Vashon Glacial Till. Vashon Glacial Till is typically characterized by an unsorted, non-stratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden and incorporated by the glacial ice. February 4, 2019 Page 2 of 3 Stormwater Feasibility Evaluation www.cobaltgeo.com (206) 331-1097 Soil & Groundwater Conditions As part of our evaluation, we excavated one test pit within the site area to determine the shallow soil and groundwater conditions. The test pit encountered approximately 2 feet of topsoil and vegetation underlain by approximately 1 foot of loose to medium dense, silty -fine to fine grained sand with gravel (Weathered Glacial Till). This layer was underlain by dense to very dense, silty-fine to medium grained sand with gravel (Glacial Till), which continued to the termination depth of the test pit. The unweathered glacial till was well cemented and should be considered nearly impermeable. Groundwater was not encountered in the exploration during our investigation. We returned on January 15, 2019 to excavate a shallow hand boring to determine if groundwater was present. We observed light seepage at 2 feet below grade in the area of TP-1. Based on the cemented nature of the underlying unweathered glacial till, we anticipate that perched groundwater will likely be present during late -winter and early-spring months approximately 2 to 4 feet below existing site elevations. Stormwater Management Feasibility The site is underlain by glacial till which typically has a very low permeability. Groundwater was encountered at 2 feet below existing site elevations in January 2019. Infiltration is not feasible at this site due to a lack of clearance above groundwater or an impermeable layer (glacial till). A minimum 12 inch clearance is required above groundwater for infiltration systems. The measured infiltration rate at 12 inches below grade was 0.22 inches per hour taking into account correction factors for variability, testing, and influent control. Due to the soil and groundwater conditions, we do not recommend any infiltrat ion BMP’s be used at the site. We recommend utilizing dispersion trenches with limited flowpaths; or, if there is inadequate space for dispersion, direct-connection to City infrastructure using a perforated connection. Erosion and Sediment Control Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site:  Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP’s), grading activities can be completed during the wet season (generally October through April).  All site work should be completed and stabilized as quickly as possible.  Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. February 4, 2019 Page 3 of 3 Stormwater Feasibility Evaluation www.cobaltgeo.com (206) 331-1097  Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Closure The information presented herein is based upon professional interpretation utilizing standard practices and a degree of conservatism deemed proper for this project. We emphasize that this report is valid for this project as outlined above and for the current site conditions, and should not be used for any other site Sincerely, Cobalt Geosciences, LLC Exp. 6/26/2020 Phil Haberman, PE, LG, LEG Principal PH/sc N Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com SITE PLAN FIGURE 1 TP-1 Proposed Residence 56xx NE 2nd Street Renton, Washington TP-1 Subject Property PT Well-graded gravels, gravels, gravel-sand mixtures, little or no fines Poorly graded gravels, gravel-sand mixtures, little or no fines Silty gravels, gravel-sand-silt mixtures Clayey gravels, gravel-sand-clay mixtures Well-graded sands, gravelly sands, little or no fines COARSE GRAINED SOILS (more than 50% retained on No. 200 sieve) Primarily organic matter, dark in color, and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427)HIGHLY ORGANIC SOILS FINE GRAINED SOILS (50% or more passes the No. 200 sieve) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION Gravels (more than 50% of coarse fraction retained on No. 4 sieve) Sands (50% or more of coarse fraction passes the No. 4 sieve) Silts and Clays (liquid limit less than 50) Silts and Clays (liquid limit 50 or more) Organic Inorganic Organic Inorganic Sands with Fines (more than 12% fines) Clean Sands (less than 5% fines) Gravels with Fines (more than 12% fines) Clean Gravels (less than 5% fines) Unified Soil Classification System (USCS) Poorly graded sand, gravelly sands, little or no fines Silty sands, sand-silt mixtures Clayey sands, sand-clay mixtures Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays Organic silts and organic silty clays of low plasticity Inorganic silts, micaceous or diatomaceous fine sands or silty soils, elastic silt Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay Organic clays of medium to high plasticity, organic silts Moisture Content Definitions Grain Size Definitions Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (0.08 mm) Sand -Fine -Medium -Coarse Gravel -Fine -Coarse Cobbles Boulders #200 to #40 (0.08 to 0.4 mm) #40 to #10 (0.4 to 2 mm) #10 to #4 (2 to 5 mm) #4 to 3/4 inch (5 to 19 mm) 3/4 to 3 inches (19 to 76 mm) 3 to 12 inches (75 to 305 mm) >12 inches (305 mm) Classification of Soil Constituents MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by “slightly” compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose 0 to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density Consistency (Coarse Grained Soils) (Fine Grained Soils) N, SPT, Relative Blows/FT Density 0 - 4 Very loose 4 - 10 Loose 10 - 30 Medium dense 30 - 50 Dense Over 50 Very dense N, SPT, Relative Blows/FT Consistency Under 2 Very soft 2 - 4 Soft 4 - 8 Medium stiff 8 - 15 Stiff 15 - 30 Very stiff Over 30 Hard Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Soil Classification Chart Figure C1 Test Pit Logs Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Test Pit TP-1 Date: November 5, 2018 Contractor: Bob Wenzl Depth: 8’ Elevation:Logged By: PH Checked By: SC Groundwater: None Material Description Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 DCP Equivalent N-Value 7 8 9 10 Loose to medium dense, silty-fine to medium grained sand with gravel, mottled yellowish brown to grayish brown, moist.(Wthd. Glacial Till) SM Dense to very dense, silty-fine to medium grained sand with gravel, grayish brown, moist. (Glacial Till) -Well cemented SM End of Test Pit 8’ Topsoil/Forest Duff Proposed Residence 56xx NE 2nd Street Renton, Washington