Minor Franchise Permit: MFP19004112
IVR Number: 19004112
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :07/23/2019Application Date:2923059106Parcel Number:2705 BENSON RD S
Permit Type:09/24/2019Issue Date:Franchise
Permit Work Class:09/23/2020Expiration Date:Minor Utility
Job Number:N.318672Franchise Type:Telephone
Description:Access MH in ROW, install riser on existing utility pole, overlash approx. 334 LF and terminate on private property
CONDITIONS OF OVERHEAD APPROVAL:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines
within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must
be separately submitted to the City, and no construction may take place until the City has approved a traffic control
plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Century Link
shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit
is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be
undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to
underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004112
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Qwest Corp d/b/a CenturyLink
N.318672
Austin Sweeney
253-766-7549
austin.sweeney@centurylink.com
2705 Benson Rd S
CenturyLink to access MH37, place riser on P1, and overlash on P1 – P4.
North Sky Communications 503.582.1263
NORTHSC857Q4 BL.028638
7/23/19Austin Sweeney
MFP19004112
Nathan Janders 7/26/2019
Scott Warlick 9/24/2019
RESTORATION PER CITY OF RENTON STANDARDS
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.318672
North Sky Communications 503.582.1263
Austin Sweeney 253.766.7549
23315 66th Ave S Kent, WA 98032
austin.sweeney@centurylink.com
2705 Benson Rd S
Reset FormPrint Form
Austin Sweeney
Austin Sweeney 7/23/19
MFP19004112
Monday - Friday
8:00AM - 3:00PM Scott Warlick
9/24/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
TRAFFIC CONTROL PLAN
JOB # N. 318672. C. 45
PERMIT #
Comments:
SIGN SPACING
MPH "X"45+ 500'35 350'30 200'25 100'150' Seattle200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAYTAPER 50' TO 100'max
NOT TO
SCALE Comments:
MERGING TAPER LENGTHTAPER ("L") LANE WIDTHL MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 008931, JHUBBARD.TCP@GMAIL.COM
Comments:
PLACE AERIAL FIBER FROM P.A1627017 TO P.A1717770.
ONE-LANE TWO-WAY MOVING TRAFFIC OPERATION.
TRAFFIC HELD FOR ALL ROADWAY CROSSINGS.
RESTRICTED PARKING IN WORK ZONE.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
FLAGGERS WILL MOVE WITH WORK CREW.
FLAGGERS WILL ASSIST WITH DRIVEWAYS.
FLAGGERS WILL ASSIST PEDESTRIANS.
NSPEEDLIMIT
35
DRIVEWAYDRIVEWAY
DRIVEWAY DRIVEWAYDEAD END
NOFROMTOT
OW AWAY AREAPHONE 684
-5444YOUR COMPANY NAME
5
55
-5555 PARKINGR7-T39DRIVEWA
Y11S
H
O
U
L
D
E
R
P
E
D
P
AT
H
SIDEWALK
S 27TH STBENSON
S
H
O
U
L
D
E
R
AERIAL FIBER
PLACEMENT
WORK ZONE
350' TOTAL
P.A1627017
B
E
N
S
O
N
R
D
S
PLACE IN ADVANCE OF WORK ZONE
BENSON RD S @ S 27TH ST
AERIAL FIBER PLACEMENT
ONE-LANE TWO-WAY OPERATION
350' +-350' +-350' +-W20-7ROADWORKAHEADW20-1BEPREPAREDTO STOPW3-436350' +-350' +-350' +-W20-7ROADWORKAHEADW20-1BEPREPAREDTO STOPW3-41111
Date:7/15/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 318672. C. 45
CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.Jeffrey Hubbard
Designed For: CENTURYLINK
Project # N.318672. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 7/15/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________ACCESS RD350' +-350' +-350' +-W20-7ROADWORKAHEADW20-1BEPREPAREDTO STOPW3-4LEGEND
CONES
FLAGGER
POLE
WORK AREA
WORK TRUCK
P.A1717770SIDEWALKSIDEWALKSHOULDER
NOFROMT
OTOW AWAY AREAPHONE 68
4
-5444YOUR C
OMP
ANY NAM
E
55
5-5555 PARKINGR7-T39 NOFROMTOTOW AWAY AREAPHONE
68
4-5444
YOUR
CO
M
PANY NAME
55
5-555
5 PARKINGR7-T39NOFROMTOTOW AWAY AREAPHONE 684-5444YOUR COMPANY NAME 555-5555PARKINGR7-T39RD Swww.invarion.com
MFP19004112
BENSON RD S @ 2705 BENSON RD S
MH-37 ACCESS
SHOULDER WORK
Date:7/15/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 318672. C. 45
CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
TRAFFIC CONTROL PLAN
JOB # N. 318672. C. 45
PERMIT #
Comments:
SIGN SPACING
MPH "X"45+ 500'35 350'30 200'25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAYTAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # 318672. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 7/15/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTHTAPER ("L") LANE WIDTHL MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 008931, JHUBBARD.TCP@GMAIL.COMDRIVEWAYDRIVEWAY 1111
1111 SHOULDERPED P
ATH
BENS
O
N
R
D
S
BENSON RD S 108TH
AVE SESHOULDER
SHOULDER
SIDEWALK
SIDEWALK
350' +-ROADWORKAHEADW20-1350' +-SHOULDERWORKW21-5LEGEND
CONES
S SPOTTER
WORK AREA
WORK TRUCK
MH-37
ACCESS
Comments:
ACCESS MH-37 LOCATED OFF ROADWAY.
THIS WILL BE SHOULDER WORK.
TRAFFIC FLOW IS NOT IMPACTED.
RESTRICTED PARKING IN WORK ZONE.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
WORK ZONE
8' X 125'
S
350' +-ROADWORKAHEADW20-1SPEED
LIMIT
35 N2705
BENSON
RD S
www.invarion.com
MFP19004112
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.10003510000”NVICINITY MAPDRAFTED BY: MOUNTAIN LTD/DL - 07/08/19(+$'4'0)+0''456'2*'0567#462*10'01
Ä(+'.&'0)+0''4/#46+0/%'.41;2*10'01
Ä'/#+.OOEGNTQ["OQWPVCKPNVFEQO5%12'1(914-#6/#0*1.'2.#%'0'9Ä(+0':+56+0)%10&7+66121.'4+5'4721021.'#0&18'4.#5*10':+56+0)%#$.'6121.'2.#%'61**.'#8'52.+%'.112+0/#0*1.'#0&#.112#621.'23N05E29N.318672W26226RNTNWA012705 BENSON RD SRENTON, WA 9805513MFP19004112
TTEE CATV CATV CATV GG TS TS WW S
S SD SD
IRRIG IRRIG C/L C/L R/W R
/W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''4/#46+0/%'.41;2*10'01
Ä'/#+.OOEGNTQ["OQWPVCKPNVFEQODRAFTED BY: MOUNTAIN LTD/DL - 07/08/19(+$'4'0)+0''456'2*'0567#462*10'01
Ä23N05E29N.318672W26226RNTNWA012705 BENSON RD SRENTON, WA 9805523MFP19004112
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''4/#46+0/%'.41;2*10'01
Ä'/#+.OOEGNTQ["OQWPVCKPNVFEQODRAFTED BY: MOUNTAIN LTD/DL - 07/08/19(+$'4'0)+0''456'2*'0567#462*10'01
Ä23N05E29N.318672W26226RNTNWA012705 BENSON RD SRENTON, WA 9805533 EOP EOP R/W R/W R/W R/W R/W C/L C/L C/L C/L R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP T58'62'34'8' PLANTER5' SIDEWALK32'6' SIDEWALK158'120'73'10'DWDWDWDWDWDWDW29230591062705 BENSON RD S63870001401305 S 27TH ST63870001301307 S 27TH ST63870001201405 S 27TH STDW
/*2.#%'(+0':%10&7+66121.'29230590612607 JONES AVE S1234ITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER10+32313924/16617624'A162701729' NEUTRAL & SECONDARY HOA24'-09" STREETLIGHT HOA23', 17' & 14' CATV HOA24' FIBER HOA 22' CTL HOARISRE UP POLE, OVERLASHITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER21+90316924/16619022'-10"A108447330' NEUTRAL & SECONDARY HOA22' CATV HOA22'-10" FIBER HOA21' CTL HOAOVERLASHITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER33+10316924/16620323'-05"A061409326'-07" NEUTRAL HOA26'-02" SECONDARY HOA24'-07" STREETLIGHT HOA22'-04" CATV HOA23'-05" FIBER HOA21' CTL HOAOVERLASHITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER43+83316928/16620629'-05"A171777034' NEUTRAL HOA28' CATV HOA29'-05" FIBER HOA25' CTL HOALEAVE 100' COIL ON POLEOVERLASHT
**2.#%'(+0':%10&7+661**MFP19004112
23315 66th Ave S
Kent, WA 98032
July 9, 2019
City of Renton, Department of Community & Economic Development
1055 South Grady Way
Renton, WA 98057
RE : Variance for overhead installation of communication lines and facilities
To whom it may concern,
This letter is being sent as a revised application for a variance to the undergrounding requirements found in Renton
Municipal Code (RMC) 4-6-090 subsection C which states that “All new electrical or communication facilities shall
be required to be installed underground”. CenturyLink is applying for this aerial variance with proposed re-use of
an existing aerial route due to the build costs of an underground design outweighing the general welfare
consideration implicit with new underground installation:
1. Underground construction would be far more intrusive and be the cause of a greater disturbance to local
residences, when considering noise, duration of work, and pedestrian and vehicle traffic.
2. Placement and overlash of a new fiber optic cable to existing aerial facilities will not cause an adverse
impact to residents. The aerial construction will be complete within a couple of days and CenturyLink will
clean overlashed spans as necessary. In comparison, it can take up to a couple weeks to complete all
placement and restoration with new underground construction.
3. Construction of new underground facilities poses greater risk to existing underground utilities within the
work area – such as sanitary sewer, storm sewer, water, and gas facilities.
4. The cost for underground construction would increase the cost of facility placement about 11.8 times, or
approximately $21.6k, compared to overhead facility placement.
With the approval of the variance, CenturyLink will commence with the coordination and implementation of
overhead facility installation and traffic control as required to ensure public safety. CenturyLink and its contractors
agree to follow the requirements and standards provided by the City of Renton to make certain the safe and efficient
installation of the proposed facilities.
If you have any further questions or concerns regarding this project, please contact Jesse Patjens at 425-429-5722
or Jesse.Patjens@CenturyLink.com.
Sincerely,
Jesse Patjens
Local Network Engineer
Field Operations & Network Implementation
CenturyLink
MFP19004112
September 24, 2019
Jesse Patjens
Qwest Corp d/b/a CenturyLink
23315 66th Ave S
Kent, WA 98032
Via Email: Jesse.Patjens@CenturyLink.com
SUBJECT: Request for Undergrounding Exemption (N.318672, MFP19004112, 2705 Benson Rd S)
Dear Mr. Patjens:
The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
CenturyLink proposes to have North Sky Communications overlash approximately 351 lineal feet of new
24-count aerial fiber to existing Puget Sound Energy (PSE) power poles beginning at 2705 Benson Rd S,
proceeding east across Benson Rd S and continuing along the south side of S 27th ST, then crossing S 27th
ST to the north side ending at 2607 Jones Ave S.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii. City
of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any
telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate
telecommunications facilities in, under, over or across any public way of the City, and to also provide
telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use
of such public ways from the City pursuant to Section 5-19-3 of this Chapter.”
CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a
blanket grant of authority, dating back to territorial times, and therefore has unique status as compared
to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink,
RCW Section 35.99.030 states that a city or town may not require a “master permit” from service
providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link
has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct
and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per
the RCW and Washington State Constitution, cable service is not a right granted without a franchise.
Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not
the provision of future cable.
CenturyLink N.318672
Page 2 of 2
September 24, 2019
In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties;
when costs outweigh the general welfare consideration implicit in underground installation; or, if the
growth pattern of the area has not been sufficiently established to determine the ultimate service routes.
In this instance, the portion of the route proposed for aerial installation is in an area where cost to
underground one utility service will be cost prohibitive.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant for the Project Reach is approved with conditions subject to the conditions
below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i) ii.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1)
any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case Century Link shall participate
in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines.
The new aerial lines must be undergrounded within one year, or approved otherwise by the
City, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, October 8, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Jesse Patjens, CenturyLink Jesse.Patjens@CenturyLink.com
Amy Silbaugh, CenturyLink amy.silbaugh@centurylink.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19004112
Engineering
1 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within
the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Century Link shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines,
or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
2 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
3 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.