NE 114 OF SE 114 OF SEC. 4, TWP. 23 N., RNG. 5 E., W.M.
CITY OF RENTON, STATE OF WASHINGTON
042305-9395
042305-9421
Trn 11 1 rn r. IM.
x x x
EXISTING R.R TIE WALLS
042305-9420
FILTER FABRIC PROTECTION
TREE PROTECTION
CLEARING LIMITS
SILT FENCE
APPROXIMATE CUT/FILL VOLUMES
CUT 50 C. Y.
FILL: 100 C. Y.
DISTURBANCE AREA
0.55 AC.
o W�M�C�
�a
0 4" sT'��° w
�SSION-Al,
8105119
7
REVISED PER SPU
COMMENTS
6
ADDED SPU PIPE SUPPORT PLAN
5
REVISED PER CITY COMMENTS DATED
4111119
4
REVISED PER CITY COMMENTS DATED
3122119
3
REVISED PER CITY COMMENTS DATED
2/1/19
2
REVISED PER CITY COMMENTS DATED
8110118
1
REVISED PER CITY COMMENTS DATED
7130118
N0.
REVISION
042305-9267
042305-9419
042305-9077
10' LANDSCAPE &
PRIVATE DRAINAGE
EASEMENT
CONSTRUCTION SEQUENCE:
LEGEND
1.
PRE -CONSTRUCTION MEETING.
O
FOUND MONUMENT IN CASE
2.
POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE
NUMBER OF ESC SUPERVISOR.
®
FOUND REBAR & CAP
3.
FLAG OR FENCE CLEARING LIMITS.
4.
INSTALL CATCH BASIN PROTECTION IF REQUIRED.
(M)
MEASURED
5.
GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6.
INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
FFE
FINISHED FLOOR ELEVATION
7.
CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE
®
WATER METER
DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT
DEVELOPMENT.
QS
SEWER MANHOLE
8.
MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF
RENTON EROSION AND SEDIMENT CONTROL STANDARDS.
Q❑
STORM MANHOLE
9.
RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR
INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE SO THAT
❑
CATCH BASIN
THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE
CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS.
¢
UTILITY POLE
10.
COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS
DURING THE DRY SEASON OR TWO DAY DURING WET SEASON WITH STRAW,
UTILITY POLE WITH LIGHT
WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT.
11.
STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN 7 DAYS.
STORM LINE
12.
SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE
SEWER LINE
STABILIZED AND BEST MANAGEMENT PRACTICES REMOVED IF APPROPRIATE.
13.
UPON COMPLETION OF THE PROJECT. ALL DISTURBED AREAS MUST BE
WOOD FENCE
STABILIZED AND BMP'S REMOVED, IF APPROPRIATE.
x
WIRE FENCE
�
ROCKERY
CA
DECIDUOUS TREE
NEM
8105119
NEM
NEM
6110119
NEM
NEM
6/7/19
NEM
SURVEYED:
NEM
3/27/19
NEM
DESIGNED:
NEM
3/6/19
NEM
NEM
2119111
NEM
DRAWN:
NEM
91211181
NEM
CHECKED:
I:�'W.Jrr=r►»ca .....
x
0
z
0 5 10 20
SCALE 1 " = 20'
EROSION CONTROL GENERAL NOTES:
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY,
WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING
MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE
FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION
AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE
DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS
PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE
SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE
COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE
AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30TH) OR
SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM
SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL
AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE
COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL
BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
STRUCTURAL NOTES.-
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS
FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE
REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE METHOD OF BANK STABILIZATION AND EROSION CONTROL.
ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY
ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS.
ROCKERIES OUTSIDE OF RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE.
R-401503
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
jchavez 08/12/2019 '
SDM
Ste:
1 = 20'
VERTICAL: NAVD 831
HORIZONTAL: NAD 1983/1991
CITY 0F
H U YN H SHORT R T PLAT
DATE:
8 05 19
/ /
NEM
`
LUA 17- 000855
FIELDBOOK:
RENTON
PAGE:
N/A
LFM
ONE INCH
DATUM
•
Planning/Building/Public Works Dept.
TESC PLAN
DRAWING NO:
17597
NEM
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
CJA
SHEEr.3,
10