Loading...
HomeMy WebLinkAbout9_Construction Mitgation Description.pdfMeadowvue Construction Mitigation Description Preliminary Plat Application Page 1 of 1 CPH Project No. 0035-15-012 Proposed Construction Dates Grading and road construction will start upon approval of construction plans fall of 2017. Hours of Operation for Single Family Construction Site Per City of Renton: Monday – Friday: 7am – 8pm Saturday: 9am – 8pm Sunday: None Proposed Hauling/Transportation Routes All equipment materials and laborers will enter the site off 156th Ave SE. A detailed haul route will be provided by the contractor selected to construct the improvements. It is anticipated that the haul route would be via SR-169 to 154th Pl SE. Heading north on 154th Pl SE the roadway turns into SE 142nd Pl then to 156th Ave SE. The project site is located on the left (west) side of 156th Ave SE. Measures to be implemented to minimize dust, traffic and transportation impacts, mud, noise, and other noxious characteristics Dust: Best management practices will be used to minimize dust on the construction site. Water trucks or metered fire hoses will be used as needed to wet down the areas used by construction equipment. Disturbed slopes will be hydroseeded per the Erosion/Sedimentation Control Plan to control dust. Traffic: During road and building construction, the traffic entering and leaving the site will consist of subcontractors and deliveries. When arriving for work, the subcontractors will be travelling opposite the majority of traffic leaving the Meadowvue Neighborhood, and materials are primarily delivered at off peak hours during the day. None of these operations are anticipated to have a significant impact on the peak or non-peak hour traffic in the area. Any special hours proposed for construction or hauling There are no special hours proposed for construction or hauling without prior approval from the City of Renton. Preliminary Traffic Control Plan General access to the property will be from 156th Ave SE. It is anticipated that the existing roadway will remain open during construction and access to the properties along 156th Ave SE will be maintained. Traffic Control is anticipated to consist of occasional single lane closures along 156th Ave SE. A standard one-lane, two-way traffic control with flaggers may be used similar to WSDOT Plan TC1.