Loading...
HomeMy WebLinkAboutR_401311IRS (V 00 0 N U m 0 c 0 Ll E m Y 0 0 m 0 ca J SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE - APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18 A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10/01/18 P. of WAsh� �f BOE//V� OD x 31271 w� ��ssioNaL ACCEPTABILITY IJDM THIS DESIGN AND/OR CHE( SPECIFICATION IS APPROVED SPT ENGI APPROVED BY DEPT. DATE BEE )AI L SUBTITLE 06/08/18 06/08/18 06/08/18 TITLE OVERALL UTILITY PLAN r_3,Salle] 1■son IIIatonw ot1:0011111roJ:41 RENTON SITE GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. SEE SHEETS G02-G04 FOR GENERAL NOTES. 4. SEE SHEET G07 FOR EXISTING SITE PLAN. 5. SEE SHEET G09 FOR OVERALL SITE PLAN. 6. SEE STORM DRAINAGE PLANS FOR DRAINAGE PLANS AND DETAILS. 7. SEE MECHANICAL PLANS FOR COMPRESSED AIR, FIRE PROTECTION, AND WATER PLANS AND DETAILS. 8. SEE ELECTRICAL PLANS FOR DATA, GROUNDING, AND POWER PLANS AND DETAILS. CONSTRUCTION NOTES FIRE HYDRANT 2� REPLACED UTILITY HARDSTAND NEW OIL/WATER SEPARATOR R::�:- NEW ENHANCED WATER QUALITY TREATMENT VAULT 5� NEW ACTUATED SPILL CONTROL VALVE SLOTTED DRAIN :� SAFE DRAIN CONTAINMENT VALVES B::� SECTION VALVE FUTURE STORM DRAINAGE CONNECTION W-401301 R-401311 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING 01�SURFACE WATER UTILITY afowler 12/20/2018 rStraka 12/20/2018vii W4700331 J" "' n ""' ` 10/01 / 18 G10 G10 JOB NO. COMP NO. W4700331 DWG N0. RENTON, WA 4-APRON-R-G10 CIVIL MASTER SITE