Loading...
HomeMy WebLinkAboutR_401340/ Z' ORDINARY HIGH WATER _ _ _ _ _ _ _ LAKE WASH NGTON _ SUMMER o EL 15.18 (NGVD 29)— I — — WINTER o EL 13.18 (NGVD 29) _ = EASEMENT LINE (TYP) I T HOUS —LINE .... IA , I I 1 I II 1, J 0 m a 31 CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 SYM REVISION APRON R INFRASTRUCTURE A CITY OF RENTON COMMENTS B CONSTRUCTION PHASING & PIPE DEPTH I — _ — J: _ I I— — — — — 1 1 / I 4-82 BUILDING - rt a . I- I- � I ° I o — — / \ I ° / mile �r ° '� I I 4-81 BUILDING \ ►I I ° Ld I ,w 4-41 BUILDING L_... 3I1m i, wi \ •• II � I 4-20 BUILDING 200-FT SHORELINE SETBACK r I I \H ARgO w ° - ° ° NEW BUILDING 4-87 TO BE CONSTRUCTED UNDER SEPARATE PERMIT. i I f AREA 1 & 3: PHASE 6 CONSTRUCTION PHASING KEY PLAN eA PHASE 6 (AREA 1- 1. REMOVE EXISTING PAVEMENT AT MITIGATION HANGAR, NORTH OF BLDG 4-81 AND AS REQUIRED TO CONSTRUCT UTILITY IMPROVEMENTS. INSTALL STORM SEWER SYSTEMS AND UTILITIES AND BRING TO FINISH GRADE. PROVIDE TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY PROTECTION AND MAINTENANCE OF TRANSIT ROUTES. 2. COMPLETE CONSTRUCTION OF AREA 3 STORM CONVEYANCE SYSTEM. •1103-18, 1102-18 • 1106-18, 1104-18, 1102-18 • 1105E-18, 1105A-18, 1105-18, 1104-18 3. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT OF SERVICE PER REMOVAL PLANS. 4. REMOVE OR ABANDON IN -PLACE EXISTING FIRE PROTECTION SYSTEM AND ABOVE AND BELOW GRADE UTILITIES TAKEN OUT OF SERVICE PER REMOVAL PLANS. BY APPROVED DATE SYM W4700331 ABAM SPT 06/08/18 W4700331 ABAM SPT 10/01/18 W4700331 ABAM SPT 1 10/09/18 REVISION 5. CONSTRUCT MECHANICAL, ELECTRICAL, DATA, AND FIRE SERVICE 1 UTILITIES WITHIN WORK LIMITS. 6. COMPLETE PHASED DEMOLITION AND REMOVAL OF PILE SUPPORTED STRUCTURES AS SHOWN IN STRUCTURAL PLANS AND CONSTRUCT SUB GRADE IMPROVEMENTS PER PLANS. 7. COMPLETE AREA 1 FIRE PROTECTION SYSTEM CONSTRUCTION. 8. COMPLETE AREA 1 STORM SYSTEM CONSTRUCTION 91073A-18, 1073-18, 1074-18 91071 A-18, 1071-18, 1072-18, 1073-18 9. COMPLETE AREA 1 PERMANENT PAVEMENT 10. COMPLETE AIRCRAFT STAGING STALLS R10 - R14 PRIOR TO PHASE 7 BY I APPROVED I DATE 1 x 777 . � I JIB P. of WA �f BOE//V� � �P ��• �1 x 31271 w� ��ssioNaL i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 DRAWN DATE SUBTITLE ACCEPTABILITY BEE 06/08/18 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED SPT 06 08 18 ENGINEER TITLE APPROVED BY DEPT. I DATE BEE 06/08/18 CIVIL MASTER CIVIL PERMIT PHASING PLAN - AREA 1 & 3: PHASE 6 APRON R INFRASTRUCTURE RENTON SITE SITE a a .p 2 e ut° 0 4-86 BUILDING R-401340 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING afowler 12/20/2018 01 wI` \LIV W4700331 J `' I� D 10/09/ 18 SHEET C500-1 G C23- JOB NO. COMP NO. W4700331 RENTON, WA DWG NO. 4-APRON-R-0500-1 G