HomeMy WebLinkAbout20190930161513.pdfi
Earth
lulian
4
To:
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Develo meat Date: September 30, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly inn
Attn: Mr. Duane Meyer
Email: duane(a,accrete.build
No. of
Copies Date Description
1 9/23-9/27/19 Daily Field Reports # 37-40
Comments:
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
CC:
1:
John Wilson
ATTN._johnw@rinocon.com
2:
Mark Richardson
ATTN:
mark accrete.build
3:
Jeff Brain
ATTN'
eff accrete. build
4.
Jennifer Vo ele
ATTN:
jenniferaa accrete.build
5:
Jonathan Chavez
ATTN.
_jchavez@rentonwa.gov
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NW«C
AK
Re I
' 1805 13611 Place NE, FAX:
Suite 201 (425) 449-4711 Time On Site
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 4:15 PM
DAILY FIELD REPORT Travel Time Weather —
1.25 Hr. RT 60s°F, Overcast
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By91Z°)
I Rino Construction Rod
FA,epproved Plans/Permits onsite ❑ YES NO Project No Permit No
At the client's request, ESNW rep was onsite to observe storm line backfill and earthwork activities.
Storm Line Backfill
While onsite, rep observed contractor use a small sized excavator to excavate a storm line. Rep observed trench to
be W3'xD3' approximately. Contractor was observed placing 12" corrugated pipe at the toe of the excavation and
embedding the pipe in an 8" lift of 5/8" minus crushed rock. Contractor expressed plans to continue storm line
excavation and backfill tomorrow, September 24, 2019. Rep will return to observe and test the backfill as needed.
Project No.
Page of
Report No.
0895.06
1 /1
37
Time Off Site
Date
Day of Week
5:00 PM
9/23/19
Monday
ESNW rep will return to observe earthwork activities when requested by client.
1
Andrew Kimn, Field Technician, 206-430-9183
[COLPY
TO:
CONTINUED ON NEXT PAGE CI
bAFF M. Earth Solutions NWLLC Field Rep
AK
i t 1805 1361h Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710 9:30 AM
DAILY FIELD REPORTTravel Time
J 1.25 Hr. RT
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
rAre approved Plans/Permits onsite
Job Location
4_500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
❑ YES ❑ NO
Project No
Project No
Page of
Report No.
0895.06
1/1
38
Time Off Site
Date
Day of Week
10:00 AM
9/24/19
Tuesday
Weather
60s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By �q%g
Permit No
_ 1
At the client's request, ESNW rep was onsite to observe baker tank turbidity, rockeries and earthwork activities.
Baker Tank Turbidity
While onsite, rep observed that baker tanks were filled with onsite stormwater. Rep used a turbidity meter and took
turbidity test on stored storm water from baker tanks. Rep observed 16.0 NTUs and 17 NTUs meeting the public
stormwater requirements.
Rockeries
Rep used a'/" steel t -probe and observed the keyway for the rockery located at the upper tier of the mid -east perimeter
of the site. Rep observed the keyway to be very dense, firm, unyielding, and suitable for support of the proposed
rockery. Rep observed contractor place a few courses of rocks. Rep will return tomorrow, September 25, 2019, to
observe the continuation of the rockery construction.
ESNW rep will return to observe earthwork activities when requested by client.
1
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
l
CONTINUED ON NEXT PAGE
Earth
80111111iQlffS
NWL Lc
Earth Solutions NWLLC
1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
Field Rep. Project No.
AK 1 0895.06
Time On Site I Time Off Site
9:45 AM 1 10:45 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
I
G�Grading Contractor Grading Foreman
Rino Construction Rod
FArepproved Plans/Permits onsite
El YES R NO Project No.
Page of
Report No.
1/2
39
Date
Day of Week
9/26/19
Thursday
Weather
60s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
Test Reference Maximum Fill Test Dry % of
Number Test Location (Water Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.ft. % lbs./cu.ft. Dry Density
33 1 See map for approximate location I -2' 1 1 1 130.7 1 11.6 1 124.2 1 95
FAt the client's request, ESNW rep was onsite to observe and test water line backfill, baker tank turbidity, rockeries,
vault excavation and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD7'). Rep observed
contractor place an 8" ductile iron pipe in a 12" ductile casing at the toe of the trench. Rep observed contractor bedding
the pipe in a 12" lift of pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12%
18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate
of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Baker Tank Turbidity
Rep observed that baker tanks were filled with onsite stormwater. Rep used a turbidity meter and took turbidity test
on stored storm water from full baker tank. Rep observed 7.9 NTUs meeting the public stormwater requirements.
Rockeries
Rep observed that the rockery contractor had completed the third -tier rockery at along the upper east perimeter to the
site. Rep observed that contractor had backfilled the rockery boulders with 2"4' quarry spalls.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
' COPY TO:
CONTINUED ON NEXT PAGE
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
❑ YES ❑ NO Project No.
Project No.
Earth Solutions NWILILC
Field Rep.
0895.06
2/2
AK
t { '
1805 136" Place NE, FAX:
Time On Site
10:45 AM
Suite 201 (425) 449-4711
Thursday
Bellevue, WA 98005 TOLL FREE:
9:45 AM
60s°F, Clear
(425) 449-4704 (866) 366-8710
Client / Owner
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
_.. ........... ..._�
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractors Superintendent
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
❑ YES ❑ NO Project No.
Project No.
Page of
Report No.
0895.06
2/2
39
Time Off Site
Date
Day of Week
10:45 AM
9/26/19
Thursday
Weather
60s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
COPY TO: CONTINUED ON NEXT PAGE
Field Rep Project No Page of Report No.
Earth Solutions WILL C AK 0895.061/1 40
t t
1805136 1h Place NE, , FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 9/27/19 Friday
(425) 449-4704 (866) 366-8710 1:15 PM 2:30 PM y
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 60s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By9%Z9
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD7'). Rep observed
contractor place an 8" ductile iron pipe in a 12" ductile casing at the toe of the trench. Rep observed contractor bedding
the pipe in a 12" lift of pea gravel. Rep observed contractor pouring concrete for thrust block at the first bend of the
pipe. Rep will return Monday, September 30, 2019, to observe and test compaction of the water line backfill.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
OTO:
CONTINUED ON NEXT PAGE