Loading...
HomeMy WebLinkAboutR_40139075 N 00 N u; 0 z 0 0 A ca J I AI/E- \AIA0L1INI(`T0N1 i BerizerABAM CALL 48 HOURS BEFORE YOU DIG 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250 SYM REVISION - APRON R INFRASTRUCTURE W4700331 \ 200' SHORELINE SETBACK \ PER CITY OF RENTON \ • 2 \ 3 \ \ \ 6 PC \ N: 186007.65 \ E: 1300405.46 \ \ c \ \ MATCH LINE, SEE SHEET C500-4E 6 / i 6 I I / R-240' ` 1 C � I I Y I` C500-4J \\ po I / I / 1 I _ 30N3J XNIINIVHO,- J.71 E: 1300364.08 1 Imo- --------_ _ 4 N: 185971.68 - \ -E: 1300160.68 \ I \ I \ I \ 4 N- 185969.17 \ E: 1300151.00 \ I \ I \ I \ I \ I BY I APPROVED I DATE I SYM REVISION ABAM I SPT 06/08/18 I 1 PT N: 185977.08 1� E: 1300360.19 1 I N: 186015.86 4 ,d E: 1300315.72 110 N: 186009.02 1 E: 1300308.42 _------R--200' - - I 1 PC N: 185944.46 E: 1300312.41 1 1 - X 4 \ 5 PT N: 185928.93 E: 1300307.25 1 1 COI °om oa I \ \ 1 PC 1 N: 185932.29 E: 1300281.02 I I. \ I \ -T - 1 I I \ I I I 1 I \ N: 185917.23 1 E: 1300225.01 I I I I I I PC - - - - - I N: 185899.07 5 _ - I E: 1300203.62 I I I I I I � I 12' 12' I a" I I 1= I MATCH LINE, SEE SHEET C500-4C BY I APPROVED I DATE P. of WA �f BOE//V� OD x 31271 w� ��ssioNaL ,61 o 0 m o m m �HARDSTAND 0 omamom om 1 1 20 40 DRAWN DATE SUBTITLE ACCEPTABILITY JDM 06/08/18 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED SPT 06 08 18 ENGINEER TITLE APPROVED BY DEPT. I DATE JLC 06/08/18 CIVIL MASTER GENERAL NOTES 1. REFER TO SHEET G2 FOR GENERAL STRIPING NOTES 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. 4. DOUBLE YELLOW CENTERLINE STRIPING PER SHEET C500-4G DETAIL 8 5. PEDESTRIAN LANE STRIPING PER SHEET C500-4G DETAIL 4 AND 5 6. WHITE STRIPE PER SHEET C500-4G DETAIL 6 7. WHITE GORE STRIPING PER SHEET C500-4G DETAIL 11 8. RED GORE STRIPING PER SHEET C500-4G DETAIL 10 9. 15 MPH STRIPING PER SHEET C500-4G DETAIL 2 AND 3 10. TRAFFIC ARROW PER SHEET C500-4G DETAIL 12 11. SECTION VALVE MARKINGS AT VALVE. VALVE PAINT MARKINGS PER SHEET M510-2 DETAIL 4. REFER TO SHEET M262 FOR VALVE LOCATION. 12. REFER TO ELECTRICAL PLANS FOR STATIC GROUND MARKINGS AND ASSOCIATED DETAILS. 13. REFRESH EXISTING PAVEMENT MARKINGS DIRECTLY ADJACENT TO PROJECT LIMITS AS DIRECTED BY BOEING REPRESENTATIVE IN FIELD. 14. SEE SHEET C500-46 FOR SIGN LOCATIONS AND DESCRIPTIONS. CONSTRUCTION NOTES PROVIDE DOUBLE YELLOW CENTERLINE STRIPING PROVIDE "15 MPH" LETTERING 3� STATIC GROUND. SEE GENERAL NOTE 12 4� PROVIDE RED GORE STRIPING PROVIDE 4" WIDE WHITE PAINT STRIPE PROVIDE 6" WIDE YELLOW TOWPATH STRIPE CIVIL PERMIT PAVEMENT MARKING PLAN - SHEET 4 APRON R INFRASTRUCTURE RENTON SITE SITE KEY PLAN SCALE: N.T.S. T-401304 R-401390 IN COMPLIANCE WITH CITY OF RENTON STANDARDS W4700331 - 06/08/18 SHEET C5004D C74 JOB N0. COMP NO. W4700331 RENTON, WA DWG N0. 4-APRON-R-0500-4D