HomeMy WebLinkAboutR_4013192MATCH LINE, SEE SHEET BE
\ o
\ N
I 1
I
c
SYM I REVISION
A I APRON R INFRASTRUCTURE
E51(
HARI
BY APPROVED DATE SYM
W47003311 CASNE I CEC 1 06.08.18
CV41MIR
0
0 ai
1❑
I
200' HORELINE SETBACK
PER CiY OF RENTON .4
O
O
- - - - � II- - -7--
MATCH LINE, SEE SHEET E9C
BY I APPROVED I DATE
- s
Q� BOE/NG
C'—
0
U
CD
m
0
w
O 0 m O m
m R5 11 HARDSTAND
0
l� RAMP/DECK
0 ;� n
QD
0
0
1 10 1 10 20 '1 �. /- %)
SCALE: IN FEET
i�
of al�r� ACCEPTABILITY
HGG
04.07.17
SUBTITLE
�4�
CHECKED
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
DAT
04.07.17
ENGINEER
TITLE
P VIED BY
DEPT.
I DATE
DAT
04.07.17
35276
OIST
�� ONAL����� �
PARTIAL SITE GROUNDING PLAN
APRON R INFRASTRUCTURE
RENTON SITE
ELECTRICAL MASTER SITE
LEGEND
3/4"x3O' COPPER CLAD GROUND ROD
EXOTHERMIC WELD OR APPROVED
COMPRESSION FITTING
GENERAL NOTES
1. NO EXPOSED GALVANIZED STEEL TO BE INSTALLED
ABOVE GRADE ON APRON. PVC COATED OR PAINTED
RIGID STEEL IS ACCEPTABLE.
2. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE
SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM
1983(91). VERTICAL DATUM: NATIONAL GEODETIC
VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM
CONVERSION: NGVD29 TO THE NORTH AMERICAN
VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60
FEET.
REFERENCE DRAWINGS
04-APRON-R-E510-6 GROUNDING DETAILS
CONSTRUCTOR NOTES
PROVIDE AND INSTALL BARE 4/0 GROUND
CONDUCTOR ALONG CONDUIT PATHWAY INSIDE
TRENCHING. SEE DETAIL E510-5 FOR ORIENTATION.
PROVIDE AND INSTALL GROUND ROD AND CONNECT
TO NEWLY INSTALLED DISTRIBUTION STAND. SEE
GROUNDING DETAIL SHEET E510-6 FOR REFERENCE.
KEY PLAN
SCALE: N.T.S.
LAKE WASHINGTON
4-83
O
CCASNE ENGINEERING, INC.
ELECTRICAL AND TECHNOLOGY CONSULTANTS
10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033
(425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140
CIVIL PERMIT
W4700331 JI'VIUVL n ""'L 06.08.18
SHEET /�
E9D E24
JOB NO. COMP NO.
W4700331
RENTON, IRA DWG NO. RTN-YD-E9D
L
r�