Loading...
HomeMy WebLinkAboutR_4013192MATCH LINE, SEE SHEET BE \ o \ N I 1 I c SYM I REVISION A I APRON R INFRASTRUCTURE E51( HARI BY APPROVED DATE SYM W47003311 CASNE I CEC 1 06.08.18 CV41MIR 0 0 ai 1❑ I 200' HORELINE SETBACK PER CiY OF RENTON .4 O O - - - - � II- - -7-- MATCH LINE, SEE SHEET E9C BY I APPROVED I DATE - s Q� BOE/NG C'— 0 U CD m 0 w O 0 m O m m R5 11 HARDSTAND 0 l� RAMP/DECK 0 ;� n QD 0 0 1 10 1 10 20 '1 �. /- %) SCALE: IN FEET i� of al�r� ACCEPTABILITY HGG 04.07.17 SUBTITLE �4� CHECKED THIS DESIGN AND/OR SPECIFICATION IS APPROVED DAT 04.07.17 ENGINEER TITLE P VIED BY DEPT. I DATE DAT 04.07.17 35276 OIST �� ONAL����� � PARTIAL SITE GROUNDING PLAN APRON R INFRASTRUCTURE RENTON SITE ELECTRICAL MASTER SITE LEGEND 3/4"x3O' COPPER CLAD GROUND ROD EXOTHERMIC WELD OR APPROVED COMPRESSION FITTING GENERAL NOTES 1. NO EXPOSED GALVANIZED STEEL TO BE INSTALLED ABOVE GRADE ON APRON. PVC COATED OR PAINTED RIGID STEEL IS ACCEPTABLE. 2. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. REFERENCE DRAWINGS 04-APRON-R-E510-6 GROUNDING DETAILS CONSTRUCTOR NOTES PROVIDE AND INSTALL BARE 4/0 GROUND CONDUCTOR ALONG CONDUIT PATHWAY INSIDE TRENCHING. SEE DETAIL E510-5 FOR ORIENTATION. PROVIDE AND INSTALL GROUND ROD AND CONNECT TO NEWLY INSTALLED DISTRIBUTION STAND. SEE GROUNDING DETAIL SHEET E510-6 FOR REFERENCE. KEY PLAN SCALE: N.T.S. LAKE WASHINGTON 4-83 O CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140 CIVIL PERMIT W4700331 JI'VIUVL n ""'L 06.08.18 SHEET /� E9D E24 JOB NO. COMP NO. W4700331 RENTON, IRA DWG NO. RTN-YD-E9D L r�