HomeMy WebLinkAboutR_4013214GENERAL NOTES
FINISHED GRADE
27" MIN.
X�4)
V45B/CKT 44"C, 3#600, #2/0 GND 7.5
2" SPARE (FIBER)�_/1
r-I21 D
2" BED
#4/0 BARE CU GROUND
DUCT BANK CROSS-SECTION
SCALE: 1-1 /2"=1'-0" Ell 1,1�361IE51'0-7.1
FINISHED GRADE
27" MIN.
2" SPARE (FIBER)
2" BED
SYM I REVISION
APRON R INFRASTRUCTURE
7.5"
V45A/CKT 11
4"C, 3#600, #2/0 GND
4" SPARE
V45B/CKT 11 1„
4"C, 3#600, #2/0 GND 7.I
#4/0 BARE CU GROUND
DUCT BANK CROSS-SECTION
SCALE: 1-1 /2"=1'-0"
BY APPROVED DATE SYM
W47003311 CASNE I CEC 1 06.08.18
Ell 13,E 1 14, E363, E364J E510-7.1
V41wou
BY I APPROVED I DATE
FINISHED GRADE
2"
2" BE[
FINISHED GRADE
2" BED
Q� ""A/NG 0
C'—
27" MIN. \Ir)oA lr\ilT 11
DUCT BANK CROSS-SECTION
SCALE: 1-1/2"=1'-0" E1 13,E1 14,E363,E�64IE51'0-7
27" MIN.
2" SPARE (FIBER)�� 2„
4"
D a V28A/CKT 11 „
::::�1_4"C, 3#600, #2/0 GND 7.5
4" L
#4/0 BARE CU GROUND
DUCT BANK CROSS-SECTION
SCALE: 1-1 /2"=1 ' -0"
��� of WAS L�T�
35276
OIST
�� ONAL����� �
El 14,E 115, E364, E365J E510-7.1
ACCEPTABILITY CASNE
THIS DESIGN AND/OR CHECK[
SPECIFICATION IS APPROVED CEC
N IN
;,ROVED BY DEPT. I DATE LDB
GRAPHIC SCALE:
SCALE: 1-1 /2"=1 ' -0"
0 3" 6" 1' 2'
NIL SUBTITLE
12.21.17
12.21.15
TITLE
12.21.15
ELECTRICAL MASTER
BURIED CONDUITS DETAILS
APRON R INFRASTRUCTURE
APRON R
1. DUCT BANK ELEVATION SHALL BE SET TO
MINIMIZE VERTICAL OFFSETS TO MANHOLES,
HANDHOLES WHILE MAINTAINING NO LESS
THAN CODE MINIMUM BURIAL DEPTH.
2. QUANTITY OF 400HZ FEEDERS TO BE
REDUCED TO COUNT REQUIRED TO FEED
DOWNSTREAM GATE BOXES. IF FIELD
CONDITIONS REQUIRE MOVE THE 400 HERTZ
TO THE OPPOSITE SIDE OF DUCT BANK.
3. HAND HOLES SHALL BE SET ON A 6" BED
OF GRAVEL.
CONSTRUCTION NOTES
CCASNE ENGINEERING, INC.
ELECTRICAL AND TECHNOLOGY CONSULTANTS
10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033
(425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140
CIVIL PERMIT
W47003311 06.08.18
SHEET
E510-5 E46
JOB N0. COMP NO.
W4700331
RENTON, WA DWG N0. 05-APRON-R-E510-5
A