Loading...
HomeMy WebLinkAboutR_4013214GENERAL NOTES FINISHED GRADE 27" MIN. X�4) V45B/CKT 44"C, 3#600, #2/0 GND 7.5 2" SPARE (FIBER)�_/1 r-I21 D 2" BED #4/0 BARE CU GROUND DUCT BANK CROSS-SECTION SCALE: 1-1 /2"=1'-0" Ell 1,1�361IE51'0-7.1 FINISHED GRADE 27" MIN. 2" SPARE (FIBER) 2" BED SYM I REVISION APRON R INFRASTRUCTURE 7.5" V45A/CKT 11 4"C, 3#600, #2/0 GND 4" SPARE V45B/CKT 11 1„ 4"C, 3#600, #2/0 GND 7.I #4/0 BARE CU GROUND DUCT BANK CROSS-SECTION SCALE: 1-1 /2"=1'-0" BY APPROVED DATE SYM W47003311 CASNE I CEC 1 06.08.18 Ell 13,E 1 14, E363, E364J E510-7.1 V41wou BY I APPROVED I DATE FINISHED GRADE 2" 2" BE[ FINISHED GRADE 2" BED Q� ""A/NG 0 C'— 27" MIN. \Ir)oA lr\ilT 11 DUCT BANK CROSS-SECTION SCALE: 1-1/2"=1'-0" E1 13,E1 14,E363,E�64IE51'0-7 27" MIN. 2" SPARE (FIBER)�� 2„ 4" D a V28A/CKT 11 „ ::::�1_4"C, 3#600, #2/0 GND 7.5 4" L #4/0 BARE CU GROUND DUCT BANK CROSS-SECTION SCALE: 1-1 /2"=1 ' -0" ��� of WAS L�T� 35276 OIST �� ONAL����� � El 14,E 115, E364, E365J E510-7.1 ACCEPTABILITY CASNE THIS DESIGN AND/OR CHECK[ SPECIFICATION IS APPROVED CEC N IN ;,ROVED BY DEPT. I DATE LDB GRAPHIC SCALE: SCALE: 1-1 /2"=1 ' -0" 0 3" 6" 1' 2' NIL SUBTITLE 12.21.17 12.21.15 TITLE 12.21.15 ELECTRICAL MASTER BURIED CONDUITS DETAILS APRON R INFRASTRUCTURE APRON R 1. DUCT BANK ELEVATION SHALL BE SET TO MINIMIZE VERTICAL OFFSETS TO MANHOLES, HANDHOLES WHILE MAINTAINING NO LESS THAN CODE MINIMUM BURIAL DEPTH. 2. QUANTITY OF 400HZ FEEDERS TO BE REDUCED TO COUNT REQUIRED TO FEED DOWNSTREAM GATE BOXES. IF FIELD CONDITIONS REQUIRE MOVE THE 400 HERTZ TO THE OPPOSITE SIDE OF DUCT BANK. 3. HAND HOLES SHALL BE SET ON A 6" BED OF GRAVEL. CONSTRUCTION NOTES CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140 CIVIL PERMIT W47003311 06.08.18 SHEET E510-5 E46 JOB N0. COMP NO. W4700331 RENTON, WA DWG N0. 05-APRON-R-E510-5 A