Loading...
HomeMy WebLinkAboutR_4013186LOAD SUMMARY LEGEND GENERAL NOTES UNIT SUB V45B CIRCUIT BREAKER TRIP SETTINGS EATON MAGNUM DS W/ DIGITRIP 1150 BREAKER NO. SENSOR RATING PLUG RATING LONG TIME SHORT TIME INST. PICKUP GROUND FAULT MAINTENANCE MODE PICKUP DELAY PICKUP DELAY PICKUP DELAY MAIN 2000A 2000A 1 17.5 2.5 0.3 0.4 0.2 2.5 4D 800A 800A 1 24 2.5 0.4 5 2.5 3A 3B 2000A 2000A 0.85 12 2.5 0.2 0.25 0.1 2.5 3C 800A 800A 3D 800A 800A 1 17.5 4 0.1 6 2.5 2B12A I wl IiJ l IiJ z CDf Q zl zl O U 0 OO / Oo 000� ' Sg800:5 A 2)4"C PVC, 3#600kcmil F1, 2/0 GND 110 V45 R12 F- -]PULL BOX F- -1 TAP BOX _j 5 2 2 (2)4"C PVC, 3 3#600kcmil (2)4"C PVC, #2/0 GND 3#600kcmil 635 #2/0 GND 80 65,000 480V, 2000A BUS 45,751 /22,845 aa� 00 0 0 000� S 2 SETS OF 4"C, 800:5 A 3#500KCMIL, Pg #1/0 GND 205 MCC #3 _ 28,496/18,300 800A 3#3/0, #1/0 GND 480V 14,000 5 12,333/9,785 R12 200A MCB 0 3/4"C, 2# 12, #12 GND 5 MPZ 4 R12-1 365/364 30A MCB 5KVA 480V: 1 20/240V (2)4"C PVC, 3#600kcmil 2 757 F #2/0 GND 155 R11 TAP BOX LI I 6# /03GND0, 1 11 ,440/9,2199 R11 3 200A MCB Cl:) 3/4"C, 2# 12, #12 GND MPZ R11-1 365/364 30A MCB 5KVA 480V: 1 20/240V F_7 R10 TAP BOX 2 2"C, 3#3/0, O #1/0 GND 10,032/8,288 R10 200A MCB — 3/4"C, 2# 12, #12 GND MPZ R10-1 364/363 30A MCB 5KVA 480V: 1 20/240V KIRK KEY INTERLOCK TABLE SUBSTATION 45B S1 S2 MAIN OPEN EITHER SWITCH DOOR 0 0 0 CLOSE S1 0 0 CLOSE S2 0 0 OPEN S1 0 OPEN S2 0 "0" OPEN POSITION REQUIRED FOR OPERATION "S1" SWITCH 1 "S2" SWITCH 2 N� I as CD 00 0 25T- s 800:5 A 15KV CABLE 13,129 PFD FDR FROM PLATFORM "V9" 3rd FDR 1A5B EXISTING SUBSTATION V45 (FURNISHED BY BOEING) PEAK DEMAND LOAD AS OF 10.11.13 960kVA NO LOAD ADDED EXIST IN BLDG 4-20 13,341 ----------------------- PM v 1 --- 1 3A L�J TB 600A,15KV,FUSED CPT 1 �� S2 S1 MV. SELECTOR 3A 1000/1333 kVA TB 3A 13,800-480Y/277V MAIN 30,4W 125E 2000:5(3)^> 1 2000AF _ o—� 2000AT - L.A. — 85KAIC - i n 25-2 PB 25X-2 207 2 SETS OF 4"C, 4#500KCMIL, #1/0 GND 24,071 /15,801 A9-1 800A 30,000 LTG. DIST. MAIN 2",4#4/0 255 22),4#4/0 35 8,915/7,606 19,76 /13,90 G2 B8 225A 225A LIGHTING LIGHTING MLO MLO 175' 25,000 14,000 2",4#4/0 155 1 a� G10 1 1,951/9,644> 225A LIGHTING MLO 14,000 2",4#4/0 D3 225A 11,193/9,156 LIGHTING MLO 14,000 .SUBSTATION VAULT V45B - ONE LINE DIAGRAM 163" INSTRUMENTS INSTRUMENTS AIN MEMAIN ERING MEMERING MAIN 800A TIE MAIN NSTRUMENTS PROVISION EAKE BRR NSTURMENTS 2EAKE 800A 800A MAIN APRON R APRON R MAIN 2000A R13-R14 R10-R12 2000A 800A 800A 800A 800A PANEL MCC #1 MCC#3 PANEL A9 A9 -1 V45A V45B ® FUSE CIRCUIT BREAKER, AIR, DRAWOUT AF-FRAME RATING AS -SENSOR RATING AX-PLUG RATING AT -TRIP SETTING 277/480V PANEL 120/208V PANEL uilij TRANSFORMER, 480V/120/208V ryTn UNLESS OTHERWISE NOTED MOTOR CONTROL CENTER XXX/XXX AVAILABLE FAULT CURRENT (CLOSED TRANSITION/NORMAL) xxxx AIC RATING OF EQUIPMENT XXXX FEEDER LENGTH IN FEET .ELEVATION -SUBSTAT ON V45A & V45B SCALE: NONE 1. UNLESS OTHERWISE NOTED PROVIDE/INSTALL ALL CONDUIT, WIRE, SUPPORTS, PANELS, TRANSFORMERS, BREAKERS. 2. ALL WORK SHOWN ON THE DRAWINGS AND INCLUDED IN 0 C THE SPECIFICATIONS SHALL BE INCLUDED IN THIS JOB, EXCEPT ASA SPECIFICALLY INDICATED OTHERWISE. C' C 3. ELECTRICAL DEMOLITION: THIS ELECTRICAL c SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL 0 ELECTRICAL DEMOLITION OF EXISTING ELECTRICAL SYSTEMS T NOT BEING RE -USED. DELIVER ALL EXPLOSION PROOF C ELECTRICAL EQUIPMENT TO THE OWNER FOR USE, DISPOSAL, OR INSTRUCTIONS. SEE DEMOLITION DRAWINGS OBSERVING AND EXECUTING THE GENERAL DEMOLITION NOTES AND THE NOTES ON EACH SHEET. ALSO INCLUDE THE SAME FOR THE DEMOLITION PHOTO BOOK. 4. THIS ELECTRICAL SUBCONTRACTOR SHALL ACQUAINT THEMSELVES WITH ALL THE DRAWINGS OF THE BID DOCUMENTS. THEY SHALL ESPECIALLY NOTE THE TYPE OF CONSTRUCTION IN THE AIRCRAFT PAINT AREA AND COORDINATE THE ELECTRICAL INSTALLATION WITH ALL ASPECTS OF THIS CONSTRUCTION. 5. ALL CONTROL PANELS AND CONTROL STATIONS WHICH ARE ELECTRICAL AND WHICH ARE FURNISHED WITH EQUIPMENT PURCHASED BY OTHER TRADES SHALL BE MOUNTED AND WIRED INTO THE SYSTEM. 6. CLASSIFIED WIRING IN AND OUT OF CLASSIFIED AREAS:cy T THIS ELECTRICAL SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL CODE REQUIRED SEALS, DRAINS, ETC. FOR C COMPLETION OF ALL WIRING IN CLASSIFIED AREAS SUCH C AS CLASS 1, DIVISION 1, GROUP C & D AREA WHETHER SHOWN ON THE DRAWINGS OR NOT. r T 7. WIRING INSIDE AIRCRAFT PAINT HANGAR: ALL WIRING INSIDE G THE AIRCRAFT PAINT HANGAR AREA SHALL BE CONCEALED - OUTSIDE THE AREA IN SO FAR AS IS PHYSICALLY - POSSIBLE. SEALS AND DRAINS FOR CLASSIFIED WIRING SHALL BE ACCESSIBLE. CONNECT PRIMARY SWITCH AUXILIARY CONTACTS TO POWER MONITOR FOR SWITCH POSITION STATUS REPORTING. REFERENCE DRAWINGS 04-21-E4A 04-21-E515-1 A CONSTRUCTION NOTES: PROVIDE PARALLEL SETS OF CONDUCTORS FROM SOURCE BREAKER TO HARDSTAND R12 TAP BOX. USE EXISTING CONDUIT RACEWAY TO PULL BOX ON 4-41 BUILDING. PROVIDE AND c EXTEND RACEWAY FROM PULL BOX TO T u HARDSTAND. C PROVIDE NEMA 4X STAINLESS STEEL, OR C C APPROVED EQUAL, TAP BOX. r T PROVIDE 225A RATED, NEMA 4X SS, 480V, 30, a 3W PANELBOARD WITH 2O0A MAIN CIRCUIT BREAKER AND MOLDED CASE BRANCH BREAKERS. ® PROVIDE 5KVA, 480V:120/240V MINI POWER ZONE RATED FOR OUTDOOR INSTALLATIONS. PROVIDE BELOW GRADE CONDUIT AND CONDUCTORS. SEE PARTIAL PLAN VIEW DRAWINGS FOR ROUTING. CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140 CIVIL PERMIT SCALE: NONE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE l DRAWN DATE SUBTITLE SUBSTATION V45B -ONE LINE DIAGRAM CURRENT REVISION SYMBOL DATE WA tr ACCEPTABILITY J.RICKARD 7 30 06 of h'r � W4700331 06.08.18 A SUBSTATION V45A AND V45B INSTALLATION W1808396 CASNE CEC 07.16.14 G �� �� THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED MARTIN 9-10-96 SHEET B ARC FLASH STUDY CASNE RJJ 09.22.16 �� ® _ P VED BY DEPT. DATE ENGINEER CHECKED TITLE APRON R INFRASTRUCTURE E4A E18 RECORD DRAWING CASNE RJJ 01.20.17 35276 �,� BUILDING 04-041 JOB NO. COMP NO. C APRON R INFRASTRUCTURE W4700331 CASNE DAT 06.08.18 °� ISTER� 11 APPROVED W4700331 jONAL � sII APPROVED DWG N0. ELECTRICAL MASTER RENTON, WA 04-041-E4A