HomeMy WebLinkAboutAdden 09 • CAG-17-082 , Adden #9-19 � Washington State VI/ Department of Transportation Supplemental Agreement Organization and Address Number 9 Perteet,Inc. 505-5th Ave.S.,#300. Original Agreement Number Seattle,WA 98104 CAG-17-082 Phone: 425-252-7700 Project Number Execution Date Completion Date May I,2017 December 31,2021 Project Title New Maximum Amount Payable N.Park Avenue Extension-Preliminary Design $948,126.00 Description of Work Supplement 9 is needed to assist the City with consulting in support of construction documents needed to relocate the Boeing Duct Bank which currently has an access manhole in the future Park Avenue N extension roadway. The Local Agency of City of Renton desires to supplement the agreement entered in to with Perteet,Inc. and executed on May 1,2017 and identified as Agreement No. CAG-17-082 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See attached exhibit A-9 II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change III Section V, PAYMENT, shall be amended as follows: See exhibit A-9. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Peter De Boldt By: )1 4(74° /17/i� 7vr\ � 6-ve% l�j VYff'/ 121�M Consultant Signature J J Approving Authority signature • 4/10)/ Dat DOT Form 140-063 Revised 09/2005 • Exhibit"A" J Summary of Payments Supplement Supplement Supplement Supplement Supplement#8 Supplement#9 Basic Agreement #1* #2• Supplement#3 Supplement#4 #52* #6"" Supplement#7 ass "s"ss Total Direct Salary Cost $ 46,162.00 $ - $ 4,906.00 $ 83,300.00 $ - $ (7,305.00) $ 63,130.97 $ (2,283.00) $ 6,460.00 $ 194,369.97 Overhead(Including Payroll Additives) $ 84,911.00 $ - $ 9,025.00 $ 153,222.00 $ - $ (13,439.00) $ 116,123.11 $ (4,198.00) $ 11,883.00 $ 357,527.11 Direct Non-Salary Costs $ • 2,450.00 $ - $ 54,176.00 $ 129,211.00 $ - $ 23,083.00 $ 50,161.00 $ 7,211.00 $ 12,378.00 $ 278,670.00 Fixed Fee $ 14,772.00 $ - $ 1,570.00 $ 26,656.00 $ - $ (2,338.00) $ 20,201.92 $ (730.00) $ 2,067.00 $ 62,198.92 !Management Reserve $ 11,360.00 $ - $ 5,000.00 $ 39,000.00 $ 55,360.00 !Total $ 159,655.00 $ - $ 74,677.00 $ 392,389.00 $ - $ - $ 288,617.00 $ - $ 32,788.00 $ 948,126.00 f"Time extension only "Supplement 5 reallocates expense budget from Perteet to Casne Engineering I ***Supplement 6 reallocates labor and expense budget from Perteet to Abeyta&Associates for ROW acquisition efforts,and the design of Boeing's driveway off of Logan at 1 NE7th St. This reallocation is in lieu of completing 60-percent design for the portion of the road north of the BNSF right-of-way. I ¢""Supplementt8reallocateslaborandexpensebudgetfromPerteettolAllianceforsurveyandbasemapeffortintheBNSFTrestlearea. I 1 L"Y4a'Supplement 9 provides budget for Final Design of Boeing Dud Bank. _ _ I Scope of Services Park Avenue N Extension—Final Design Phase Duct Bank Design City of Renton • 505 5TH AVENUES,SUITE 300 PE RT E E T SEATTLE,WA 98104 Better communities,by design 800.615.9900 1206.436.0515 PARK AVENUE N EXTENSION—FINAL DESIGN PHASE Agreement with Perteet Inc. During the term of this Contract,Perteet,Inc.(CONSULTANT)will perform professional services for the City of Renton(CITY),as detailed below: INTRODUCTION The project will construct improvements to extend Park Avenue N from the existing intersection with Logan Avenue N northward to connect to the Southport site now under construction.The purpose of the roadway extension is to provide a connection to the Southport development and relieve congestion on Lake Washington Boulevard. GENERAL SCOPE OF SERVICES This supplement is for Casne Engineering,Inc.to develop final construction documents To relocate the Boeing Duct Bank which currently has an access manhole in the future Park Avenue N extension roadway to a location that is outside of the future Park Avenue N extension roadway. The design of the final construction documents will be based on the preliminary plans developed by Casne Engineering,Inc in December 2018. The construction documents will be developed for construction by the Boeing Company before construction of the City's Park Avenue N extension project. Additionally,this supplement is for the CONSULTANT to develop demolition/restoration construction documents to accompany Casne's work as detailed in Task 12.The demolition/restoration construction documents under this supplement will be part of the duct bank construction package to be constructed by Boeing and its contractors,not the City of Renton's Park Avenue N Extension project. Currently only local agency funds will be used in the planning,design,and/or construction of the project.The CONSULTANT will use procedures outlined in the WSDOT Local Agency Guidelines(LAG Manual)during development of the project. • Deliverables will be reviewed by Boeing prior to issuance. Upon receipt, Boeing will review within a reasonable time after submission of deliverable(s)and will provide comments in writing to be considered and incorporated into the deliverable(s). Construction documents shall be prepared,completed,and submitted for the review,comment and approval by Boeing and conform to the criteria as described below. OPTIONAL SERVICES The CONSULTANT may be asked by the CITY to provide optional services.Optional services that may be performed include: • Assistance with preparation of environmental documentation and permits • Assistance with preparation of grant funding packages • Assistance during Bidding by Boeing • Services during Construction Providing optional services will require a supplement to this agreement. 1 File location: X:\Renton,City of\Projects\20160266-N Park Ave Extension\Project Management\Contract\Contract Negotiations\Supplement#9- Cosne Final Design\Park Ave N Ext Scope and Fee-Supp#9-Casne Final Design-2019-10-01.doc PARK AVENUE N EXTENSION—FINAL DESIGN PHASE Agreement with Perteet Inc. TIME FOR COMPLETION No change to the current contract. Task 12— Boeing Electrical Duct Bank Modifications 12.3 90% Design Plans and Opinion of Cost CASNE will advance the previously prepared plans for the relocated electrical manhole and associated duct bank to a ninety percent(90%)design stage,including the following elements: • Plan view of proposed relocated manhole,associated duct bank,and BOEING electrical drawings utilizing 11"x 17"sheets at 1"=40'scale. The plan view will include station and offset to the manhole and any points where the duct bank changes direction.The design will include BOEING electrical drawings that will be required by Boeing to be updated for record electrical drawings.The design shall include electrical removal drawings for Boeing to verify the scope of the duct bank work.Drawings shall be created to meet BOEING Standard CAD files. • Profile view of the proposed relocated manhole and associated duct bank at a horizontal scale of 1"=40' and a vertical scale of 1"=10'when plotted on 11"x 17"sheets. • Electrical wiring diagram illustrating the proposed electrical system inside the new duct bank system. • The CONSULTANT will develop demolition and restoration drawings to incorporate into CASNE's drawings,also using 11"x 17'sheets at 1"=40'scale,a maximum of three sheets. • • The CONSULTANT will generate demolition and restoration quantities to incorporate into CASNE's opinion of cost. • 90%Opinion of Cost Estimate to be submitted with the ninety percent(90%)plans. • Deliverables: • Two(2)copies of the 90%BOEING Duct System plans(half size,1"=40'scale)and Opinion of Cost Estimate submitted in hard copy form and delivered by US Mail. • CAD(.dwg)files and electronic.pdf files of the 90%plans. • 90%Opinion of Cost in Excel and.pdf format. Assumptions: • The limits of new duct bank work will not extend beyond the location illustrated in the December 2018 plans prepared by Casne. 12.4 Final Design Plans, Specifications, and Opinion of Cost CASNE will advance the previously prepared plans for the relocated electrical manhole and associated duct bank to a final(100%;ready for construction)design stage,including the following elements: • Plan view of proposed relocated manhole,associated duct bank,and BOEING electrical drawings utilizing 11"x 17"sheets at 1"=40'scale. The plan view will include station and offset to the manhole and any points where the duct bank changes direction.The design will include BOEING electrical drawings that will be required by Boeing to be updated for record electrical drawings.The design shall include 2 File location: )(Menton,City of\Projects\20160266-N Park Ave Extension\Project Management\Contract\Contract Negotiations\Supplement#9- Casne Final Design\Park Ave N Ext Scope and Fee-Supp#9-Casne Final Design-2019-10-Ol.doc PARK AVENUE N EXTENSION—FINAL DESIGN PHASE Agreement with Perteet Inc. electrical removal drawings for Boeing to verify the scope of the duct bank work.Drawings shall be created to meet BOEING Standard CAD files. • Profile view of the proposed relocated manhole and associated duct bank at a horizontal scale of 1" =40' and a vertical scale of 1"=10'when plotted on 11"x 17"sheets. • Electrical wiring diagram illustrating the proposed electrical system inside the new duct bank system.' • The CONSULTANT will develop demolition and restoration drawings to incorporate into CASNE's drawings,also using 11"x 17'sheets at 1"=40'scale,a limit of three sheets. • The CONSULTANT will generate demolition and restoration quantities to incorporate into CASNE's opinion of cost. • Final Opinion of Cost Estimate to be submitted with the final plans. • The CONSULTANT will prepare a Project Manual(aka Construction Specifications and bid materials) for the project based on English units for the final submittal.These will include Special Provisions for the items of work,as well as bid and contract forms,all in a format acceptable to Boeing. Deliverables: • Two(2)copies of the Final BOEING Duct System plans(half size,1"=40'scale)and Opinion of Cost Estimate submitted in hard copy form and delivered by US Mail. • CAD(.dwg)files and electronic.pdf files of the Final plans. • Final Opinion of Cost in Excel and.pdf format. • • Final Project Manual in.pdf and Word format. Assumptions: • The Boeing Company will prepare the final documents for their selection of a Contractor for construction,solicit bids from Contractors and then manage the construction phase. DESIGN CRITERIA • The CITY will work with the CONSULTANT to develop the basic premises and criteria for the design.Reports and plans,to the extent feasible,will be developed in accordance with the latest edition and amendments of the following: 1. AASHTO 2010,"A Policy of Geometric Design of Highways and Streets." 2. WSDOT,"Standard Specifications for Road and Bridge Construction." 3. WSDOT,"Design Manual." 4. WSDOT,"Materials Laboratory Outline." 5. WSDOT,"Construction Manual." 6. WSDOT, "Local Agency Guidelines." 7. Highway Research Board's Manual entitled"Highway Capacity." 8. FHWA and WSDOT, "Manual on Uniform Traffic Control Devices for Streets and Highways." 9. Standard drawings prepared by City of Renton and furnished to the Consultant will be used as a guide in all cases where they fit design conditions and where no City of Renton standard drawings are applicable; WSDOT Standard Plans will be used as a default. 10. AASHTO"Guide for the Development of Bicycle Facilities." 3 File location: )(Menton,City of\Projects\20160266-N Park Ave Extension\Project Management\Contract\Contract Negotiations\Supplement#9- Casne Final Design\Park Ave N Ext Scope and Fee-Supp#9-Casne Final Design-2019-10-0l.doc • PARK AVENUE N EXTENSION—FINAL DESIGN PHASE Agreement with Perteet Inc. 11. AASHTO 1993"Guide for the Design of Pavement Structures." 12. WSDOT Highway Runoff Manual. 13. WSDOT Hydraulics Manual. 14. King County Surface Water Design Manual. 15. 2012 Department of Ecology Stormwater Management Manual for Western Washington. 16. City of Renton Municipal Code. Additionally,the design shall: 1. Achieve the objectives of Boeing as may be adjusted only upon written authorization from Boeing;and 2. Result in a Project which is fit for its intended purpose if the project is installed or constructed in accordance with the Construction Documents. • File location: )(Menton,City of\Projects\20160266-N Park Ave Extension\Project Management\Contract\Contract Negotiations\Supplement#9- Casne Final Design\Park Ave N Ext Scope and Fee-Supp#9-Casne Final Design-2019-10-Ol.doc •