HomeMy WebLinkAbout20191007131104.pdfCi
E��arrth
utiori
" hiWut
To
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Development Date: October 7, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
Comments:
CC:
1: John Wilson
2: Mark Richardson
I Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN. johnw(E)rinocon.com
ATTN:
mark accrete. build
ATTN:
teff accrete.build
ATTN:
Jennifer accrete. build
ATTN:
jchavez rentonwa. ov
1805 — 136t" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWI_«
I I 1805 13611 Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
Field Rep.
AK
Time On Site
10:15 AM;
3:00 PM
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No
Project No.
Page of
0895.06
1/1
Time Off Site
Date
11:15 AM;
9/30/19
4:15 PM
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Report No.
41
Day of Week
Monday
Checked By v4' 1e%1
Permit No.
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD7'). Rep observed
contractor place an 8" ductile iron pipe in a 12" ductile casing at the toe of the trench. Rep observed contractor bedding
the pipe in a 12" lift of pea gravel. Contractor expressed plans to backfill trench tomorrow, Tuesday, October 1, 2019.
Rep will return to observe and test backfill of the water line.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope tc
be (H -V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable tc
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE J
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD7'). Rep observed
contractor place an 8" ductile iron pipe in a 12" ductile casing at the toe of the trench. Rep observed contractor bedding
the pipe in a 12" lift of pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-
18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate
of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«�
Field Rep.
Project No. Page of
Report No.
AK
0895.06 1/2
42
801t[HOHS
1805 136'^ Place NE, FAX:
Time On Site
Time Off Site Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
8:30 AM;
9:15 AM; 10/2/19
Tuesday
(425) 449-4704 (866) 366-8710
4:15 PM
5:00 PM
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
60s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractors Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
Are approved Plans/Permits onsite YES F NO Project No.
Permit No.
Test
Reference
Maximum Fill Test Dry
% of
Test Location (Water Backfill) Elevation
Number
Compaction
Dry Density Moisture Density
Maximum
Curve
lbs./cu.ft % lbs./cu.ft
Dry Density
34 See map for approximate location SG
1
130.7 12.3 124.8
96 1
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD7'). Rep observed
contractor place an 8" ductile iron pipe in a 12" ductile casing at the toe of the trench. Rep observed contractor bedding
the pipe in a 12" lift of pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-
18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate
of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Grading ContractorI Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No.
Project No.
0895.06
Earth Solutions NWLLC
Field Rep.
Time Off Site
Date
AK
t t
1805136 1Place NE, FAX:
Time On Site
5:00 PM
Suite 201 (425) 449-4711
Weather
Bellevue, WA 98005 TOLL FREE:
8:30 AM;
(425) 449-4704 (866) 366-8710
4:15 PM
RJ Development, LLC
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractors Superintendent
Grading ContractorI Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No.
Project No.
0895.06
Page of
2/2
Report No
42
Time Off Site
Date
Day of Week
9:15 AM;
10/2/19
Tuesday
5:00 PM
Weather
60s°F, Clear
..................
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
k ' ^�
� 1 ..� a '"S 2 # � •r _
COPY TO: CONTINUED ON NEXT PAGE ❑
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite El YES R NO Project No.
Project No.
Earth Solutions NWLLC
Field Rep.
0895.06
1/1
AK
1=1
1805136 1h Place NE, FAX:
Time On Site
Wed
Suite 201 (425) 449-4711
Weather
Bellevue, WA 98005 TOLL FREE:
11:30 AM
(425) 449-4704 (866) 366-8710
/ Owner
rRDevelopment,
Travel Time
DAILY FIELD REPORT
LLC
1.25 Hr. RT
Project Name
Job Location
Checked By , J
`' ��
Weatherly Inn
Permit No.
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite El YES R NO Project No.
Project No.
Page of
Report No.
0895.06
1/1
43
Time Off Site Date
Day of Week
12:15 PM 10/2/19
Wed
Weather
60s°F, Clear
/ Owner
rRDevelopment,
LLC
Received Onsite By
Checked By , J
`' ��
(e ),
Permit No.
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a '/" steel t -probe and observed the keyway for
the rockery located at the southeast quadrant of the site. Rep observed
the keyway to be very dense, firm, unyielding, and suitable for support of
the proposed rockery. Rep observed contractor place a few courses of
rocks. Rep observed contractor place a 4" perforated drain pipe behind
the first course of the rockery, embed the pipe in an 18" lift of V-2" wash
rock, geotextile, then backfill over the geotextile with 2"-4" quarry spalls.
(See Image)
ESNW rep will return to observe earthwork activities when requested by
client.
Andrew Kimn, Field Technician, 206-430-9183
CONTINUED ON NEXT PAGE
Earth
solutim
NwLIC
Earth Solutions NWLLC
1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710
r Field Rep.
AK, Marley
Time On Site
1:15 PM;
3:45 PM
DAILY FIELD REPORT Travel Time ea er
Project No.
th
Page of
Report No
0895.06
1/1
44
Time Off Site
_
Date
Day of Week
L1:30M;
M
10/3/19
Thursday
W
Project Name Job Location
Weatherly Inn 4500 Talbot R
General Contractor General Contract
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite 0 YES F-]NO
1.25 Hr. RT 60s°F, Clear
Client / Owner
I. S., Renton, WA RJ Development, LLC
,'s Superintendent Received Onsite By
Project No.
Checked By
Permit No
At the client's request, ESNW rep was onsite to observe storm line backfill, storm water discharge, rockeries, vault
excavation and earthwork activities.
Storm Line Backfill
While onsite, rep observed contractor use a medium sized excavator to excavate a storm line. Rep observed trench
to be W3'xD4' approximately. Contractor was observed placing 12" corrugated pipe at the toe of the excavation and
embedding the pipe in an 8" lift of pea gravel. Contractor expressed plans to continue storm line excavation and
backfill tomorrow, October 4, 2019. Rep will return to observe and test the backfill as needed.
Storm Water Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment (<3
ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a PH level of 6.5.
Contractor expressed plans to build pump and meter before pumping water out of baker tanks. Rep met with ESNW
stormwater manager, Marley, onsite to review and discuss the storm water discharge.
Rockeries
Rep used a '/" steel t -probe and observed the keyway for the rockery located at the southeast quadrant of the site.
Rep observed the keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep
observed contractor place a few courses of rocks. Rep observed contractor place a 4" perforated drain pipe behind
the first course of the rockery, embed the pipe in an 18" lift of V-2" wash rock, geotextile, then backfill over the
geotextile with 2"4' quarry spalls.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions LIONS NWLLC Field Rep.
Project No. Page of Report No
AK
0895.06 1 /2 45
i 1805 136th Place NE, FAX:
NWLLc Suite 201 (425) 449-47116iiiL Time On Site
Date 1 Day of Week
Time Off Site
Bellevue, WA 98005 TOLL FREE:
12:45 PM
10/4/19 Friday
1:30 PM Y
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT Travel Time
Weather
1.25 Hr. RT
60s°F, Clear
Project Name Job Location
Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor General Contractor's Superintendent
Received Onsite By
Grading Contractor Grading Foreman
Checked By�o
Rino Construction Rod
Are approved Plans/Permits onsite YES ❑ NO Project No.
Permit No.
Test Reference
Maximum Fill
Test Dry
% of
Number Test Location (Storm Backfill) Elevation Compaction
Dry Density Moisture
Density
Maximum
Curve
lbs./cu.ft. %
lbs./cu.ft.
Dry Density
35 See map for approximate location -2' 1
130.7 11.1
124.5
95
36 See map for approximate location SG 1
130.7 12.9
124.0
95
37 See map for approximate location -2' 1
130.7 11.3
124.4
95
38 l See map for approximate location SG 1
130.7 10.6 124.2 95
At the client's request, ESNW rep was onsite to observe and test Oa(M
line backfill, storm water discharge, vault
excavation and earthwork activities.
Storm Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a storm line (W3'xD5'). Rep observed
contractor place a 12" corrugated pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift
of pea gravel. Rep observed contractor place brown silty sand with gravel material
in loose 12"-18" lifts and compacting
with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Storm Water Discharge
Rep observed contractor pump a baker tank into the sewer after previous visit IMHOFF cone test. Rep observed
that contractor had pumped —1000 gallons of water. Contractor expressed plans to continue pumping water into the
sewer system tomorrow and next week.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
I
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE Z
Earth Solutions N'W«C
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
2/2
45
I�Tbl rrlF+ 1805136 1h Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
12:45 PM
1:30 PM
10/4/19
Friday
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
60s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor Grading Foreman
Rino Construction Rod
Checked By
Ore approved Plans/Permits onsite 0 YES ❑ NO Project No. Permit No.
COPY TO: CONTINUED ON NEXT PAGE