DETAIL POLE PLACEMENT
FOR POLES 2, 5 & 11
POLE 8"=PPB, PS
BASE 18"=TYPE II, III
PLATE\
NOTE: SIGNAL CONTRACTOR SHALL
COORDINATE WITH THE CONCRETE
CONTRACTOR TO ENSURE PROPER
RELATIONSHIP BETWEEN THE SIGNAL
POLE AND ADA RAMP.
DETAIL
POLE PLACEMENT
FOR POLE 3
POLE
4'X4'
BASE
____LEVEL
PLATE
OLANDING
1 1 UTILITY
0' MAX
POC TO
PPB
NOTE: SIGNAL CONTRACTOR SHALL
COORDINATE WITH THE CONCRETE
CONTRACTOR TO ENSURE PROPER
RELATIONSHIP BETWEEN THE SIGNAL
POLE AND ADA RAMP.
DETAIL POLE PLACEMENT
FOR POLE 7
BACK OF
SIDEWALK
1 1 COIL
N� POLE
U- BASE
PLATE
NOTE: SIGNAL CONTRACTOR SHALL
COORDINATE WITH THE CONCRETE
CONTRACTOR TO ENSURE PROPER
RELATIONSHIP BETWEEN THE SIGNAL
POLE AND ADA RAMP.
DETAIL POLE PLACEMENT
FOR POLE 10
4'X4' POLE
LEVEL LANDING--,,- BASE t-
I � PLATE
I �
�U
8 "= PS
NOTE: SIGNAL CONTRACTOR SHALL
COORDINATE WITH THE CONCRETE
CONTRACTOR TO ENSURE PROPER
RELATIONSHIP BETWEEN THE SIGNAL
POLE AND ADA RAMP.
10 40
0 20 60
SCALE IN FEET
19TENW
SHEET TS-01:
• CONSTRUCTION NOTES
• WIRE SCHEDULE
• BREAKER SCHEDULE
SHEET TS-03:
• WIRE DIAGRAM
SHEET TS-04:
• SIGNAL POLE SCHEDULE
DETAIL POLE PLACEMENT
FOR POLE 8
POLE
BASE^
NOTE
TO LEVEL LANDING
SIGNAL CONTRACTOR SHALL
COORDINATE WITH THE CONCRETE
CONTRACTOR TO ENSURE PROPER
RELATIONSHIP BETWEEN THE SIGNAL
POLE AND ADA RAMP.
BREAKER SCHEDULE
CIRCUIT
BREAKER
CONTACTOR
VOLTS
MAIN
2P-200 AMP
---
1201240
SIGNAL
1 P-50 AMP
---
120
ILLUM A
SIGNAL ILLUM)2P-20
AMP
30 AMP
240
ILLUM B SPARE
2P-20 AMP
30 AMP
240
R/W
SIGNAL & ILLUMINATION GENERAL NOTES SECTION 257 TOWNSHIP 23 NORTH, RANGE
4 E, W.M.
1.
CONTRACTOR SHALL CHECK FOR OVERHEAD VERTICAL CLEARANCE REQUIREMENTS PER SHEET TS-04 FOR ALL SIGNAL HEADS ABOVE THE STREET PRIOR TO POURING OF
FOUNDATION.
2.
ALL TRAFFIC SIGNAL AND PEDESTRIAN HEADS AND PUSH BUTTONS SHALL BE SECURELY AND COMPLETELY COVERED WHILE NOT IN OPERATION.
J.
JUNCTION BOXES SHALL BE PLACED OUTSIDE OF PAVEMENT SURFACE AND WHEELCHAIR RAMPS UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER.
4•
ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS AND THE CURRENT EDITION OF THE CITY OF RENTON STANDARD SPECIFICATIONS AND DETAILS. THE CURRENT
EDITION OF THE CITY OF RENTON STANDARD SPECIFICATIONS AND DETAILS SHALL BE CONSIDERED PART OF THIS CONTRACT.
5.
THE LOCATIONS OF FEATURES SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR AS NECESSARY.
6.
THE CONTRACTOR SHALL SUBMIT A REQUEST TO THE INSPECTOR FOR MATERIALS APPROVAL THREE WEEKS PRIOR TO REQUESTED APPROVAL DATE.
7.
ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY REQUIREMENTS. THE CONTRACTOR SHALL CONTACT ALL PERTINENT UTILITY AGENCIES 48 HOURS BEFORE
COMMENCING WORK, AND SHALL COORDINATE WITH AFFECTED UTILITY AGENCIES THROUGHOUT THE PROJECT.
8.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY THE AFFECTED UTILITY COMPANY AND THE CITY OF
RENTON IMMEDIATELY UPON DAMAGE.
9.
EXISTING FEATURES TO REMAIN UNLESS OTHERWISE NOTED.
10.
ALL CONDUCTORS FOR SIGNAL HEADS, LOOPS, PEDESTRIAN HEADS, PUSHBUTTONS, AND STREET LIGHTS SHALL BE LABELED IN EACH JUNCTION BOX.
11.
ALL SIGNALIZED CROSSWALKS SHALL BE OPERATIONAL AT ALL TIMES UNLESS FLAGGERS/POLICE ARE PRESENT TO ASSIST PEDESTRIANS.
12.
CONTRACTOR SHALL PROVIDE TENW WITH REDLINE MARKUPS SHOWING ANY AND ALL CHANGES FROM THESE APPROVED PLANS FOLLOWING CONSTRUCTION.
13.
SIGNAL POLE BASE PLATES AND FACE OF PUSHBUTTONS SHALL ALIGN WITH THE BEARING OF THE CROSSWALK IT SERVES. FAILURE TO ORIENT POLES BASE PLATES WITH
THE CROSSWALK WILL REQUIRE THE FOUNDATION TO BE REMOVED AND RE —POURED BY THE CONTRACTOR. SEE SIGNAL POLE PLACEMENT DETAILS, THIS SHEET.
14.
CONTRACTOR SHALL CONFIRM PREFERRED TRENCHING/BORING METHOD WITH CITY OF RENTON PRIOR TO BEGINNING CONSTRUCTION.
15.
TRAFFIC SIGNAL, ILLUMINATION AND INTERCONNECT CONDUIT SHALL BE PLACED SUCH THAT IT WILL NOT CONFLICT WITH FUTURE STREET TREE OR STRUCTURE
INSTALLATIONS. VERIFY CONDUIT PLACEMENT WITH ENGINEER PRIOR TO BEGINNING CONSTRUCTION.
16.
AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE
EXISTING OR
FIRSTEOUSINOONLIWIHSSUR
DCEHOAVT)WI PORDRLFOBNESSITEGRORCONDITIONS T�ATATEEAI RETCFCTS�TOUBFACEELKADDTIALYTHESEOUMNTSS
E THAT THERE UTILITIES. ADDITIONALLY,
CONTRACTOR SHALL CONFIRM THAT THERE IS A )WINIMUM 10—FT CLEARANCE PROVIDED BETWEEN OVERHEAD POWER LINES AND THE PROPOSED SIGNAL AND LUMINAIRE
POLES PRIOR TO POLE PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY. THE CONTRACTOR SHALL CONTACT THE ENGINEER
IMMEDIATELY IF A CONFLICT IS DISCOVERED.
17.
FOR SIGNAL SYSTEM COORDINATION WITH THE CITY OF RENTON, CONTRACTOR SHALL CONTACT TRANSPORTATION MAINTENANCE ASSISTANT MANAGER, ERIC CUTSHALL
425-430-7423.
18
RESIST NTT I ALLBJUNCTION SHALL BECORRECTLYACCESS, URRENT" SHALL BE NON—SKID, SKID
SIDEWALK (LIGHTING, SIGNAL
CUNCRETE ALL
PERRSCIT Y OF RENTONASTANDARD (PEDESTRIAN
18.
ALL PUSH BUTTONS SHALL BE POLARA EZ NAVIGATOR WITH ONE (1) PROGRAMMING NOTE FOR THE ENTIRE INTERSECTION.
—
❑❑ lt_�
_—
M
M
� M
D
C)
R/W
M
7777�
M
2
(!1 r 101+50 102+00
M = �02+50 SYV 27%/� s�
ITT
_ CO (27— L 1/V , 103+00
M D E)
SD
—1 N _D SD D SD _
U) _
U1J CD �—
N —GAS GAS GAS
T T T_ T GAS
U-1 E A�
O
�S••oF wAsyB��
_ o
2.
IFS p, 35 ST6�'0�0..-
S�ONAL•��G _12
Transportation Engineering NorthWest
Transportation Planning I Design I Traffic Impact & Operations
11400 SE 8th Street, Suite 200, Bellevue, WA 98004
Office (425) 889-6747
Project Contact: Jaedi Stevens
Phone: 425-250-0868
� 35635 Q
�c�STv ;
ibhsi2
31orl?
19 6
I
_ SD
R/W aS
-
M-
—GAS _ --
E �-
�6 Gq GAS
P,
R/W RIW
0
so
M M
SW 27TH ST
SD SD
— — — — — — — — — — — — — — — —�
— — — —
GAS — GAS
T
GS — A— as
FIBER OPTIC
SPLICE SCHEMATIC
24 SMFO
24 SMFO
24 SMFO
24 SMFO
GRADY & OAKESDALE (NB)
43RD & OAKESDALE (SB)
27TH & OAKESDALE TSC
27TH & NACHES
1-12
1-12
1-6
1-6
13-18
13-18
7-12
7-12
19-24
19-24
OLD 13-18 NEVI
13-18
19-24
19-24
r
AS BUILTS
REVISION
NEW
7 20 18 SURVEYED:
DESIGNED:
JLS
DRAWN:
JLS
CHECKED:
GMD
BY DATE APPR APPROVED:
CTB
a %7M-xl
1i
I �06\11
Lis
L�
SIGNAL AND ILLUMINATION LEGEND
EX
NEW/RELOCATE
DESCRIPTION
�-
m 0
JUNCTION BOX TYPE 1,2,8
(SKID -RESISTANT)
H
MAST ARM MOUNTED SIGN
VEHICLE SIGNAL HEAD
-# ►
PEDESTRIAN SIGNAL HEAD
VIDEO DETECTION CAMERA
LUMINAIRE POLE
SIGNAL POLE TYPE III
O
TYPE PPB OR PS POLE
PPB
EMERGENCY PRE-EMPTION
DETECTOR
-A
TENON
- - -
- - -
CONDUIT/CONDUCTOR
®
®
ELECTRICAL SERVICE
CABINET W/BPS
®
®
CONTROLLER CABINET
O
DETECTION LOOPS
OCONSTRUCTION
NOTE
SIGNAL POLE NUMBER/
CONSTRUCTION NOTE
WIRE NOTE
\-- - -- --RIW
\ I
\� 0 0 0
U
Q
J
I I I I
1 2 6
o o z
J
23 6
GAS 1@ 0 G
- I- , - U
Lu- R/W O
N Cn
W
3 m
NEW FIBER SPLICE TO CONTINUE TO SW 43RD ST w
SEE FIBER OPTIC SPLICE SCHEMATIC, THIS SHEET. A—NNNNNNN 21
IN COMPLIANCE WITH CITY OF RENTON STANDARDS Cn
W
IIr
CU
Q
0
z
O
J
CU
SCALE:
VERTICAL: NAVD 1988 • DATE:
HORIZONTAL: NAD 1983/1991 CITY OF 03110117
GHC LONGACRES - MERTO BUS STOP CITY PLANS FIELDBOOK:
RENTON RENTON WASHINGTON PAGE:
ONE INCH DATUM • 1 DRAWING N0:
AT FULL SCALE Plan ning/Building/Public Works Dept. TS-02
IF NOT ONE INCH
SCALE ACCORDINGLY TRAFFIC SIGNAL PLAN
SHEET: OF:
4 9
T-388306