Loading...
HomeMy WebLinkAboutMFP19004846.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004846 IVR Number: 19004846 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :09/04/2019Application Date:3342101131Parcel Number:1214 N 29TH ST Permit Type:09/18/2019Issue Date:Franchise Permit Work Class:09/17/2020Expiration Date:Minor Utility Job Number:101122218Franchise Type:Electric Description:REVISION: Remove damaged HH1 and replace with new 17"X30" PE secondary HH. Restoration per City of Renton standards. Swing existing OH SVC on P01 to temp OH meter. Crew to install 1 run of 4/0 UG TPX in trench from P02 to meter. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 2/1/2018 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov REVISION - FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Only Current Issued Permits Qualify for a Revision. For any work related to an expired or finaled permit, a new Franchise Permit Application shall be required. Submit an electronic copy of the plans with the Revision Franchise Permit Application to franchisepermits@rentonwa.gov. Permit # Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Approved Description of Work: Proposed Description of Work: Reason for change of work: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date D&WϭϵϬϬϰϴϰϲ Wh'd^KhEEZ'zͲ>dZ/ ϭϬϭϭϮϮϮϭϴ ϮϱϯͲϮϯϰͲϲϰϭϬ KZZ/ZzZ'KZZ/͘ZzZ'ΛW^͘KD ϭϮϭϰEϮϵd,^d ^t/E'y/^d/E'K,^sKEWϬϭ;ϯϭϵϮϬϳͲϭϲϲϭϴϱͿdKdDWK,DdZ͘ZtdK/E^d>>ϭZhE K&ϰͬϬh'dWy/Eh^dKDZWZKs/dZE,&ZKDWϬϮ;ϯϭϵϮϬϳͲϭϲϲϮϬϬͿdKDdZ͘ <Wy/^d/E'W>E͘ZDKsD',,ϭEZW>t/d,EtϭϳΗyϯϬΗW ^KEZz,,͘W>^^dd, y/^d/E',,t^D' ϭϬͬϵͬϭϵCorrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.09 10:00:10 -07'00' Scott Warlick 10/11/2019 Holly Powers 10/11/2019 RESTORATION PER CITY OF RENTON STANDARDS DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101122218 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 1214 N 29TH ST SWING EXISTING OH SVC ON P01 (319207-166185) TO TEMP OH METER. CREW TO INSTALL 1 RUN OF 4/0 UG TPX IN CUSTOMER PROVIDED TRENCH FROM P02 (319207-166200) TO METER. PLEASE SEE ATTACHED ✔✔✔✔ ✔50'X4'X4' Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.09.04 15:39:51 -07'00'9/4/19 MFP19004846 Scott Warlick 9/6/2019 RESTORATION PER CITY OF RENTON STANDARDS Nathan Janders 9/18/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101122218 Potelco, Inc KHADER GOUESSE (253) 254-2896 6905 S 228th St, Kent, WA 98032 KHADER.GOUESSE@PSE.COM 1214 N 29TH ST TBD TBD CORRIE RYDBERG 9/4/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.09.04 15:39:37 -07'00' MFP19004846 Scott Warlick 9/6/2019Monday - Friday 8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK #1214P01HH1P02N 29TH STPARK AVE N 111111111212 RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURESTOP FLAGGER STOP FLAGGER STOP FLAGGERFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREA100'X'ROADWORKAHEADW20-1X'ROADWORKAHEAD W20-1W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1011222181214 N 29TH ST, RENTON09/03/19FLAVIANA.NUNES@PSE.COM425-424-7809SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTRENCHNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19004846 120311151119 1114 1213 1217 1209 1208 1214 1220 1118 1202 2913 1221 2907 12131209 281511051107120111131205ROW50'ROW 50' N 29TH STDWY PARK AVE N319207-166170 50 kVA 120/240V (C) SLAP1939 319207-166200 37.5 kVA 120/240V (C) SLAP1938 #4CU 319207-166185 25 kVA 120/240V (C) HIG 15 PARK AVE N5' X 7' WORK PIT CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED PSE INST. 1-RUN 4/0 UG TPX ± 100' CUSTOMER SUPPLIED 1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 80' 90° R=48"50'30' 6" BEDDING OF CRUSHED ROCK CUSTOMER SUPPLIED DWY 16' N 29TH ST 319207-166200 37.5kVA 120/240v DWY 16' 8' PAVEMENT SHOULDER 1220 ROW50'24'14'7'1'14' 9'27'20' 1214 13'13'EOP EOP EOP EOP 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' OVERHEAD CIRCUIT MAP 2405E136 SCALE: 6" = 1 MILE JOB SITE POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH FOR CROSSINGS IS ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 5' X 7' WORK PIT & 6" BEDDING OF CRUSHED ROCK AT HH2 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M02 TRENCHING & CONDUIT. -INSTALL ± 80' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM HH1 TO M02. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC E. SCHOTT PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. SCALE: 1" = 20' PARTIAL PLAN DETAIL N50' ROW CL S NOT TO SCALE CROSS SECTION - N 29TH ST LOOKING WEST SITE SPECIFIC NOTES AT P01: 319207-166185 -EXISTING POLE TO REMAIN AT P02: 319207-166200 -EXISTING POLE & 37.5kVA TRF TO REMAIN AT HH1: -REMOVE EXISTING HAND HOLE AT HH2: -INSTALL (1) 17" X 30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350) -INSTALL (3) 6-POS #10 - 350KCMIL CONNECTION BARS -TRANSFER EXISTING SVCS FROM HH1 TO HH2 M01 AT "1214": OH METER -REMOVE EXISTING OH METER (ALREADY DISCONNECTED) M02 AT "1214": NEW PERM METER BASE -INSTALL 200A METER ___ SPAN SPECIFIC NOTES HH2 TO M02: ,167$//5818*73;“¶BBB $&78$/ UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K. GOUESSE 253-254-2896 08/23/19 K. GOUESSE 253-254-2896 08/23/19 S. FOX 714-893-2405 08/23/19 NOT REQUIRED MFP19004846 JASWINDER SEKHON RESIDENCE HH UPGRADE & RES UG-UG SVC 1214 N 29TH ST, RENTON, WA 98056 N/A MFP19004846 N/A 101122218 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN SW 32-24N-05E N/A N/A 2405E127 2405E136 2405E127 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:KHADER GOUESSE 253-254-2896 KHADER.GOUESSE@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 508033697 594130809 108116320 101123557 108115434 101122218 UG Misc HH Removal HH Replacement (already disconnected) Superior 101122218Owner / Developer Contact Info officeATTN: N & J CONSTRUCTION CORP 8669 ASHBURY CT BLAINE, WA 98230 JASWINDER SEKHON 206-902-0804 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 3,500 SQ FT 200A GAS 10.6kW 144A 1.7% 3.9% CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 05/2019 148.00 124.00 114.00 0.00 0.00 1.55 148.00 124.00 115.55 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 Yellow PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. METER DETAIL @ M03 SCALE: NONE 32" Typical 24"Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale ConduitEndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 MAP CORRECTION NOTES: -HH1 WAS MOVED TO REFLECT ACTUAL LOCATION IN THE FIELD ___ ___ ___ ___ 2' X 2' WINDOW 2' X 2' WINDOW 6.7 CUBIC YARD OF SOIL DISPLACEMENT