HomeMy WebLinkAboutMFP19004846.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004846
IVR Number: 19004846
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :09/04/2019Application Date:3342101131Parcel Number:1214 N 29TH ST
Permit Type:09/18/2019Issue Date:Franchise
Permit Work Class:09/17/2020Expiration Date:Minor Utility
Job Number:101122218Franchise Type:Electric
Description:REVISION: Remove damaged HH1 and replace with new 17"X30" PE secondary HH. Restoration per City of Renton
standards.
Swing existing OH SVC on P01 to temp OH meter. Crew to install 1 run of 4/0 UG TPX in trench from P02 to meter.
Restoration per City of Renton standards.
APPROVED WITH COMMENTS OR REDLINES.
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 2/1/2018
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
REVISION - FRANCHISE PERMIT APPLICATION
Published: 2/1/2018
TO THE APPLICANT: Only Current Issued Permits Qualify for a Revision. For any work related to an expired
or finaled permit, a new Franchise Permit Application shall be required. Submit an electronic copy of the
plans with the Revision Franchise Permit Application to franchisepermits@rentonwa.gov.
Permit #
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Approved Description of Work:
Proposed Description of Work:
Reason for change of work:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
D&WϭϵϬϬϰϴϰϲ
Wh'd^KhEEZ'zͲ>dZ/
ϭϬϭϭϮϮϮϭϴ ϮϱϯͲϮϯϰͲϲϰϭϬ
KZZ/ZzZ'KZZ/͘ZzZ'ΛW^͘KD
ϭϮϭϰEϮϵd,^d
^t/E'y/^d/E'K,^sKEWϬϭ;ϯϭϵϮϬϳͲϭϲϲϭϴϱͿdKdDWK,DdZ͘ZtdK/E^d>>ϭZhE
K&ϰͬϬh'dWy/Eh^dKDZWZKs/dZE,&ZKDWϬϮ;ϯϭϵϮϬϳͲϭϲϲϮϬϬͿdKDdZ͘
<Wy/^d/E'W>E͘ZDKsD',,ϭEZW>t/d,EtϭϳΗyϯϬΗW
^KEZz,,͘W>^^dd,
y/^d/E',,t^D'
ϭϬͬϵͬϭϵCorrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.10.09 10:00:10 -07'00'
Scott Warlick 10/11/2019
Holly Powers 10/11/2019
RESTORATION PER CITY OF RENTON STANDARDS
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101122218
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
1214 N 29TH ST
SWING EXISTING OH SVC ON P01 (319207-166185) TO TEMP OH METER.
CREW TO INSTALL 1 RUN OF 4/0 UG TPX IN CUSTOMER PROVIDED TRENCH FROM
P02 (319207-166200) TO METER. PLEASE SEE ATTACHED
✔✔✔✔
✔50'X4'X4'
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.09.04 15:39:51 -07'00'9/4/19
MFP19004846
Scott Warlick 9/6/2019
RESTORATION PER CITY OF RENTON STANDARDS
Nathan Janders 9/18/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101122218
Potelco, Inc
KHADER GOUESSE (253) 254-2896
6905 S 228th St, Kent, WA 98032
KHADER.GOUESSE@PSE.COM
1214 N 29TH ST
TBD
TBD
CORRIE RYDBERG
9/4/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.09.04 15:39:37 -07'00'
MFP19004846
Scott Warlick
9/6/2019Monday - Friday
8:00AM - 3:00PM
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
#1214P01HH1P02N 29TH STPARK AVE N 111111111212
RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURESTOP
FLAGGER
STOP
FLAGGER
STOP
FLAGGERFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREA100'X'ROADWORKAHEADW20-1X'ROADWORKAHEAD W20-1W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1011222181214 N 29TH ST, RENTON09/03/19FLAVIANA.NUNES@PSE.COM425-424-7809SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTRENCHNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19004846
120311151119
1114
1213
1217
1209
1208 1214
1220
1118 1202
2913
1221
2907
12131209 281511051107120111131205ROW50'ROW
50'
N 29TH STDWY PARK AVE N319207-166170
50 kVA 120/240V (C)
SLAP1939
319207-166200
37.5 kVA 120/240V (C)
SLAP1938
#4CU
319207-166185
25 kVA 120/240V (C)
HIG
15
PARK AVE N5' X 7' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
PSE INST. 1-RUN 4/0 UG TPX ± 100'
CUSTOMER SUPPLIED
1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 80'
90°
R=48"50'30'
6" BEDDING OF CRUSHED ROCK
CUSTOMER SUPPLIED
DWY
16'
N 29TH ST
319207-166200
37.5kVA 120/240v
DWY
16'
8' PAVEMENT SHOULDER
1220
ROW50'24'14'7'1'14'
9'27'20'
1214
13'13'EOP
EOP
EOP
EOP
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
OVERHEAD CIRCUIT MAP 2405E136
SCALE: 6" = 1 MILE
JOB SITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH FOR CROSSINGS IS ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 5' X 7' WORK PIT & 6" BEDDING OF CRUSHED ROCK AT HH2
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M02
TRENCHING & CONDUIT.
-INSTALL ± 80' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM HH1 TO M02.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC E. SCHOTT
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
SCALE: 1" = 20'
PARTIAL PLAN DETAIL
N50' ROW
CL
S
NOT TO SCALE
CROSS SECTION - N 29TH ST
LOOKING WEST
SITE SPECIFIC NOTES
AT P01: 319207-166185
-EXISTING POLE TO REMAIN
AT P02: 319207-166200
-EXISTING POLE & 37.5kVA TRF TO REMAIN
AT HH1:
-REMOVE EXISTING HAND HOLE
AT HH2:
-INSTALL (1) 17" X 30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350)
-INSTALL (3) 6-POS #10 - 350KCMIL CONNECTION BARS
-TRANSFER EXISTING SVCS FROM HH1 TO HH2
M01 AT "1214": OH METER
-REMOVE EXISTING OH METER (ALREADY DISCONNECTED)
M02 AT "1214": NEW PERM METER BASE
-INSTALL 200A METER
___
SPAN SPECIFIC NOTES
HH2 TO M02:
,167$//5818*73;¶BBB
$&78$/
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
K. GOUESSE 253-254-2896 08/23/19
K. GOUESSE 253-254-2896 08/23/19
S. FOX 714-893-2405 08/23/19
NOT REQUIRED MFP19004846
JASWINDER SEKHON RESIDENCE
HH UPGRADE & RES UG-UG SVC
1214 N 29TH ST, RENTON, WA 98056
N/A MFP19004846
N/A 101122218
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SW 32-24N-05E N/A N/A
2405E127 2405E136 2405E127 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:KHADER GOUESSE
253-254-2896
KHADER.GOUESSE@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
508033697
594130809
108116320
101123557
108115434
101122218
UG Misc
HH Removal
HH Replacement
(already disconnected)
Superior 101122218Owner / Developer Contact Info
officeATTN:
N & J CONSTRUCTION CORP
8669 ASHBURY CT
BLAINE, WA 98230
JASWINDER SEKHON 206-902-0804
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
0'
3,500 SQ FT
200A
GAS
10.6kW
144A
1.7%
3.9%
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
05/2019
148.00 124.00 114.00
0.00 0.00 1.55
148.00 124.00 115.55
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
12" Min
in Conduit
Schedule 40 Yellow PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
12" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
METER DETAIL @ M03
SCALE: NONE
32"
Typical
24"Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
ConduitEndsClosed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
Customer's
service
conductors
Captive L-Bolt
27-1/4"
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
Lock Cover
30"
Approx
Approx
17"
Set handhole flush
to final grade
SINGLE PHASE SECONDARY HANDHOLE
Not to scale 6050.2000
MAP CORRECTION NOTES:
-HH1 WAS MOVED TO REFLECT ACTUAL LOCATION IN THE FIELD
___
___
___
___
2' X 2' WINDOW 2' X 2' WINDOW
6.7 CUBIC YARD OF SOIL DISPLACEMENT