HomeMy WebLinkAboutMFP19005357.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005357 IVR Number: 19005357 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :10/03/2019Application Date:3340403805Parcel Number:1415 MAPLE AVE SW Permit Type:10/15/2019Issue Date:Franchise Permit Work Class:10/14/2020Expiration Date:Minor Utility Job Number:186055242Franchise Type:Electric Description:Disconnect existing SVC wire from XF V01 in ROW. Reconnect new SVC wire to V01. Pothole all existing utilities. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 186055242 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 1415 MAPLE AVE SW DISCONNECT EXISTING SVC WIRE FROM XF V01 (317340-165702) IN ROW. RECONNECT NEW SVC WIRE TO V01 (317340-165702). NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED ✔✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.03 15:15:05 -07'00'10/3/19 MFP19005357 Scott Warlick 10/4/2019 RESTORATION PER CITY OF RENTON STANDARDS Holly Powers 10/14/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 186055242 Potelco, Inc DAVE HONEYSETT (253) 245-0883 6905 S 228th St, Kent, WA 98032 DAVE.HONEYSETT@PSE.COM 1415 MAPLE AVE SW TBD TBD CORRIE RYDBERG 10/3/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.03 15:14:51 -07'00' MFP19005357 Monday - Friday 8:00AM - 3:00PM 10/4/2019 Scott Warlick SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 1401 1415 1420 MAPLE AVE SW317357-165707 T0/17 25 kVA 120/240V (C) UNK (ERROR-SET FUSE) SLAG7011 317338-165702 317338-165704 J 317340-165702 2500 kVA 120/208V (ABC) 317339-165702 2500 kVA 120/208V (ABC) 317337-165704 50 kVA 120/240V (C) VIC 14 CUSTOMER OWNED, INSTALLED, & MAINTAINED (5) RUNS OF 600MCM 60' ROW GAS PHONE CABLE TV 507908079 587030003 507908211 3000202784 N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Connection Meter Distribution HP Svc/MSA Owner / Developer Contact Info officeATTN: KG INVESTMENT PROPERTIES 249 SW 41ST ST RENTON, WA 98057 SCOTT JENNINGS (253)691-1376 N Vicinity Map N/A OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE SPECIFIC NOTES SITE PLAN FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 DAVE.HONEYSETT@PSE.COM LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 33,500SQ. 3000AMPS ELEC 310KW 300A 0.7% 0.7% PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'186055242THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE HONEYSETT 253-245-0883 09/27/19 J. REIBMAN N/A 09/27/19 N/A N/A N/A J. REIBMAN N/A 09/27/19 REVIEW RENTON 1415 MAPLE AVE PROJECT DISCONNECT/RECONNECT 1415 MAPLE AVE SW, RENTON, WA 98055 N/A N/A N/A 186055242 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, NW 19 N/A N/A 2305E075 2305E076 2305E075 VIC-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Service Stubs 186055242 N/A N/A 507648970 N/A CIRCUIT FEET ADDED: 0' JOB SITE SW1 -EXISTING SWITCH CABINET AND EQUIPMENT TO REMAIN -PARK CABLES ACG412, ACG413, ACG414 WHILE WORK IS BEING DONE V01 -EXISTING 2500kVA TRF AND EQUIPMENT TO REMAIN -INSTALL (5) 501 TO 1000KCMIL CONNECTOR BARS (MID7651003) -INSTALL (20) MOUNTING BOLT KITS (MID7651008) -CONNECT 5 RUNS OF 600MCM OF CUSTOMER OWNED CABLE M01 -PSE TO REMOVE METER M02 -PSE TO INSTALL 3000AMP CT METER 6' 3' 8" FILTER FENCE SCALE: NONE MFP19005357 1415 17 17 SW 16TH ST MAPLE AVE SWFROM TO TOW AWAY AREA PHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK 111111ROAD ENDS SW1 V01M6-2W1-4LX'ROADWORKAHEADW20-1W1-4R100'ROADWORKAHEADW20-1 maintain (2) 11' lanesRIGHT KEEP R4-7B BUSINESS OWNER(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY -OB186055242 1415 Maple Ave SW, Renton, WA September 30, 2019 ina.ustemchuk@pse.com (425)398-6063 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 010768 Card Exp.06/30/2021 ina.ustemchuk@pse.com (425)398-6063 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP19005357