HomeMy WebLinkAboutAdden 05 CAG-17-149 , Adden #5-19
��, Washington•State •
�I/ Department of Transportation
. Supplemental Agreement Organization and Address
Number 5 KPG,PS, 3131 Elliott Avenue Suite 400 Seattle WA
Original Agreement Number 98121
CAG-17-149 Phone: 253-627-0720
Project Number Execution Date Completion Date
10/24/2017 12/31/2024
Project Title New Maximum Amount Payable
Williams Ave S and Wells Ave S(Conversion) $1,344,918.18 +$27,408.00=$1,372,326.18
Description of Work
Additional potholes to support the storm drainage and water main design for the Houser Way/BNSF
improvements.For detailed description,please see Exhibit A, Scope of Work.
The Local Agency of City of Renton. _ -
'desires to supplement the agreement entered in to with KPG, P.S.
and executed on 10/24/2017 - and identified as Agreement No. CAG-17-149
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
The General Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read Remains iinchan ed - 12/31/2024
;III
Section V, PAYMENT, shall be amended as follows:,
See attached Exhibits A&D.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: zler By.
1 , - ��' 1��yl /{ �r�j�-� i o/ / 7//q
Consul ignature , ptovmg'Aritt fySignature
Date
DOT Form 140-063
Revised 0912005
EXHIBIT A
CITY OF RENTON
WILLIAMS AVENUE S AND WELLS AVENUE S CONVERSION PROJECT
SUPPLEMENT 5 r ADDITIONAL POTHOLES (HOUSER WAY/BNSF)
CAG 17-149
SCOPE OF WORK
September 24,2019
A. PROJECT BACKGROUND/DESCRIPTION
To support the storm drainage and water main design for the Houser Way/BNSF
Improvements, additional potholes are required to determine if the proposed appurtenances
are in conflict with existing City, franchise, and private utilities.
The City of Renton ("City") has requested that KPG ("Consultant") enter into a supplemental
agreement to coordinate the potholing activities required to support the design effort.
B. KPG DELIVERABLES
Deliverables prepared by the Consultant are identified at the end of the Work Element(WE).
■ Monthly progress reports(1 month)
C. SCOPE OF WORK
WORK ELEMENT 30—UTILITY COORDINATION AND POTHOLING
The Consultant will coordinate with private utilities affected by the proposed design revisions.
Efforts included under this WE are as follows:
30.1 Update Utility Conflict Plan: An updated utility conflict plan will be submitted to all
purveyors with utilities in the project limits to assess whether said utilities may be in
conflict with the design revisions.
30.2 Potholing to identify potential utility conflicts will be completed as necessary for design
(20 estimated). The locations of the potholes will be surveyed and added to the
basemap.
City of Renton
Wells/Williams Conversion Project(CAG 17-149)
SUPPLEMENT 5—HOUSER WAY/BNSF ADDITIONAL UTLITY IMPROVEMENTS KPG
Project Number: 16125 1 September 2019
Work Element 30 Deliverables:
■ Utility Conflict Figure(11x17)
• Updated basemap showing utility potholes and utility locations
• Pothole Data Sheets
ADDITIONAL SERVICES
The City may require additional services of the Consultant. The scope of these services will be
determined based on the unanticipated project needs or other considerations at the sole
discretion of the City. These services will be authorized under a future contract supplement if
necessary. At the time these services are required, the Consultant shall provide a detailed
scope of work and an estimate of costs. The Consultant shall not proceed with the work until
the City has authorized the work and issued a notice to proceed.
City of Renton
Wells/Williams Conversion Project(CAG 17-149)
•
SUPPLEMENT S—HOUSER WAY/BNSF ADDITIONAL UTLITY IMPROVEMENTS KPG
Project Number: 16125 2 September 2019
EXHIBIT D
PRIME CONSULTANT COST COMPUTATIONS
Client City of Renton
Project Williams AVe S and Wells Ave S Conversion Project-SUPPLEMENT 5-ADDITIONAL POTHOLES(HOUSER WAWEINSF) InterdisciplinaryDesign
EPG PROJECT NUMBER:1612S
DATE: September,2019
Labor Hour Estimate Total Hours and Labor Fee
Pnnapel Engineering Sr.Engineer Construction Sr.Transit. Project Design Architecture Survey Engineering Survey Crew Survey Crew II Office Admin Estimate by Task
Mgr Mgr Planner Engineer Engineer Technician II Technician Technician
Urban Design Pmject Resident CAS ArcB¢edure Construction
Sr.Cons*Mgr Aviation Mgr Mgr Sr.Architect Surveyor Engineer ProjecitA Technician TechnirianI Admin
Architecture - Construction Documentation j Landscape Construction
WE No, WE Description Survey Mgr Mgr LAD Mgr Office Engr Speaalist Architect Technician
Sranspector Sr.Admin Transportation Technician
Planner
Inspector
•
S 225.00 $ 202.00 $ 184.00 $ 163.00 $ 156.00 $ 141.00 8 128.00 8 118.00. 8 112.00 $ 104.00 $ 165.00 $ 215.00 S 92.00 Hours Fee
WE 30-Utility Cooridnation - . -.
30.1 Update Utility Conflict Plan 8 2 10 E 1,840.00'
30.2 Survey and Baseman Potholes 8 8 16 2 34 S 5,568.00
Task Total 0 16 _ 0 0 0 8 0 0 2 0 16. a ,2 44 S 7,408.00
• Total Labor Hours and Fee 0 16 0 0 0 B 0 0 2 '0 16 ' 0 2 ' 44 S 7,408.00
Suboonsullants ,
Potholing 120(81000) $ 20 000.00
Subtotal $ 20,000.00
.
' Tetal Subconaubant Expense $ 20,000.00.
, . Reimbursable Direct Non-Salary Costa _ ,
Mileage at current IRS rate $ -
- Reproduction Allowance 8 -
Total Reimbursable Expense$
Total Estimated Budget S 27,408.00
FEE ESTIMATE 0262019 .