HomeMy WebLinkAboutC_Ltr McCullough @ Topgolf 10-19-19.pdf
October 19, 2019
VIA ELECTRONIC MAIL
John C. McCullough
701 Fifth Ave. Suite 6600
Seattle, WA 98104
SUBJECT: Response to Topgolf Project, LUA19-000094 (the “Project”), Request for Confirmation
Dear John McCullough:
I am in receipt of your letter, dated September 30, 2019 (Enclosed), wherein you requested the City’s more
specific response to Development Agreement compliance, as referenced in your letter. Specifically how the
Project complies with the 2003 Development Agreement allocation of 1,500 trips listed in Section 4.2.3 to that
Development Agreement.
Anticipated transportation impacts associated with the Project were addressed in the Hearing Examiner’s
decision issued August 19, 2019, as amended on reconsideration dated September 16, 2019 (collectively, the
“Hearing Examiner Decision”). First, the staff report to the Hearing Examiner addressed both a 2002
Development Agreement and the 2003 Development Agreement, explaining that neither Development
Agreement controlled the scope of the Project. Second, through its SEPA review process, the City evaluated
transportation impacts associated with the Project, and the City applied Project-specific transportation
mitigation measures in the SEPA Threshold Determination issued for the Project. The Hearing Examiner Decision
adopted those SEPA mitigation measures as conditions of Project approval. For all of these reasons, the C ity
views the issue of the Project’s transportation impacts (including trip generation) as having been addressed in
the Hearing Examiner Decision. The City intends to honor the Hearing Examiner Decision and will require the
Project to comply with the conditions imposed therein.
I trust that the above response is sufficient to address the concerns raised in your letter.
Sincerely,
Vanessa Dolbee
Current Planning Manager
Enclosure: September 30, 2019 letter, McCullough Hill Leary
cc: Chip Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Brianne Bannwarth, Development Engineering Manager
Clark Close, Senior Planner