Loading...
HomeMy WebLinkAboutMFP19005857.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005857 IVR Number: 19005857 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :10/23/2019Application Date:7227800205Parcel Number:1504 KIRKLAND AVE NE Permit Type:10/30/2019Issue Date:Franchise Permit Work Class:10/29/2020Expiration Date:Minor Utility Job Number:101123338Franchise Type:Electric Description:Install 3" sch80 25' in ROW. At P01 install 3"riser and secondary UG line extension 25 in ROW. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101123338 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 1504 & 1506 KIRKLAND AVE NE CUSTOMERS CONTRACTOR WILL OPEN THEIR 38" TRENCH AND INSTALL 3" SCH80, APPROX 25' IN ROW PSE CREW WILL SET UP AT P01 (318750-166788) AND INSTALL 3" RISER AND SECONDARY UG LINE EXT APPROX 25' IN ROW HS CUT ANTICIPATED ✔✔✔✔ ✔25'X40"X38" Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.23 11:45:09 -07'00'10/23/19 MFP19005857 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 10/30/2019 Holly Powers 10/30/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101123338 Potelco, Inc JESSE DOUCET (206) 573-3576 6905 S 228th St, Kent, WA 98032 JESSE.DOUCET@PSE.COM 1504 & 1506 KIRKLAND AVE NE TBD TBD CORRIE RYDBERG 10/23/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.23 11:44:54 -07'00' Monday - Friday 8:00AM - 3:00PM Scott Warlick 10/30/2019 MFP19005857 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). KIRKLAND AVE NE1513 3105 1507 1501 3102 3101 3021 ROW 60' 318737-166811 300 kVA 120/208V (ABC) 318737-166805 318763-166806 SLAH0575 318763-166814 37.5 kVA 120/240V (B) 318749-166806 SLAH5055 NE 15TH ST NE 15TH ST ROW60'ROW60'UNIT 101 UNIT 102 UNIT 201 UNIT 202 1500 HIG 13 J 318730-166788 SLAH5053 318730-166797 50 kVA 120/240V (A) 318730-166805 X3317 318758-166788 SLAH5054 318758-166796 X9508 (1506)(1504)318750-166788 50 kVA 120/240V (A) CUSTOMER SUPPLIED 5'6" X 4'5" WORK PIT 90° 15'R=48"25'4' X 4' WORK PIT CUSTOMER SUPPLIED PSE INST. 1-RUN 350 UG TPX ± 75' CUSTOMER SUPPLIED 1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 40' 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIEDKIRKLAND AVE NEROW 60'EOPEOP5'7' 32' 1'1'SIDEWALK5' 318750-166788 50 kVA 120/240V (A)SIDEWALK5' 4' UNIT 102 UNIT 201 UNIT 202 3' 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' JOB SITE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT P01 -REQUIRED TO PROVIDE 5'6 X 4'5 WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT HH1 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. Myer PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE POWER GENERAL NOTES - MULTIFAMILY PROJECT 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 Yellow PVC Gas Service Line 40" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. SITE SPECIFIC NOTES AT P01: 318750-166788 -EXISTING 45' CL-3 (1967) POLE TO REMAIN -INSTALL 1- 3" SEC RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) ± 30' ___' ACTUAL AT HH1: -INSTALL (1) 17"x30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350) -INSTALL (3) 6-POS FARGOS BARS AT HH2: -INSTALL (1) 17"x30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350) -INSTALL (3) 6-POS FARGOS BARS SPAN SPECIFIC NOTES P01 TO HH1: -INSTALL 1-3" SCH'L 80 CONTINUOUS PVC CONDUIT, ± 40' ___' ACTUAL -INSTALL 1-RUN 350MCM UG TPX, ± 75’ ___' ACTUAL ___ UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. DOUCET 206-573-3576 10/16/19 F. WATSON 253-437-6743 10/16/19 M. HAIGHT 714-893-2405 10/16/19 N/A RENTON 1504 KIRKLAND AVE DUPLEX OH TO UG SEC, NEW HH 1504 & 1506 KIRKLAND AVE NE, RENTON 98056 101123338 AS NOTED 1 OF 1 KING CSPSKEIN SW 4-23N-05E 2305E015 2305E040 2305E015 HIG-13 CENTURYLINK KENNETH LUU 206-346-0144 COMCAST BILL WALKER 253-288-7538 E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSE DOUCET 206-573-3576 JESSE.DOUCET@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 508289058 507786073 587030519 101123338Superior 101123338SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2305E040 Owner / Developer Contact Info officeATTN: CALLIDUS DEVELOPMENT INC 16805 SE 43RD COURT BELLEVUE, WA 98006 ANDREW RUTTAN 206-390-8245 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 1,900 SQ FT 200A GAS 18kW 80A 2.1% 1.2% CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-13 05/2019 184.00 128.00 100.00 2.63 0.00 0.00 186.63 128.00 100.00 PARTIAL PLAN DETAIL SCALE: 1" = 20' E 60' ROW CL W NOT TO SCALE CROSS SECTION - KIRKLAND AVE LOOKING NORTH CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS 1504 2 HH1 1 4 0 - 1506 2 HH1 1 4 0 - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE PSE 1730 POLYETHELYNE HANDHOLE PLAN VIEW 2" APPROX 30" APPROX17"ELECTRIC 4' - 5" PENTABOLT LOCK COVER 5' - 6" 18" SIDE VIEW4" X 4" KNOCKOUT (2 PLACES) APPROX 27"APPROX 40"20" CONDUITS ENTER FROM BENEATHAT ONE END OF HANDHOLE SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL Not to scale Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE 4'x4' Work Pit UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 ___ ___ MFP19005857 1504150618 18 18181818NE 15TH ST NE 15TH ST maintain (2) 11' lanes FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK P01 CONETOPPER ROAD WORK AHEAD W20-1RIGHT SHOULDER CLOSED W21-5aRW1-4L100'100'100'ROADWORKAHEADW20-1100' 101 102 201 202CONETOPPERROADWORKAHEADW20-1W1-4R100'100'100'ROADWORKAHEADW20-1100' 18 18KIRKLAND AVE NETHE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY -O%101123338 1504 & 1506 KIRKLAND AVE NE, RENTON, WA 98056 10/14/2019 jason.bisenius@pse.com 425-424-7316 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 TEMPORARY TRAFFIC CONTROL PLAN SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP19005857