HomeMy WebLinkAbout4144_001.pdfField Rep Project No.
LL t Earth Solutions NWLLC , AK 0895.06
NWILLC 1805 — 136" Place N.E., Suite 201, Time On Site Time Off Site
Bellevue, WA 98005
Phone (425) 449-4704 FAX (425) 449-4711 11:45 AM 12:15 PM
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
Project Name 74500
ob Location
Weatherly Inn Talbot Rd. S., Renton
Erosion Control BMPs Overall ConditionG= Good F=Fair Need Repair
(13 Elements) P=Poor Y= Yes N=No
1. Preserve Vegetation/Mark Clearing Limits
• Buffer Zones Around Sensitive Areas G N
• Silt Fence
2. Establish Construction Access
• Fabric/Quarry Spalls G N
• Wheel Wash
• Sweeper Truck
3. Control Flow Rates
• Stormwater Vault/Facility
• Straw Wattles G N
• Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation G N
Straw
• Sediment Ponds/Traps/Filters
• Chemical Treatment
5. Stabilize Soils
■ Nets and Blankets
• Mulch / Bark / Rock
• Hydroseeding / Grass
• Plastic Sheeting
• Stabilize Stockpiles
• Stockpiles
• PAM
• Water Truck
6. Protect Slopes
• Benching / Track Walking
• Pipe Slope Drains
• Plastic Sheeting /Anchors (1)
7. Protect Drain Inlets
• Catch Basin Inserts
• Gutter/ Road
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
Nets and Blankets
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
10. Control De -Watering
11. Maintain BMPs
12. Manage the Project
• Maintain SWPPP / Site Loa Book
13. Protect Low Impact Development
(LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
G N
G N
G N
N/A N/A
Page 1 of 2 Report No.
61a
i
Date _ Day of Week
10/28/19 Monday
NPDES Permit No
WAR -307963
Client / Owner
RJ Development, LLC
Comments
Silt fence working as intended
Sweep roadway when soil is seen on surface,
replenish quarry spalls as needed
Add check dams and straw wattles as needed to
slow stonnwater onsite
Add straw as needed throughout the site, 2"
minimum
CB inserts working as intended
N/A
N/A I N/A 1 N/A
N/A N/A N/A
G N See recommended notes
G N Available upon request
Field Rep. NPDES Permit No Date Project No.
AK WAR -307963 10/28/19 0895.06
Monitoring and Records / Recommendations?
Will existing BMPs need to be modified or removed, or other BMPs installed?
If YES, list the action items to be completed on the following table: ❑ YES ® NO
Page 2 of 2 Report No.
61a
Actions / Recommendations To Be Completed
_
Sweep site entrance when soil is seen on roadway
Completed
Y or N)__
Initials / Date
If Complete)
Ongoing
Ongoing
Add 2" straw throughout the site over exposed soils as needed
Ongoing
Ongoing
Replenish quarry spalls at the main entrance to the site as needed
Ongoing
Ongoing
Replace plastic sheeting on exposed slopes as needed
Ongoing
Ongoing
Turbidity Meter Used: Hanna Meter #
Monitor Location
Turbidity (NTUs)
pH
Notes
Describe Current Weather Conditions: 50sO F, Clear
Approximate amount of precipitation since last inspection:
0.07 inches
Approximate amount of precipitation in the last 24 hours:
0.00 inches
Was water quality sampling part of this inspection?
❑ YES ® NO
If YES, record results in the table below:
Describe below the discharging stormwater, if present.
Note the presence of suspended sediment, "cloudiness",
discoloration, or oil sheen.
N/A
Turbidity Meter Used: Hanna Meter #
Monitor Location
Turbidity (NTUs)
pH
Notes
® YES ❑ NO
• Is the site in compliance with the SWPPP and the permit requirements?
• If NO, indicate tasks necessary to bring site into compliance on the "Actions To
Be Completed" table above, and include dates each job will be completed
■ If NO, has the non-compliance been report to Dept. of Ecology? ❑ YES ❑ NO
• If NO, should the SWPPP be modified? ❑ YES ❑ NO
Sign the following certificate:
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief."
y. g n rew imn
CESCL Certification Number: _CESCL-EF8182309 etokbb
Inspection completed on: (Date) 10/28/19