Loading...
HomeMy WebLinkAbout20191031131028.pdfTo: La r1M �5v 1 �i#ire n Wilt Earth Solutions NW, LLC LETTER OF TRANSMITTAL RJ Development Date: October 30, 2019 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Duane Meyer Email: duane ,accrete.build No. of Copies Date Description 1 10/14/19 Daily Field Re ort(s # 51 Comments: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 CC: 1: John Wilson ATTN: ohnw nnocon.com 2: Mark Richardson ATTN: mark u accrete. build 3: Jeff Brain ATTN:efif�accrete.bukj 4: Jennifer Vo ele ATTN' Lennifer accrete. build 5: Jonathan Chavez ATTN- ichavez@brentonwa.gov Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 Earth Solutions NW«C t 1=1 1805 136" Place NE, FAX: Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: Project Name Weatherly Inn General Contractor Grading Contractor Rino Construction Field Rep. AK Time On Site 11:45 AM Travel Time 1.25 Hr. RT Job Location 4500 Talbot Rd. S., Renton, WA General Contractor's Superintendent Grading Foreman Rod Project No. Page of Report No. 0895.06 1/1 51 (425)449-4704 (866)366-8710 DAILY FIELD REPORT Project Name Weatherly Inn General Contractor Grading Contractor Rino Construction Field Rep. AK Time On Site 11:45 AM Travel Time 1.25 Hr. RT Job Location 4500 Talbot Rd. S., Renton, WA General Contractor's Superintendent Grading Foreman Rod Project No. Page of Report No. 0895.06 1/1 51 Time Off Site Date Day of Week 1:15 PM 10/14/19 Monday Weather 60s0F, Clear Client / Owner RJ Development, LLC Received Onsite By 1 _ L,necKea esy 1e/11 Are approved Plans/Permits onsite El YES ❑ NO Project No. Permit No. At the client's request, ESNW rep was onsite to observe and test storm water discharge, sewer line backfill, vault excavation and earthwork activities. Storm Water Discharge ' While onsite, rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment (<3 ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a PH level of 6.5. 1 Sewer Line Backfill Rep observed contractor use a large excavator to excavate a sewer line. Contractor expressed plans to continue working on sewer line excavation and backfill tomorrow, Tuesday, October 15, 2019. Rep will return to observe and test the backfill as needed. Vault Excavation Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. ESNW rep will returntoobserve earthwork activities when requested by client. f Senior Field Technician, 206-430-9183 COPY TO: CONTINUED ON NEXT PAGE n