Loading...
HomeMy WebLinkAboutCO 1 CAG-19-209 , CO • #1-19 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-19-209 Rainier Ave North Culvert Improvement Project C.O.# 1 SWP-27-4031 CONTRACTOR: Nordvind Sewer Service, LLC. SUMMARY OF PROPOSED CHANGE: Extra Grout Concrete Mix $18,091.14 During project construction,a significant additional amount of grout concrete mix(1,266 gallons)was needed to repair the bottom of the existing 36"CMP Culvert prior to the installation of the new Cure-In Place Pipe(CIPP).This was due to the existing CMP culvert being in more deteriorated conditions than anticipated and the inability to • completely CCTV prior to construction phase.The payment will be made in accordance with the contractor's unit bid price.The work was performed on October 11,2019. TOTAL CHANGE ORDER COST: $18,091.14 Additional Working Days added to the Contract for this Change Order: 1 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $106,75158 $106,751.58 $18,091.14 $124,842.72 SIGNATURES: Contractor: I Date: 10/29/19 0 30 q Project Manager: 1 /Date: fi/ Approved By: Date: 10/7/ RonEld Straka,U y Systems Di recto Approved By: 9 cOf 3/0144/04_, Date: l(l/1,/C( Gregg Zimmet n,Prks Administrator !! Approved By: Date: Shane Moloney,City Attorn • H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-4031 Rainier&Benson Culvert Replacement\1600 Construction\Change Order\CO-1