HomeMy WebLinkAboutMFP19005413.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19005413
IVR Number: 19005413
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :10/01/2019Application Date:7231502030Parcel Number:104 BURNETT AVE S
Permit Type:11/05/2019Issue Date:Franchise
Permit Work Class:11/04/2020Expiration Date:Minor Utility
Job Number:N.571919Franchise Type:Telephone
Description:Century Link to access MH194, MH193, and overlash onto 6 poles.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Qwest Corp d/b/a CenturyLink
Austin Sweeney
253-766-7549
austin.sweeney@centurylink.com
104 Burnett Ave S N.571919
CenturyLink to access MH194, MH193, and overlash onto 6 poles.
North Sky Communications 503.582.1263
NORTHSC857Q4 BL.028638
8/14/19Austin Sweeney
MFP19005413
Nathan Janders 10/15/2019
RESTORATION PER CITY OF RENTON STANDARDS
Scott Warlick 10/28/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.571919
North Sky Communications 503.582.1263
Austin Sweeney 253.766.7549
23315 66th Ave S Kent, WA 98032
austin.sweeney@centurylink.com
104 Burnett Ave S
Reset FormPrint Form
Austin Sweeney
Austin Sweeney 8/14/19
MFP19005413
Monday - Friday
8:00AM - 3:00PM Scott Warlick
10/8/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
TRAFFIC CONTROL PLAN
JOB # N. 571919. C. 45
PERMIT #
25
Comments:
ACCESS MH-193 IN SIDEWALK/ROADWAY.
RIGHT-LANE CLOSURE WESTBOUND
S 2ND ST. ARROW BOARD WILL BE USED.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
SIDEWALK REMAINS OPEN/ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
NSPEEDLIMIT
25
DRIVEWAYS
S 2ND ST BURNETT AVE SBURNETT AVE SBURN
E
T
T
P
L
SW20-1ROADWORKAHEADW20-1ROADWORKAHEADARROWBOARD
MH-193
ACCESS
WORK ZONE
11' X 250'
(TOTAL)111111SIDEWALK
SIDEWALK
ONE-WAY
Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm.
Comments:
SIGN SPACINGMPH "X"45+ 500'35 350'30 200'
25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY
TAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # N. 571919. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 8/8/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER
THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
19
100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +-
100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +-
W20-1
ROADWORKAHEAD100'+-MERGING
TAPER 115'100'+-10
0
'
+
-
S 2ND ST @ BURNETT AVE S
MH-193 ACCESS
RIGHT-LANE CLOSURE
121212
1010
11111111LEGEND
ARROW BOARD CONES
CROSSWALK S SPOTTER
TRAFFIC LIGHT WORK AREA
WORK TRUCK
www.invarion.com
MFP19005413
N
SPEEDLIMIT25
TRAFFIC CONTROL PLAN
JOB # N. 571919. C. 45
PERMIT #
Comments:
ACCESS MH-194 LOCATED IN SIDEWALK.
RIGHT-LANE CLOSURE WESTBOUND
S 2ND ST. ARROW BOARD WILL BE USED.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
PEDESTRIANS ROUTED AROUND WORK AREA.
CURB RAMPED TO MEET ADA REQUIREMENTS.
SPOTTER WILL ASSIST WITH PEDESTRIANS.
S 2ND ST @ MORRIS AVE S
MH-194 ACCESS
RIGHT-LANE CLOSURE DRI
V
E
W
A
Y
ISLAND ISLANDISLAND
S
RIGHT LANECLOSEDAHEADW20-5W20-1ROADWORKAHEAD11111111ARROWBOARD
WORK AREA
11' X 250'(TOTAL)
MH-194
ACCESS
WORK ZONE
11' X 250'
(TOTAL)
SIDEWALK
S 2ND ST
MORRIS AVE SSIDEWALK
SIDEWALK DETOURM4-9bDETOURM4-9bONE-WAY
ISLAND
2020
Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
SIGN SPACING
MPH "X"45+ 500'35 350'30 200'25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'
25 / 30 20' 40'ONE-LANE TWO-WAYTAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # N. 571919. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 8/8/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTHTAPER ("L") LANE WIDTH
L MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:
JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +-11111111100' +-100' +-
MERGING
TAPER 115'
SIDEWALK
ONE-WAY
LEGEND
ARROW BOARD CONES
CROSSWALK S SPOTTER
WORK AREA WORK TRUCK
www.invarion.com
MFP19005413
TRAFFIC CONTROL PLAN
JOB # N. 571919. C. 45
PERMIT #
Comments:
SIGN SPACINGMPH "X"45+ 500'35 350'30 200'
25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY
TAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # N. 571919. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 8/8/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER
THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
BURNETT AVE S @ S 2ND ST
AERIAL FIBER PLACEMENT
MOBILE SHOULDER WORK
1
0
1
0
11111111
121212SEE SHEET 2Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm.SIDEWALKSIDEWALKBURNETT AVE S
191911 11 11
BURNETT PL
SS 2ND ST100' +-ROADWORKAHEADW20-1SHOULDERWORKW21-5100' +-100' +-ROADWORKAHEAD
W20-1
BURNETT AVE S
POLE 1 DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYS S
Comments:
PLACE AERIAL FIBER ALONG BURNETT AVE S.
THIS WILL BE MOBILE SHOULDER WORK.
TRAFFIC FLOW IS NOT IMPACTED.
MAINTAIN 11' MINIMUM LANE WIDTH.
RESTRICTED PARKING IN WORK ZONE.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
SIDEWALKS REMAIN OPEN/ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
LEGEND
CROSSWALK S SPOTTER
TRAFFIC LIGHT WORK AREA
WORK TRUCK
AERIAL FIBER
PLACEMENT
WORK ZONE
MOVING
8' X ~800'NOFROM
TOTOW AWAY AREAPHON
E
6
84
-5444
YOU
R
COM
PA
NY
N
A
ME
55
5
-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE
684
-5444
YOU
R
COM
PAN
Y
NA
ME
55
5-5555 PARKINGNOFROMTOTOW AWAY
AREA
PHONE
68
4
-5444YOUR
C
OMP
AN
Y
NAM
E
5
55
-5555 PARKINGNOFROMTOTOW AWAY AR
EAPHONE 684
-5444
YOU
R
COM
PA
N
Y
NA
ME
55
5-5555 PARKINGNOFROMTOTOW AWAY
AREA
PHONE
68
4
-5444YOUR
C
OMP
AN
Y
NAM
E
5
55
-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE
684
-5444
YOU
R
COM
PAN
Y
NA
ME
55
5-5555 PARKING11' MIN
DRIVEWAY
AERIAL
SHEET 1 OF 2
PARKING AREA
PARKING AREA
PARKING AREA
SIDEWALK
SIDEWALKN SPEED
LIMIT
25
www.invarion.com
MFP19005413
TRAFFIC CONTROL PLAN
JOB # N. 571919. C. 45
PERMIT #
Comments:
SIGN SPACINGMPH "X"45+ 500'35 350'30 200'
25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY
TAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # N. 571919. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 8/8/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER
THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
AERIAL
SHEET 2 OF 2
1919BURNETT AVE S
BURNETT AVE SNOFROMTOTOW AWAY AREAPHONE
6
84
-5444YOUR CO
MPA
NY
N
AME
5
55
-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE
68
4
-5444
YOU
R
COM
PAN
Y
NA
M
E
55
5-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE
6
84
-5444YOUR CO
MPA
NY
N
AME
5
55
-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE
68
4
-5444
YOU
R
COM
PAN
Y
NA
M
E
55
5-5555 PARKINGNOFROM
TOTOW AWAY AREAPHON
E
6
84
-5444
YOU
R
COM
PA
NY
N
A
ME
55
5
-5555 PARKING11' MIN
S S
POLE 6
100' +-ROADWORKAHEADW20-1100' +-ROADWORKAHEAD
W20-1 1919Comments:
PLACE AERIAL FIBER ALONG BURNETT AVE S.
THIS WILL BE MOBILE SHOULDER WORK.
TRAFFIC FLOW IS NOT IMPACTED.
MAINTAIN 11' MINIMUM LANE WIDTH.
RESTRICTED PARKING IN WORK ZONE.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
SIDEWALKS REMAIN OPEN/ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS. SEE SHEET 1BURNETT AVE S @ S TOBIN ST
AERIAL FIBER PLACEMENT
MOBILE SHOULDER WORK
LEGEND
CROSSWALK S SPOTTER
TRAFFIC LIGHT WORK AREA
WORK TRUCK
Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm.
AERIAL FIBER
PLACEMENT
WORK ZONE
MOVING
8' X ~800'S TOBIN ST38
PARKING AREA
PARKING AREA
SIDEWALK
SIDEWALK NSPEED
LIMIT
25
www.invarion.com
MFP19005413
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.771006970000”NVICINITY MAPDRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803214(+'.&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO5%12'1(914-27..((41//#0*1.'6*417)*/#0*1.'6*417)**#0&*1.'Ä7221.'5Ä(+$'4'0)+0''456'2*'0567#462*10'01
ÄMFP19005413
TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L
B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQODRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803224(+$'4'0)+0''456'2*'0567#462*10'01
ÄMFP19005413
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO400DRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803234(+$'4'0)+0''456'2*'0567#462*10'01
Ä R/W EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W EOP
R/W EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W EOP R/W R/W EOP EOP EOP R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP R/W R/W R/W R/W R/W
R/W R/W R/W R/W TTT2'333'24'20'24'19'38'6' S/W6' S/W
8' S/W
3'52615011541920565540'30'31'43'18'41'38'17'41'2'16'016'1(0'9(+0':7)016'1(0'9(+0':7)1MATCH SHEET 4ITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1166035/31786821'-05"A136519530'-05" NEUTRAL HOA23' FIBER HOA21'-05" TELCO HOAEXISTING ATTACHMENTS15'30'29'42'016'1(0'9(+0':7)614+5'46' S/W110'MFP19005413
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQODRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803244(+$'4'0)+0''456'2*'0567#462*10'01
ÄMATCH SHEET 4 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W 23456104951031078' S/W4' GRASS38'17'41'140'157'140'150'ITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER2317883/16603523'A136519430'-02" NEUTRAL HOA29'-02" STREETLIGHT HOA24'-05" FIBER HOA23' TELCO HOAEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER3317897/16603620'-09"A136519329'-09" NEUTRAL HOA29' STREETLIGHT HOA22'-08" CATV HOA22'-08" FIBER HOA20'-09" TELCO HOAEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER4317912/16603618'-07"A136519230'-05" NEUTRAL HOA29'-02" STREETLIGHT HOA22' CATV HOA22' FIBER HOA18'-07" TELCO HOATRIM TREESEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER5317926/16603620'-08"A136519130'-03" NEUTRAL HOA29' STREETLIGHT HOA22'-04" CATV HOA22'-04" FIBER HOA20'-08" TELCO HOATRIM TREESEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER6317942/16603721'A136519029'-09" NEUTRAL HOA28'-07" STREETLIGHT HOA22'-09" CATV HOA22'-09" FIBER HOA21' TELCO HOAEXISTING ATTACHMENTSMFP19005413
23315 66th Ave S
Kent, WA 98032
August 27, 2019
City of Renton, Department of Community & Economic Development
1055 South Grady Way
Renton, WA 98057
RE : Variance for overhead installation of communication lines and facilities
To whom it may concern,
This letter is being sent as a revised application for a variance to the undergrounding requirements found in Renton
Municipal Code (RMC) 4-6-090 subsection C which states that “All new electrical or communication facilities shall
be required to be installed underground”. CenturyLink is applying for this aerial variance with proposed re-use of
an existing aerial route due to the build costs of an underground design outweighing the general welfare
consideration implicit with new underground installation :
1. Underground construction would be far more intrusive and be the cause of a greater disturbance to local
residences, when considering noise, duration of work, and pedestrian and vehicle traffic.
2. Placement and overlash of a new fiber optic cable to existing aerial facilities will not cause an adverse
impact to residents. The aerial construction will be complete within a couple of days and CenturyLink will
clean overlashed spans as necessary. In comparison, it can take up to a couple weeks to complete all
placement and restoration with new underground construction.
3. Construction of new underground facilities poses greater risk to existing underground utilities within the
work area – such as sanitary sewer, storm sewer, water, and gas facilities.
4. The cost for underground construction would increase the cost of facility placement about 7.13 times, or
approximately $23.9k, compared to overhead facility placement.
With the approval of the variance, CenturyLink will commence with the coordination and implementation of
overhead facility installation and traffic control as required to ensure public safety. CenturyLink and its contractors
agree to follow the requirements and standards provided by the City of Renton to make certain the safe and efficient
installation of the proposed facilities.
If you have any further questions or concerns regarding this project, please contact Jesse Patjens at 425-429-5722
or Jesse.Patjens@CenturyLink.com.
Sincerely,
Jesse Patjens
Local Network Engineer
Field Operations & Network Implementation
CenturyLink
MFP19005413
November 5, 2019
Jesse Patjens
Qwest Corp d/b/a CenturyLink
23315 66th Ave S
Kent, WA 98032
Via Email: Jesse.Patjens@CenturyLink.com
SUBJECT: Request for Undergrounding Exemption (N.571919, MFP19005413, 104 Burnett Ave S)
Dear Mr. Patjens:
The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
CenturyLink proposes to have North Sky Communications overlash approximately 697 lineal feet of new
24-count aerial fiber to existing Puget Sound Energy (PSE) power poles beginning at the pole at the
southwest corner of 710 S 2nd Street, proceeding north along the east side of Burnett Ave S for 697 Lineal
feet and ending at 104 Burnett Ave S.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) i and ii. City
of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any
telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate
telecommunications facilities in, under, over or across any public way of the City, and to also provide
telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use
of such public ways from the City pursuant to Section 5-19-3 of this Chapter.”
CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a
blanket grant of authority, dating back to territorial times, and therefore has unique status as compared
to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink,
RCW Section 35.99.030 states that a city or town may not require a “master permit” from service
providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link
has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct
and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per
the RCW and Washington State Constitution, cable service is not a right granted without a franchise.
Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not
the provision of future cable.
CenturyLink N.571919
Page 2 of 2
November 5, 2019
In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties;
when costs outweigh the general welfare consideration implicit in underground installation; or, if the
growth pattern of the area has not been sufficiently established to determine the ultimate service routes.
In this instance, the portion of the route proposed for aerial installation is in an area where cost to
underground one utility service will be cost prohibitive.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant for the Project Reach is approved with conditions subject to the conditions
below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i) ii.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1)
any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case Century Link shall participate
in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines.
The new aerial lines must be undergrounded within one year, or approved otherwise by the
City, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, November 19, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Jesse Patjens, CenturyLink Jesse.Patjens@CenturyLink.com
Amy Silbaugh, CenturyLink amy.silbaugh@centurylink.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19005413
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within
the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Century Link shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines,
or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
4 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
Page 1 of 1