Loading...
HomeMy WebLinkAboutMFP19005413.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005413 IVR Number: 19005413 Permit Informaon Permit Name:Century Link Permits Address/Locaon :10/01/2019Application Date:7231502030Parcel Number:104 BURNETT AVE S Permit Type:11/05/2019Issue Date:Franchise Permit Work Class:11/04/2020Expiration Date:Minor Utility Job Number:N.571919Franchise Type:Telephone Description:Century Link to access MH194, MH193, and overlash onto 6 poles. Contacts Name Address PhoneTypeBilling C/O QWEST CORP 1801 CALIFORNIA ST #4600 Denver, CO 80202 Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Heather Binkly Dycom Industries dba North Sky 11770 Us Hwy 1, SUITE 101 Palm Beach Gardens, FL 33408 B: (360) 254-6920 O: (360) 450-3287 Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Qwest Corp d/b/a CenturyLink Austin Sweeney 253-766-7549 austin.sweeney@centurylink.com 104 Burnett Ave S N.571919 CenturyLink to access MH194, MH193, and overlash onto 6 poles. North Sky Communications 503.582.1263 NORTHSC857Q4 BL.028638 8/14/19Austin Sweeney MFP19005413 Nathan Janders 10/15/2019 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 10/28/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: N.571919 North Sky Communications 503.582.1263 Austin Sweeney 253.766.7549 23315 66th Ave S Kent, WA 98032 austin.sweeney@centurylink.com 104 Burnett Ave S Reset FormPrint Form Austin Sweeney Austin Sweeney 8/14/19 MFP19005413 Monday - Friday 8:00AM - 3:00PM Scott Warlick 10/8/2019 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). TRAFFIC CONTROL PLAN JOB # N. 571919. C. 45 PERMIT # 25 Comments: ACCESS MH-193 IN SIDEWALK/ROADWAY. RIGHT-LANE CLOSURE WESTBOUND S 2ND ST. ARROW BOARD WILL BE USED. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALK REMAINS OPEN/ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS. NSPEEDLIMIT 25 DRIVEWAYS S 2ND ST BURNETT AVE SBURNETT AVE SBURN E T T P L SW20-1ROADWORKAHEADW20-1ROADWORKAHEADARROWBOARD MH-193 ACCESS WORK ZONE 11' X 250' (TOTAL)111111SIDEWALK SIDEWALK ONE-WAY Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER] Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm. Comments: SIGN SPACINGMPH "X"45+ 500'35 350'30 200' 25 100'150' Seattle200' Sea TacJeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY TAPER 50' TO 100'max Designed For: CENTURYLINK Project # N. 571919. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Approved 8/8/2019 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ NOT TO SCALE Comments: MERGING TAPER LENGTH TAPER ("L") LANE WIDTH L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245 SHOULDER 40 270 295 320 TAPER 45 450 495 5401/3 L UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM 19 100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +- 100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +- W20-1 ROADWORKAHEAD100'+-MERGING TAPER 115'100'+-10 0 ' + - S 2ND ST @ BURNETT AVE S MH-193 ACCESS RIGHT-LANE CLOSURE 121212 1010 11111111LEGEND ARROW BOARD CONES CROSSWALK S SPOTTER TRAFFIC LIGHT WORK AREA WORK TRUCK www.invarion.com MFP19005413 N SPEEDLIMIT25 TRAFFIC CONTROL PLAN JOB # N. 571919. C. 45 PERMIT # Comments: ACCESS MH-194 LOCATED IN SIDEWALK. RIGHT-LANE CLOSURE WESTBOUND S 2ND ST. ARROW BOARD WILL BE USED. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. PEDESTRIANS ROUTED AROUND WORK AREA. CURB RAMPED TO MEET ADA REQUIREMENTS. SPOTTER WILL ASSIST WITH PEDESTRIANS. S 2ND ST @ MORRIS AVE S MH-194 ACCESS RIGHT-LANE CLOSURE DRI V E W A Y ISLAND ISLANDISLAND S RIGHT LANECLOSEDAHEADW20-5W20-1ROADWORKAHEAD11111111ARROWBOARD WORK AREA 11' X 250'(TOTAL) MH-194 ACCESS WORK ZONE 11' X 250' (TOTAL) SIDEWALK S 2ND ST MORRIS AVE SSIDEWALK SIDEWALK DETOURM4-9bDETOURM4-9bONE-WAY ISLAND 2020 Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER] Comments: General Requirements1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be ____am to ____pm. Comments: SIGN SPACING MPH "X"45+ 500'35 350'30 200'25 100'150' Seattle200' Sea TacJeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60' 25 / 30 20' 40'ONE-LANE TWO-WAYTAPER 50' TO 100'max Designed For: CENTURYLINK Project # N. 571919. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Approved 8/8/2019 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM: JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM 100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +-11111111100' +-100' +- MERGING TAPER 115' SIDEWALK ONE-WAY LEGEND ARROW BOARD CONES CROSSWALK S SPOTTER WORK AREA WORK TRUCK www.invarion.com MFP19005413 TRAFFIC CONTROL PLAN JOB # N. 571919. C. 45 PERMIT # Comments: SIGN SPACINGMPH "X"45+ 500'35 350'30 200' 25 100'150' Seattle200' Sea TacJeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY TAPER 50' TO 100'max Designed For: CENTURYLINK Project # N. 571919. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Approved 8/8/2019 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ NOT TO SCALE Comments: MERGING TAPER LENGTH TAPER ("L") LANE WIDTH L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245 SHOULDER 40 270 295 320 TAPER 45 450 495 5401/3 L UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM BURNETT AVE S @ S 2ND ST AERIAL FIBER PLACEMENT MOBILE SHOULDER WORK 1 0 1 0 11111111 121212SEE SHEET 2Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER] Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm.SIDEWALKSIDEWALKBURNETT AVE S 191911 11 11 BURNETT PL SS 2ND ST100' +-ROADWORKAHEADW20-1SHOULDERWORKW21-5100' +-100' +-ROADWORKAHEAD W20-1 BURNETT AVE S POLE 1 DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYS S Comments: PLACE AERIAL FIBER ALONG BURNETT AVE S. THIS WILL BE MOBILE SHOULDER WORK. TRAFFIC FLOW IS NOT IMPACTED. MAINTAIN 11' MINIMUM LANE WIDTH. RESTRICTED PARKING IN WORK ZONE. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS. LEGEND CROSSWALK S SPOTTER TRAFFIC LIGHT WORK AREA WORK TRUCK AERIAL FIBER PLACEMENT WORK ZONE MOVING 8' X ~800'NOFROM TOTOW AWAY AREAPHON E 6 84 -5444 YOU R COM PA NY N A ME 55 5 -5555 PARKINGNOFROMTOTOW AWAY AREAPHONE 684 -5444 YOU R COM PAN Y NA ME 55 5-5555 PARKINGNOFROMTOTOW AWAY AREA PHONE 68 4 -5444YOUR C OMP AN Y NAM E 5 55 -5555 PARKINGNOFROMTOTOW AWAY AR EAPHONE 684 -5444 YOU R COM PA N Y NA ME 55 5-5555 PARKINGNOFROMTOTOW AWAY AREA PHONE 68 4 -5444YOUR C OMP AN Y NAM E 5 55 -5555 PARKINGNOFROMTOTOW AWAY AREAPHONE 684 -5444 YOU R COM PAN Y NA ME 55 5-5555 PARKING11' MIN DRIVEWAY AERIAL SHEET 1 OF 2 PARKING AREA PARKING AREA PARKING AREA SIDEWALK SIDEWALKN SPEED LIMIT 25 www.invarion.com MFP19005413 TRAFFIC CONTROL PLAN JOB # N. 571919. C. 45 PERMIT # Comments: SIGN SPACINGMPH "X"45+ 500'35 350'30 200' 25 100'150' Seattle200' Sea TacJeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAY TAPER 50' TO 100'max Designed For: CENTURYLINK Project # N. 571919. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Approved 8/8/2019 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ NOT TO SCALE Comments: MERGING TAPER LENGTH TAPER ("L") LANE WIDTH L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245 SHOULDER 40 270 295 320 TAPER 45 450 495 5401/3 L UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM AERIAL SHEET 2 OF 2 1919BURNETT AVE S BURNETT AVE SNOFROMTOTOW AWAY AREAPHONE 6 84 -5444YOUR CO MPA NY N AME 5 55 -5555 PARKINGNOFROMTOTOW AWAY AREAPHONE 68 4 -5444 YOU R COM PAN Y NA M E 55 5-5555 PARKINGNOFROMTOTOW AWAY AREAPHONE 6 84 -5444YOUR CO MPA NY N AME 5 55 -5555 PARKINGNOFROMTOTOW AWAY AREAPHONE 68 4 -5444 YOU R COM PAN Y NA M E 55 5-5555 PARKINGNOFROM TOTOW AWAY AREAPHON E 6 84 -5444 YOU R COM PA NY N A ME 55 5 -5555 PARKING11' MIN S S POLE 6 100' +-ROADWORKAHEADW20-1100' +-ROADWORKAHEAD W20-1 1919Comments: PLACE AERIAL FIBER ALONG BURNETT AVE S. THIS WILL BE MOBILE SHOULDER WORK. TRAFFIC FLOW IS NOT IMPACTED. MAINTAIN 11' MINIMUM LANE WIDTH. RESTRICTED PARKING IN WORK ZONE. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS. SEE SHEET 1BURNETT AVE S @ S TOBIN ST AERIAL FIBER PLACEMENT MOBILE SHOULDER WORK LEGEND CROSSWALK S SPOTTER TRAFFIC LIGHT WORK AREA WORK TRUCK Date:8/8/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 571919. C. 45CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER] Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be ____am to ____pm. AERIAL FIBER PLACEMENT WORK ZONE MOVING 8' X ~800'S TOBIN ST38 PARKING AREA PARKING AREA SIDEWALK SIDEWALK NSPEED LIMIT 25 www.invarion.com MFP19005413 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.771006970000”NVICINITY MAPDRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803214(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO5%12'1(914-27..((41//#0*1.'6*417)*/#0*1.'6*417)**#0&*1.'Ä7221.'5Ä(+$'4'0)+0''456'2*'0567#462*10'01  ÄMFP19005413 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQODRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803224(+$'4'0)+0''456'2*'0567#462*10'01  ÄMFP19005413 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQO400DRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803234(+$'4'0)+0''456'2*'0567#462*10'01  Ä R/W EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W EOP R/W EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W EOP R/W R/W EOP EOP EOP R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W TTT2'333'24'20'24'19'38'6' S/W6' S/W 8' S/W 3'52615011541920565540'30'31'43'18'41'38'17'41'2'16'016'ž1(0'9(+0':7)016'ž1(0'9(+0':7)1MATCH SHEET 4ITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1166035/31786821'-05"A136519530'-05" NEUTRAL HOA23' FIBER HOA21'-05" TELCO HOAEXISTING ATTACHMENTS15'30'29'42'016'ž1(0'9(+0':7)614+5'46' S/W110'MFP19005413 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"EGPVWT[NKPMEQODRAFTED BY: MOUNTAIN LTD/DL - 07/23/1923N05E18N.571919W26226RNTNWA01104 BURNETT AVE SRENTON, WA 9803244(+$'4'0)+0''456'2*'0567#462*10'01  ÄMATCH SHEET 4 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W 23456104951031078' S/W4' GRASS38'17'41'140'157'140'150'ITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER2317883/16603523'A136519430'-02" NEUTRAL HOA29'-02" STREETLIGHT HOA24'-05" FIBER HOA23' TELCO HOAEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER3317897/16603620'-09"A136519329'-09" NEUTRAL HOA29' STREETLIGHT HOA22'-08" CATV HOA22'-08" FIBER HOA20'-09" TELCO HOAEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER4317912/16603618'-07"A136519230'-05" NEUTRAL HOA29'-02" STREETLIGHT HOA22' CATV HOA22' FIBER HOA18'-07" TELCO HOATRIM TREESEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER5317926/16603620'-08"A136519130'-03" NEUTRAL HOA29' STREETLIGHT HOA22'-04" CATV HOA22'-04" FIBER HOA20'-08" TELCO HOATRIM TREESEXISTING ATTACHMENTSITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER6317942/16603721'A136519029'-09" NEUTRAL HOA28'-07" STREETLIGHT HOA22'-09" CATV HOA22'-09" FIBER HOA21' TELCO HOAEXISTING ATTACHMENTSMFP19005413 23315 66th Ave S Kent, WA 98032 August 27, 2019 City of Renton, Department of Community & Economic Development 1055 South Grady Way Renton, WA 98057 RE : Variance for overhead installation of communication lines and facilities To whom it may concern, This letter is being sent as a revised application for a variance to the undergrounding requirements found in Renton Municipal Code (RMC) 4-6-090 subsection C which states that “All new electrical or communication facilities shall be required to be installed underground”. CenturyLink is applying for this aerial variance with proposed re-use of an existing aerial route due to the build costs of an underground design outweighing the general welfare consideration implicit with new underground installation : 1. Underground construction would be far more intrusive and be the cause of a greater disturbance to local residences, when considering noise, duration of work, and pedestrian and vehicle traffic. 2. Placement and overlash of a new fiber optic cable to existing aerial facilities will not cause an adverse impact to residents. The aerial construction will be complete within a couple of days and CenturyLink will clean overlashed spans as necessary. In comparison, it can take up to a couple weeks to complete all placement and restoration with new underground construction. 3. Construction of new underground facilities poses greater risk to existing underground utilities within the work area – such as sanitary sewer, storm sewer, water, and gas facilities. 4. The cost for underground construction would increase the cost of facility placement about 7.13 times, or approximately $23.9k, compared to overhead facility placement. With the approval of the variance, CenturyLink will commence with the coordination and implementation of overhead facility installation and traffic control as required to ensure public safety. CenturyLink and its contractors agree to follow the requirements and standards provided by the City of Renton to make certain the safe and efficient installation of the proposed facilities. If you have any further questions or concerns regarding this project, please contact Jesse Patjens at 425-429-5722 or Jesse.Patjens@CenturyLink.com. Sincerely, Jesse Patjens Local Network Engineer Field Operations & Network Implementation CenturyLink MFP19005413 November 5, 2019 Jesse Patjens Qwest Corp d/b/a CenturyLink 23315 66th Ave S Kent, WA 98032 Via Email: Jesse.Patjens@CenturyLink.com SUBJECT: Request for Undergrounding Exemption (N.571919, MFP19005413, 104 Burnett Ave S) Dear Mr. Patjens: The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. CenturyLink proposes to have North Sky Communications overlash approximately 697 lineal feet of new 24-count aerial fiber to existing Puget Sound Energy (PSE) power poles beginning at the pole at the southwest corner of 710 S 2nd Street, proceeding north along the east side of Burnett Ave S for 697 Lineal feet and ending at 104 Burnett Ave S. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) i and ii. City of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate telecommunications facilities in, under, over or across any public way of the City, and to also provide telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use of such public ways from the City pursuant to Section 5-19-3 of this Chapter.” CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a blanket grant of authority, dating back to territorial times, and therefore has unique status as compared to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink, RCW Section 35.99.030 states that a city or town may not require a “master permit” from service providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per the RCW and Washington State Constitution, cable service is not a right granted without a franchise. Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not the provision of future cable. CenturyLink N.571919 Page 2 of 2 November 5, 2019 In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties; when costs outweigh the general welfare consideration implicit in underground installation; or, if the growth pattern of the area has not been sufficiently established to determine the ultimate service routes. In this instance, the portion of the route proposed for aerial installation is in an area where cost to underground one utility service will be cost prohibitive. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant for the Project Reach is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i) ii. Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Century Link shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, November 19, 2019. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Jesse Patjens, CenturyLink Jesse.Patjens@CenturyLink.com Amy Silbaugh, CenturyLink amy.silbaugh@centurylink.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP19005413 Engineering 1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Century Link shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. 4 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. Page 1 of 1