Minor Franchise Permit: MFP19004107
IVR Number: 19004107
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :07/23/2019Application Date:7221400025Parcel Number:1223 S 3RD ST
Permit Type:11/05/2019Issue Date:Franchise
Permit Work Class:11/04/2020Expiration Date:Minor Utility
Job Number:101120152Franchise Type:Electric
Description:Install new overhead service from existing utility pole in ROW to new utility pole and new meter on private property.
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101120152
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
1223 S 3RD ST
new overhead secondary span wire from P01 (grid# 317781-166214) to P02 (grid# 317785-166216)
Overhead seconday wire has already been approved by City of Renton Inspector, Pat Miller, per meeting in field on 4/26/2019
Variance letter is being attached. No HS cuts anticiapted
✔✔
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.07.23 13:37:43 -07'00'7/23/29
MFP19004107
Nathan Janders 7/25/2019
Scott Warlick 9/30/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101120152
Potelco, Inc
KHADER GOUESSE (253) 254-2896
6905 S 228th St, Kent, WA 98032
KHADER.GOUESSE@PSE.COM
1223 S 3RD ST
TBD
TBD
CORRIE RYDBERG
7/23/29
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.07.23 13:38:01 -07'00'
MFP19004107
Monday - Friday
8:00AM - 3:00PM Scott Warlick
9/30/2019
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
RE: PSE Job Number 101120152
LOCATION OF WORK: 1223 S 3RD ST, RENTON,WA,98057
TYPE OF WORK: Installing new overhead secondary span wire from pole in right of
way to pole on customer’s property.
SCOPE OF WORK:
Overhead seconday span wire has already been approved by City of Renton Inspector,
Pat Miller, per meeting in field on 4/26/2019.
Variance letter is being attached to the file as requested for documentation purposes.
Sincerely,
Khader Gouesse
Puget Sound Energy
Project Manager
Customer & System Projects
MFP19004107
1209
300
1223
310
1211
311
315
316
S 3R
D S
T
S
3
R
D
S
T
RENTON AVE SROW
40'
PARCEL #
7221400025
317796-166220
X5003 317796-166227
317781-166232
15 kVA 120/240V (B)317781-166214
25 kVA 120/240V (B)
DWY
1- RUN 1/0 OH TPX 60'1- RUN 1/0 OH TPX 80'317796-166207
GRA
16
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
K. GOUESSE 253-254-2896 05/09/19
K. GOUESSE 253-254-2896 05/09/19
E. SCHOTT 714-893-2405 05/09/19
RW-113840 RENTON
GRINOLD'S RESIDENCE
OH SECONDARY LINE EXT, OH SVC
1223 S 3RD ST, RENTON, WA 98057
N/A N/A
N/A 101120152
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SW 17-23N-05E N/A N/A
2305E067 2305E088 2305E067 GRA-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:KHADER GOUESSE
253-254-2896
KHADER.GOUESSE@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#101120152Owner / Developer Contact Info
officeATTN:
MANLY GRINOLDS
1223 S 3RD ST
RENTON, WA 98057
ANTHONY DAVIS 253-951-7372
POWER GENERAL NOTES - RESIDENTIAL PROJECT
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
8.
9.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
JOB SITE
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E088
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
SITE SPECIFIC NOTES
AT P01: 317781-166214
-EXISTING POLE TO REMAIN
AT P02 NEW: 317785-166216
-INSTALL NEW 35' CL-4 DISTRIBUTION POLE W/ GROUNDS PER STD 6010.1100 (PS354)
-INSTALL NEW GRID # 317785-166246
AT M01 EXISTING
-REMOVING THE EXISTING 100A METER
AT M02 "1223": NEW METER BASE
-INSTALL 200A METER
___
___
___
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
0'
1,700 SQ FT
200A
ELECTRIC
7.7kW
80A
2.3%
3.9%
SPAN SPECIFIC NOTES
P01 TO P02:
-INSTALL 1-RUN 1/0 OH TPX, ± 60' ___' ACTUAL
P02 TO M01:
-INSTALL 1-RUN 1/0 OH TPX, ± 80' ___' ACTUAL
317785-166216
507589789 101120152Superior
507807843 101120153OH Svc Replacement
108113600Removal
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OD WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
___
N
CL
S
NOT TO SCALE
CROSS SECTION - RENTON AVE S
LOOKING WEST MFP19004107
P01
13 13
13 13W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-1
R
O
A
DWO
R
K
A
H
E
A
D
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROAD
AHEAD100'100'100'FLAGGER/SPOTTER SHALL
ESCORT PEDESTRIANS
AROUND WORK AREA
S 3RD ST
RENTON AVE SPLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999
INFRASOURCE
LLC
000
0000
000 NO PARKINGNO-PA
RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKN PSE PUGETSOUNDENERGY
JOB#101120152
1223 S 3RD ST, RENTON, WA 98057
06/19/19
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 1 of 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP19004107
RE: PSE Job Number 101120152
LOCATION OF WORK: 1223 S 3RD ST, RENTON,WA,98057
TYPE OF WORK: Installing new overhead secondary span wire from pole in right of
way to pole on customer’s property.
SCOPE OF WORK:
The customer is currently served overhead and we are upgrading his service. The existing
service does not have proper clearance on the customer roof and is a safety hazard. The
service wire is a safety hazard because the service wire travels from the pole (317781-
166214) in the right-of-way through the Maple tree on the customer’s property to the
mast, see photo 1.
We are requesting an overhead secondary span wire to be added between the exiting pole
(317781-166214) in the right-of-way to a new pole on private property. The reason we
need a variance is because we are not able to trench to the existing pole in ROW without
damaging the existing sidewalk, see photo 2. The second reason is that we want to avoid
damaging the roots of the existing well grown Maple tree on the customer’s property, see
photo 3.
All photos are on the pages below.
Variance letter is being attached to the file as requested for documentation purposes.
Sincerely,
Khader Gouesse
Puget Sound Energy
Project Manager
Customer & System Projects
MFP19004107
Photo 1-Path of service wire through the tree. The lower wire is communication.
Photo 2 – Pole in the sidewalk.
MFP19004107
Photo 3 –View of Maple tree on customer’s property.
MFP19004107
November 5, 2019
Khader Gouesse
Puget Sound Energy - Electric
P.O. Box 97034
Bellevue, WA 98009-9734
Via Email: Khader.Gouesse@pse.com
SUBJECT: Request for Undergrounding Exemption
(PSE#101120152, MFP19004107, 1223 S 3rd Street)
Dear Mr. Gouesse:
The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from
Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities
shall be required to be installed underground, pursuant to the standards of the section of RMC.
PSE proposes to have Potelco Inc. install a new overhead secondary span wire from pole at the south east
corner of 1223 S 3rd St to a new pole set on customers property
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) i. Ordinance
5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect,
maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of
electrical energy and gas, in, upon, over, under, along, across and through the franchise area.
The proposal would utilize existing poles and attach to the existing aerial path. A minimum vertical height
clearance of 15’-6” would need to be provided for; therefore, staff recommends this as a condition of
approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(i) i which
allows for extensions of existing overhead communication facilities when there is a technological difficulty
associated with the particular facility, or the particular real property involved.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(i) i.
PSE Electric #101120152
Page 2 of 2
November 5, 2019
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case PSE shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, November 19, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Sandy Leek, PSE, sandy.leek@pse.com
Corrie Rydberg, PSE, Corrie.Rydberg@pse.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19004107
Engineering
1 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE
shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
2 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
Page 1 of 1