Loading...
HomeMy WebLinkAboutMFP19004107.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004107 IVR Number: 19004107 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :07/23/2019Application Date:7221400025Parcel Number:1223 S 3RD ST Permit Type:11/05/2019Issue Date:Franchise Permit Work Class:11/04/2020Expiration Date:Minor Utility Job Number:101120152Franchise Type:Electric Description:Install new overhead service from existing utility pole in ROW to new utility pole and new meter on private property. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101120152 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 1223 S 3RD ST new overhead secondary span wire from P01 (grid# 317781-166214) to P02 (grid# 317785-166216) Overhead seconday wire has already been approved by City of Renton Inspector, Pat Miller, per meeting in field on 4/26/2019 Variance letter is being attached. No HS cuts anticiapted ✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.07.23 13:37:43 -07'00'7/23/29 MFP19004107 Nathan Janders 7/25/2019 Scott Warlick 9/30/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101120152 Potelco, Inc KHADER GOUESSE (253) 254-2896 6905 S 228th St, Kent, WA 98032 KHADER.GOUESSE@PSE.COM 1223 S 3RD ST TBD TBD CORRIE RYDBERG 7/23/29 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.07.23 13:38:01 -07'00' MFP19004107 Monday - Friday 8:00AM - 3:00PM Scott Warlick 9/30/2019 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). RE: PSE Job Number 101120152 LOCATION OF WORK: 1223 S 3RD ST, RENTON,WA,98057 TYPE OF WORK: Installing new overhead secondary span wire from pole in right of way to pole on customer’s property. SCOPE OF WORK: Overhead seconday span wire has already been approved by City of Renton Inspector, Pat Miller, per meeting in field on 4/26/2019. Variance letter is being attached to the file as requested for documentation purposes. Sincerely, Khader Gouesse Puget Sound Energy Project Manager Customer & System Projects MFP19004107 1209 300 1223 310 1211 311 315 316 S 3R D S T S 3 R D S T RENTON AVE SROW 40' PARCEL # 7221400025 317796-166220 X5003 317796-166227 317781-166232 15 kVA 120/240V (B)317781-166214 25 kVA 120/240V (B) DWY 1- RUN 1/0 OH TPX 60'1- RUN 1/0 OH TPX 80'317796-166207 GRA 16 N Vicinity Map N/A FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K. GOUESSE 253-254-2896 05/09/19 K. GOUESSE 253-254-2896 05/09/19 E. SCHOTT 714-893-2405 05/09/19 RW-113840 RENTON GRINOLD'S RESIDENCE OH SECONDARY LINE EXT, OH SVC 1223 S 3RD ST, RENTON, WA 98057 N/A N/A N/A 101120152 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN SW 17-23N-05E N/A N/A 2305E067 2305E088 2305E067 GRA-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:KHADER GOUESSE 253-254-2896 KHADER.GOUESSE@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER#101120152Owner / Developer Contact Info officeATTN: MANLY GRINOLDS 1223 S 3RD ST RENTON, WA 98057 ANTHONY DAVIS 253-951-7372 POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. JOB SITE SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2305E088 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES AT P01: 317781-166214 -EXISTING POLE TO REMAIN AT P02 NEW: 317785-166216 -INSTALL NEW 35' CL-4 DISTRIBUTION POLE W/ GROUNDS PER STD 6010.1100 (PS354) -INSTALL NEW GRID # 317785-166246 AT M01 EXISTING -REMOVING THE EXISTING 100A METER AT M02 "1223": NEW METER BASE -INSTALL 200A METER ___ ___ ___ CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 1,700 SQ FT 200A ELECTRIC 7.7kW 80A 2.3% 3.9% SPAN SPECIFIC NOTES P01 TO P02: -INSTALL 1-RUN 1/0 OH TPX, ± 60' ___' ACTUAL P02 TO M01: -INSTALL 1-RUN 1/0 OH TPX, ± 80' ___' ACTUAL 317785-166216 507589789 101120152Superior 507807843 101120153OH Svc Replacement 108113600Removal UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OD WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation ___ N CL S NOT TO SCALE CROSS SECTION - RENTON AVE S LOOKING WEST MFP19004107 P01 13 13 13 13W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-1 R O A DWO R K A H E A D W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROAD AHEAD100'100'100'FLAGGER/SPOTTER SHALL ESCORT PEDESTRIANS AROUND WORK AREA S 3RD ST RENTON AVE SPLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 000 0000 000 NO PARKINGNO-PA RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKN PSE PUGETSOUNDENERGY JOB#101120152 1223 S 3RD ST, RENTON, WA 98057 06/19/19 JOHN.CROFOOT@PSE.COM 425-424-6658 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 55 + 60/65 45/55 35/40 30 25 SIGN SPACING "X" 800 500' 350' 200' 100' MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY ROW ROW Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP19004107 RE: PSE Job Number 101120152 LOCATION OF WORK: 1223 S 3RD ST, RENTON,WA,98057 TYPE OF WORK: Installing new overhead secondary span wire from pole in right of way to pole on customer’s property. SCOPE OF WORK: The customer is currently served overhead and we are upgrading his service. The existing service does not have proper clearance on the customer roof and is a safety hazard. The service wire is a safety hazard because the service wire travels from the pole (317781- 166214) in the right-of-way through the Maple tree on the customer’s property to the mast, see photo 1. We are requesting an overhead secondary span wire to be added between the exiting pole (317781-166214) in the right-of-way to a new pole on private property. The reason we need a variance is because we are not able to trench to the existing pole in ROW without damaging the existing sidewalk, see photo 2. The second reason is that we want to avoid damaging the roots of the existing well grown Maple tree on the customer’s property, see photo 3. All photos are on the pages below. Variance letter is being attached to the file as requested for documentation purposes. Sincerely, Khader Gouesse Puget Sound Energy Project Manager Customer & System Projects MFP19004107 Photo 1-Path of service wire through the tree. The lower wire is communication. Photo 2 – Pole in the sidewalk. MFP19004107 Photo 3 –View of Maple tree on customer’s property. MFP19004107 November 5, 2019 Khader Gouesse Puget Sound Energy - Electric P.O. Box 97034 Bellevue, WA 98009-9734 Via Email: Khader.Gouesse@pse.com SUBJECT: Request for Undergrounding Exemption (PSE#101120152, MFP19004107, 1223 S 3rd Street) Dear Mr. Gouesse: The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. PSE proposes to have Potelco Inc. install a new overhead secondary span wire from pole at the south east corner of 1223 S 3rd St to a new pole set on customers property ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) i. Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area. The proposal would utilize existing poles and attach to the existing aerial path. A minimum vertical height clearance of 15’-6” would need to be provided for; therefore, staff recommends this as a condition of approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(i) i which allows for extensions of existing overhead communication facilities when there is a technological difficulty associated with the particular facility, or the particular real property involved. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i) i. PSE Electric #101120152 Page 2 of 2 November 5, 2019 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, November 19, 2019. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Sandy Leek, PSE, sandy.leek@pse.com Corrie Rydberg, PSE, Corrie.Rydberg@pse.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP19004107 Engineering 1 Engineering General Conditions The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. 2 Engineering General Conditions Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 Engineering General Conditions A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4 Engineering General Conditions Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. Page 1 of 1