HomeMy WebLinkAboutS-396505rel
cW PBO
O
n
0
n
1 rnrKln
X 6' TEMPORARY CHAINLINK CONSTRUCTION FENCE
CONSTRUCTION LIMITS
COMPOST DIKE
0aILIIwMilIM\FA'IIK�1
1. SHOULD CONTAMINATED SOILS BE DISCOVERED ON
THE SITE, CONTRACTOR SHALL CONTACT BOEING
CONSTRUCTION MANAGER AT TIME OF DISCOVERY FOR
CONTAMINATED SOIL HANDLING AND DISPOSITION.
2. PROVIDE SECURED TEMPORARY CONSTRUCTION
FENCING AT PROJECT PERIMETER (6' CHAINLINK) AS
SHOWN AND/OR REQUIRED BY THE BOEING
CONSTRUCTION MANAGER.
3. PROVIDE SITE TRAFFIC PLAN TO BOEING
CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION
START FOR REVIEW AND APPROVAL. PEDESTRIAN AND
VEHICULAR ACCESS SHALL BE COORDINATED AND
MAINTAINED THROUGHOUT CONSTRUCTION.
,CONSTRUCTION NOTES
CATCH BASIN INLET PROTECTION
C513C-1C
SECURED CONSTRUCTION FENCING
CONSTRUCTION LIMITS
COMPOST SOCK DIKE 1' OFFSET FROM
® TEMPORARY CONSTRUCTION FENCING, 46 LF
C513C-1 C
TEMPORARY TRAFFIC BARRIER
A B C D E F G H
N
20' 10' 0 20' 40'
SCALE IN FEET
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY zMS DRAWN DATF 07.15.1g SUBTITLE CURRENT REVISION SYMBOL DATE
REPLACE 04-042 SEWAGE LIFT STATION W19111354 ABAM 07.15.19� RSETHIS DESIGN AND/OR CHECKED 07.15.19 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN W19111354 - 07.15.19
4 ° SPECIFICATION IS APPROVED DRS SHEET
BO ZAV" ® �� ENGINEER TITLE
� APPROVED BY DEPT. DATE ZMS 07.15.19 REPLACE 04-042 SEWAGE LIFT STATION C2-6C
��
CHECKED
APPROVED BUILDING 04-042 JOB N0. COMP N0.
��r15TER�4 tia`�'- W1911 1354
APPROVED
CIVIL MASTER RENTON, WA DWG N0. RTN-YD-C2-6C
N
M
C�
0
c)
r
1
U
L J
r
O
c)
O
I
r
J
T�
V ,
M
O
O
O
I
r
rr