Loading...
HomeMy WebLinkAboutS-396505rel cW PBO O n 0 n 1 rnrKln X 6' TEMPORARY CHAINLINK CONSTRUCTION FENCE CONSTRUCTION LIMITS COMPOST DIKE 0aILIIwMilIM\FA'IIK�1 1. SHOULD CONTAMINATED SOILS BE DISCOVERED ON THE SITE, CONTRACTOR SHALL CONTACT BOEING CONSTRUCTION MANAGER AT TIME OF DISCOVERY FOR CONTAMINATED SOIL HANDLING AND DISPOSITION. 2. PROVIDE SECURED TEMPORARY CONSTRUCTION FENCING AT PROJECT PERIMETER (6' CHAINLINK) AS SHOWN AND/OR REQUIRED BY THE BOEING CONSTRUCTION MANAGER. 3. PROVIDE SITE TRAFFIC PLAN TO BOEING CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START FOR REVIEW AND APPROVAL. PEDESTRIAN AND VEHICULAR ACCESS SHALL BE COORDINATED AND MAINTAINED THROUGHOUT CONSTRUCTION. ,CONSTRUCTION NOTES CATCH BASIN INLET PROTECTION C513C-1C SECURED CONSTRUCTION FENCING CONSTRUCTION LIMITS COMPOST SOCK DIKE 1' OFFSET FROM ® TEMPORARY CONSTRUCTION FENCING, 46 LF C513C-1 C TEMPORARY TRAFFIC BARRIER A B C D E F G H N 20' 10' 0 20' 40' SCALE IN FEET SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY zMS DRAWN DATF 07.15.1g SUBTITLE CURRENT REVISION SYMBOL DATE REPLACE 04-042 SEWAGE LIFT STATION W19111354 ABAM 07.15.19� RSETHIS DESIGN AND/OR CHECKED 07.15.19 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN W19111354 - 07.15.19 4 ° SPECIFICATION IS APPROVED DRS SHEET BO ZAV" ® �� ENGINEER TITLE � APPROVED BY DEPT. DATE ZMS 07.15.19 REPLACE 04-042 SEWAGE LIFT STATION C2-6C �� CHECKED APPROVED BUILDING 04-042 JOB N0. COMP N0. ��r15TER�4 tia`�'- W1911 1354 APPROVED CIVIL MASTER RENTON, WA DWG N0. RTN-YD-C2-6C N M C� 0 c) r 1 U L J r O c) O I r J T� V , M O O O I r rr