Loading...
HomeMy WebLinkAboutR-397817SIGNAL PLAN LEGEND EXISTING NEW ---- ---- CONDUIT VEHICLE SIGNAL HEAD PEDESTRIAN SIGNAL HEAD EMERGENCY VEHICLE PREEMPT DETECTION m O a TYPE 1, 2, AND (3, 7, OR 8) JUNCTION BOX =D 25-TA JUNCTION BOX LUMINAIRE POLE SIGNAL POLE W/ LUMINAIRE j PEDESTRIAN SIGNAL PEDESTAL W/ PUSHBUTTON ® SERVICE CABINET SIGN ON MAST ARM m SIGNAL CONTROLLER CABINET VIDEO DETECTION CAMERA ❑ B VIRTUAL VEHICLE DETECTION ZONE (DETECTION CAMERA) ♦ WIRELESS ACCESS ANTENNA (KING COUNTY FURNISHED) 0 CONDUIT RUN NUMBER OSIGNAL POLE STANDARD NUMBER OCONSTRUCTION NOTE GENERAL NOTES: 1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY STANDARDS, WSDOT/APWA STANDARD PLANS, CURRENT WSDOT STANDARD SPECIFICATIONS, LATEST AMENDMENTS TO THE STANDARD SPECIFICATIONS, SPECIAL PROVISIONS, AND THESE PLANS. 2. UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND MAY NOT BE ALL INCLUSIVE. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION AND DIRECTIONAL BORING. CONFLICTS ARE TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. 3. ALL NEW METAL CONDUIT SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH NEC REQUIREMENTS AND WSDOT STANDARD PLAN J-60.05-00 (TYPICAL GROUNDING DETAILS).. 4. CONDUITS AND JUNCTION BOX LOCATIONS ARE SCHEMATIC. VERIFY FINAL LOCATIONS WITH THE ENGINEER PRIOR TO INSTALLATION. 5. NEW JUNCTION BOXES LOCATED WITHIN PEDESTRIAN WALKWAYS SHALL HAVE SKID -RESISTANT LID SURFACE. 6. PROPOSED CONDUITS PLACE BENEATH ROADWAYS AND SHOULDER AREAS SHALL BE SCHEDULE 80 PVC. PROPOSED CONDUITS PLACED IN ALL OTHER AREAS SHALL BE SCHEDULE 40 PVC. DIRECTIONAL BORED CONDUITS SHALL BE HDPE. 7. ALL PEDESTRIAN PUSH BUTTONS SHALL BE ACCESSIBLE APS TYPE AND CONFORM TO THE CONTRACT SPECIFICATIONS. PUSH BUTTONS SHALL BE MOUNTED PER MANUFACTURER'S SPECIFICATIONS. 8. ALL NEW CONDUCTOR(S) SHALL BE PERMANENTLY LABELED IN EACH JUNCTION BOX, CABINET, AND TERMINAL CABINET. Q POLE NOTES: 1. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-26.10-02. FURNISH AND INSTALL TYPE III DUAL MAST ARM SIGNAL POLE. FURNISH AND INSTALL TWO VEHICLE SIGNAL HEADS, ONE TYPE 764 EMERGENCY VEHICLE PRE-EMPTION DETECTOR, ONE VIDEO DETECTION CAMERA, AND ONE STREET NAME SIGN ON THE NORTHBOUND MAST ARM. FURNISH AND INSTALL ONE 135 WATT LED LUMINAIRE (TYPE III, 4000K, FLAT LENS) WITH HOUSE -SIDE -SHIELD ON THE LUMINAIRE ARM. FURNISH AND INSTALL ONE VEHICLE SIGNAL HEAD, TWO PEDESTRIAN SIGNAL HEADS, ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY, AND ONE TERMINAL CABINET ON THE POLE. FURNISH AND INSTALL THREE (ONE WITH FLASHING YELLOW ARROW) VEHICLE SIGNAL HEADS, ONE TYPE 764 EMERGENCY VEHICLE PRE-EMPTION DETECTOR, ONE VIDEO DETECTION CAMERA WITH RADAR, ONE STREET NAME SIGN AND ONE REGULATORY SIGN ON THE WESTBOUND MAST ARM. 2. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-26.10-02. FURNISH AND INSTALL TYPE III DUAL MAST ARM SIGNAL POLE. FURNISH AND INSTALL THREE (ONE WITH FLASHING YELLOW ARROW) VEHICLE SIGNAL HEADS, ONE TYPE 764 EMERGENCY VEHICLE PRE-EMPTION DETECTOR, ONE VIDEO DETECTION CAMERA WITH RADAR, ONE STREET NAME SIGN, AND ONE REGULATORY SIGN ON THE EASTBOUND MAST ARM. FURNISH AND INSTALL TWO VEHICLE SIGNAL HEADS, ONE TYPE 764 EMERGENCY VEHICLE PRE-EMPTION DETECTOR, ONE VIDEO DETECTION CAMERA, AND ONE STREET NAME SIGN AND ONE REGULATORY SIGN ON THE SOUTHBOUND MAST ARM. FURNISH AND INSTALL ONE 135 WATT LED LUMINAIRE (TYPE III, 4000K, FLAT LENS) ON THE LUMINAIRE ARM. FURNISH AND INSTALL ONE PEDESTRIAN SIGNAL HEAD, AND ONE TERMINAL CABINET ON THE POLE. 3. CONSTRUCT FOUNDATION PER COR STD PLAN 117.1 AND POLE SCHEDULE. FURNISH AND INSTALL LED LUMINAIRE WITH PHOTOCELL, LUMINAIRE ARM, AND STEEL POLE. FURNISH AND INSTALL ONE SIGNAL HEAD, TWO PEDESTRIAN SIGNAL HEADS ON THE POLE. FOR LUMINAIRE POLE DETAILS, SEE COR STD PLAN 117.1 (EXCEPT INSTALLATION SHALL NOT INCLUDE THE PEDESTRIAN "SMALL SERIES" LED LUMINAIRE AND BANNER BRACKETS). 4. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-20.10-04. FURNISH AND INSTALL ONE PEDESTRIAN PUSH BUTTON POST. FURNISH AND INSTALL ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 5. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-21.10-04. FURNISH AND INSTALL ONE TYPE PS POLE AND ONE PEDESTRIAN SIGNAL HEAD. FURNISH AND INSTALL ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 6. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-21.10-04. FURNISH AND INSTALL ONE TYPE PS POLE. FURNISH AND INSTALL ONE PEDESTRIAN SIGNAL HEAD AND ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 7. CONSTRUCT FOUNDATION PER COR STD PLAN 117.1 AND POLE SCHEDULE. FURNISH AND INSTALL LED LUMINAIRE, LUMINAIRE ARM, AND STEEL POLE. FURNISH AND INSTALL ONE PEDESTRIAN SIGNAL HEAD AND ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. FOR LUMINAIRE POLE DETAILS, SEE COR STD PLAN 117.1 (EXCEPT INSTALLATION SHALL NOT INCLUDE THE PEDESTRIAN "SMALL SERIES" LED LUMINAIRE AND BANNER BRACKETS). 8. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-21.10-04. FURNISH AND INSTALL ONE TYPE PS POLE. FURNISH AND INSTALL ONE PEDESTRIAN SIGNAL HEAD AND ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 9. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-20.10-03. FURNISH AND INSTALL ONE PEDESTRIAN PUSH BUTTON POST. FURNISH AND INSTALL ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 10. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-20.10-03. FURNISH AND INSTALL ONE PEDESTRIAN PUSH BUTTON POST. FURNISH AND INSTALL ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 11. CONSTRUCT FOUNDATION PER COR STD PLAN 117.1 AND POLE SCHEDULE. FURNISH AND INSTALL LED LUMINAIRE, LUMINAIRE ARM, AND STEEL POLE. FOR LUMINAIRE POLE DETAILS, SEE COR STD PLAN 117.1 (EXCEPT INSTALLATION SHALL NOT INCLUDE THE PEDESTRIAN "SMALL SERIES" LED LUMINAIRE AND BANNER BRACKETS). 12. EXISTING LUMINAIRE TO CONNECT TO SERVICE CABINET #S1, CIRCUIT C. 13. CONSTRUCT FOUNDATION PER WSDOT STD PLAN J-20.10-04. FURNISH AND INSTALL ONE PEDESTRIAN PUSH BUTTON POST. FURNISH AND INSTALL ONE ACCESSIBLE PEDESTRIAN PUSH BUTTON ASSEMBLY ON THE POLE. 0 CONSTRUCTION NOTES: 11. FURNISH AND INSTALL NEW TYPE 2 JUNCTION BOX PER WSDOT STD PLAN J-40.10-03 WITH LID LABELED "SIGNAL". 12. FURNISH AND INSTALL NEW TYPE 8 JUNCTION BOX PER WSDOT STD PLAN J-40.30-03 WITH LID LABELED "SIGNAL". 13. CONSTRUCT FOUNDATION PER COR STD PLAN 117.1 AND POLE SCHEDULE. FURNISH AND INSTALL LED LUMINAIRE, LUMINAIRE ARM, AND POLE. FOR LUMINAIRE POLE DETAILS, SEE COR STD PLAN 117.1 (EXCEPT INSTALLATION SHALL NOT INCLUDE THE PEDESTRIAN "SMALL SERIES"LED LUMINAIRE AND BANNER BRACKETS). 14. REMOVE EXISTING LUMINAIRE, POLE, AND ASSOCIATED CONDUIT/WIRING/JUNCTION BOX. GRIND EXISTING FOUNDATION 2-FEET BELOW FINISHED GRADE. 15. EXISTING LUMINAIRE TO REMAIN. MAINTAIN CIRCUIT CONTINUITY DURING CONSTRUCTION. 16. FURNISH AND INSTALL NEW TYPE 1 JUNCTION BOX PER WSDOT STD PLAN J-40.10-03 WITH LID LABELED "TS". 17. CONSTRUCT TRAFFIC CONTROLLER AND ELECTRICAL SERVICE CABINET FOUNDATION PAD PER COR STD DETAILS 126.2. FURNISH AND INSTALL ELECTRICAL SERVICE CABINET, TYPE TS2-TYPE 6 P+ CABINET, EAGLE CONTROLLER, INCLUDING ALL ASSOCIATED EQUIPMENT TO OPERATE A FULLY FUNCTIONING TRAFFIC SIGNAL SYSTEM. 18. INSTALL CONDUIT INTO EXISTING TYPE 7 JUNCTION BOX. ADJUST AND RAISE LID OF EXISTING BOX TO BE FLUSH WITH TOP OF SIDE WALK. 19. ROUTE FIBER THROUGH EXISTING CONDUIT. 20. SPLICE FIBERS IN VAULT ACCORDING TO FIBER OPTIC SPLICE DIAGRAMS S1.A AND S1.13. (DRAWING NO. SS1 AND SS2) COIL 100' OF FIBER SLACK IN THE VAULT. CONTACT COR IT NETWORK SYSTEMS MANAGER RON HANSEN AT (425)430-6873 AND TRANSPORTATION MAINTENANCE SUPERVISOR ERIC CUTSHALL AT (425)430-7423 TO COORDINATE WHEN SPLICING SHALL OCCUR TO MINIMIZE DISRUPTION TO TRAFFIC SIGNAL COMMUNICATION. 21. PROVIDE 75' OF FIBER SLACK IN THE JUNCTION BOX. 22. FURNISH AND INSTALL NEW 25-TA JUNCTION BOX PER SHEET SDI. 23. REMOVE CONDUCTORS AND ABANDON CONDUIT IN PLACE. 24. INTERCEPT EXISTING CONDUIT, EXTEND CONDUIT INTO PROPOSED JUNCTION BOX. 25. RECONNECT EXISTING LUMINAIRE ONTO NEW ELECTRICAL CIRCUIT C, SERVICE CABINET S1. 26. REMOVE EXISTING JUNCTION BOX. 27. INSTALL KING COUNTY FURNISHED AND WIRELESS ACCESS ANTENNA CONNECT WITH CAT-6 CABLE. CAT-6 CABLE SHALL RUN FROM THE TOP SHELF OF THE SIGNAL CABINET TO THE WIRELESS ACCESS ANTENNA. AFTER PULLING CAT-6 CABLE, CONNECT RJ-45 CONNECTORS TO EACH END AND TEST PIN OUTS. 28. REMOVE EXISTING LUMINAIRE, POLE, AND GRIND EXISTING FOUNDATION 2-FEET BELOW FINISHED GRADE. MAINTAIN AND KEEP OPERATIONAL THE EXISTING CIRCUIT FOR THE PARK AND RIDE LIGHTING SYSTEM. 29. FURNISH AND INSTALL ONE (1) 12CT FIBER PATCH PANEL (LC CONNECTORS) IN THE UPPER COMPARTMENT OF THE NEW DOUBLE DOOR P+ CABINET AND ONE (1) 12CT FIBER PATCH PANEL (SC CONNECTORS) IN THE LOWER COMPARTMENT OF THE NEW DOUBLE DOOR P+ CABINET AS SHOWN IN THE DETAILS ON DRAWINGS SD3. FURNISH AND INSTALL THE TSP INTERFACE PANEL. 30. CONTRACTOR SHALL VERIFY THE DEPTH AND LOCATION OF UTILITIES. UTILITY DEPTH IS KNOWN TO BE SHALLOW. 9. ALL NEW TRAFFIC SIGNAL, PEDESTRIAN HEADS, AND PUSH BUTTONS SHALL BE SECURELY COVERED WHILE NOT IN OPERATION. 10. NEW CONDUITS SHALL SHARE THE SAME TRENCH WITH OTHER NEW UTILITIES WHEREVER PRACTICABLE. 11. CONTRACTOR SHALL MAINTAIN THE EXISTING OR HIGHER LIGHTING LEVELS UNTIL NEW FIXTURES AND INSTALLED AND OPERATIONAL. 12. CONDUIT BENDS AND SWEEPS FOR FIBER CONDUIT RUNS SHALL NOT EXCEED 3-FEET MINIMUM RADIUS. 13. NUMBER OF CONDUIT BENDS BETWEEN PULL POINTS SHALL NOT BE MORE THAN THE EQUIVALENT OF FOUR 90 DEGREE BENDS OR 360 DEGREES TOTAL. THE CONTRACTOR SHALL FURNISH AND INSTALL ADDITIONAL Approved For Bid JUNCTION BOXES AS REQUIRED. 1g0AK7 0 Robert M. Hanson P.E. Date FEDAID: CM-1292(002) CITY OF 719 Second Ave., Suite 1250 F RECORD DR]d!­ "°°' CALL 48 HOURS 9 re `� 1„ 10 °�RENTON SIGNAL 8c ILLUMINATION Seattle, Washin ton 98104 mformodon shown on tnls a de°Danes o designed � pPublic Works Department(206)382-9800 c E4 l os-constructed componeo6.RECORD DRAWING WST WDATEA"R "eowm. DATUM A roved For Construction 7TH AND SHATTUCKBEFORE YOU DIG 'S d deepp SG-1 vwmvAksassoclates.corn SIONAL ' P a;ded9 by°others and was 1-800-424-55555 NO. REVISION BY gym. "" ORD1NG' Robert M. Hanson P.E. Date Eer 17 `29