HomeMy WebLinkAboutAdministrative Site DevelopmentDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
ADMINISTRATIVE SITE DEVELOPMENT PLAN REPORT & DECISION
REPORT DATE: August 6, 2015
Project Name: Southport Office Development Minor Modification
Owner: Michael Christ; 1083 Lake Washington Blvd, Suite 50; Renton, WA 98056
Applicant: Greg Krape; Hotel at Southport, LLC; 1083 Lake Washington Blvd, Suite 50;
Renton, WA 98056
Contact: Bill Stalzer; Stalzer & Associates; 603 Stewart St, Suite 512; Seattle, WA 98101
File Number: LUA00-156, MOD
Project Manager: Rocale Timmons, Senior Planner
Project Summary: The applicant requested a Minor Site Plan Modification for the construction of
three, 125-foot tall, office buildings totaling approximately 743,610 gross square
feet. The office buildings consists of approximately 732,855 square feet of office
space, 6,630 square feet of retail space, and a 4,125 square foot restaurant. The
office spaces are integrated with and sit on top of a parking structure that includes
2,120 parking spaces, 245 bicycle parking spaces for use by the proposed office,
adjacent hotel, and ancillary uses. The property is located within the Commercial
Mixed Use (CMU) land use designation and the Urban Center (UC) zoning
classification. However, the proposal is vested to COR-3 zoning classification as
part of the Southport Development Planned Action FSEIS (September 9, 1999),
and the Southport Level II Master Plan and Shoreline Development Permit (LUA99-
189, SA-A, SM) and the subsequent Master Site Plan Modifications (dated
February 4, 2008 and September 23, 2014). Modifications to the approved site
plan include a shift of the office buildings to the south consistent with the
locations in the 2014 Master Site Plan minor modification; increase the setback
from the Boeing industrial buildings by an additional 15 feet to the east; and an
increase in building modulation. Access to the site is proposed from Lake
Washington Blvd via an internal road network to the overall Southport
Development site. The site is not located within the Shoreline Jurisdiction.
Project Location: 1101 Lake Washington Blvd
Site Area: 5.62 acres
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 2 of 13
Site Plan Report
A. EXHIBITS:
Exhibit 1: 2015 Southport Office Development Report and Decision
Exhibit 2: Approved Southport Master Site Plan (2014)
Exhibit 3: 2015 Southport Office Site Plan
Exhibit 4: Landscape Plan
Exhibit 5: Elevations
Exhibit 6: Transportation Assessment prepared by TenW (dated May 13, 2014)
Exhibit 7: Southport Office Development Modification ERC Memo (dated July 24, 2015)
Exhibit 8: Approved Southport Master Site Plan Minor Modification Report (dated September 23,
2014)
Exhibit 9: Approved Southport Office Development Level I Site Plan Report (dated February 5, 2001)
Exhibit 10: Aerial Photograph
Exhibit 11: Vested Commercial Office Residential – 3 Development Standards
Exhibit 12: Vested Shoreline Master Program Regulations - 1999
Exhibit 13: Southport Planned Action Ordinance (#4804)
Exhibit 14: Approved Southport Master Site Plan (LUA99-189/dated July 18, 2000)
Exhibit 15: Approved Southport Master Site Plan Minor Modification Letter (dated February 4, 2008)
Exhibit 16: Planned Action Designation (dated April 4, 2000)
Exhibit 17: Southport FSEIS and Mitigation Document (dated September 17, 1999)
Exhibit 18: Southport Master Site Plan/Hotel ERC Memo (dated July 14, 2014)
Exhibit 19: Revised Southern Elevation (dated June 12, 2015)
Exhibit 20: Ground Effects Diagram (dated June 12, 2015)
Exhibit 21: Lake Washington Existing Trail Condition
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 3 of 13
Site Plan Report
B. GENERAL INFORMATION:
1. Owner(s) of Record:
Michael Christ
1083 Lake Washington Blvd, Suite 50
Renton, WA 98056
2. Comprehensive Plan Land Use Designation: Vested to Urban Center North (UCN) - 1999
3. Zoning Classification: Vested to 1999 Commercial Office Residential-3
(COR-3) (Exhibit 11)
4. Existing Site Use: Vacant/Gravel Parking Lot
5. Neighborhood Characteristics:
a. North: Southport Hotel
b. East: Multi-Family Residential (UCN-2 zone)
c. South: Puget Sound Energy (UCN-2 zone)
d. West: Boeing Renton Plant (UCN-2 zone)
6. Site Area: 245,086 square feet (5.62 acres)
C. HISTORICAL/BACKGROUND:
Action Land Use File No. Ordinance No. Date
Comprehensive Plan N/A 5099 11/01/2004
Zoning N/A 5100 11/01/2004
Annexation N/A 1791 09/09/1959
Planned Action EIS N/A 4804 10/25/1999
Master Site Plan & Shoreline
Substantial Development
Permit
LUA99-189 N/A 04/07/2000
Minor Modification for the
Southport Master Site Plan
LUA99-189 N/A 02/04/2008
Administrative Site Plan
Review (Bristol Apartments)
LUA01-144 N/A 02/22/2002
Administrative Site Plan
Review (Southport Office
Bldgs)
LUA00-156 N/A 02/05/2001
Southport
Hotel/Modification to
Master Site Plan
LUA14-000645 N/A 09/23/2014
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 4 of 13
Site Plan Report
D. PUBLIC SERVICES:
1. Existing Utilities
a. Water: Water service would be provided by the City of Renton. There is an existing 12-inch water
main located within the internal access road for the adjacent properties east of the proposed
development, known as Southport Phases 1 & 2, (refer to City project plans no. W-2882 and W-
3291). The static water pressure is about 128 psi at ground elevation of 22 feet.
b. Sewer: Sewer service would be provided by the City of Renton. There is an 8-inch sewer main in an
easement on the site.
c. Surface/Storm Water: There is a private storm drainage conveyance system and water quality
treatment on site.
2. Streets: There are partial street improvements in Lake Washington Blvd NE to accommodate the
proposed use.
3. Fire Protection: City of Renton Fire Department
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-070: Zoning Use Table
c. Section 4-2-120: Development Standards for Commercial Zoning Classifications (1999) (Exhibit 11)
2. Chapter 4 Property Development Standards
3. Chapter 6 Streets and Utility Standards
4. Chapter 9 Procedures and Review Criteria
a. Section 4-9-200: Site Plan Review
5. Chapter 11 Definitions
F. ADMINSTRATIVE SITE PLAN REVIEW FINDINGS OF FACT:
1. The Southport Office Development project includes three office buildings totaling approximately
743,610 gross square feet. The office buildings consists of approximately 732,855 square feet of office
space, 6,630 square feet of ground-level retail space, and 4,125 square feet of ground-level restaurant
space. The office spaces are integrated with and sit on top of a parking structure that includes 2,120
parking spaces, 245 bicycle parking spaces, and showers, changing and bathroom facilities for use by
office, retail, restaurant and hotel employees.
2. The Southport Office Level I Site Plan application was approved on February 5, 2001 subject to six
conditions of approval (Exhibit 9):
1) Dedication of a maintenance easement for the pedestrian promenade / trail along the Lake
Washington Shoreline benefiting the City of Renton shall be recorded. The dedication language
shall be approved by the City Attorney prior to recording. Recording shall be prior to
occupancy.
2) A note shall be included in the Southport Office Building lease agreements that states the
development has been presumed to be compatible with activities associated with Renton
International Airport.
3) Reserved.
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 5 of 13
Site Plan Report
4) The applicant shall install “Children at Play” signs where vehicle traffic may be routed near
Gene Coulon Park. Installation shall be prior to construction permits.
5) A site lighting plan will be required that demonstrates consideration of placement and design of
exterior lighting in order to avoid excessive brightness or glare to adjacent properties and
streets. The plan will be required prior to building permits.
6) A Transportation Demand Management Program will be required to be submitted and
approved prior to occupancy.
7) The site plan must be revised to reflect that the northernmost edge of the restaurant is not
within 75’ of the shoreline edge. This revision must be approved by the Development Services
Department prior to building permits.
3. The requested modification to the approved Southport Office Level I Site Plan includes the following
changes:
Shifting of the structures: The westernmost office building (Building 1) would be shifted 1 84
feet southward and 15 feet eastward, for a 35-foot setback from the western property line
(Boeing Manufacturing Facilities). The center office building (Building 2) would shift 51 feet
southward in alignment with the north façade of Building 1. The easternmost office building
(Building 3) would shift 44 feet southward to offset it from the north façade of the other two
buildings, all consistent with the locations in the 2014 Master Site Plan (Exhibit 2).
Additional street-level amenities are proposed including a system of pedestrian arcades along
the north facade of each building; landscaped pedestrian entrances to each office building; a
grand staircase with an outdoor terrace between Buildings 1 and 2; a 2-story retail space in
Building 2 with adjacent outdoor seating; and a street-level 2-story restaurant with an outdoor
seating area in Building 3.
Substantially increasing building modulation by setting back the north and east facades of the
office floor component from the edges of the pedestal; adding geometric floorplate extensions
with view terraces on a portion of the east facades of the office component; stepping back the
south façades of the office components of Buildings 1 and 2 approximately 70 feet from the
south façade of the parking structure; wrapping the office component of Building 3 around the
east and south sides of the garage; modulating the south façades of the office components with
a vertical channel in the façade and outdoor view terraces on the southeast corner of upper
floors; and adding landscaped rooftop terraces of the east side of each building providing 360
degree views of the surrounding area.
Relocating the restaurant from the isolated northwest corner of the site to the street-level
northeast corner of building 3 which is a more active pedestrian location than its previous
location.
Eliminating one northern parking garage entry/exit and redirecting traffic flows in and out of
the parking garage to shift vehicular traffic away from the hotel, restaurant, retail space, Br istol
1, and the waterfront promenade.
Adding a row of alternating evergreen and white poplar trees along the south property line to
visually screen the parking garage from distant views.
4. The property is located within the Commercial Mixed Use (CMU) land use designation and the Urban
Center (UC) zoning classification. However, the proposal is vested to the COR-3 zoning classification as
part of the Southport Development Planned Action Final Supplemental Environmental Impact
Statement (SFEIS) (September 17, 1999); the Southport Level II (Master Site Plan); subsequent Master
Site Plan Modifications (dated February 4, 2008/Exhibit 15 and September 23, 2014/Exhibit 8); and
Southport Office Level I Site Plan (dated February 5, 2001/Exhibit 9).
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 6 of 13
Site Plan Report
5. Since the 2000 Master Site Plan approval, the City has issued Level I Site Plan approvals for all three of
the Southport Development: Phase I, The Bristol, a mixed/use residential complex; Phase II, the subject
proposal for three office buildings; and Phase III, the hotel. The proposed Southport Office
Development Site Plan implements Phase II of the Southport Master Site Plan.
6. The FSEIS and mitigation document was issued for the Southport Planned Action in September 1999
(Exhibit 17). Ordinance #4804 was adopted by the City Council in October 1999 designating a Planned
Action of the subject site (Exhibit 13).
7. The objective of the Southport Planned Action SFEIS was to complete the environmental review in
advance of the overall conceptual Master Site Plan. Project applications and development phases are
then allowed to proceed without additional environmental review provided the proposed development
is consistent with the plan alternatives and level of development that was analyzed in the EIS process.
8. On April 4, 2000, the City determined that the Southport Master Site Plan was consistent with both the
range of plan alternatives that were evaluated in the FSEIS and with the development levels or
parameters as specified in the Planned Action Oridinance (Exhibit 16).
9. On July 14, 2014, the City determined that the 2014 Southport Master Site Plan modification (LUA14-
000645) was also consistent with both the range of plan alternatives that were evaluated in the FSEIS
and with the development levels or parameters as specified in the Planned Action Oridinance (Exhibit
18). Any subsequent applications to develop the property consistent with the Master Site Plan would
also be covered by the Planned Action and would not require additional SEPA review.
10. The City’s Environmental Review Committee determined that the proposed Minor Modification to the
Southport Office Site Plan continues to meet the criteria outlined in the Planned Action Ordinance
(Ordinance #4804) and qualifies as a planned action; the proposal shall not require a SEPA threshold
determination, preparation of an EIS, or be subject to further review pursuant to SEPA (Exhibit 7). As
part of the third and final phase the applicant will be responsible for completing all remaining
mitigation measures.
11. The Southport Master Site Plan and Level I Site Plan approval remained valid and effective through July
18, 2015. The subject Minor Modification and associated building permit (B1500568) were submitted,
and deemed complete prior to July 18, 2015 and consequently remain vested to the land use
regulations in effect at the time of the Southport Master Site Plan approval. Once approved, this Minor
Modification and the related building permit (including all related construction permits) will remain
valid and effective pursuant to the permit durations set forth in the Renton City Code (RMC 4 -5-050)
and the International Building Code (IBC), subject to renewals and extensions consistent with those
provisions.
12. The proposed office building complex is set back more than 200 feet from the shoreline and as a result
the shoreline regulations are not applicable to the subject Minor Modification request.
13. The combined maximum building height and site elevation cannot exceed the maximum height of 179
feet above sea level, meeting current FAA maximum height for structures.
14. Access to the site would be provided via an existing internal private street extended from Lake
Washington Boulevard NE.
15. Approximately 3.2 acres of ground related open space is planned for the entire Southport
development.
16. The proposed parking structure provides direct pedestrian access to and from the hotel, along with
vertical circulation for pedestrians to move to and from the exterior pedestrian plaza and office building
lobbies. In accordance with the parking requirements in the 1999 Renton Municipal Code Section 4 -4-
080 and the requested parking modifications, parking for the office, retail, restaurant uses and for the
hotel are provided in the parking structure as follows:
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 7 of 13
Site Plan Report
Occupancy Net Floor
Area/Square
Foot
Minimum
Ratio/1,000
Maximum
Ratio/1,000
Minimum
Stalls
Maximum
Stalls
Stalls
Provided
Office 654,784 2.0 4.5 1,310 2,947 1,592
Restaurant 4,093 10.0 10.0 41 41 41
Retail 3,831 4.0 5.0 16 20 20
Hotel N/A N/A N/A 467 467 467
Total 1,834 3,475 2,120
17. The Planning Division of the City of Renton accepted the above master application for review on May 5,
2015 and determined it complete on May 13, 2015. The project complies with the 120-day review
period.
18. No agency or public comments were received.
19. Representatives from various city departments have reviewed the application materials to identify and
address issues raised by the proposed development. These comments are contained in the official file,
and the essence of the comments have been incorporated into the appropriate sections of this report
and the Departmental Recommendation at the end of this report.
20. The proposal requires a Minor Modification to the approved Site Plan (Level 1 Site Plan) approved on
February 5, 2001 (Exhibit 9). The following table contains project elements intended to comply with
the minor modification to approved Site Plans criteria, as outlined in RMC 4-9-200H.2:
Table A: MINOR MODIFICATION TO AN APPROVED MASTER PLAN OR SITE PLAN
Minor modifications may be permitted by administrative determination. To be considered a minor
modification, the amendment must not:
Involve more than a ten percent (10%) increase in area or scale of the development in the
approved plan.
Staff Comment: The proposed Minor Modification represents approximately a 2.5%
decrease in the scale/square footage of development from the 2001 Site Plan approval:
Use 2001 Southport Office Site Plan
(Exhibit 9)
2015 Southport Office Site Plan
Minor Modification
Retail (Specialty) SF 0 6,630
Restaurant SF 10,000 4,125
Office SF 750,000 732,855
Parking Stalls 1,850 1,653 (not including 467 parking
stalls)
Total Square Feet 760,000 743,610
Compliant if
all
conditions
of approval
are met
Have a significantly greater impact on the environment and/or public facilities than the
approved plan.
Staff Comment: Many of the original components of the approved site plan remain the same
and continue to comply with Site Plan Review decision criteria, as outlined in RMC 4-9-200.E
as wells as implement the approved Master Site Plan (as modified on February 4,
2008/Exhibit 15 and September 23, 2014/Exhibit 8). The proposed modification would be
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 8 of 13
Site Plan Report
required to demonstrate compliance with those conditions issued as part of the original
approval (see above, Finding of Fact 2).
Specific Site Plan Review criteria is used to ensure proposed changes (see above, Finding of
Fact 3) would not have a significantly greater impact on the environment and/or public
facilities than the approved plan. The applicable criterion include: Circulation, Landscaping,
Structure Scale, and Transportation.
Circulation: Providing desirable transitions and linkages between uses, streets, walkways
and adjacent properties.
Staff Comment: Physical transition and linkage elements would be provided along the
north, east and south property lines. The design of the three office buildings provides
public and tenant amenities by blending the office plaza area with the hotel porte
cochere (Exhibit 20). Each office building has its own distinctive landscaped entrance
and lobby off of the pedestrian plaza, which fronts on and connects with the hotel porte
cochere (Exhibit 4). The lobby of each building in turn is connected to the lobby of the
other two buildings by a system of wide interconnected pedestrian passageways. Along
the route between Buildings 2 and 3, an open-air conferencing and garden pavilion off
the lobby provides a direct view of Lake Washington down the internal street between
the Bristol apartments and the hotel (Exhibit 20).
The proposal includes a designated area for pedestrians abutting the southern
elevation which currently does not include a linkage across the eastern most garage
entrance on the southern facade. Given the intensity of the use, it is imperative there be
a provision of safe, designated, and attractive pedestrian connections between all
parking areas, buildings, public sidewalks and adjacent properties. Therefore staff
recommends, as a condition of approval, the applicant be required to provide a
continual pedestrian connection, along the southern façade of the parking garage.
Additionally, all designated pedestrian areas shall be differentiated, in material, from
drive aisles. A revised site plan shall be submitted to, and approved by, the Current
Planning Project Manager prior to construction permit approval.
Along Lake Washington a pedestrian walkway easement extends a pedestrian route to
the east property line providing a pedestrian and bicycling connection to Gene Coulon
Park for the entire length of the Southport shoreline. The sidewalk on the east side of
the hotel and office provides a direct pedestrian route to the waterfront area.
The SFEIS included mitigation measures requiring water access and trail connections
from Gene Coulon Park to the Cedar River Trail by a dedicated public recreation
easement (Exhibit 17). Three public recreation easements have been recorded
(Recording numbers 20051021000894, 20051021000895, and 20051021000896). Staff
recommends, as a condition of approval, a public recreation easement be recorded
prior to the issuance of the building permit approval to provide the required public
pedestrian access along the waterfront. The recreation easement shall traverse
north/south, and connect to the existing east/west walkway easement for a future
continuous trail connection from Gene Coulon Park to the Cedar River Trail (Exhibit 21).
Landscaping: Using landscaping to provide transitions between a development and
surrounding properties to reduce noise and glare, maintain privacy, and generally enhance
the appearance of the project.
Staff Comment: A conceptual landscape plan was submitted with the project
application (Exhibit 4). The landscape plan includes a general planting plan. The use of
paving patterns, planting beds and site walls appear to reinforce the architectural
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 9 of 13
Site Plan Report
elements of the proposed structure. It is unclear, without specific detail, if the proposed
landscape planting plan provided a diverse mix of vegetation needed to meet the intent
of the code. The applicant has proposed white poplars along its southern property line.
While poplars grow quickly, making them potential screens and windbreaks they
possess weak wood, making them a hazard near structures when branches break off in
storms. Additionally, their shallow roots can buckle pavement and sidewalks, and
poplars are messy, dropping leaves, twigs and their cottony seeds. Therefore, an
alternative tree species shall be used for screening along the southern property line.
Staff recommends, as a condition of approval, the applicant submit a revised and
detailed landscape plan complying with the following: a mixture of trees, shrubs, and
groundcover to satisfaction of the Current Planning Project Manager. The detailed
landscape plan, shall be submitted to, and approved by, the Current Planning Project
Manager prior to construction permit issuance.
Underground irrigation systems are required to be installed and maintained for all
landscaped areas. The irrigation system shall provide full water coverage of the
planted areas specified on the plan.
Structure Scale: Consideration of the scale of proposed structures in relation to natural
characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian
and vehicle needs.
Staff Comment: The office continues to comply with the height standards in the COR-3
zoning as demonstrated in the 2001 Level I Site Plan approval (Exhibit 9) and remains
unchanged. The 2015 Southport Office Site Plan modification intends to improve upon
the approved 2001 Southport Office Site Plan. Specifically, the office buildings have
been moved farther away from the Boeing industrial buildings, hotel, and residential
buildings. The increase in separation serves to provide greater privacy, sunlight and
separation of high-volume pedestrian and vehicle areas. Additionally, numerous
outdoor terraces have been incorporated into the design in order to provide enhanced
distant and site views.
The overall massing and architectural treatment of the office buildings provides for a
varied, articulated form combined with a consistent design aesthetic. The office
component of each building sits on a pedestal at approximately 50 feet in height which
reflects the scale of the adjacent Bristol apartment buildings. The office component is
set back from the edges of the pedestal to create a more slender form allowing for a
change of scale and relief. Additionally, the office component of Building 3 wraps
around the entire east façade of the parking garage and a portion of the south façade
to provide a cohesive streetscape for pedestrians on the internal street between the
Bristol apartment buildings and the office buildings, as well as for drivers entering the
site from Lake Washington Boulevard North (Exhibit 5). The office component of
Buildings 1 and 2 steps back approximately 70 feet from the south façade of the garage
to provide a significant visual break in the façade between the garage and office
building forms (Exhibits 5)
While the office portion of proposed Building 3 has been wrapped around the east and
southwest facades of the parking garage to reduce the visual impact from adjacent
properties the seven story parking garage is readily visible from south/Park Ave. In
order to address the massing of the parking structure the applicant has proposed a
simplistic aesthetic while providing visual screening of automobile lights with precast
panels as well as landscaping along the southern property line. All garage lighting is
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 10 of 13
Site Plan Report
proposed to have sharp cutoff shields to eliminate evening light pollution. Staff is
supportive of the simplistic design. However, the seven story garage as proposed is
monotonous and does not include sufficient design elements which serve to reduce the
visual bulk of the building. Material variation and/or architectural enhancements are
needed in order to create variation and enhance visual appeal to meet the intent of this
criterion. In response, the applicant submitted revised elevations for the southern
garage façade following the submittal of the subject application (Exhibit 19). Staff
determined that these proposed elevation revisions (Exhibit 19) addressed staff’s
concerns and would serve to reduce the visual bulk of the southern garage façade.
Staff recommends, as a condition of approval, the applicant provide a material/colors
board to the Current Planning Project Manager prior to the primary building permit
approval. The materials board shall demonstrate compatibility with the Bristol
Apartments and hotel.
The applicant submitted revised elevations for the southern garage façade following
the submittal of the subject application (Exhibit 19). The proposed elevation revisions
(Exhibit 19) would serve to satisfy the condition of approval to reduce the visual bulk of
the southern garage façade.
Transportation:
Staff Comment: Vehicular access is provided from the closest public street, Lake
Washington Boulevard NE, to the Southport development. Pedestrian access is
provided along a portion of the streets adjacent to the Southport property. Vehicle
access points to the parking garage have been adjusted: one of the two north
entrances in the 2001 site plan has been eliminated; one of the south entrances has
been widened; and a new entrance has been added along the west side of the garage.
These changes provide greater separation between pedestrian and vehicular routes,
thereby improving pedestrian safety and increasing the efficiency of vehicle access to
and from the garage. The proposed development is expected to maintain the safety
and efficiency of pedestrian and vehicle circulation on the site if all conditions of
approval are complied with.
The applicant submitted a trip generation analysis (Exhibit 6) for the 2014 Southport
Master Site Plan which provided a comparison of the PM peak hour trip generation
analyses documented in the Southport Master Site Plan approval and subsequent
modifications (Exhibits 8 and 15). The transportation assessment noted that that the
PM Peak Hour trips generated by the uses in the 2014 Minor Modification compared to
the 2000 Southport Master Site Plan (1,314 trips) are less than the number of PM Peak
Hour trips in the approved 2008 Minor Modification to the Master Site Plan due to a
reduction in the number of hotel rooms. Additionally, the proposed number of trips is
within the range of PM Peak Hour trips analyzed in the Planned Action (1,355 trips). As
a result, no additional transportation analysis or traffic mitigation is anticipated beyond
the SFEIS. The measures identified in the Southport Planned Action Mitigation
Document (Exhibit 17) mitigate the transportation impacts of the proposed office.
Since the 2001 Southport Office Building Site Plan approval, SECO has installed
intersection, railroad crossing, and sidewalk improvements at the intersection of the
internal road and Lake Washington Blvd North, as well as water mains, sewer mains,
com-conduit pathways and electrical pathways, feeders and associated utility vaults as
part of the infrastructure to support both the office development and adjacent hotel
project. Additional site access and off-site road improvements on Lake Washington
Boulevard North consistent with the 1999 Mitigation Document will be completed as
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 11 of 13
Site Plan Report
warranted prior to occupancy of each office building. Specifically but not limited to the
widening of Lake Washington Blvd south of Houser (to provide a 4-lane section) and
widening of the existing on-site bridge over John’s Creek to provide a new 4-lane bridge
will be required to be installed prior to occupancy of the office buildings.
Therefore staff recommends, as a condition of approval, the applicant be required to
construct improvements which include the widening of Lake Washington Blvd NE, south
of Houser (to provide a 4-lane section), and widen the existing on-site bridge over
John’s Creek to provide a new 4-lane bridge. The applicant shall construct the
improvements prior to temporary occupancy for the third and final office building.
Traffic impact fees would be determined at time of building permit(s) issuance.
The modification does not change the boundaries of the originally approved plan.
Staff Comment: The boundaries in the approved 2001 Southport Office Site Plan (Exhibit 9)
remain unchanged in the requested minor modification.
G. CONCLUSIONS:
1. The Southport Office Development is consistent with the approved Master Site Plan (as modified on
February 4, 2008/Exhibit 15 and September 23, 2014/Exhibit 8) and therefore complies with the
Planned Action thresholds.
2. The Southport Office Development is consistent with the Minor Modification criteria to an approved
Site Plan, if all conditions of approval are met.
3. The proposal is compliant and consistent with the plans, policies, regulations and approvals to which it
is vested if all conditions of approval are met.
4. Staff does not anticipate any adverse impacts on surrounding properties and uses as long as the
conditions of approval are complied with.
5. The proposed use is anticipated to be compatible with existing and future surrounding uses as
permitted in the UC zoning classification.
6. The scale, height and bulk for the proposed structures are appropriate for the site.
7. Safe and efficient access and circulation has been provided for all users if all conditions of approval are
met.
8. There are adequate public services and facilities to accommodate the proposed use.
9. Adequate parking for the proposed use has been provided.
10. The proposed site plan ensures safe movement for vehicles and pedestrians and has mitigated
potential effects on the surrounding area if all conditions of approval are complied with.
11. The proposed development would not generate any long term harmful or unhealthy conditions.
Potential noise, light and glare impacts from the proposed use have been evaluated and mitigated if all
conditions of approval are complied with.
12. Landscaping has been provided in all areas not occupied by the buildings or paving.
CityofRentonDeportmentofCommunity&EconomicDevelopmentAdministrativeSitePlonReport&DecisionSOUTHPORTOFFICEDEVELOPMENTMINORMODIFICATIONLUAOO-000156,MODReportofAugust6,2015Page12of13H.DECISION:TheproposedSitePlanMinorModification,FileNo.LUAOO-156,MODisapproved.Theproposalissubjecttothefollowingconditions:1.TheapplicantshallcomplywithallmitigationmeasuresissuedaspartoftheSFEIS,datedSeptember17,1999(Exhibit17).2.TheapplicantshalldemonstratecompliancewithallconditionsofapprovalissuedaspartoftheSouthportOfficeLevelISitePlan,datedFebruary5,2001(Exhibit9).3.Theapplicantshallberequiredtoprovideacontinualpedestrianconnection,alongthesouthernfaçadeoftheparkinggarage.Additionally,alldesignatedpedestrianareashallbedifferentiated,inmaterial,fromdriveaisles.Arevisedsiteplanshallbesubmittedto,andapprovedby,theCurrentPlanningProjectManagerpriortoconstructionpermitapproval.4.Theapplicantshallrecordapublicrecreationeasementpriortoissuanceofthebuildingpermitapproval.Sucheasementshallconnecttotheexistingpedestrianeasements(identifiedabove)forafuturecontinuoustrailconnectionfromGeneCoulonParktotheCedarRiverTrail.SucheasementshallbesubjecttoseveralconditionsprecedentsuchthattheeasementrightsgrantedthereinshallonlybecomeeffectiveifandwhentheCitycompletes(definedashavingsecuredallnecessarypropertytights,permits,andfinancingtocompleteconstruction)thetrailconnectiononthepropertytothewest(currentlyownedbyBoeingandDNRasshowninExhibit21).Further,theCitywillmakecontinuous,diligenteffortstoobtainasubstituteoverlandeasementfromtheadjoiningpropertytothewest(currentlyownedbyBoeing),andtheeasementrequiredinthisconditionshallexpireassoonastheCityisabletoobtainasubstituteoverlandeasementovertheadjoiningpropertytothewest.ThefinaltermsofthesubjecteasementshallbesubjecttoreviewandapprovalbytheCityAttorney.5.Theapplicantshallsubmitarevisedanddetailedlandscapeplancomplyingwiththefollowing:amixtureoftrees,shrubs,andgroundcovertosatisfactionoftheCurrentPlanningProjectManager.Thedetailedlandscapeplan,shallbesubmittedto,andapprovedby,theCurrentPlanningProjectManagerpriortoconstructionpermitissuance.6.Theapplicantshallprovideamaterial/colorsboardtotheCurrentPlanningProjectManagerpriortotheprimarybuildingpermitapproval.ThematerialsboardshalldemonstratecompatibilitywiththeBristolApartmentsandhotel.7.TheapplicantshallberequiredtoconstructimprovementswhichincludethewideningofLakeWashingtonBlvdNE,southofHouser(toprovidea4-lanesection),andwidentheexistingon-sitebridgeoverJohn’sCreektoprovideanew4-lanebridge.Theapplicantshallconstructtheimprovementspriortotemporaryoccupancyforthethirdandfinalofficebuilding.NJenniferHenninq/PlanningDirectorJDateSitePlanReport
City of Renton Department of Community & Economic Development Administrative Site Plan Report & Decision
SOUTHPORT OFFICE DEVELOPMENT MINOR MODIFICATION LUA00-156, MOD
Report of August 6, 2015 Page 13 of 13
Site Plan Report
TRANSMITTED this this 6th day of August 2015 to the Contact/Applicant/Owner:
Applicant: Owner: Contact:
Greg Krape
Hotel at Southport, LLC
1083 Lake Washington Blvd, Suite 50
Renton, WA 98056
Michael Christ
1083 Lake Washington Blvd, Suite 50
Renton, WA 98056
Bill Stalzer
Stalzer & Associates
603 Stewart St, Suite 512
Seattle, WA 98101
TRANSMITTED this this 6th day of August 2015 to the Parties of Record:
Yeh-Hee Hahn
CBRE Brokerage Services
1201 Pacific Ave, Ste #1502
Tacoma, WA 98042
Bob Braaf
1085 Lake Washington Blvd N, Ste
#C411
Renton, WA 98056
Mike O’Halloran
4420 4th Ave
Renton, WA 98059
The Boeing Company
PO Box 3707
Seattle, WA 98124-2207
TRANSMITTED this 6th day of August 2015 to the following:
C.E. “Chip” Vincent, CED Administrator
Vicki Grover, Interim Development Engineering Manager
Vanessa Dolbee, Current Planning Manager
Fire Marshal
Land Use Action Appeals, Request for Reconsideration, & Expiration
The review decisions will become final if the decisions are not appealed within 14 days of the decision date.
Minor Modification to Approved Site Plan Approval Appeal: Appeals of the administrative modification to
approved site plan must be filed in writing to the Hearing Examiner on or before 5:00 p.m. on August 20,
2015.
APPEALS: An appeal of the decision(s) must be filed within the 14-day appeal period (RCW 43.21.C.075(3);
WAC 197-11-680). Renton Municipal Code Section 4-8-110 governs appeals to the Hearing Examiner. Appeals
must be filed in writing together with the $250.00 application fee to Hearing Examiner, City of Renton, 1055
South Grady Way, Renton, WA 98057. Additional information regarding the appeal process may be obtained
from the City Clerk’s Office, Renton City Hall - 7th Floor, (425) 430-6510.
RECONSIDERATION: Within 14 days of the decision date, any party may request that a decision be reopened by
the Administrator (Decision-maker). The Administrator (Decision-maker) may modify his decision if material
evidence not readily discoverable prior to the original decision is found or if he finds there was
misrepresentation of fact. After review of the reconsideration request, if the Administrator (Decision-maker)
finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period.
Any person wishing to take further action must file a formal appeal within the 14-day appeal timeframe.
EXPIRATION PERIOD: The Administrative Site Development Plan Review decision will expire two (2) years from
the date of decision or the expiration of the Master Site Plan whichever comes first.
THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications
may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals
to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing
through the Hearing Examiner. All communications are public record and this permits all interested parties to
know the contents of the communication and would allow them to openly rebut the evidence in writing. Any
violation of this doctrine could result in the invalidation of the appeal by the Court.