HomeMy WebLinkAboutSouthport Road Mitigation Plan Approval Letter'R Denis Law Mayor Community & Economic Development C. E. "Chip" Vincent, Administrator August 16, 2016 Scott Rosenstock Southport, LLC 1083 Lake Washington Blvd N, Suite #50 Renton, WA 98056 Subject: Approval of Final Mitigation Plan/Proposed Maintenance & Monitoring Southport Road Improvement, LUA00-156 To Whom It May Concern: Mitigation Plan Approval: We have reviewed and approved the final stream mitigation plan/monitoring proposal for the Southport Access Road Improvement project, dated July 18, 2016 and received by the City on July 19, 2016. Please provide me with an electronic copy of the final mitigation plan, dated July 18, 2016. The mitigation project shall be installed in conformance with the approved plan prior final inspection. Next Steps: Work with Jan Illian in the Plan Review Section to obtain construction permits and begin work on stream mitigation installation consistent with the approved plan. Mitigation Installation and Approval: Once the stream mitigation has been installed (plants, signage, fencing, etc.) pursuant to the approved plan, please have biologist provide me with written verification that the installation is in conformance with the approved plan. You may be planning on installing the mitigation project after the commencement of construction; in order to provide you with the amount of security necessary for the installation of the plantings, signage, fencing; we will need a copy of the signed installation contract for this work. Surety Amount: In order to provide you with the amount of security necessary for the installations and/or maintenance and monitoring of the stream mitigation plantings, 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov August 16, 2016 Page 2 signage, and fencing, we will need a copy of the signed installation/maintenance and monitoring contract for this work. Based on the opinion of probable mitigation costs I received for installation, maintenance, and monitoring for the mitigation project, the total amount of your installation surety device is $47,981.25 and the maintenance and monitoring surety device is $30,000.00. The specific breakdown is as follows: Installation $38,385.00 TOTAL @125% $47,981.25 Maintenance & Monitoring $24,000.00 TOTAL @125% $30,000.00 These amounts are deemed sufficient to guarantee that structures, improvements, and mitigation required by permit condition will be installed according to plan and perform satisfactorily for a minimum of five (5) years after they have been completed. Please come to the 61h Floor of Renton City Hall to pay the surety device. The following security devices are acceptable for the purposes of installation of required critical areas mitigation performance and critical areas monitoring/maintenance: 1. Cash; 2. Letter of credit; 3. Set aside letter; provided, that the funds cannot be withdrawn, spent, or committed to any third party; 4. Savings account assigned to the City and blocked as to withdrawal by the secured party without the City's approval; or Any security device must be payable to the City upon demand by the City. In the event that improvements are not completed as required or maintenance is not performed satisfactorily, the City will notify the applicant/developer, property owner and guarantor in writing. The notice will state the specific defects that must be remedied and the date the work shall be completed. In the event the applicant/developer fails to complete all improvement work required in compliance with approved mitigation plan, dated July 18, 2016, the City reserves the right to proceed against the security for funds necessary to complete the improvements. If the amount of security is less than the expense incurred by the City, the applicant/developer shall be liable to City for the difference. The installation surety will be released upon written approval of the City once installation of all improvements is completed per the approved mitigation plan or alternatively per an approved as -built plan. August 16, 2016 Page 3 The maintenance and monitoring surety will be released upon written approval of the City once the five year maintenance and monitoring program is completed, and all performance measures are met, per the approved mitigation plan. As Built Plans for the Mitigation Area: A copy of the as -built plans of the approved mitigation plan, prior to final inspection shall be provided to the City; unless plantings are installed as exactly per plan. Please send all required information to my attention. Feel free to contact me at 425- 430-7219 if you have any questions regarding this letter. Sincerely, Ro ale Timmons Senior Planner CC File No. LUA00-156