SIGNAL DISPLAYS (EXISTING TO REMAIN)
R 12" R 12"
�— 12" Y 12"C913 0
� 12" G 12"
VEHICLE HEADS: VEHICLE HEADS: PEDESTRIAN HEADS
11,71 21,22,41 68,69
61,62
ILLUMINATION CRITERIA
1.0 FOOT CANDLES
4:1 UNIFORMITY
0.72 LIGHT LOSS FACTOR
PHASE DIAGRAM
01 NOT USED 05
02 06
03 07
04 08
•---► VEHICLE MOVEMENT
-�—-� PEDESTRIAN MOVEMENT
PRE—EMPT
A = 02
B = 04 & 07
C = 01 & 06
NOTE: EXISTING PHASING TO REMAIN
NOT USED
SEE DRAWING 6.04 FOR
STREET LIGHTING
ILLUMINATION POLE
SCHEDULE
N 1
0 1 13 1
0 3 12 3
ui
LC
uJ
9 LC M a
Y / 9
0
LC
1
W
7
3 7�4
f�
8 1
11
62
C1
11
69
(1-4
10
3 % �11
64+00
CONSTRUCTION NOTES
O1 CONSTRUCT CITY PEDESTRIAN —SCALE LUMINAIRE POLE FOUNDATION PER COR STD PLAN 117.2. FURNISH AND INSTALL CITY
PEDESTRIAN —SCALE POLE, ARM, LUMINAIRE, AND ALL ASSOCIATED EQUIPMENT PER THE POLE SCHEDULE DRAWING 6.04 THE
PROJECT SPECIFICATIONS, AND COR STD. PLANS 117.2 AND 117.3. APPLY DECAL NUMBERING WITH COR POLE ID PEf THE
POLE CHART AND COR STD PLAN 121.
�2 EXISTING LUMINAIRE POLE TO REMAIN.
O ADJUST EXISTING JUNCTION BOX TO FINISHED GRADE AS NEEDED. EXTEND NEW CONDUIT TO EXISTING JUNCTION BOX.
4 CONSTRUCT SERVICE CABINET FOUNDATION PER COR STD PLAN 126.2. FURNISH AND INSTALL SERVICE CABINET PER COR
STD PLAN 122.1. LOCATION AND ORIENTATION OF FOUNDATION AND CABINET SHALL BE VERIFIED BY CITY OF RENTON
INSPECTOR PRIOR TO INSTALLATION OF CONDUITS.
OAPPROXIMATE POWER CONNECTION POINT. CONTRACTOR SHALL PROVIDE CONDUIT TO UTILITY POLE PER THE WIRING
SCHEDULE. CONTRACTOR SHALL COORDINATE WITH PSE FOR SPECIFIC REQUIREMENTS. PSE TO PROVIDE 120/240 VOLT
SINGLE PHASE POWER SOURCE. CONTRACTOR SHALL COORDINATE WITH PSE FOR SERVICE CABINET ELECTRICAL HOOK—UP,
SHALL PREPARE/SUBMIT ALL APPLICABLE PERMITS, AND SHALL PAY ALL ASSOCIATED FEES.
SEE DRAWINGS 4.03, 4.05, AND 4.08 FOR CONDUIT AND JUNCTION BOX INSTALLATION DETAILS ON BRIDGE DECK.
O7 RELOCATE EXISTING LUMINAIRE POLE ONTO NEW BRIDGE STRUCTURE PER DRAWING 4.08.
OFURNISH AND INSTALL CITY PEDESTRIAN —SCALE POLE, ARM, LUMINAIRE, AND ALL ASSOCIATED EQUIPMENT PER THE POLE
SCHEDULE DRAWING 6.04, THE PROJECT SPECIFICATIONS, AND COR STD. PLANS 117.2 AND 117.3. APPLY DECAL
NUMBERING WITH COR POLE ID PER THE POLE CHART AND COR STD PLAN 121. MOUNT TO BRIDGE STRUCTURE PER
DRAWING 4.08.
O9 INSTALL 6' DIA. TYPE 3 LOOP DETECTOR PER WSDOT STANDARD PLAN J-50.12.
10 RELOCATE EXISTING WSDOT LUMINAIRE POLE PER THE POLE CHART, DRAWING 6.04. REMOVE EXISTING FOUNDATION AND
CONDUIT.
11 RELOCATE EXISTING JUNCTION BOX OUTSIDE SIDEWALK. INTERCEPT AND EXTEND EXISTING CONDUIT.
12 PROTECT AND MAINTAIN EXISTING LOOP DETECTOR.
13 EXTEND CONDUIT TO EXISTING JUNCTION BOX.
14 INSTALL TYPE APS PEDESTRIAN PUSHBUTTON TO EXISTING POLE, REMOVE EXISTING PUSHBUTTON AND REPAIR HOLE PER
WSDOT APPROVED —METHOD. SALVAGED EQUIPMENT BECOMES PROPERTY OF WSDOT.
15 INSTALL NEW FOUNDATION PER WSDOT STANDARD PLAN J-21.10. RELOCATED EXISTING PS POLE, PEDESTRIAN HEAD AND
PUSHBUTTON TO NEW FOUNDATION. REMOVE EXISTING FOUNDATION TO MINIMUM 24" BELOW FINISH GRADE. FILL AND
COMPACT VOID.
1)1
7
SYA
/ 2
I
L6264
L61 # _-
63 °
- L65 8 i !
L11�
L 12
L13
6sfoo
r
I# #
!
t
! ! =e
1
ILLUMINATION WIRING SCHEDULE
ILLUM. EQUIP. SVC ALLOW. ALLOW.
GRND. PWR 2C(SH) PULL CONDUIT FILL FILL
NO. RACEWAY CONDUIT SIZE #8 #8 #2 LOOP WIRE FILL (26%) (40%)
EX. NEW EX. NEW EX. NEW EX. NEW EX. NEW
1 1 2" NEW SCH 40 CITY 2 1 1 1 0.17 0.86 ---
2 2" NEW RGS CITY 2 1 0.17 0.89 ---
3 3' NEW RGS CITY 3 0.94 1.95 ---
4 2" NEW SCH 40 WSDOT 2 1 1 0.17 0.86 ---
5 2" EX WSDOT 2 0.17 0.86 ---
6 2" NEW RGS WSDOT 2 1 0.17 0.86 ---
7 2' NEW SCH 40 WSDOT 3 0.27 0.86 ---
8 4" NEW SCH 40 SPARE ITS 1 --- 3.35 ---
9 4 NEW RGS SPARE ITS 1 --- 1 3.35 ---
1 ADDENDUM #1
NUMBER
REVISION DESCRIPTION
EMH CTB 1 4/7/2014
BY APP. DATE
—� ® 1 !
` P /�/) I ? 1-405 SB
,...... ! "" if
11 Q
A # 1
ii # i
i
i
!
I !
!
!
GENERAL CONSTRUCTION NOTES !
!
1. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE
ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT
IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO
IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS THE FIRST
ORDER OF BUSINESS THE CONTRACTOR SHALL POTHOLE EACH NEW LUMINAIRE POLE LOCATION
TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY,
THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10—FT CLEARANCE PROVIDED
BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE
PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY. THE
CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED.
SURVEYED:
DRAWN BY: 19TENW
{ DESIGN BY:
Transportation Engineering NorthWest
CHECK BY: Transportation Planning I Design I Traffic Impact & Operations
PROD MGR: PO Box 65254, Seattle, WA 98155 1 Office (206) 361-7333
�•I� Project Contact: Chris Bicket, P.E.
Phone: 425-250-5002
i !
!
1-405 NB j
f
1
�t
r
r !
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
ILLUMINATION WIRING SCHEDULE
ILLUM. EQUIP. SVC ALLOW. ALLOW.
GRND. PWR 2C(SH) PULL CONDUIT FILL FILL
NO. RACEWAY CONDUIT SIZE #8 #8 #2 LOOP WIRE FILL (26%) (40%)
EX. NEW EX. NEW EX. NEW EX. NEW EX. NEW
1 1 2" NEW SCH 40 CITY 2 1 1 1 0.17 0.86 ---
2 2" NEW RGS CITY 2 1 0.17 0.89 ---
3 3' NEW RGS CITY 3 0.94 1.95 ---
4 2" NEW SCH 40 WSDOT 2 1 1 0.17 0.86 ---
5 2" EX WSDOT 2 0.17 0.86 ---
6 2" NEW RGS WSDOT 2 1 0.17 0.86 ---
7 2' NEW SCH 40 WSDOT 3 0.27 0.86 ---
8 4" NEW SCH 40 SPARE ITS 1 --- 3.35 ---
9 4 NEW RGS SPARE ITS 1 --- 1 3.35 ---
1 ADDENDUM #1
NUMBER
REVISION DESCRIPTION
EMH CTB 1 4/7/2014
BY APP. DATE
—� ® 1 !
` P /�/) I ? 1-405 SB
,...... ! "" if
11 Q
A # 1
ii # i
i
i
!
I !
!
!
GENERAL CONSTRUCTION NOTES !
!
1. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE
ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT
IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO
IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS THE FIRST
ORDER OF BUSINESS THE CONTRACTOR SHALL POTHOLE EACH NEW LUMINAIRE POLE LOCATION
TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY,
THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10—FT CLEARANCE PROVIDED
BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE
PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY. THE
CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED.
SURVEYED:
DRAWN BY: 19TENW
{ DESIGN BY:
Transportation Engineering NorthWest
CHECK BY: Transportation Planning I Design I Traffic Impact & Operations
PROD MGR: PO Box 65254, Seattle, WA 98155 1 Office (206) 361-7333
�•I� Project Contact: Chris Bicket, P.E.
Phone: 425-250-5002
i !
!
1-405 NB j
f
1
�t
r
r !
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
1 ADDENDUM #1
NUMBER
REVISION DESCRIPTION
EMH CTB 1 4/7/2014
BY APP. DATE
—� ® 1 !
` P /�/) I ? 1-405 SB
,...... ! "" if
11 Q
A # 1
ii # i
i
i
!
I !
!
!
GENERAL CONSTRUCTION NOTES !
!
1. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE
ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT
IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO
IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS THE FIRST
ORDER OF BUSINESS THE CONTRACTOR SHALL POTHOLE EACH NEW LUMINAIRE POLE LOCATION
TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY,
THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10—FT CLEARANCE PROVIDED
BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE
PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY. THE
CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED.
SURVEYED:
DRAWN BY: 19TENW
{ DESIGN BY:
Transportation Engineering NorthWest
CHECK BY: Transportation Planning I Design I Traffic Impact & Operations
PROD MGR: PO Box 65254, Seattle, WA 98155 1 Office (206) 361-7333
�•I� Project Contact: Chris Bicket, P.E.
Phone: 425-250-5002
i !
!
1-405 NB j
f
1
�t
r
r !
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT
IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO
IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS THE FIRST
ORDER OF BUSINESS THE CONTRACTOR SHALL POTHOLE EACH NEW LUMINAIRE POLE LOCATION
TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY,
THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10—FT CLEARANCE PROVIDED
BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE
PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY. THE
CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED.
SURVEYED:
DRAWN BY: 19TENW
{ DESIGN BY:
Transportation Engineering NorthWest
CHECK BY: Transportation Planning I Design I Traffic Impact & Operations
PROD MGR: PO Box 65254, Seattle, WA 98155 1 Office (206) 361-7333
�•I� Project Contact: Chris Bicket, P.E.
Phone: 425-250-5002
i !
!
1-405 NB j
f
1
�t
r
r !
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
i !
!
1-405 NB j
f
1
�t
r
r !
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
CITY OF RENTON
MIL
Fublic Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
LEGEND
EXIST. NEW/RELOCATED DESCRIPTION
I z ID m 0 El JUNCTION BOX TYPE 1,2,8
® NEMA JUNCTION BOX
VEHICLE SIGNAL HEAD
PEDESTRIAN SIGNAL HEAD
SIGNAL POLE TYPE III
SIGNAL POLE TYPE II
O O TYPE PS POLE
-T_ NON—APS PPB
APS PPB
0 LOOP DETECTION TYPE 3
VIDEO DETECTION ZONE
------ - ----- CONDUIT
MAST ARM MOUNTED SIGN
EMERGENCY PRE—EMPTION
DETECTOR
WSDOT ROAD —SCALE POLE
® CITY PED.—SCALE POLE
M CONTROLLER CABINET
® SERVICE CABINET
OCONSTRUCTION NOTE
OSIGNAL POLE NUMBER
O CITY PED.—SCALE POLE
NUMBER
WSDOT ROAD —SCALE POLE
NUMBER
aWIRE NOTE
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44
1-405 NB f
ON -RAMP
!
/ !
1
!
1/
l
J
19
'gQ
b
e N.
(0
g. �ro
N
G
10 40
0 20 60
SCALE IN FEET
HIGHLANDS TO LANDING DRAWING NO. 6.03
PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796
TRAFFIC SIGNAL AND ILLUMINATION PLAN FEDAIDNO. CM-1070(007)
DATE: June 2013
SHEET NO. 29 OF 44